CN111174444A CN202010117420.3A CN202010117420A CN111174444A CN 111174444 A CN111174444 A CN 111174444A CN 202010117420 A CN202010117420 A CN 202010117420A CN 111174444 A CN111174444 A CN 111174444A
Authority
CN
China
Prior art keywords
water
preheating
temperature
stop
setting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010117420.3A
Other languages
Chinese (zh)
Inventor
郑来松
郭灵华
卢克勤
潘叶江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vatti Co Ltd
Original Assignee
Vatti Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vatti Co Ltd filed Critical Vatti Co Ltd
Priority to CN202010117420.3A priority Critical patent/CN111174444A/en
Publication of CN111174444A publication Critical patent/CN111174444A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters
    • F24H9/2035Arrangement or mounting of control or safety devices for water heaters using fluid fuel

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Domestic Plumbing Installations (AREA)

Abstract

The invention discloses a control method for intelligent preheating of a zero-cold-water heater, which comprises the following steps of: s1, recording the primary water flow L required by the primary zero cold water preheating of the water heater0(ii) a S2, when the water flow in the circulating pipeline reaches the set temperature T during the preheating againSetting upThen, the circulating water flow L generated in the preheating process is calculated1(ii) a At the same time, the return water temperature T is collectedReturn waterWhen the return water temperature T isReturn waterGreater than a set temperature TSetting upThen, the process proceeds to S3; s3, according to the primary water flow L0And the flow rate L of the circulating water1And the inlet water temperature TInflow waterAnd a stopping temperature TStopThe relationship (2) judges whether or not the warm-up is completed. The invention passes through the primary water flow L0And the flow rate L of the circulating water1Or the inlet water temperature TInflow waterAnd a stopping temperature TStopThe preheating is judged to be finished, and the problem that the cold water pipe in the zero-cold-water preheating is full of hot water is effectively solved.

Description

Control method for intelligent preheating of zero-cold-water heater
Technical Field
The invention belongs to the technical field of water heaters, and particularly relates to a control method for intelligent preheating of a zero-cold-water heater.
Background
The zero-cold-water gas water heater has become a trend in the water heater industry because the zero-cold-water gas water heater can realize that hot water can be used immediately after being started, and when the preheating function is started, a built-in circulating pump runs to drive water stored in an external hot water pipe and a water return pipe to circularly flow and realize preheating. The specific process of zero-cold water is as follows: and (3) starting a zero-cold-water function under the condition of no boiled water, starting a water pump in the water heater, enabling hot water pipeline water to flow out through a water outlet pipe of the water heater after starting, enabling the outflow water to flow back to the water heater through a water return pipeline to form a circulating pipeline, starting combustion heating after the water heater detects a water flow signal, and heating all water in the whole circulating pipeline to a set temperature after 3-5 minutes to finish a zero-cold-water preheating process.
The zero cold water preheating process of the existing gas water heater mostly stops preheating when the water temperature reaches the target temperature, and at the moment, a cold water pipe is used as a water return pipe for circulating heating, so that the whole cold water pipeline is filled with hot water. When the user uses cold water, hot water flows out, and the user needs to wait for a long time to use the cold water, which causes energy waste.
Disclosure of Invention
In view of the above, the present invention provides a control method for intelligent preheating of zero-cold water heater, which uses primary water flow L0And the flow rate L of the circulating water1And the inlet water temperature TInflow waterAnd a stopping temperature TStopThe preheating is judged to be finished, and the problem that the cold water pipe in the zero-cold-water preheating is full of hot water is effectively solved.
The invention adopts the technical scheme that a control method for intelligent preheating of a zero-cold-water heater comprises the following steps:
s1, recording the primary water flow L required by the primary zero cold water preheating of the water heater0
S2, when the gas water heater is preheated again, when the temperature of the water flow in the circulating pipeline reaches the set temperature TSetting upThen, the circulating water flow L generated in the preheating process is calculated1
At the same time, the return water temperature T is collectedReturn waterWhen the return water temperature T isReturn waterGreater than a set temperature TSetting upWhen the temperature of the water is higher than the set temperature,proceeding to S3;
s3, according to the primary water flow L0And the flow rate L of the circulating water1And the inlet water temperature TInflow waterAnd a stopping temperature TStopJudging whether preheating is finished or not according to the relation;
wherein the stop temperature TStopFor determining whether the water flow is heated to a steady state by setting a temperature TSetting upAnd inlet water temperature TInflow waterTo be determined.
Specifically, the primary water flow needed by the primary zero cold water preheating of the water heater is recorded and is taken as the primary water flow L0And the flow rate L of the circulating water1And the inlet water temperature TInflow waterAnd a stopping temperature TStopAny one of the two relations is used as a judgment condition for judging whether the preheating is finished or not, so that the condition that the cold water pipe is filled with hot water due to excessive preheating is effectively avoided.
Preferably, in the step S3, the flow rate L is determined according to the primary water flow0And the flow rate L of the circulating water1Relationship (c) and inlet water temperature TInflow waterAnd a stopping temperature TStopJudging whether the preheating is finished or not according to the relation of (1), specifically:
when the circulating water flow L1Satisfies the formula (1) or the inlet water temperature TInflow waterContinuously above the stopping temperature TStopWhen the preheating is finished, preheating is finished;
L1≥(50%~60%)*L0(1)。
thus, when the zero cold water function of the water heater is used for the first time, the temperature T is setSetting upStopping temperature TStopAnd the temperature T of the inlet waterInflow waterThree factors, recording the cumulative initial water flow L after preheating0Namely, the accumulated water flow of a large cycle is completed in the preheating process, and in order to avoid the situation that the cold water pipe is filled with hot water in the subsequent preheating process, the total water amount preheated again is calculated according to the accumulated water flow of the primary preheating, namely, when the circulating water flow L is1≥(50%~60%)*L0Therefore, no matter the water heater with the two-pipe structure or the three-pipe structure is used, the hot water pipe can be effectively ensured to be filled with hot waterAnd the cold water pipe is not filled with hot water.
Preferably, the inlet water temperature TInflow waterContinuously above the stopping temperature TStopThe method specifically comprises the following steps:
temperature T of inlet waterInflow waterIs greater than the stopping temperature T for at least 5sStop
Thus, by judging the inlet water temperature TInflow waterWhether it lasts at least 5s greater than the stop temperature TStopThereby judging whether the water temperature is stable or not, and judging whether the preheating can be stopped or not.
Preferably, in the step S1, the water flow L required for the initial preheating of the zero-cold-water heater is recorded0The method specifically comprises the following steps:
s11, starting the preheating function and inputting the set temperature TSetting upAnd a stopping temperature TStopPreheating is carried out;
in the specific embodiment, the preheating process of the initial zero cold water preheating is as follows:
s111, starting a preheating function and inputting a set temperature TSetting upAnd a stopping temperature TStop
S112, the water pump runs, and whether the ignition condition is met or not is judged, namely whether the water flow reaches more than 2.5L/min within 8S or not is judged; if so, opening the gas valve and igniting the water heater to work; if not, alarming abnormally, namely alarming when the water pump is abnormal or the pipeline is blocked and the like;
s113, reaching the set temperature TSetting upCalculating and recording the accumulated circulating water flow;
s114, judging the backwater temperature TReturn waterWhether or not it is higher than the set temperature TSetting upIf yes, entering the next step, otherwise, entering S113;
here, the return water temperature TReturn waterThe water temperature is the water temperature on one side of the water return pipeline close to the water heater, namely the water temperature when the water is heated and then circulates back to the water heater in the preheating process; thus, by judging the backwater temperature TReturn waterWhether or not it is higher than the set temperature TSetting upFor ensuring that the flow of water heated in the preheating process completes a complete cycle, i.e. the heated water returns from the return pipeTo a water heater.
S115, judging the inlet water temperature TInflow waterWhether it lasts at least 5s greater than the stop temperature TStopIf yes, entering the next step, otherwise, entering S113;
thus, by judging the inlet water temperature TInflow waterWhether or not to continue to be greater than the stopping temperature T for at least 5sStopThe device is used for determining whether a stable hot water state is reached or not so as to judge whether preheating is finished or not;
s116, stopping preheating, closing a gas valve, extinguishing the gas valve, calculating and recording the total accumulated water flow before 5S, namely the primary water flow L in the primary preheating process0
Therefore, after the water temperature reaches a stable state, the accumulated water flow before 5s is calculated, namely the water flow of a complete cycle in preheating.
S12, completing preheating, closing the gas valve, extinguishing the gas valve, and calculating the accumulated water flow in the primary preheating process, namely the primary water flow L0
The primary preheating specifically refers to: before the user uses the preheating function of the water heater, the power-off time of the water heater exceeds 30 min.
In the specific embodiment, the power is cut off for more than 30min before the user uses the water heater, and the water heater is used for the first time when the zero cold water preheating function of the water heater is used again; the water heater is started by first power-on of the water heater which is powered off for a long time, and is not particularly used for the first time of a new water heater.
Preferably, the stop temperature T in S3StopDetermined by the following equation:
when T isInflow water≤TSetting upAt-15 ℃ TStop=TSetting up-10℃;
When T isSetting up-15℃<TInflow water<TSetting upAt-10 ℃ TStop=TSetting up-5℃;
When T isInflow water≥TSetting upAt-10 ℃ TStop=TInflow water+(5~10)℃。
Preferably, when TInflow water≥TSetting upAt-10 ℃ TStop=TInflow water+5℃。
In the specific embodiment, when T isInflow water≥TSetting upAt-10 ℃ TStop=TInflow water+ (5-10) DEG C, preferably TStop=TInflow water+5 ℃ where the temperature T of the feed water isInflow waterIs the initial inlet water temperature, i.e. the inlet water temperature at which preheating is started this time, i.e. when TInflow water≥TSetting upAt-10 ℃ through the initial inlet water temperature TInflow waterTo determine the stopping temperature TStop. Thus, when the zero cold water preheating function of the gas water heater is used for the first time in summer, the inlet water temperature T is higherInflow waterHigher and set temperature TSetting upThe difference between the two is small, the two are close, misjudgment can be caused, the actual cycle does not complete a large cycle, and preheating is stopped in advance; therefore, when it is to be used for the first time, T is setStop=TInflow waterAnd +/-5-10 ℃, and the preheating is stopped when a large cycle is ensured. For example, in summer, the inlet water temperature may reach 33 ℃ at times, if the set temperature T is reachedSetting upAt 35 ℃, the two are relatively close to each other, which may cause erroneous judgment.
Preferably, the primary water flow rate L in S10The average value of the sum of the accumulated water flow of the first two times or the first three times when the zero cold water preheating function of the water heater is used for the first time.
Preferably, the total amount of water preheated in S2 is L1≥50%*L0
The invention has the beneficial effects that: the invention uses the primary water flow L required by the primary preheating process of the water heater with the function of preheating zero cold water for the primary use0Recording and preheating the inlet water temperature TInflow waterAnd a stop temperature TStopComparing to ensure the stability of hot water in the preheating process; at the same time, the invention uses the primary water flow L0And the flow rate L of the circulating water1And the inlet water temperature TInflow waterAnd a stopping temperature TStopEither of the above relationships is used as a judgment condition for stopping the preheating, and the judgment condition can be set in the hot water pipeWhen the cold water pipe is full of hot water, the preheating is stopped, and the problem that the cold water pipe is full of hot water in the zero-cold-water preheating mode is effectively solved.
Drawings
FIG. 1 is a flow chart of a method in embodiment 1 of a control method for intelligent preheating of a zero-cold-water heater according to the present invention;
FIG. 2 is a flow chart of the method of embodiment 2 in the control method for intelligent preheating of the zero-cold-water heater of the present invention;
fig. 3 is a flowchart of a method in embodiment 3 of the control method for intelligent preheating of a zero-cold-water heater according to the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail with reference to the following embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
The invention provides a control method for intelligent preheating of a zero-cold-water heater, which comprises the following steps of:
s1, recording the primary water flow L required by the primary zero cold water preheating of the water heater0
S2, when the gas water heater is preheated again, when the temperature of the water flow in the circulating pipeline reaches the set temperature TSetting upThen, the circulating water flow L generated in the preheating process is calculated1
At the same time, the return water temperature T is collectedReturn waterWhen the return water temperature T isReturn waterGreater than a set temperature TSetting upThen, the process proceeds to S3;
s3, according to the primary water flow L0And the flow rate L of the circulating water1And the inlet water temperature TInflow waterAnd a stopping temperature TStopJudging whether preheating is finished or not according to the relation;
wherein the stop temperature TStopFor determining whether the water flow is heated to a steady state by setting a temperature TSetting upAnd inlet water temperature TInflow waterTo be determined.
Example 1
The embodiment provides a control method for intelligent preheating of a zero-cold-water heater, as shown in fig. 1, including the following steps:
s1, recording the primary water flow L required by the primary zero cold water preheating of the water heater0
Here, the user is powered off for more than 30min before using the water heater, and the water heater is used for the first time when the zero cold water preheating function of the water heater is used again; the water heater is started by electrifying for the first time after long-time power failure, and is not particularly used for the first time of a new water heater;
s2, when the gas water heater is preheated again, when the temperature of the water flow in the circulating pipeline reaches the set temperature TSetting upThen, the circulating water flow L generated in the preheating process is calculated1
Set temperature TSetting upThe temperature to be set by a user according to the requirement, namely the temperature to be reached by the water flow in the actual use of the user is generally 35-50 ℃, and the stop temperature T is set by the userStopThe water flow heating device is used for judging whether the water flow is heated to a stable state or not so as to ensure the use of a user;
at the same time, the return water temperature T is collectedReturn waterWhen the return water temperature T isReturn waterGreater than a set temperature TSetting upThen, the process proceeds to S3;
thus, by detecting the backwater temperature TReturn waterWhether water flow passes through a circulation in the preheating process or not can be judged, the water flow enters the water heater through the water return pipeline again, and when the water temperature enters the water heater through the water return pipeline, namely the water return temperature TReturn waterReaches a set temperature TSetting upIndicating that the water has been heated.
For general water heaters and household pipelines, 20s is the shortest time for hot water to return to the gas water heater through the water return pipeline again, so that the temperature T of the inlet water can be judged after the hot water is combusted for 20sInflow waterWhether or not it lasts for 5s greater than the stop temperature TStop
S3, according to the primary water flow L0And the flow rate L of the circulating water1And the inlet water temperature TInflow waterAnd a stopping temperatureTStopJudging whether preheating is finished or not according to the relation;
specifically, when the circulating water flow L is1Satisfies the formula (1) or the inlet water temperature TInflow waterGreater than said stop temperature T for at least 5sStopWhen the preheating is finished, preheating is finished;
L1≥(50%~60%)*L0(1)。
for a water heater with a two-pipe structure, the lengths of the hot water pipe and the cold water pipe are the same, and the circulating water flow L is equal1With the primary water flow rate L0May be L1≥50%*L0
Wherein the stop temperature TStopFor determining whether the water flow is heated to a steady state by setting a temperature TSetting upAnd inlet water temperature TInflow waterTo determine;
stopping temperature TStopDetermined by the following equation:
when T isInflow water≤TSetting upAt-15 ℃ TStop=TSetting up-10℃;
When T isSetting up-15℃<TInflow water<TSetting upAt-10 ℃ TStop=TSetting up-5℃;
When T isInflow water≥TSetting upAt-10 ℃ TStop=TInflow water+ (5-10) DEG C, preferably TStop=TInflow water+5 ℃ where the temperature T of the feed water isInflow waterIs the initial inlet water temperature before preheating is started.
Thus, when the zero cold water preheating function of the gas water heater is used for the first time in summer, the inlet water temperature T is higherInflow waterHigher and set temperature TSetting upThe difference between the two is small, the two are close, misjudgment can be caused, the actual cycle does not complete a large cycle, and preheating is stopped in advance; therefore, when it is to be used for the first time, T is setStop=TInflow waterAnd +/-5-10 ℃, and the preheating is stopped when a large cycle is ensured. For example, in summer, the inlet water temperature may reach 33 ℃ at times, if the set temperature T is reachedSetting upAt 35 ℃, the two are relatively close to each other, which may cause erroneous judgment.
To improve the accuracy of the preheating process, the primary water flow rate L0The average value of the sum of the cumulative water flow of the first two or three times when the zero cold water preheating function of the water heater is used for the first time is adopted.
The working principle is as follows: when the control method of the embodiment is used, the primary water flow L required by the primary zero cold water preheating of the water heater is firstly recorded0Namely the accumulated water flow for preheating is completed, and when the water is preheated again, the circulating water flow L in the preheating process is used1With primary water flow L0The relationship of (1): l is1≥(50%~60%)*L0Or temperature T of the feed waterInflow waterGreater than said stop temperature T for at least 5sStopWhether the preheating is finished or not is judged by either of the two methods, namely the temperature of the water flow is stable or the preheating circulating water amount reaches 50% -60% of the accumulated water flow after the preheating is finished in the primary preheating process, so that the hot water pipe is filled with the hot water and the preheating is finished.
The primary water flow L required by the primary preheating process of the water heater with the zero cold water preheating function is used for the first time in the embodiment0Recording to obtain the flow L of the circulating water for filling the hot water pipe with hot water in the subsequent preheating process1And by adjusting the inlet water temperature T in the preheating processInflow waterAnd a stop temperature TStopComparing to ensure the stability of hot water in the preheating process; thus, the primary water flow rate L is used in the present embodiment0And the flow rate L of the circulating water1And the inlet water temperature TInflow waterAnd a stopping temperature TStopAny one of the two relations is used as a judgment condition for stopping preheating, the preheating can be stopped when the hot water pipe is filled with hot water, and the problem that the cold water pipe is filled with hot water in zero cold water preheating is effectively solved.
Example 2
The same procedure as that of embodiment 1, except that the preheating process of the zero cold water preheating function of the water heater for the first time is refined, as shown in fig. 2, and the method comprises the following steps:
s1, recording the initial zero of the water heaterPrimary water flow L required for cold water preheating0
The method specifically comprises the following steps:
s11, starting the preheating function and inputting the set temperature TSetting upAnd a stopping temperature TStopPreheating is carried out;
s12, after preheating is finished, closing the gas valve, extinguishing the gas valve, and calculating the accumulated water flow in the primary preheating process, namely the primary water flow L0
S2, when the gas water heater is preheated again, when the temperature of the water flow in the circulating pipeline reaches the set temperature TSetting upThen, the circulating water flow L generated in the preheating process is calculated1
Set temperature TSetting upThe temperature to be set by a user according to the requirement, namely the temperature to be reached by the water flow in the actual use of the user is generally 35-50 ℃, and the stop temperature T is set by the userStopThe water flow heating device is used for judging whether the water flow is heated to a stable state or not so as to ensure the use of a user;
at the same time, the return water temperature T is collectedReturn waterWhen the return water temperature T isReturn waterGreater than a set temperature TSetting upThen, the process proceeds to S3;
s3, according to the primary water flow L0And the flow rate L of the circulating water1And the inlet water temperature TInflow waterAnd a stopping temperature TStopJudging whether preheating is finished or not according to the relation;
specifically, when the circulating water flow L is1Satisfies the formula (1) or the inlet water temperature TInflow waterGreater than said stop temperature T for at least 5sStopWhen the preheating is finished, preheating is finished;
L1≥(50%~60%)*L0(1)。
for a water heater with a two-pipe structure, the lengths of the hot water pipe and the cold water pipe are the same, and the circulating water flow L is equal1With the primary water flow rate L0May be L1≥50%*L0
Wherein the stop temperature TStopFor determining whether the water flow is heated to a steady state by setting a temperature TSetting upAnd inlet waterTemperature TInflow waterTo determine;
stopping temperature TStopDetermined by the following equation:
when T isInflow water≤TSetting upAt-15 ℃ TStop=TSetting up-10℃;
When T isSetting up-15℃<TInflow water<TSetting upAt-10 ℃ TStop=TSetting up-5℃;
When T isInflow water≥TSetting upAt-10 ℃ TStop=TInflow water+ (5-10) DEG C, preferably TStop=TInflow water+5℃。
Thus, when the zero cold water preheating function of the gas water heater is used for the first time in summer, the inlet water temperature T is higherInflow waterHigher and set temperature TSetting upThe difference between the two is small, the two are close, misjudgment can be caused, the actual cycle does not complete a large cycle, and preheating is stopped in advance; therefore, when it is to be used for the first time, T is setStop=TInflow waterAnd +/-5-10 ℃, and the preheating is stopped when a large cycle is ensured. For example, in summer, the inlet water temperature may reach 33 ℃ at times, if the set temperature T is reachedSetting upAt 35 ℃, the two are relatively close to each other, which may cause erroneous judgment.
The working principle is as follows: when the control method of the embodiment is used, the primary water flow L required by the primary zero cold water preheating of the water heater is firstly recorded0Namely the accumulated water flow for preheating is completed, and when the water is preheated again, the circulating water flow L in the preheating process is used1With primary water flow L0The relationship of (1): l is1≥(50%~60%)*L0Or temperature T of the feed waterInflow waterGreater than said stop temperature T for at least 5sStopWhether the preheating is finished or not is judged by either of the two methods, namely the temperature of the water flow is stable or the preheating circulating water amount reaches 50% -60% of the accumulated water flow after the preheating is finished in the primary preheating process, so that the hot water pipe is filled with the hot water and the preheating is finished.
This example is through the heat to the function of preheating zero cold water for the first timePrimary water flow L required for primary preheating process of water heater0Recording to obtain the flow L of the circulating water for filling the hot water pipe with hot water in the subsequent preheating process1And by adjusting the inlet water temperature T in the preheating processInflow waterAnd a stop temperature TStopComparing to ensure the stability of hot water in the preheating process; thus, the primary water flow rate L is used in the present embodiment0And the flow rate L of the circulating water1And the inlet water temperature TInflow waterAnd a stopping temperature TStopAny one of the two relations is used as a judgment condition for stopping preheating, the preheating can be stopped when the hot water pipe is filled with hot water, and the problem that the cold water pipe is filled with hot water in zero cold water preheating is effectively solved.
Example 3
The same process as that of embodiment 1 or embodiment 2, except that the preheating process of the zero cold water preheating function of the water heater for the first time and the process of preheating again are refined and optimized, as shown in fig. 3, the method comprises the following steps:
s1, recording the primary water flow L required by the primary zero cold water preheating of the water heater0
The method specifically comprises the following steps:
s11, when the zero cold water preheating function of the water heater is used for the first time, the water heater is powered on, the preheating function is started, and the set temperature T is inputSetting upAnd a stopping temperature TStopPreheating is carried out;
s111, starting a preheating function and inputting a set temperature TSetting upAnd a stopping temperature TStop
Stopping temperature TStopBy setting the temperature TSetting upAnd inlet water temperature TInflow waterTo determine; set temperature TSetting upThe temperature to be set by a user according to the requirement, namely the temperature to be reached by the water flow in the actual use of the user is generally 35-50 ℃, and the stop temperature T is set by the userStopUsed for judging whether the water flow is heated to a stable state or not, thereby ensuring the use of users.
Here, according to the set temperature TSetting upAnd inlet water temperature TInflow waterTo determine the stopping temperature TStopEither is provided withThe water flow in the preheating process is ensured to complete a complete cycle and be heated integrally, and the temperature of the water flow can be ensured to be stable;
stopping temperature TStopThe specific determination process is determined by the following formula:
when T isInflow water≤TSetting upAt-15 ℃ TStop=TSetting up-10℃;
When T isSetting up-15℃<TInflow water<TSetting upAt-10 ℃ TStop=TSetting up-5℃;
When T isInflow water≥TSetting upAt-10 ℃ TStop=TInflow water+ (5-10) DEG C, preferably TStop=TInflow water+5℃。
Thus, when the zero cold water preheating function of the gas water heater is used for the first time in summer, the inlet water temperature T is higherInflow waterHigher and set temperature TSetting upThe difference between the two is small, the two are close, misjudgment can be caused, the actual cycle does not complete a large cycle, and preheating is stopped in advance; therefore, when it is to be used for the first time, T is setStop=TInflow waterAnd +/-5-10 ℃, and the preheating is stopped when a large cycle is ensured. For example, in summer, the inlet water temperature may reach 33 ℃ at times, if the set temperature T is reachedSetting upAt 35 ℃, the two are relatively close to each other, which may cause erroneous judgment.
S112, the water pump runs, and whether the ignition condition is met or not is judged, namely whether the water flow reaches more than 2.5L/min within 8S or not is judged;
if so, opening the gas valve and igniting the water heater to work;
if not, an abnormal alarm is given, namely the conditions such as water pump abnormality or pipeline blockage can occur, and an alarm is given.
S113, reaching the set temperature TSetting upCalculating and recording the accumulated circulating water flow;
s114, judging the backwater temperature TReturn waterWhether or not it is higher than the set temperature TSetting up
If so, the next step is carried out,i.e. comparing the inlet water temperature TInflow waterWhether or not it lasts for 5s greater than the stop temperature TStopSo as to judge whether the hot water is stable;
if not, entering S113, then recording the accumulated water flow;
thus, by detecting the backwater temperature TReturn waterWhether water flow passes through a circulation in the preheating process or not can be judged, the water flow enters the water heater through the water return pipeline again, and when the water temperature enters the water heater through the water return pipeline, namely the water return temperature TReturn waterReaches a set temperature TSetting upIndicating that the water has been heated.
For general water heaters and household pipelines, 20s is the shortest time for hot water to return to the gas water heater through the water return pipeline again, so that the temperature T of the inlet water can be judged after the hot water is combusted for 20sInflow waterWhether or not it lasts for 5s greater than the stop temperature TStop
S115, judging the inlet water temperature TInflow waterWhether it lasts at least 5s greater than the stop temperature TStop
If yes, entering S116, stopping preheating, closing a gas valve, and extinguishing;
if not, entering S113, namely continuing to preheat;
thus, by the temperature T of the inlet waterInflow waterWhether or not it lasts for 5s greater than the stop temperature TStopTo determine whether the water temperature is stable, thereby determining whether the preheating can be stopped.
Particularly, by judging the return water temperature TReturn waterWhether or not it is higher than the set temperature TSetting upThe water flow heated in the preheating process is ensured to complete a complete cycle, namely the heated water returns to the water heater from the water return pipeline; then judging the inlet water temperature TInflow waterWhether or not it lasts for 5s greater than the stop temperature TStopThe method is used for determining whether a stable hot water state is achieved or not so as to judge whether the preheating is finished or not.
S116, stopping preheating, closing a gas valve, extinguishing the gas valve, calculating and recording the accumulated water flow sum before 5S, namely the accumulated water flow sum L in the primary preheating process0
Here, the cumulative water flow rate sum L0The average value of the accumulated water flow sum of the first two times or the first three times when the zero cold water preheating function of the water heater is used for the first time can be ensured0The accuracy of (2).
S12, completing preheating, closing the gas valve, extinguishing the gas valve, and calculating the accumulated water flow in the primary preheating process, namely the primary water flow L0
S2, when the gas water heater is preheated again, when the temperature of the water flow in the circulating pipeline reaches the set temperature TSetting upThen, the circulating water flow L generated in the preheating process is calculated1
At the same time, the return water temperature T is collectedReturn waterWhen the return water temperature T isReturn waterGreater than a set temperature TSetting upThen, the process proceeds to S3;
the method specifically comprises the following steps:
s21, starting the preheating function again, operating the water pump, and judging whether the ignition condition is met, namely whether the water flow reaches more than 2.5L/min within 8S;
if so, opening the gas valve and igniting the water heater to work;
if not, an abnormal alarm is given, namely the conditions such as water pump abnormality or pipeline blockage can occur, and an alarm is given.
S22, reaching the set temperature TSetting upThen, the circulating water flow L generated in the preheating process is calculated1
S23, collecting the backwater temperature TReturn waterAnd judging the return water temperature TReturn waterWhether or not it is greater than the set temperature TSetting up
If yes, go to S3;
otherwise, returning to S22;
s3, according to the primary water flow L0And the flow rate L of the circulating water1And the inlet water temperature TInflow waterAnd a stopping temperature TStopJudging whether preheating is finished or not according to the relation;
the method specifically comprises the following steps:
s31, judging the inlet water temperature TInflow waterWhether or not toFor 5s greater than the stopping temperature TStop
If yes, entering S33, stopping preheating, closing the gas valve, and extinguishing;
if not, the next step is carried out, namely the flow L of the circulating water is judged1With primary water flow L0By the relationship of the circulating water flow L1As another judgment condition whether the preheating is completed;
thus, by the temperature T of the inlet waterInflow waterWhether or not it lasts for 5s greater than the stop temperature TStopTo determine whether the water temperature is stable, thereby determining whether the preheating can be stopped.
S32, judging whether the circulating water flow L1 meets the formula: l is1≥(50%~60%)*L0
If yes, entering S33, stopping preheating, closing the gas valve, and extinguishing;
if not, entering S22, namely, continuing preheating;
thus, when the zero cold water function of the water heater is used for the first time, the temperature T is setSetting upStopping temperature TStopAnd the temperature T of the inlet waterInflow waterRecording the accumulated water flow after preheating, namely the accumulated water flow after completing one large cycle in the preheating process, and using the initial water flow L for initial preheating to avoid filling hot water in a cold water pipe in the subsequent preheating process0As a criterion for determining the flow rate of the recirculated water for reheating, i.e. L1≥(50%~60%)*L0Therefore, whether the water heater with the two-pipe structure or the three-pipe structure is used, the hot water pipe can be effectively filled with hot water, and the cold water pipe is not filled with hot water.
For a two-pipe water heater, the circulating water flow rate L1≥50%*L0And (4) finishing.
And S33, stopping preheating, closing the gas valve, extinguishing the gas valve and completing the preheating process.
The working principle is as follows: when the control method of the embodiment is used, the temperature T of the inlet water in the preheating process is adjustedInflow waterAnd a stop temperature TStopComparing to determine the completion of the initial zero cold water preheating process and recording the water heaterInitial water flow L required for initial zero cold water preheating0Namely the accumulated water flow for preheating is completed, and when the water is preheated again, the circulating water flow L in the preheating process is used1With primary water flow L0The relationship of (1): l is1≥(50%~60%)*L0Or temperature T of the feed waterInflow waterGreater than said stop temperature T for at least 5sStopEither one of the two methods is used for judging whether the preheating is finished, namely the water flow temperature is stable or the preheating circulating water amount reaches 50% -60% of the accumulated water flow, so that the hot water pipe is filled with the hot water and the preheating is finished.
The primary water flow L required by the primary preheating process of the water heater with the zero cold water preheating function is used for the first time in the embodiment0Recording to obtain the flow L of the circulating water for filling the hot water pipe with hot water in the subsequent preheating process1And by adjusting the inlet water temperature T in the preheating processInflow waterAnd a stop temperature TStopComparing to ensure the stability of hot water in the preheating process; thus, the primary water flow rate L is used in the present embodiment0And the flow rate L of the circulating water1And the inlet water temperature TInflow waterAnd a stopping temperature TStopAny one of the two relations is used as a judgment condition for stopping preheating, the preheating can be stopped when the hot water pipe is filled with hot water, and the problem that the cold water pipe is filled with hot water in zero cold water preheating is effectively solved.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention are included in the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (9)

1. A control method for intelligent preheating of a zero-cold-water heater is characterized by comprising the following steps:
s1, recording the primary water flow L required by the primary zero cold water preheating of the water heater0
S2, gas-fired hot waterWhen the device is preheated again, when the temperature of the water flow in the circulating pipeline reaches the set temperature TSetting upThen, the circulating water flow L generated in the preheating process is calculated1
At the same time, the return water temperature T is collectedReturn waterWhen the return water temperature T isReturn waterGreater than a set temperature TSetting upThen, the process proceeds to S3;
s3, according to the primary water flow L0And the flow rate L of the circulating water1And the inlet water temperature TInflow waterAnd a stopping temperature TStopJudging whether preheating is finished or not according to the relation;
wherein the stop temperature TStopFor determining whether the water flow is heated to a steady state by setting a temperature TSetting upAnd inlet water temperature TInflow waterTo be determined.
2. The method as claimed in claim 1, wherein the step S3 is executed according to the primary water flow L0And the flow rate L of the circulating water1Relationship (c) and inlet water temperature TInflow waterAnd a stopping temperature TStopJudging whether the preheating is finished or not according to the relation of (1), specifically:
when the circulating water flow L1Satisfies the formula (1) or the inlet water temperature TInflow waterContinuously above the stopping temperature TStopWhen the preheating is finished, preheating is finished;
L1≥(50%~60%)*L0(1)。
3. the method of claim 2, wherein the inlet water temperature T is controlled by the intelligent preheat of a zero-cold-water heaterInflow waterContinuously above the stopping temperature TStopThe method specifically comprises the following steps:
temperature T of inlet waterInflow waterIs greater than the stopping temperature T for at least 5sStop
4. The method for controlling the intelligent preheating of the zero-cold-water heater according to claim 3,recording initial water flow L required by initial preheating of zero-cold-water heater in S10The method specifically comprises the following steps:
s11, starting the preheating function and inputting the set temperature TSetting upAnd a stopping temperature TStopPreheating is carried out;
s12, after preheating is finished, closing the gas valve, extinguishing the gas valve, and calculating the accumulated water flow in the primary preheating process, namely the primary water flow L0
5. The method for controlling the intelligent preheating of the zero-cold-water heater according to claim 4, wherein the primary preheating specifically includes: before the user uses the preheating function of the water heater, the power-off time of the water heater exceeds 30 min.
6. The method for controlling the intelligent preheating of the zero-cold-water heater according to any one of claims 1 to 5, wherein the temperature T is stopped in the step S3StopDetermined by the following equation:
when T isInflow water≤TSetting upAt-15 ℃ TStop=TSetting up-10℃;
When T isSetting up-15℃<TInflow water<TSetting upAt-10 ℃ TStop=TSetting up-5℃;
When T isInflow water≥TSetting upAt-10 ℃ TStop=TInflow water+(5~10)℃。
7. The method as claimed in claim 6, wherein when T is the time T for intelligent preheating of the zero-cold-water heaterInflow water≥TSetting upAt-10 ℃ TStop=TInflow water+5℃。
8. The method for controlling the intelligent preheating of the zero-cold-water heater according to any one of claims 1 to 5, wherein the primary water flow L in S1 is0The average value of the sum of the accumulated water flow of the first two times or the first three times when the zero cold water preheating function of the water heater is used for the first time.
9. The method as claimed in claim 8, wherein the flow rate of the circulating water for re-preheating in S2 is L1≥50%*L0
CN202010117420.3A 2020-02-25 2020-02-25 Control method for intelligent preheating of zero-cold-water heater Pending CN111174444A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010117420.3A CN111174444A (en) 2020-02-25 2020-02-25 Control method for intelligent preheating of zero-cold-water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010117420.3A CN111174444A (en) 2020-02-25 2020-02-25 Control method for intelligent preheating of zero-cold-water heater

Publications (1)

Publication Number Publication Date
CN111174444A true CN111174444A (en) 2020-05-19

Family

ID=70651436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010117420.3A Pending CN111174444A (en) 2020-02-25 2020-02-25 Control method for intelligent preheating of zero-cold-water heater

Country Status (1)

Country Link
CN (1) CN111174444A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112082272A (en) * 2020-10-21 2020-12-15 佛山市九零物联科技有限公司 Water heater control system with zero cold water function and working method
CN112113345A (en) * 2020-09-09 2020-12-22 华帝股份有限公司 Method for judging completion of preheating cycle of gas water heater
CN113834218A (en) * 2021-09-26 2021-12-24 华帝股份有限公司 Preheating control method of gas water heater and gas water heater

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016008763A (en) * 2014-06-24 2016-01-18 株式会社ガスター Bath device
CN106052143A (en) * 2016-07-18 2016-10-26 芜湖美的厨卫电器制造有限公司 Water heater system and preheating control method thereof
CN107192134A (en) * 2017-05-09 2017-09-22 广东万家乐燃气具有限公司 A kind of fuel gas water heating system and its self study pre-heating mean
CN207035515U (en) * 2017-05-09 2018-02-23 广东万家乐燃气具有限公司 A kind of fuel gas water heating system
CN207501464U (en) * 2017-12-01 2018-06-15 广东万家乐燃气具有限公司 Intelligent central fuel gas water heating device
CN110285578A (en) * 2019-05-13 2019-09-27 广东万家乐燃气具有限公司 A kind of zero cold water circulating system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016008763A (en) * 2014-06-24 2016-01-18 株式会社ガスター Bath device
CN106052143A (en) * 2016-07-18 2016-10-26 芜湖美的厨卫电器制造有限公司 Water heater system and preheating control method thereof
CN107192134A (en) * 2017-05-09 2017-09-22 广东万家乐燃气具有限公司 A kind of fuel gas water heating system and its self study pre-heating mean
CN207035515U (en) * 2017-05-09 2018-02-23 广东万家乐燃气具有限公司 A kind of fuel gas water heating system
CN207501464U (en) * 2017-12-01 2018-06-15 广东万家乐燃气具有限公司 Intelligent central fuel gas water heating device
CN110285578A (en) * 2019-05-13 2019-09-27 广东万家乐燃气具有限公司 A kind of zero cold water circulating system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112113345A (en) * 2020-09-09 2020-12-22 华帝股份有限公司 Method for judging completion of preheating cycle of gas water heater
CN112113345B (en) * 2020-09-09 2022-02-22 华帝股份有限公司 Method for judging completion of preheating cycle of gas water heater
CN112082272A (en) * 2020-10-21 2020-12-15 佛山市九零物联科技有限公司 Water heater control system with zero cold water function and working method
CN113834218A (en) * 2021-09-26 2021-12-24 华帝股份有限公司 Preheating control method of gas water heater and gas water heater
CN113834218B (en) * 2021-09-26 2022-12-06 华帝股份有限公司 Preheating control method of gas water heater and gas water heater

Similar Documents

Publication Publication Date Title
CN111174444A (en) Control method for intelligent preheating of zero-cold-water heater
CN111503899B (en) Rapid heating temperature control method of gas heat exchange equipment
CN110220313B (en) Gas water heater control method and gas water heater
CN108679848A (en) A kind of the flow property judgment method and gas-heating water heater of hot-water supply
CN102066848A (en) Method for controlling a hot water temperature in using low flux in hot water supply system
JP6032931B2 (en) Hot water system
KR102057367B1 (en) Heat pump heat supply system
CN110207389A (en) Control method for pressurization function of gas water heater
CN110220314A (en) Gas water heater control method and gas water heater
TW201346195A (en) Method for controlling hot water pre-heating of water heater according to hot water using pattern of user
CN111561786A (en) Preheating control method of zero-cold-water gas water heater
CN111322764A (en) Gas water heater with rapid heating function and rapid heating control method
CN109945499A (en) A kind of water-heater system control method and water heater
JP6129033B2 (en) Hot water system
CN110207388B (en) Intelligent shutdown control method for gas water heater
CN209295420U (en) A kind of dual-purpose stove work system
CN114484886B (en) Zero cold water control method with preheating overtemperature protection and control device thereof
JP6607375B2 (en) Auxiliary heat source machine
KR101592264B1 (en) Driving method a non-condensing of a boiler condensing
CN113266951B (en) Control method and control system of gas water heater and gas water heater
JP5604119B2 (en) Hot water storage hot water supply system
CN112577201B (en) Domestic water constant-temperature supply structure of gas heating stove and anti-freezing method thereof
CN114251839B (en) Water heater control method and water heater
CN106168411A (en) A kind of bushing type heating bathing dual-purpose water heater and control method thereof
JP6045108B2 (en) One can two water channel combustion equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200519

RJ01 Rejection of invention patent application after publication