CN1111579A - Ski-lifting system - Google Patents

Ski-lifting system Download PDF

Info

Publication number
CN1111579A
CN1111579A CN 94113431 CN94113431A CN1111579A CN 1111579 A CN1111579 A CN 1111579A CN 94113431 CN94113431 CN 94113431 CN 94113431 A CN94113431 A CN 94113431A CN 1111579 A CN1111579 A CN 1111579A
Authority
CN
China
Prior art keywords
downhill race
race car
band conveyor
carrying
downhill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 94113431
Other languages
Chinese (zh)
Other versions
CN1065146C (en
Inventor
稻田升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JAPAN LUGE KK
Original Assignee
JAPAN LUGE KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JAPAN LUGE KK filed Critical JAPAN LUGE KK
Publication of CN1111579A publication Critical patent/CN1111579A/en
Application granted granted Critical
Publication of CN1065146C publication Critical patent/CN1065146C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Intermediate Stations On Conveyors (AREA)
  • Chain Conveyers (AREA)

Abstract

To provide a carrying system for smoothly and automatically carrying a vehicle to a high place after the vehicle is slid from the high place to a low place with a user embarked thereon. This system for carrying a vehicle 10 having slid from a high place to a low place again to the high place is formed of a vehicle carrying system 14 having a carrying means 18 for carrying the vehicle from the low place to the high place; a transferring means 20 for guiding the vehicle to the carrying means in the low place; and an unloading means 22 for unloading the vehicle carried to the high place from the carrying means.

Description

Ski-lifting system
The present invention is the system that moves that a kind of downhill race car the unpowered device of downhill race from high to lower is transported to eminence once again.
In recent years, existing people has proposed the vehicle-mounted people of downhill race with no any engine installation; This downhill race car is slided from high to lower, with this idea as amusement.When this recreational facilities are provided, should be taken into account that the user slides from high to lower after, must reclaim the downhill race car, move eminence once again.
Yet, at present also not about the ideal device of eminence or the imagination of system are arrived in the conveyance of this downhill race car, so satisfactory recreational facilities can't be provided.
The object of the present invention is to provide a kind of user take advantage of this downhill race car from the eminence downhill race behind lower, satisfactorily and automatically the handling system of this downhill race car conveyance to eminence.
For achieving the above object, the present invention has provided a kind of the system of the downhill race car conveyance once again of downhill race from high to lower to eminence, it by this downhill race car from the hoist Handling device of conveyance of lower, the downhill race car that is positioned at lower imported the conveyer of carrying apparatus and the downhill race car that will carry aloft draws off the moving-out device formation of Handling device.
In addition, this ski-lifting system also can further be provided with the aggregating apparatus that the downhill race car after making downhill race compiles at lower in the front of conveyer, also the distribution device that the downhill race car that unloads aloft is assigned to many roads can be set on moving-out device.
As mentioned above, the present invention can be automatically with the downhill race car from lower satisfactorily conveyance just can make the passenger need not to wait for limited downhill race car, thereby high recreational facility can be provided to eminence.
Describe the present invention in detail below with reference to accompanying drawing, wherein:
Fig. 1 is the downhill race axletree mapping of the unpowered device of handling system carrying of the present invention;
Fig. 2 is the track route planar view of the downhill race car of unpowered device in the handling system of the present invention;
Fig. 3 is aggregating apparatus and conveyer planar view;
Fig. 4 is the section-drawing along IV among Fig. 3-IV line;
Fig. 5 is Handling device, moving-out device and mobile device lateral plan;
Fig. 6 is the lateral plan of hook;
Fig. 7 is the front view of hook;
Fig. 8 is aggregating apparatus, conveyer and Handling device lateral plan;
Fig. 9 is the distribution device planar view;
Figure 10 is the section-drawing along X among Fig. 9-X line;
Figure 11 is the distribution device lateral plan;
Figure 12 is the hook side view of another embodiment;
Figure 13 is the hook front view of another embodiment;
Figure 14 is an expression guide rod action diagram;
Figure 15 is that the route planar view is walked by the downhill race garage of the unpowered device in the second embodiment of the invention;
Figure 16 be second embodiment take device and carrying truck lateral plan;
Figure 17 be second embodiment take device and carrying truck planar view;
Figure 18 be another embodiment move the truck lateral plan;
Figure 19 is that the route planar view is walked by the downhill race garage of the unpowered device in the third embodiment of the invention;
Figure 20 is the lateral plan of third embodiment of the invention;
Figure 21 is the partial enlarged drawing of second band conveyor of the 3rd embodiment;
Figure 22 is that the route planar view is walked by the downhill race garage of the unpowered device in the fourth embodiment of the invention;
Figure 23 is Elevator band conveyor, aggregating apparatus and transmits and use the band conveyor lateral plan.
In the accompanying drawings, the 10th, downhill race car, the 14th, ski-lifting system, the 16th, aggregating apparatus, the 18th, carrying apparatus, the 20th, conveyer, the 22nd, moving-out device, the 24th, distribution device, the 26th, mobile device.
Below in conjunction with the description of drawings embodiments of the invention.
Fig. 1 represents the downhill race car 10 that handling system of the present invention is carried.This downhill race car 10 is no any engine installation as mentioned above, travels in utilization ramp from high to lower etc.Label 11 is handles of downhill race car 10, can control travelling of downhill race car 10 with this handle 11.Handle 11 is the Y font, is provided with auxiliary rod 13 between two handles of handle.
Fig. 2 is the running route 12 of expression downhill race car 10 and downhill race car 10 is transported to the planar view of the handling system 14 of departure place B from place of arrival A that the descent path in the present embodiment is from the hilltop to the foot of the hill.This handling system 14 is provided with the aggregating apparatus 16 that the downhill race car 10 that arrives destination A is pooled together; Downhill race car 10 is transported to the Handling device 18 on mountain top from the foot of the hill; Aggregating apparatus 16 contained downhill race cars 10 are sent to conveyer 20 on the Handling device 18; The downhill race car 10 that is transported to the mountain top is drawn off the moving-out device 22 of Handling device; Downhill race car 10 is assigned to route 12 a plurality of departure place B distribution device 24 and downhill race car 10 is moved to the mobile device 26 of distribution device 24 from moving-out device 22.
Aggregating apparatus 16 mainly is provided with first and second and compiles with band conveyor 28,30 as shown in Figure 3.Each compile with band conveyor all be in and transmission described later with the coaxial position of band conveyor 42.First and second compiles with band conveyor 28,30 as shown in Figure 4, is separately positioned on the chassis 34, and chassis 34 then is placed in along on the guide rail 32 of the Width laying of conveyer, and it can be moved at this Width.Label 36 is to make each chassis 34 interconnected link 36.The 37th, for making oil hydraulic cylinder or the air cylinder of two chassis 34 along guide rail 32 side travels.Certainly also availablely manually carry out above-mentioned side travel.In addition, above-mentioned oil cylinder or cylinder 37 also can move according to the detection signal that detects the sensor (omitting among the figure) of contained downhill race car on the band conveyor in the aggregating apparatus 16.
Handling device 18 is mainly and promotes cable 40 as shown in Figure 5, and this cable is provided with the hook 38 that hangs downhill race car 10 at regular intervals, almost extends to the mountain top from the foot of the hill, and shape is driven ringwise simultaneously.This Handling device 18 also can be installed in hook common skiing with on the bottom surface of cableway.When native system was worked, it was driven always.Hook 38 is provided with shown in Fig. 6,7 in couples.Hook 38 is used to hang the auxiliary rod 13 of downhill race driver handle 11 by 41 supportings of hook back plate.
Conveyer 20 is mainly formed with band conveyor 42 by transmitting as shown in Figure 8.This transmits with band conveyor 42, when native system work, keep at any time than the speed of the hook 38 of the aforementioned conveyer 18 carryings work speed of some slowly.
Moving-out device 22 is mainly formed by shifting out with band conveyor 44 as shown in Figure 5.This shifts out with band conveyor 44, sees from the side to be approximated to down " V " font, and its terminal part mobilely is connected with device 26 with described later.Shift out with band conveyor 44, when native system work, keep at any time than the aforementioned hook 38 transporting velocitys work speed of some soon.
Distribution device 24 as shown in Figure 9, and is main by the standby path 48 that is provided with stop mechanism 47; Rotation band conveyor 50 and downhill race car 10 formed near the drive access 52 that this band conveyor 50 is sent to the departure place.The mechanism that stop mechanism 47 temporarily stops to carry the downhill race car when being 50 rotations of rotation band conveyor.The bottom surface of standby path 48 and drive access 52 as shown in figure 10, along several first carrying rollers 54 of vertical arrangement of path, too along several second carrying rollers 56 of vertical arrangement of path, the downhill race car is slick and sly to import thereby make at medial surface.In addition, this standby path 48 and drive access 52 have the decline degree of dip as shown in figure 11.So downhill race car 10 under the deadweight effect, is sent to the drive access direction by first and second carrying roller 54,56.Transfer path 52 as shown in Figure 9, form by three parallel handover paths.By executing commentaries on classics band conveyor 50 downhill race car 10 is distributed to these three handover path 52A, 52B, 52C.Certainly, this distribution device also can be controlled by microcomputer.
Mobile device 26 mainly contains and makes downhill race car 10 move to the mobile with band conveyor 46 of distribution device 24 from moving-out device 22.
The following describes the action of present embodiment.
Along route 12 downhill race downhill race car on earth, collected in the aggregating apparatus 16, import its band conveyor then successively.At first, at state as Fig. 3, with transmit with band conveyor 42 couplings, be positioned at first on the same axis and compile with band conveyor 28 and work.This first compiles with band conveyor 28 downhill race car 10 to be transported to and transmits with on the band conveyor 42.On the other hand, second compiles with band conveyor 30 and does not work this moment, will be contained in this along route 12 downhill race downhill race car 10 on earth successively by the passenger of each downhill race car 10 or staff and compile with on the band conveyor 30.First compiles all to be transported to band conveyor 28 contained downhill race cars 10 and transmits with after on the band conveyor 42, and first and second compiles with band conveyor 28,30 and is moved by the direction of chassis 34 by arrow A among Fig. 3.When second compile with band conveyor with transmit be connected with band conveyor 42 after, then second compiles with band conveyor 30 and begins to move.Then, by downhill race car passenger or staff with first compiling that aforementioned downhill race car 10 is packed into and stopped with on the band conveyor 28.So repeatedly, then compile just automatically to be moved to and transmit with on the band conveyor 42 with the contained downhill race car of band conveyor 10.
Be moved to transmit and continue carrying by this conveyer with the downhill race car 10 on the band conveyor 42.At this moment, because the transporting velocity of aforementioned hook 38 is faster than transmitting with band conveyor 42, so hook 38 can catch up with downhill race car 10, the front end of hook 38 inserts the auxiliary rod 13 of aforementioned handle 11.Like this, downhill race car 10 is transported to the mountain top by hook 38 by promoting cable 40, is transported to aforementioned shifting out with on the band conveyor.
Shift out with band conveyor 44 as shown in Figure 5, be down " V " font substantially, its responsiveness is than the quick action that promotes cable 40.In addition, promote cable 40 and slightly be horizontal-extending, dwindled interval with this transport plane 44.When being moved to, shifts out with on the band conveyor 44 time by downhill race car 10 that hook 38 hangs, downhill race car 10 relative to hook 38 to the right oblique upper move, its result is when handle 11 breaks away from hook 38, and downhill race car 10 is moved to mobile using on the band conveyor 46 by shifting out with band conveyor 44.
Then downhill race car 10 is transported on the standby path 48 with band conveyor 46 by moving.Because standby path 48 tilts downwards, so be moved to the downhill race car 10 on the standby path 48, forwards advance by first and second carrying roller 54,56, stop at the front end of standby path 48 owing to the effect of shutdown feature 47.After confirming rotation band conveyor 50 and certain drive access 52 is connected, then stop mechanism 47 is disengaged.After one in the downhill race car 10 that is stopping to drive to rotation band conveyor 50, then stop mechanism 47 was locked once again.Downhill race car 10 is after band conveyor 50 is transported to drive access 52 by rotation, and rotation band conveyor 50 begins rotation, up to after other drive access 52 is connected, just stops the rotation.Rotation band conveyor 50 1 stops the rotation, and then stop mechanism 47 is disengaged, and makes the downhill race car 10 that is parked in the there drive to rotation band conveyor 50.Like this, by rotation band conveyor 50, with 10 1 one tablelands of downhill race car, be assigned to drive access 52A, 52B, 52C equably, and be moved to respectively and drive access 52A, 52B, 52C bonded assembly departure place.The passenger can take the downhill race car 10 that is moved to the departure place and travel on the downhill race route.
As mentioned above, according to present embodiment, can automatically be transported to eminence to the downhill race car that gets off from the eminence downhill race once again.
In the present embodiment, the hook 38 that promotes on the cable is Cheng Yilie configurations, if hook 38 parallel side by side several, and correspondingly increase the lane of traffic of band conveyor, then can carry downhill race car 10 quickly.
Figure 12,13 expression hooks, 38 additional embodiments.The end of this hook 38 is connected on the back plate 56 by pivoted lever 54, and can rotate.Pivoted lever 54 stretches out than a back plate direction laterally.The end of this pivoted lever 54 is provided with the guide plate 60 that connects aftermentioned guide rail 58.The two sides of this guide plate 60 are provided with pair of guide rods 62.The front end of each guide rod 62 is all crooked laterally, and two guide rods all forwards become "<" font (referring to Figure 14).
Guide rail 58 is arranged near the terminal point that promotes cable, promptly aforementioned have shift out with near the band conveyor.Guide rail 58 is the position between each guide rail 62, and extends to the direction that promotes cable, draws close (referring to Figure 14) gradually.
Figure 14 represents the action of guide rod 62.The hook 38 that hangs the downhill race car moves because of promoting cable, when shifting out band conveyor, and insertion guide rail 58 between the guide rod 62 that at first in its hook, is provided with.And then when hook 38 advanced, guide rail 58 was just gradually near promoting cable, make guide plate 60 bottom surface contact guide rail 58 above.Because guide plate 60 is raised, pivoted lever 54 is rotated.Corresponding therewith hook 38 rotates, and hook 38 leaves downhill race car 10, and downhill race car 10 is loaded onto to be shifted out with band conveyor 44.Therefore, the swinging hook for present embodiment uses shifts out with band conveyor and need not make down " V " font.
Figure 15 represents the planar view of second embodiment of the invention.Number in the figure 12 is downhill race car 10 running routes, and label 64 is the travel of the carrying truck 66 of carrying downhill race car 10 described later.This second embodiment mainly forms by the carrying truck 66 of the departure place that downhill race car 10 is transported to the mountain top from the place of arrival at the foot of the hill with pack into the loading attachment 68 of this carrying truck 66 of downhill race car.
Loading attachment 68 is mainly used band conveyor 70 by carrying as shown in figure 16; Carrying is formed with path 72 and the truck elevator 74 that carrying truck 66 above-below directions are moved.Carrying is made up of three row band conveyors with band conveyor 70 as shown in figure 17, and three row conveyers all can load downhill race car 10 separately.Carrying links with carrying with the contained truck body of band conveyor 70 and truck elevator 74 with path 72, as shown in figure 16, has the decline gradient.The structure of this transmission usefulness path 72 and aforementioned standby path 48 and drive access 52 are same, utilize its degree of dip carrying downhill race car 10.Truck elevator 74 mainly is made up of the supporting station 76 of supporting carrying truck 66 and the oil cylinder 78 that these supporting station 76 above-below directions are moved.Carrying if connect microcomputer (omitting among the figure), then can be controlled action separately with band conveyor 70 and oil cylinder 78.
Carrying is provided with three layers of shelf 80 that load downhill race car 10 with truck 66, and every layer of shelf 80 can load three row's downhill race cars 10 side by side.By the height of truck elevator 74 adjustment supporting stations, the base end part of certain always connects the front end of carrying path in each layer shelf 80 so that make.
The following describes the action of second embodiment.At first, will be placed on carrying with on the band conveyor 70 along the intact downhill race car 10 of route 12 downhill race by the passenger.At this moment, carrying is transported to carrying with on the path 72 with band conveyor 70 work with downhill race car 10, utilizes its degree of dip that downhill race car 10 is transported to carrying with on the shelf 80 of truck then.After filling downhill race car 10 in the shelf 80, then carrying quits work with band conveyor 70, and the carrying of downhill race car 10 temporarily stops.Adjust the supporting station 72 of carrying by oil cylinder 74 then, the some and front end of carrying with path 68 in all the other shelfs 80 is connected with truck.So repeatedly, after three layers of shelf of truck were all filled downhill race car 10, carrying quit work with band conveyor 70.Make truck supporting station 76 be put into ground with oil cylinder 74, then carrying is travelled at road 64 with truck 66, and downhill race car 10 is transported to the mountain top.
Among second embodiment, can utilize the truck elevator to adjust the height of shelf 80, as shown in figure 18, also can adjust the height of shelf by the oil cylinder 75 that truck carries.
The following describes third embodiment of the invention.Figure 19 is the downhill race car 10 running route planar views that third embodiment of the invention is provided with.This route is different with above-mentioned route, is artificial the construction fully.Downhill race car 10 can drive to place of arrival A from being positioned at pylon 84 top departure place B.The 3rd embodiment is shown in Figure 19,20, and is main by first band conveyor 82 that the downhill race car 10 of place of arrival A is sent and downhill race car 10 is transported to pylon 84 top second band conveyors 86 forms.
First band conveyor 82 is made up of two row conveyers as shown in figure 19.Second band conveyor 86 is formed to the two row conveyers at pylon 84 tops from the leading section of first band conveyor 82 by connecting.As shown in figure 21, glide because of inclination, be provided with anti-skid device 88 for avoiding downhill race car 10.
Figure 22 is the planar view of downhill race car 10 running routes 12 of fourth embodiment of the invention setting.Label 90 is king-tower framves.Downhill race car 10 drives to from the departure place B that is positioned at these king-tower frame 90 the superiors 91 and is located at place of arrival A on the ground.The 4th embodiment as shown in figure 23, by the elevator 92 that downhill race car 10 is transported to king-tower frame 90 the superiors 91; To be pooled to the aggregating apparatus 94 at a place and the transmission that the downhill race car 10 of aggregating apparatus 94 carryings is sent to elevator 92 is formed with band conveyor 96 to the downhill race car 10 of place of arrival A.
Aggregating apparatus 94 is same with above-mentioned first embodiment, is compiled with band conveyor by first and second and forms, and can laterally move by chassis 34.Elevator 92 is arranged on the inside of king-tower frame 90, has the cantilevered bracket 98 that several load downhill race car 10.This cantilevered bracket 98 is designed to the structure that can prevent that the downhill race car from dropping.
As mentioned above, the invention provides a kind of user take the downhill race car from the eminence downhill race behind lower, satisfactorily and automatically this downhill race car is transported to once again the handling system of eminence.

Claims (3)

1, be used for the downhill race car from the eminence downhill race to lower is transported to the ski-lifting system of above-mentioned eminence, it is characterized in that, this system is provided with the Handling device that the downhill race car is transported to eminence from lower; The downhill race car that will be positioned at lower imports the conveyer of Handling device; And the downhill race car that will be transported to eminence draws off the moving-out device of Handling device.
2, ski-lifting system as claimed in claim 1 is characterized in that, is provided with the aggregating apparatus that the downhill race car after making downhill race compiles at lower in the front of conveyer.
3, ski-lifting system as claimed in claim 1 or 2 is characterized in that, is provided with to be unloaded the distribution device that is assigned to many roads in the downhill race car of eminence by moving-out device.
CN94113431A 1994-01-31 1994-12-29 Ski-lifting system Expired - Fee Related CN1065146C (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2902194A JPH08112455A (en) 1994-01-31 1994-01-31 Vehicle carrying system
JP629021 1994-01-31
JP6-29021 1994-01-31

Publications (2)

Publication Number Publication Date
CN1111579A true CN1111579A (en) 1995-11-15
CN1065146C CN1065146C (en) 2001-05-02

Family

ID=12264765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN94113431A Expired - Fee Related CN1065146C (en) 1994-01-31 1994-12-29 Ski-lifting system

Country Status (2)

Country Link
JP (1) JPH08112455A (en)
CN (1) CN1065146C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110650781A (en) * 2017-05-26 2020-01-03 环球城市电影有限责任公司 Variable vehicle ride diverter

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3114332A (en) * 1960-05-16 1963-12-17 Walt Disney Prod Bobsled amusement ride
US3548753A (en) * 1968-06-18 1970-12-22 Edward M Thurston Loading means for chair lift
US4050385A (en) * 1975-09-29 1977-09-27 Walt Disney Productions High capacity passenger transport apparatus
US4236454A (en) * 1978-03-09 1980-12-02 Erickson Alve J Mountain monorail slide
FR2588762B1 (en) * 1985-10-18 1987-11-27 Lamoureux Marc LIGHT VEHICLE GUIDING CIRCUIT
JPH05290296A (en) * 1992-04-07 1993-11-05 Mitsubishi Electric Corp Ropeway operation monitor device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110650781A (en) * 2017-05-26 2020-01-03 环球城市电影有限责任公司 Variable vehicle ride diverter
CN110650781B (en) * 2017-05-26 2021-03-12 环球城市电影有限责任公司 Variable vehicle ride diverter

Also Published As

Publication number Publication date
CN1065146C (en) 2001-05-02
JPH08112455A (en) 1996-05-07

Similar Documents

Publication Publication Date Title
KR101653672B1 (en) A Container Handling system comprising a crane and a plurality of base elements which can be mounted on top of containers for supporting the crane and transporting the containers
US3541962A (en) Urban transportation system
EP1752352A2 (en) Operating method for a disengageable aerial ropeway
US5320473A (en) Transfer apparatus, multilevel storage system and method of lifting loads
CN101547822A (en) Carriage type conveyance device
US5857821A (en) System for loading and unloading rail vehicles
WO2021244381A1 (en) Article storage and taking system
CN1802279A (en) Carrying system
CN112046507A (en) Hybrid cable/rail transport system
CN1288423A (en) Freight container and method of transporting a load
CN109911786A (en) A kind of machine for collecting load rapid transport system and method at logistics node station
CN1485259A (en) Transport installation for paper reels, method for its operation and vehicle
CN1270928C (en) Apparatus for moving containers
WO2021244383A1 (en) Eplane-moving parking device
CN113620172A (en) Lifting and transferring device and method for freight air-rail container
CN108999445B (en) Double-conversion double-row multilayer stereoscopic parking device and vehicle parking and taking method thereof
CN212333653U (en) Article storing and taking system
CN205476676U (en) Double -deck parking equipment with sweep and upper layer load template are carried to ground
CN1065146C (en) Ski-lifting system
CN106586358B (en) Object storage mechanism and its handling device, access method
CN208307641U (en) A kind of materials conveying system
CN212336858U (en) Plane moving type parking equipment
CN114269665B (en) Hybrid cable/rail transport system
CN111517049A (en) Transportation system and method
CN1660636A (en) Method and system for rail bound rapid transit vehicle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee