CN111127219A - Power insurance claim settlement method and device based on block chain intelligent contracts - Google Patents
Power insurance claim settlement method and device based on block chain intelligent contracts Download PDFInfo
- Publication number
- CN111127219A CN111127219A CN201911124177.1A CN201911124177A CN111127219A CN 111127219 A CN111127219 A CN 111127219A CN 201911124177 A CN201911124177 A CN 201911124177A CN 111127219 A CN111127219 A CN 111127219A
- Authority
- CN
- China
- Prior art keywords
- settlement
- power failure
- met
- information
- fault
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/08—Insurance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
Abstract
The invention aims to solve the problem of low power insurance claim settlement efficiency in the prior art, and provides a power insurance claim settlement method and device based on a block chain intelligent contract, so that the power insurance claim settlement efficiency is improved. The method comprises the following steps: generating first intelligent contracts for insurance claim settlement of each power consumption type of each region based on fault power failure data of each power consumption type of each region, and acquiring power supply information and weather early warning information; and when the claim settlement triggering condition is met, triggering the first intelligent contract to generate a claim settlement result according to the power supply information and executing a claim settlement instruction. According to the technical scheme, the power failure data serve as the basis of the first intelligent contract, whether the claim settlement triggering condition is met or not is automatically judged according to the power supply information and the weather early warning information, when the claim settlement triggering condition is met, the claim settlement result is generated through the first intelligent contract according to the power supply information, the claim settlement is executed, and the claim settlement efficiency is greatly improved.
Description
Technical Field
The invention belongs to the field of electric power, and particularly relates to an electric power insurance claim settlement method and device based on a block chain intelligent contract.
Background
At the present stage, the power failure loss due to user failure cannot be compensated, and insurance protection is needed, but the insurance schemes in the prior art are all implemented through manual insurance, and the defects of low insurance efficiency and poor safety are overcome.
Disclosure of Invention
The invention aims to solve one of the problems in the prior art, and provides a block chain-based power insurance claim settlement method and device, which can improve the power insurance claim settlement efficiency.
In one aspect of the disclosure, the electric power insurance claim settlement method based on the block chain intelligent contract is applied to a block chain comprising insurance claim settlement mechanism nodes, power supply mechanism nodes and meteorological mechanism nodes;
acquiring fault power failure data of each power consumption type of each region written by a power supply mechanism node;
generating a standard premium of each power utilization type of each region based on the fault power failure data of each power utilization type of each region;
generating first intelligent contracts for insurance claim settlement of each electricity type of each region based on the standard premium of each electricity type of each region;
acquiring power supply information written in by a power supply mechanism node;
acquiring weather early warning information written in by a node on the side of a meteorological institution;
judging whether the claim settlement triggering condition is met or not according to the power supply information and the weather early warning information;
if the claim settlement triggering condition is met, acquiring the region and the electricity utilization type of the user meeting the claim settlement triggering condition, triggering a corresponding first intelligent contract based on the region and the electricity utilization type of the user, enabling the first intelligent contract to generate a claim settlement result according to the power supply information, and writing the claim settlement result into the block chain to trigger the insurance agency claim settlement;
and acquiring a claim settlement instruction written in the insurance claim settlement institution node, and executing the claim settlement instruction.
Optionally, the power supply information includes basic data, power failure data and a fault repair work order, wherein the basic data includes planned power failure information, the power failure data includes terminal power failure information, and the fault repair work order includes a customer number and a fault equipment property right.
Optionally, judging whether the claim settlement triggering condition is met according to the power supply information and the weather early warning information includes: judging whether yellow and above weather early warning occurs in a power failure stage or not based on the terminal power failure information and the weather early warning information when the power failure of the terminal is judged according to the terminal power failure information;
if the early warning of the weather of yellow or above occurs in the power failure stage, judging that the claim settlement triggering condition is not met, otherwise, judging whether the power failure stage is planned power failure according to planned power failure information and terminal power failure information;
if the power failure stage is planned power failure, judging that the claim settlement condition is not met, otherwise, judging whether the power failure stage is single-family fault according to the power failure information of the terminal;
if the fault is a single-family fault, judging that the claim settlement triggering condition is met, otherwise, judging whether the claim settlement triggering condition is met according to the fault repair work order.
Optionally, the determining whether the claim settlement triggering condition is met according to the fault repair work order includes:
judging whether the fault repair work order contains the client number of the client to be claim for settlement or not according to the fault repair work order;
if the client number of the client to be claimed is not contained, judging that the claim trigger condition is not met, if the client number of the client to be claimed is contained, judging whether the client property right equipment fails according to the fault report worksheet, if the client property right equipment fails, judging that the claim trigger condition is not met, and if the client property right equipment fails, judging that the claim trigger condition is met.
Optionally, the block chain is a federation chain.
In a second aspect of the present disclosure, an electric power insurance claim settlement apparatus based on a block chain intelligent contract is applied to a block chain including an insurance claim settlement mechanism node, a power supply mechanism node, and a meteorological mechanism node, the apparatus including:
the first acquisition module is used for acquiring fault power failure data of each power consumption type of each region written by the power supply mechanism node;
the standard premium calculation module is used for generating standard premiums of all the electricity utilization types of all the regions based on the fault power failure data of all the electricity utilization types of all the regions;
the intelligent contract generating module is used for generating first intelligent contracts for insurance claim settlement of each electricity utilization type of each region based on the standard premium of each electricity utilization type of each region;
the second acquisition module is used for acquiring power supply information written in by the power supply mechanism node;
the third acquisition module is used for acquiring weather early warning information written in by the nodes of the meteorological institution;
the claim settlement triggering module is used for judging whether the claim settlement triggering conditions are met or not according to the power supply information and the weather early warning information; if the claim settlement triggering condition is met, acquiring the region and the electricity utilization type of the user meeting the claim settlement triggering condition, triggering a corresponding first intelligent contract based on the region and the electricity utilization type of the user, enabling the first intelligent contract to generate a claim settlement result according to the power supply information, and writing the claim settlement result into the block chain to trigger the insurance agency claim settlement;
and the claim settlement execution module is used for acquiring a claim settlement instruction written in the insurance claim settlement institution node and executing the claim settlement instruction.
Optionally, the power supply information includes basic data, power failure data and a fault repair work order, wherein the basic data includes planned power failure information, the power failure data includes terminal power failure information, and the fault repair work order includes a customer number and a fault equipment property right.
Optionally, judging whether the claim settlement triggering condition is met according to the power supply information and the weather early warning information includes: judging whether yellow and above weather early warning occurs in a power failure stage or not based on the terminal power failure information and the weather early warning information when the power failure of the terminal is judged according to the terminal power failure information;
if the early warning of the weather of yellow or above occurs in the power failure stage, judging that the claim settlement triggering condition is not met, otherwise, judging whether the power failure stage is planned power failure according to planned power failure information and terminal power failure information;
if the power failure stage is planned power failure, judging that the claim settlement condition is not met, otherwise, judging whether the power failure stage is single-family fault according to the power failure information of the terminal;
if the fault is a single-family fault, judging that the claim settlement triggering condition is met, otherwise, judging whether the claim settlement triggering condition is met according to the fault repair work order.
Optionally, the determining whether the claim settlement triggering condition is met according to the fault repair work order includes:
judging whether the fault repair work order contains the client number of the client to be claim for settlement or not according to the fault repair work order;
if the client number of the client to be claimed is not contained, judging that the claim trigger condition is not met, if the client number of the client to be claimed is contained, judging whether the client property right equipment fails according to the fault report worksheet, if the client property right equipment fails, judging that the claim trigger condition is not met, and if the client property right equipment fails, judging that the claim trigger condition is met.
Optionally, the block chain is a federation chain.
The technical scheme of the present disclosure can be implemented to obtain the following beneficial technical effects: according to the technical scheme, the standard premium of each power consumption type of each region is generated based on the fault power failure data of each power consumption type of each region, and the first intelligent contract for insurance claim settlement of each power consumption type of each region is generated based on the standard of the standard premium; and automatically judging whether the claim trigger condition is met or not according to the power supply information and the weather early warning information, and generating a claim result according to the power supply information through a first intelligent contract and executing claim when the claim trigger condition is met. The method has the advantages that the standard premium is automatically generated according to the fault power failure data of each power utilization type of each region, the first intelligent contract is generated based on the standard premium, and the efficiency can be improved; and can realize claim settlement quickly. The decentralized management based on the block chain technology does not need a central server, avoids expensive operation and maintenance cost, reduces cost, and simultaneously avoids the safety problems that the central server is attacked and data is difficult to recover. Based on the block chain intelligent contract, the link of claim settlement application and on-site survey is removed, and the problems of complicated insurance claim settlement procedure and high operation cost are solved. .
Drawings
Fig. 1 is a flowchart of a method for electric power insurance claim settlement based on a block chain intelligent contract according to an embodiment of the present disclosure;
fig. 2 is a connection diagram of an electric power insurance claim settlement device based on a block chain intelligent contract according to an embodiment of the present disclosure.
Detailed Description
To facilitate understanding of those skilled in the art, the present invention will be further described with reference to specific examples:
example 1:
as shown in fig. 1, the power insurance claim settlement method based on the intelligent block chain contract is applied to a block chain including insurance claim settlement mechanism nodes, power supply mechanism nodes and meteorological mechanism nodes;
step S1: acquiring fault power failure data of each power consumption type of each region written by a power supply mechanism node;
step S2: generating a standard premium of each power utilization type of each region based on the fault power failure data of each power utilization type of each region;
step S3: generating first intelligent contracts for insurance claim settlement of each electricity type of each region based on the standard premium of each electricity type of each region;
step S4: acquiring power supply information written in by a power supply mechanism node;
step S5: acquiring weather early warning information written in by a node on the side of a meteorological institution;
step S6: judging whether the claim settlement triggering condition is met or not according to the power supply information and the weather early warning information;
step S7: if the claim settlement triggering condition is met, acquiring the region and the electricity utilization type of the user meeting the claim settlement triggering condition, triggering a corresponding first intelligent contract based on the region and the electricity utilization type of the user, enabling the first intelligent contract to generate a claim settlement result according to the power supply information, and writing the claim settlement result into the block chain to trigger the insurance agency claim settlement;
step S8: and acquiring a claim settlement instruction written in the insurance claim settlement institution node, and executing the claim settlement instruction.
According to the technical scheme, the standard premium of each power consumption type of each region is generated based on the fault power failure data of each power consumption type of each region, and the first intelligent contract for insurance claim settlement of each power consumption type of each region is generated based on the standard premium; and automatically judging whether the claim trigger condition is met or not according to the power supply information and the weather early warning information, and generating a claim result according to the power supply information through a first intelligent contract and executing claim when the claim trigger condition is met. The method has the advantages that the standard premium is automatically generated according to the fault power failure data of each power utilization type of each region, the first intelligent contract is generated based on the standard premium, and the efficiency can be improved; and can realize claim settlement quickly. The decentralized management based on the block chain technology does not need a central server, avoids expensive operation and maintenance cost, reduces cost, and simultaneously avoids the safety problems that the central server is attacked and data is difficult to recover. Based on the block chain intelligent contract, the link of claim settlement application and on-site survey is removed, and the problems of complicated insurance claim settlement procedure and high operation cost are solved.
Regarding "the reference premium for each electricity usage type of each area", the areas may be divided at an area level or a ballast level. The electricity utilization types comprise high voltage of an enterprise, low voltage of residents and low voltage of non-residents. Specifically, the standard premium of the enterprise high pressure in the Ningbo Yuyao city area, the standard premium of the resident low pressure in the Ningbo Yuyao city area, the standard premium of the non-resident low pressure in the Ningbo Yuyao city area, the standard premium of the enterprise high pressure in the Ningbo Yuyao area, and the like. The intelligent contract can calculate the premium according to the standard premium and the power failure duration; is the length of the power outage times the baseline premium times a fixed parameter.
And generating a standard premium for each power consumption type of each region based on the fault power failure data of each power consumption type of each region. The calculation cost of the standard premium can be reduced, and meanwhile, the standard premium can be adjusted in real time according to the requirement; because the block chain technology is adopted, the trust standard is provided, the standard premium is calculated and modified in a specific calculation mode, the user can accept the standard premium, and the practicability is improved.
As an alternative to the above embodiment, the power supply information includes basic data, power failure data, and a fault repair order, where the basic data includes scheduled power failure information, the power failure data includes terminal power failure information, and the fault repair order includes a customer number and a fault equipment property right.
As an alternative to the foregoing embodiment, the determining whether the claim settlement triggering condition is satisfied according to the power supply information and the weather warning information includes: judging whether yellow and above weather early warning occurs in a power failure stage or not based on the terminal power failure information and the weather early warning information when the power failure of the terminal is judged according to the terminal power failure information;
if the early warning of the weather of yellow or above occurs in the power failure stage, judging that the claim settlement triggering condition is not met, otherwise, judging whether the power failure stage is planned power failure according to planned power failure information and terminal power failure information;
if the power failure stage is planned power failure, judging that the claim settlement condition is not met, otherwise, judging whether the power failure stage is single-family fault according to the power failure information of the terminal;
if the fault is a single-family fault, judging that the claim settlement triggering condition is met, otherwise, judging whether the claim settlement triggering condition is met according to the fault repair work order.
Whether the claim triggering condition is met or not is automatically judged according to the weather condition, the planned power failure information and the terminal power failure information, so that claims are prevented from being triggered under non-claim conditions such as natural disasters and the like, and the safety is improved.
As an alternative to the above embodiment, the determining whether the claim trigger condition is satisfied according to the troubleshooting work order includes:
judging whether the fault repair work order contains the client number of the client to be claim for settlement or not according to the fault repair work order;
if the client number of the client to be claimed is not contained, judging that the claim trigger condition is not met, if the client number of the client to be claimed is contained, judging whether the client property right equipment fails according to the fault report worksheet, if the client property right equipment fails, judging that the claim trigger condition is not met, and if the client property right equipment fails, judging that the claim trigger condition is met.
And automatically judging whether the power failure is caused by the self reason of the client according to the client number and the fault of the client property right equipment.
As an alternative to the above embodiment, the blockchain is a federation chain.
Example 2
As shown in fig. 2, the power insurance claim settlement apparatus based on the intelligent block chain contract is applied to the block chain including insurance claim settlement mechanism nodes, power supply mechanism nodes and meteorological mechanism nodes, and the apparatus includes:
the first acquisition module 1 is used for acquiring fault power failure data of each power consumption type of each region written by a power supply mechanism node;
the standard premium calculation module 2 is used for generating standard premiums of all the electricity utilization types of all the regions based on the fault power failure data of all the electricity utilization types of all the regions;
the intelligent contract generating module 3 is used for generating first intelligent contracts for insurance claim settlement of each electricity type of each region based on the standard premium of each electricity type of each region;
the second acquisition module 4 is used for acquiring power supply information written in by the power supply mechanism node;
the third acquisition module 5 is used for acquiring weather early warning information written in by the nodes on the side of the meteorological institution;
the claim settlement triggering module 6 is used for judging whether the claim settlement triggering conditions are met or not according to the power supply information and the weather early warning information; if the claim settlement triggering condition is met, acquiring the region and the electricity utilization type of the user meeting the claim settlement triggering condition, triggering a corresponding first intelligent contract based on the region and the electricity utilization type of the user, enabling the first intelligent contract to generate a claim settlement result according to the power supply information, and writing the claim settlement result into the block chain to trigger the insurance agency claim settlement;
and the claim settlement executing module 7 is used for acquiring a claim settlement instruction written in the insurance claim settlement institution node and executing the claim settlement instruction.
As an alternative to the above embodiment, the power supply information includes basic data, power failure data, and a fault repair order, where the basic data includes scheduled power failure information, the power failure data includes terminal power failure information, and the fault repair order includes a customer number and a fault equipment property right.
As an alternative to the foregoing embodiment, the determining whether the claim settlement triggering condition is satisfied according to the power supply information and the weather warning information includes: judging whether yellow and above weather early warning occurs in a power failure stage or not based on the terminal power failure information and the weather early warning information when the power failure of the terminal is judged according to the terminal power failure information;
if the early warning of the weather of yellow or above occurs in the power failure stage, judging that the claim settlement triggering condition is not met, otherwise, judging whether the power failure stage is planned power failure according to planned power failure information and terminal power failure information;
if the power failure stage is planned power failure, judging that the claim settlement condition is not met, otherwise, judging whether the power failure stage is single-family fault according to the power failure information of the terminal;
if the fault is a single-family fault, judging that the claim settlement triggering condition is met, otherwise, judging whether the claim settlement triggering condition is met according to the fault repair work order.
As an alternative to the above embodiment, the determining whether the claim trigger condition is satisfied according to the troubleshooting work order includes:
judging whether the fault repair work order contains the client number of the client to be claim for settlement or not according to the fault repair work order;
if the client number of the client to be claimed is not contained, judging that the claim trigger condition is not met, if the client number of the client to be claimed is contained, judging whether the client property right equipment fails according to the fault report worksheet, if the client property right equipment fails, judging that the claim trigger condition is not met, and if the client property right equipment fails, judging that the claim trigger condition is met.
As an alternative to the above embodiment, the blockchain is a federation chain.
It should also be noted that the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in the process, method, article, or apparatus that comprises the element.
The above are only specific embodiments of the present invention, but the technical features of the present invention are not limited thereto, and any changes or modifications within the scope of the present invention by those skilled in the art are covered by the present invention.
Claims (10)
1. The electric power insurance claim settlement method based on the block chain intelligent contract is characterized by being applied to a block chain comprising insurance claim settlement mechanism nodes, power supply mechanism nodes and meteorological mechanism nodes;
acquiring fault power failure data of each power consumption type of each region written by a power supply mechanism node;
generating a standard premium of each power utilization type of each region based on the fault power failure data of each power utilization type of each region;
generating first intelligent contracts for insurance claim settlement of each electricity type of each region based on the standard premium of each electricity type of each region;
acquiring power supply information written in by a power supply mechanism node;
acquiring weather early warning information written in by a node on the side of a meteorological institution;
judging whether the claim settlement triggering condition is met or not according to the power supply information and the weather early warning information;
if the claim settlement triggering condition is met, acquiring the region and the electricity utilization type of the user meeting the claim settlement triggering condition, triggering a corresponding first intelligent contract based on the region and the electricity utilization type of the user, enabling the first intelligent contract to generate a claim settlement result according to the power supply information, and writing the claim settlement result into the block chain to trigger the insurance agency claim settlement;
and acquiring a claim settlement instruction written in the insurance claim settlement institution node, and executing the claim settlement instruction.
2. The method of claim 1, wherein the power supply information comprises basic data, outage data, and a troubleshooting work order, wherein the basic data comprises planned outage information, the outage data comprises terminal outage information, and the troubleshooting work order comprises a customer number and a failed equipment property.
3. The method of claim 2, wherein determining whether the claim settlement triggering condition is satisfied according to the power supply information and the weather warning information comprises: judging whether yellow and above weather early warning occurs in a power failure stage or not based on the terminal power failure information and the weather early warning information when the power failure of the terminal is judged according to the terminal power failure information;
if the early warning of the weather of yellow or above occurs in the power failure stage, judging that the claim settlement triggering condition is not met, otherwise, judging whether the power failure stage is planned power failure according to planned power failure information and terminal power failure information;
if the power failure stage is planned power failure, judging that the claim settlement condition is not met, otherwise, judging whether the power failure stage is single-family fault according to the power failure information of the terminal;
if the fault is a single-family fault, judging that the claim settlement triggering condition is met, otherwise, judging whether the claim settlement triggering condition is met according to the fault repair work order.
4. The method of claim 3, wherein determining whether a claim trigger condition is met based on the rework shop order comprises:
judging whether the fault repair work order contains the client number of the client to be claim for settlement or not according to the fault repair work order;
if the client number of the client to be claimed is not contained, judging that the claim trigger condition is not met, if the client number of the client to be claimed is contained, judging whether the client property right equipment fails according to the fault report worksheet, if the client property right equipment fails, judging that the claim trigger condition is not met, and if the client property right equipment fails, judging that the claim trigger condition is met.
5. The method of claim 1, wherein the blockchain is a federation chain.
6. Electric power insurance claim settlement device based on intelligent contract of block chain, its characterized in that is applied to the block chain including insurance claim settlement mechanism node, power supply mechanism node, meteorological mechanism node, the device includes:
the first acquisition module is used for acquiring fault power failure data of each power consumption type of each region written by the power supply mechanism node;
the standard premium calculation module is used for generating standard premiums of all the electricity utilization types of all the regions based on the fault power failure data of all the electricity utilization types of all the regions;
the intelligent contract generating module is used for generating first intelligent contracts for insurance claim settlement of each electricity utilization type of each region based on the standard premium of each electricity utilization type of each region;
the second acquisition module is used for acquiring power supply information written in by the power supply mechanism node;
the third acquisition module is used for acquiring weather early warning information written in by the nodes of the meteorological institution;
the claim settlement triggering module is used for judging whether the claim settlement triggering conditions are met or not according to the power supply information and the weather early warning information; if the claim settlement triggering condition is met, acquiring the region and the electricity utilization type of the user meeting the claim settlement triggering condition, triggering a corresponding first intelligent contract based on the region and the electricity utilization type of the user, enabling the first intelligent contract to generate a claim settlement result according to the power supply information, and writing the claim settlement result into the block chain to trigger the insurance agency claim settlement;
and the claim settlement execution module is used for acquiring a claim settlement instruction written in the insurance claim settlement institution node and executing the claim settlement instruction.
7. The apparatus of claim 1, wherein the power supply information comprises base data, outage data, and a troubleshooting work order, wherein the base data comprises planned outage information, the outage data comprises terminal outage information, and the troubleshooting work order comprises a customer number and a failed equipment property.
8. The apparatus of claim 7, wherein determining whether the claim settlement triggering condition is satisfied according to the power supply information and the weather warning information comprises: judging whether yellow and above weather early warning occurs in a power failure stage or not based on the terminal power failure information and the weather early warning information when the power failure of the terminal is judged according to the terminal power failure information;
if the early warning of the weather of yellow or above occurs in the power failure stage, judging that the claim settlement triggering condition is not met, otherwise, judging whether the power failure stage is planned power failure according to planned power failure information and terminal power failure information;
if the power failure stage is planned power failure, judging that the claim settlement condition is not met, otherwise, judging whether the power failure stage is single-family fault according to the power failure information of the terminal;
if the fault is a single-family fault, judging that the claim settlement triggering condition is met, otherwise, judging whether the claim settlement triggering condition is met according to the fault repair work order.
9. The apparatus of claim 8, wherein the determining whether the claim trigger condition is satisfied from the rework shop order comprises:
judging whether the fault repair work order contains the client number of the client to be claim for settlement or not according to the fault repair work order;
if the client number of the client to be claimed is not contained, judging that the claim trigger condition is not met, if the client number of the client to be claimed is contained, judging whether the client property right equipment fails according to the fault report worksheet, if the client property right equipment fails, judging that the claim trigger condition is not met, and if the client property right equipment fails, judging that the claim trigger condition is met.
10. The method apparatus of claim 9, wherein the blockchain is a federation chain.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911124177.1A CN111127219A (en) | 2019-11-18 | 2019-11-18 | Power insurance claim settlement method and device based on block chain intelligent contracts |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911124177.1A CN111127219A (en) | 2019-11-18 | 2019-11-18 | Power insurance claim settlement method and device based on block chain intelligent contracts |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111127219A true CN111127219A (en) | 2020-05-08 |
Family
ID=70495988
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911124177.1A Pending CN111127219A (en) | 2019-11-18 | 2019-11-18 | Power insurance claim settlement method and device based on block chain intelligent contracts |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111127219A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112613877A (en) * | 2020-12-17 | 2021-04-06 | 腾讯科技(深圳)有限公司 | Intelligent contract triggering method and device applied to block chain network and related equipment |
CN113221176A (en) * | 2021-01-27 | 2021-08-06 | 支付宝(杭州)信息技术有限公司 | Service processing method and device based on block chain and electronic equipment |
CN113221176B (en) * | 2021-01-27 | 2024-04-26 | 支付宝(杭州)信息技术有限公司 | Business processing method and device based on block chain and electronic equipment |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101017561A (en) * | 1999-08-06 | 2007-08-15 | Aceina控股公司 | Systems for, and method of, insuring risks in a restructured energy industry |
CN104091231A (en) * | 2014-06-30 | 2014-10-08 | 国家电网公司 | Distribution network fault repairing commanding and processing system and method |
CN108540483A (en) * | 2018-04-23 | 2018-09-14 | 北京云图科瑞科技有限公司 | A kind of apparatus monitoring method and device based on block chain |
CN109389513A (en) * | 2018-12-11 | 2019-02-26 | 北京京东尚科信息技术有限公司 | Medical insurance Claims Resolution method, apparatus, equipment and computer readable storage medium |
CN109584082A (en) * | 2018-09-17 | 2019-04-05 | 平安科技(深圳)有限公司 | Settlement of insurance claim method, electronic device and storage medium based on block chain |
CN110287186A (en) * | 2019-05-31 | 2019-09-27 | 武汉大学 | A kind of smart grid data management system and method based on block chain technology with sovereign right |
-
2019
- 2019-11-18 CN CN201911124177.1A patent/CN111127219A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101017561A (en) * | 1999-08-06 | 2007-08-15 | Aceina控股公司 | Systems for, and method of, insuring risks in a restructured energy industry |
CN104091231A (en) * | 2014-06-30 | 2014-10-08 | 国家电网公司 | Distribution network fault repairing commanding and processing system and method |
CN108540483A (en) * | 2018-04-23 | 2018-09-14 | 北京云图科瑞科技有限公司 | A kind of apparatus monitoring method and device based on block chain |
CN109584082A (en) * | 2018-09-17 | 2019-04-05 | 平安科技(深圳)有限公司 | Settlement of insurance claim method, electronic device and storage medium based on block chain |
CN109389513A (en) * | 2018-12-11 | 2019-02-26 | 北京京东尚科信息技术有限公司 | Medical insurance Claims Resolution method, apparatus, equipment and computer readable storage medium |
CN110287186A (en) * | 2019-05-31 | 2019-09-27 | 武汉大学 | A kind of smart grid data management system and method based on block chain technology with sovereign right |
Non-Patent Citations (1)
Title |
---|
林伟明等: "改善供用电可靠性的新型停电保险机制", 《电力系统自动化》, vol. 30, no. 18, pages 27 - 32 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112613877A (en) * | 2020-12-17 | 2021-04-06 | 腾讯科技(深圳)有限公司 | Intelligent contract triggering method and device applied to block chain network and related equipment |
CN112613877B (en) * | 2020-12-17 | 2021-12-07 | 腾讯科技(深圳)有限公司 | Intelligent contract triggering method and device applied to block chain network and related equipment |
CN113221176A (en) * | 2021-01-27 | 2021-08-06 | 支付宝(杭州)信息技术有限公司 | Service processing method and device based on block chain and electronic equipment |
CN113221176B (en) * | 2021-01-27 | 2024-04-26 | 支付宝(杭州)信息技术有限公司 | Business processing method and device based on block chain and electronic equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Moser et al. | Identification of technical risks in the photovoltaic value chain and quantification of the economic impact | |
Sperstad et al. | A comprehensive framework for vulnerability analysis of extraordinary events in power systems | |
Marqusee et al. | Reliability of emergency and standby diesel generators: Impact on energy resiliency solutions | |
Curtis | Maintaining mission critical systems in a 24/7 environment | |
CN107092222B (en) | Based on the integrated power grid regulation operational administrative system of anti-error check analysis | |
BRPI1105058A2 (en) | distribution control center | |
CN106651643A (en) | Power security management and control method for whole process based on distribution and adjustment | |
Chang et al. | A return on investment analysis of applying health monitoring to LED lighting systems | |
CN111277641A (en) | Power failure event notification method and device, computer equipment and storage medium | |
Schelling et al. | Simbalink: Towards a sustainable and feasible solar rural electrification system | |
CN111127219A (en) | Power insurance claim settlement method and device based on block chain intelligent contracts | |
Kwasinski et al. | Telecom power planning for natural and man-made disasters | |
Mujjuni et al. | Evaluation of Power Systems Resilience to Extreme Weather Events: A Review of Methods and Assumptions | |
Culler et al. | Resilience Framework for Electric Energy Delivery Systems (R. 1) | |
Krings et al. | A simple GSPN for modelling common mode failures in critical infrastructures | |
Dimitriou et al. | Integrating the loss of economic value in lightning-related risk assessments of large scale photovoltaic systems participating in regulated and competitive energy markets | |
CN111161083A (en) | Block chain-based power insurance claim settlement method and device | |
Chattopadhyay et al. | Integrating resilience in power system planning: A note for practitioners | |
Finster et al. | Front-line resilience perspectives: The electric grid | |
Blackmore et al. | Improving network reliability through effective asset management | |
Ciapessoni et al. | Power System Resilience: definition, features and properties | |
Bohman | Investing in Power System Resilience: A mixed methods approach to assessing the tradeoffs of resilience strategies | |
Koo | Power quality monitoring in uk national grid electricity transmission system | |
Lakshita et al. | High Impact Low Probability Weatherization Impact Analysis for Electricity Infrastructure | |
Camillo et al. | Vulnerability and Recovery Capacity Assessment of Real Distribution Systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |