CN111101659A - Integrated roof modeling connecting structure - Google Patents

Integrated roof modeling connecting structure Download PDF

Info

Publication number
CN111101659A
CN111101659A CN201911420644.5A CN201911420644A CN111101659A CN 111101659 A CN111101659 A CN 111101659A CN 201911420644 A CN201911420644 A CN 201911420644A CN 111101659 A CN111101659 A CN 111101659A
Authority
CN
China
Prior art keywords
fixed strip
length direction
strip
strips
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911420644.5A
Other languages
Chinese (zh)
Inventor
张婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yinxiang Kongjian Shenzhen Interior Design Engineering Co ltd
Original Assignee
Yinxiang Kongjian Shenzhen Interior Design Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yinxiang Kongjian Shenzhen Interior Design Engineering Co ltd filed Critical Yinxiang Kongjian Shenzhen Interior Design Engineering Co ltd
Priority to CN201911420644.5A priority Critical patent/CN111101659A/en
Publication of CN111101659A publication Critical patent/CN111101659A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • E04D13/0404Drainage on the roof surface
    • E04D13/0445Drainage channels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • E04D13/16Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure

Abstract

The invention relates to an integrated roof modeling connecting structure, which belongs to the technical field of building roofs and adopts the technical scheme that the integrated roof modeling connecting structure comprises a roof foundation, wherein a first fixing strip is fixedly arranged on the roof foundation, a second fixing strip is arranged on the first fixing strip, a plurality of first fixing strips and a plurality of second fixing strips are arranged in parallel, a first groove is formed in the top surface of each first fixing strip along the length direction of the first fixing strip, a second groove is formed in the top surface of each second fixing strip along the length direction of the second fixing strip, two sides of each second fixing strip in the length direction are respectively lapped on two adjacent first fixing strips, and the first fixing strips are positioned between the two adjacent second fixing strips, so that the effect of improving the uniformity degree of the stress of the roof during raining is achieved.

Description

Integrated roof modeling connecting structure
Technical Field
The invention relates to the technical field of building roofs, in particular to an integrated roof modeling connecting structure.
Background
The integrated decoration is a new decoration construction form in recent years, the integrated roof connecting structure is one of the integrated decorations, all parts required by the roof connecting structure are produced and finished in a factory and then are transported to a decoration site for combined installation, so that the construction is simpler and more convenient, and the construction efficiency of the installation site can be greatly improved.
The existing Chinese patent with reference to publication number CN110359642A discloses an integrated roof modeling connecting structure, which comprises a roof foundation and a roof tile assembly, wherein the roof tile assembly comprises a first assembly, a second assembly and a third assembly, the first assembly, the second assembly and the third assembly respectively comprise a plurality of first aluminum alloy members, second aluminum alloy members and third aluminum alloy members which are arranged in parallel, the first aluminum alloy members are provided with first grooves with upward notches, the second aluminum alloy members are respectively provided with upper grooves with upward notches and lower grooves with downward notches, and the third aluminum alloy members are provided with third grooves with downward notches; during installation, the first component is arranged on the upper side of the roof foundation, the second component is arranged on the upper side of the first component, the third component is arranged on the upper side of the second component, the adjacent groove walls of the first grooves on different first aluminum alloy components are positioned in the lower grooves of the same second aluminum alloy component, the adjacent groove walls of the upper grooves and the lower grooves on different second aluminum alloy components are positioned in the first grooves of the same first aluminum alloy component, the adjacent groove walls of the upper grooves on different second aluminum alloy components are positioned in the third grooves of the same third aluminum alloy component, the adjacent groove walls of the third grooves on different third aluminum alloy components are positioned in the upper grooves of the same second aluminum alloy component, and therefore field assembly is achieved, welding is not needed, and water leakage is avoided.
The above prior art solutions have the following drawbacks: when raining, a part of rainwater falls on the top surface of the third aluminum alloy member, the other part of rainwater falls in the upper groove of the second aluminum alloy member, and the rainwater falling on the top surface of the third aluminum alloy member can also flow into the upper groove along the two sides of the third aluminum alloy member, so that a large amount of rainwater is collected in the upper groove, the second aluminum alloy member bears larger pressure, the whole roof is unevenly stressed, the second aluminum alloy member and the third aluminum alloy member are easily made, the service life of the first aluminum alloy member is greatly different, and the second aluminum alloy member is seriously damaged.
Disclosure of Invention
The invention aims to provide an integrated roof modeling connecting structure which has the effect of improving the uniformity of the stress of a roof in rainy days.
The technical purpose of the invention is realized by the following technical scheme:
the utility model provides an integrated form roofing molding connection structure, including the roofing basis, the fixed first fixed strip that is provided with on the roofing basis, be provided with the second fixed strip on the first fixed strip, the equal parallel arrangement of first fixed strip and second fixed strip has a plurality of, first recess has been seted up along its length direction to first fixed strip top surface, the second recess has been seted up along its length direction to the top surface of second fixed strip, the both sides of second fixed strip length direction are taken respectively on two adjacent first fixed strips, first fixed strip is located between two adjacent second fixed strips.
Through adopting above-mentioned technical scheme, because first recess has been seted up to the top surface of first fixed strip, the second recess has been seted up to the top surface of second fixed strip, during rainy, partly rainwater falls into first recess, and another part rainwater falls into the second recess to make the rainwater flow down from the roofing along first recess and second recess simultaneously, avoid first fixed strip or the independent atress of second fixed strip, make the roofing atress more even, thereby prolonged roofing connection structure's whole life. The both sides of second fixed strip length direction are taken respectively on two adjacent first fixed strips, avoid appearing the clearance between first fixed strip and the second fixed strip, make the rainwater can flow in first recess or second recess to roofing connection structure's water-proof effects has been guaranteed.
The present invention in a preferred example may be further configured to: the bottom of the first groove is provided with a plurality of first arc-shaped grooves with upward openings and mutually abutted ends, and the length direction of the first arc-shaped grooves is the same as that of the first fixing strips.
By adopting the technical scheme, the plurality of first arc-shaped grooves are formed in the bottoms of the first grooves, when less rainwater exists, the rainwater falling into the first grooves can flow to the lowest ends of the first arc-shaped grooves along the arc surfaces of the first arc-shaped grooves and flow down from the roof along the length direction of the first arc-shaped grooves, so that the first grooves can better guide a small amount of rainwater, and the water accumulation in the first grooves is avoided; because first arc wall is provided with a plurality of, and the mutual butt of adjacent first arc wall to the homogeneity that distributes when rainwater flows in can also guaranteeing first recess when playing the guide effect, has guaranteed the even degree of first fixed strip atress.
The present invention in a preferred example may be further configured to: the bottom of the second groove is provided with a plurality of second arc-shaped grooves with upward openings and mutually abutted, and the length direction of the second arc-shaped grooves is the same as that of the second fixing strips.
By adopting the technical scheme, the plurality of second arc-shaped grooves are formed in the bottoms of the second grooves, when less rainwater exists, the rainwater falling into the second grooves can flow to the lowest ends of the second arc-shaped grooves along the arc surfaces of the second arc-shaped grooves and flow down from the roof along the length direction of the second arc-shaped grooves, so that the second grooves can better guide a small amount of rainwater, and the water accumulation in the second grooves is avoided; because the second arc wall is provided with a plurality of, and the mutual butt of adjacent second arc wall to the homogeneity that distributes when rainwater flows in can also guaranteeing the second recess when playing the guide effect, has guaranteed the even degree of second fixed strip atress.
The present invention in a preferred example may be further configured to: the two sides of the second fixing strip in the length direction are fixedly provided with clamping strips, and the two clamping strips are respectively positioned in the first grooves in the two adjacent first fixing strips and are abutted against the side faces of the first grooves.
Through adopting above-mentioned technical scheme, two card strips on the second fixed strip are located the first recess on two adjacent first fixed strips respectively to block the second fixed strip between two adjacent first fixed strips, prevent that the second fixed strip from taking place to separate with first fixed strip, improved the joint strength between first fixed strip and the second fixed strip, avoid appearing the gap between first fixed strip and the second fixed strip, thereby guaranteed roofing connection structure's structural strength and waterproof nature. Two card strips all with the side butt of first recess, avoid first fixed strip and second fixed strip great coincidence to appear in the direction of height to improved the material utilization ratio of first fixed strip and second fixed strip, also prevented that first fixed strip and second fixed strip from taking place the dislocation along its width direction, further improved the inseparable degree of being connected between first fixed strip and the second fixed strip.
The present invention in a preferred example may be further configured to: the top of first fixed strip is provided with two support bars along its length direction's both sides respectively fixedly, and the bottom surface of second fixed strip and the top surface butt of support bar.
Through adopting above-mentioned technical scheme, through setting up the support bar, make the bottom surface of second fixed strip place respectively on two adjacent support bars that first fixed strip is close to each other to increased the area of contact between the bottom surface of second fixed strip and the first fixed strip, reduced compressive stress, improved the supporting role to the second fixed strip, further improved the atress situation of second fixed strip, make the atress of second fixed strip on its width direction more even.
The present invention in a preferred example may be further configured to: adjacent two be provided with the stay tube that the cross-section is the rectangle between the first fixed strip, stay tube length direction's both sides respectively with two adjacent first fixed strip butt, the top surface of stay tube and the bottom surface butt of support bar.
Through adopting above-mentioned technical scheme, set up the stay tube through the bottom at the support bar, further improved the supporting role to the second fixed strip, prevent that the support bar from appearing warping, improved roofing connection structure's stability, make roofing connection structure's atress more even. The both sides of stay tube respectively with two adjacent first fixed strip butts, play limiting displacement to two adjacent first fixed strips, make the both sides of first recess on the first fixed strip all by the chucking between card strip and stay tube, prevent that first fixed strip and second fixed strip from taking place the dislocation along its width direction, improved the inseparable degree of being connected between first fixed strip and the second fixed strip to roofing connection structure's structural strength has been improved.
The present invention in a preferred example may be further configured to: the supporting pipe is characterized in that limiting plates perpendicular to the supporting pipe are fixedly arranged at two ends of the supporting pipe in the length direction, the top surface of each limiting plate is flush with the bottom of the corresponding second groove, and two side surfaces of each limiting plate are flush with the side surfaces deviating from the corresponding two clamping strips.
Through adopting above-mentioned technical scheme, all set up the limiting plate at the both ends of stay tube, make first fixed strip and second fixed strip all blocked between two limiting plates, carry on spacingly along its length direction to first fixed strip and second fixed strip, prevent that first fixed strip and second fixed strip from taking place the dislocation along its length direction, improved roofing connection structure's structural strength and stability, guaranteed roofing connection structure's water-proof effects.
The present invention in a preferred example may be further configured to: the top ends of the two side surfaces of the second groove incline downwards to one side close to the second groove.
Through adopting above-mentioned technical scheme, the top of two sides of second recess is all downward to the lopsidedness that is close to the second recess, makes the rainwater that falls down on two sides of second recess can flow in the second recess along the incline direction, avoids two sides of second recess to leave ponding, has strengthened roofing connection structure's drainage effect.
In conclusion, the beneficial technical effects of the invention are as follows:
1. the first groove is formed in the top surface of the first fixing strip, the second groove is formed in the top surface of the second fixing strip, so that when raining, one part of rainwater falls into the first groove, the other part of rainwater falls into the second groove, the rainwater flows down from the roof along the first groove and the second groove simultaneously, and the uniformity of the stress of the roof is improved;
2. through the arrangement of the clamping strips, the two clamping strips on the second fixing strip are respectively positioned in the first grooves on the two adjacent first fixing strips, so that the second fixing strip is clamped between the two adjacent first fixing strips, a gap between the first fixing strip and the second fixing strip is avoided, and the structural strength and the waterproofness of the roof connecting structure are ensured;
3. by arranging the supporting tube, the supporting effect on the second fixing strip is further improved, the stability of the roof connecting structure is improved, and the stress of the roof connecting structure is more uniform;
4. through setting up the limiting plate, make first fixed strip and second fixed strip all blocked between two limiting plates, prevent that first fixed strip and second fixed strip from taking place the dislocation along its length direction, improved roofing connection structure's structural strength and stability.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a partial sectional view for showing the support tube.
In the figure, 1, a roof foundation; 2. a first fixing strip; 21. a first groove; 211. a first arc-shaped slot; 22. a supporting strip; 3. a second fixing strip; 31. a second groove; 311. a second arc-shaped slot; 32. clamping the strip; 4. supporting a tube; 41. and a limiting plate.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, an integrated roof modeling connection structure comprises a roof foundation 1, a first fixing strip 2 and a second fixing strip 3, wherein the first fixing strip 2 and the second fixing strip 3 are arranged in parallel, the first fixing strip 2 is fixedly arranged on the roof foundation 1, and the second fixing strip 3 is arranged on the first fixing strip 2.
Referring to fig. 2, a first groove 21 is formed in the top surface of the first fixing strip 2 along the length direction, the first groove 21 penetrates through two ends of the first fixing strip 2 along the length direction, a plurality of first arc-shaped grooves 211 with upward openings and mutually abutted against each other are formed in the bottom of the first groove 21, the length direction of the first arc-shaped grooves 211 is the same as the length direction of the first fixing strip 2, and the length of the first arc-shaped grooves 211 is the same as the length of the first groove 21; the length direction of the second fixing strip 3 is the same as that of the first fixing strip 2, a second groove 31 is formed in the top surface of the second fixing strip 3 along the length direction of the top surface of the second fixing strip, the second groove 31 penetrates through two ends of the second fixing strip 3, a plurality of second arc-shaped grooves 311 which are upward in opening and mutually abutted are formed in the bottom of the second groove 31, the length direction of the second arc-shaped grooves 311 is the same as that of the second fixing strip 3, the length of the second arc-shaped grooves 311 is the same as that of the second groove 31, and the top ends of two side surfaces of the second groove 31 incline downwards to one side close to the second groove 31; the both sides of 3 length direction of second fixed strip are taken respectively on two adjacent first fixed strips 2, and first fixed strip 2 is located between two adjacent second fixed strips 3.
When raining, partly rainwater falls into first recess 21, and the bottom of first arc wall 211 is flowed to along the cambered surface of first arc wall 211, another part rainwater falls into second recess 31, and the bottom of second arc wall 311 is flowed to along the cambered surface of second arc wall 311, first arc wall 211 and second arc wall 311 play the guide effect to the rainwater, can also guarantee simultaneously that the rainwater evenly distributed more in first recess 21 and second recess 31, make the rainwater flow down from the roofing along first recess 21 and second recess 31 simultaneously, avoid first fixed strip 2 or the independent atress of second fixed strip 3, make roofing connection structure's atress more even.
Referring to fig. 2, the bottom surface of the second fixing strip 3 is fixedly provided with two vertical clamping strips 32, the length direction of the clamping strips 32 is the same as that of the second fixing strip 3, the two clamping strips 32 are respectively arranged on two sides of the length direction of the second fixing strip 3 and respectively located in the first grooves 21 on the two adjacent first fixing strips 2, and the two clamping strips 32 are respectively abutted to the inner side surfaces, close to the first grooves 21 on the two adjacent first fixing strips 2, of the two adjacent first fixing strips 2.
During the installation, place second fixed strip 3 between two adjacent first fixed strips 2, make 3 length direction's of second fixed strip both sides be located the upside of two adjacent first fixed strips 2 respectively, and make two card strips 32 insert respectively in the first recess 21 on two adjacent first fixed strips 2, make two card strips 32 respectively with two adjacent first fixed strips 2 on the medial surface butt that first recess 21 is close to each other, thereby block 3 cards of second fixed strip between two adjacent first fixed strips 2, the possibility that first fixed strip 2 and second fixed strip 3 take place the dislocation along its width direction has been reduced, prevent to appear the clearance between first fixed strip 2 and the second fixed strip 3, roofing connection structure's waterproof nature has been guaranteed.
Referring to fig. 2, horizontal supporting bars 22 are fixedly arranged on both sides of the first fixing bar 2 in the length direction, the top surfaces of the supporting bars 22 are flush with the top surface of the first fixing bar 2, and the bottom surfaces of the second fixing bars 3 are abutted to the top surfaces of the supporting bars 22. Through setting up support bar 22, increased with the area of contact of 3 bottom surfaces of second fixed strip, strengthened the supporting role to second fixed strip 3, reduced the local stress of first fixed strip 2 with the contact department of second fixed strip 3, improved roofing connection structure's stability.
Referring to fig. 2, a supporting tube 4 is arranged between two adjacent first fixing strips 2, the length direction of the supporting tube 4 is the same as that of the first fixing strips 2, the cross section of the supporting tube 4 is rectangular, two sides of the supporting tube 4 in the length direction are respectively abutted against the two adjacent first fixing strips 2, the top surface of the supporting tube 4 is abutted against the bottom surface of the supporting strip 22, and the bottom surface is abutted against the roof foundation 1; referring to fig. 1, both ends of the supporting tube 4 in the length direction are fixedly provided with a limiting plate 41 vertical to the length direction, the top surface of the limiting plate 41 is flush with the bottom of the second groove 31, and two side surfaces of the limiting plate 41 are flush with the side surfaces deviating from the two clamping strips 32 respectively.
During installation, the supporting tube 4 is placed on the roof foundation 1, the first fixing strips 2 are arranged on two sides of the supporting tube 4 in the length direction respectively, the first fixing strips 2 are abutted to the supporting tube 4, the supporting strips 22 are abutted to the supporting tube 4, and the first fixing strips 2 are fixed on the roof foundation 1, so that the supporting tube 4 is clamped on the roof foundation 1 by the two adjacent first fixing strips 2, and after the second fixing strips 3 are arranged on the two adjacent first fixing strips 2, the supporting tube 4 can support the first fixing strips 2 and the second fixing strips 3, so that the stress conditions of the first fixing strips 2 and the second fixing strips 3 are improved; meanwhile, the supporting tube 4 plays a further limiting role in the first fixing strip 2 and the second fixing strip 3 along the width direction of the fixing strips, so that the first fixing strip 2 and the second fixing strip 3 are prevented from being staggered along the width direction of the fixing strips; in addition, after the installation is accomplished, first fixed strip 2 and second fixed strip 3 are all by the chucking between two limiting plates 41 at 4 both ends of stay tube, prevent that first fixed strip 2 and second fixed strip 3 from appearing the dislocation along its length direction, have improved the joint strength between first fixed strip 2 and the second fixed strip 3 to roofing connection structure's stability has been improved.
The implementation principle of the embodiment is as follows: during the installation, place stay tube 4 on roofing basis 1 earlier, then place first fixed strip 2 respectively in 4 length direction's of stay tube both sides, make first fixed strip 2 and 4 butts of stay tube, and make support bar 22 take the top surface at stay tube 4, then fix first fixed strip 2 on roofing basis 1, place second fixed strip 3 between two adjacent first fixed strips 2 again, make two card strips 32 on the second fixed strip 3 insert respectively in the first recess 21 on two adjacent first fixed strips 2, two card strips 32 at this moment respectively with two adjacent first fixed strips 2 on the medial surface butt that first recess 21 is close to each other, and first fixed strip 2 and 3 length direction's of second fixed strip both ends respectively with two limiting plate 41 butts on the stay tube 4, thereby accomplish roofing connection structure's installation. When raining, partly rainwater falls into first recess 21 in, and the bottom of the cambered surface flow direction first arc wall 211 along first arc wall 211, another part rainwater falls into second recess 31, and the bottom of cambered surface flow direction second arc wall 311 along second arc wall 311, first arc wall 211 and second arc wall 311 play the guide effect to the rainwater, can also guarantee simultaneously that the rainwater evenly distributed is in first recess 21 and second recess 31 more, make the rainwater flow down from the roofing along first recess 21 and second recess 31 simultaneously, avoid first fixed strip 2 or the independent atress of second fixed strip 3, the even degree of roofing atress when having improved raining.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (8)

1. The utility model provides an integrated form roofing molding connection structure, includes roofing basis (1), its characterized in that: the roof is fixed on roof foundation (1) and is provided with first fixed strip (2), be provided with second fixed strip (3) on first fixed strip (2), first fixed strip (2) and the equal parallel arrangement of second fixed strip (3) have a plurality of, first recess (21) have been seted up along its length direction to first fixed strip (2) top surface, second recess (31) have been seted up along its length direction to the top surface of second fixed strip (3), second fixed strip (3) length direction's both sides are taken respectively on two adjacent first fixed strips (2), first fixed strip (2) are located between two adjacent second fixed strips (3).
2. An integrated roofing moulding connection according to claim 1, wherein: a plurality of first arc-shaped grooves (211) with upward openings and mutually abutted are formed in the groove bottoms of the first grooves (21), and the length direction of each first arc-shaped groove (211) is the same as that of the first fixing strip (2).
3. An integrated roofing moulding connection according to claim 1, wherein: a plurality of second arc-shaped grooves (311) with upward openings and mutually abutted are formed in the groove bottoms of the second grooves (31), and the length direction of each second arc-shaped groove (311) is the same as that of the second fixing strip (3).
4. An integrated roofing moulding connection according to claim 1, wherein: two sides of the second fixing strip (3) in the length direction are respectively and fixedly provided with two clamping strips (32), and the two clamping strips (32) are respectively positioned in the first grooves (21) on the two adjacent first fixing strips (2) and are abutted against the side faces of the first grooves (21).
5. An integrated roofing moulding connection according to claim 1, wherein: the top of first fixed strip (2) is provided with two support bars (22) along its length direction's both sides respectively fixedly, and the bottom surface of second fixed strip (3) and the top surface butt of support bar (22).
6. An integrated roofing moulding connection according to claim 5, wherein: adjacent two be provided with between first fixed strip (2) stay tube (4) that the cross-section is the rectangle, stay tube (4) length direction's both sides respectively with two adjacent first fixed strip (2) butt, the top surface of stay tube (4) and the bottom surface butt of support bar (22).
7. An integrated roofing moulding connection according to claim 6, wherein: supporting tube (4) length direction's both ends all are fixed and are provided with limiting plate (41) perpendicular to it, and the top surface of limiting plate (41) flushes with the tank bottom of second recess (31), and two sides of limiting plate (41) flush with the side that deviates from each other with two card strips (32) respectively.
8. An integrated roofing moulding connection according to claim 1, wherein: the top ends of two side surfaces of the second groove (31) incline downwards to one side close to the second groove (31).
CN201911420644.5A 2019-12-31 2019-12-31 Integrated roof modeling connecting structure Pending CN111101659A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911420644.5A CN111101659A (en) 2019-12-31 2019-12-31 Integrated roof modeling connecting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911420644.5A CN111101659A (en) 2019-12-31 2019-12-31 Integrated roof modeling connecting structure

Publications (1)

Publication Number Publication Date
CN111101659A true CN111101659A (en) 2020-05-05

Family

ID=70426148

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911420644.5A Pending CN111101659A (en) 2019-12-31 2019-12-31 Integrated roof modeling connecting structure

Country Status (1)

Country Link
CN (1) CN111101659A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102635207A (en) * 2012-04-28 2012-08-15 龙宏元 Dredged and concealed waterproof (and heat-insulating) system
CN107268886A (en) * 2017-05-03 2017-10-20 湖南固尔邦幕墙装饰股份有限公司 Build cross beam sectional bar, drainage system and glass sunlight house
CN207110285U (en) * 2017-05-04 2018-03-16 广州市雅麒木屋有限公司 A kind of roof structure of waterproof and heat-insulating
CN208918149U (en) * 2018-09-04 2019-05-31 阳光电源股份有限公司 Longitudinal sink, holder device and Photovoltaic Building Integration roofing
CN110359642A (en) * 2019-06-21 2019-10-22 苏州金螳螂建筑装饰股份有限公司 A kind of integrated form roofing moulding connection structure
CN111042584A (en) * 2019-12-24 2020-04-21 南通海驹钢结构有限公司 Novel steel construction canopy

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102635207A (en) * 2012-04-28 2012-08-15 龙宏元 Dredged and concealed waterproof (and heat-insulating) system
CN107268886A (en) * 2017-05-03 2017-10-20 湖南固尔邦幕墙装饰股份有限公司 Build cross beam sectional bar, drainage system and glass sunlight house
CN207110285U (en) * 2017-05-04 2018-03-16 广州市雅麒木屋有限公司 A kind of roof structure of waterproof and heat-insulating
CN208918149U (en) * 2018-09-04 2019-05-31 阳光电源股份有限公司 Longitudinal sink, holder device and Photovoltaic Building Integration roofing
CN110359642A (en) * 2019-06-21 2019-10-22 苏州金螳螂建筑装饰股份有限公司 A kind of integrated form roofing moulding connection structure
CN111042584A (en) * 2019-12-24 2020-04-21 南通海驹钢结构有限公司 Novel steel construction canopy

Similar Documents

Publication Publication Date Title
CN113136940A (en) Prefabricated building unit, assembly type building with roof and construction method
CN212034024U (en) Novel support of photovoltaic board
CN203387141U (en) Draining-type cable trench
CN111101659A (en) Integrated roof modeling connecting structure
CN111535577A (en) Cast-in-place light concrete fast-assembling standard formwork system of metal joist wall structure
CN205804790U (en) A kind of building-drainage system and use the Split mounting type building of this system
CN207332060U (en) A kind of assembled hollow floor
CN210561724U (en) Prefabricated bridge deck for bridge
CN114673265A (en) Waterproof structure and waterproof construction method for building outer wall board
CN109339328B (en) Cavity type eave structure and construction method thereof
CN214013757U (en) Cable bridge not prone to water accumulation
CN114197761B (en) Gutter structure at top of daylighting roof and construction method thereof
CN214785212U (en) Prefabricated polyhedral building structure
CN213062658U (en) Support of photovoltaic board
CN218862197U (en) Waterproof movable board house
CN211143377U (en) Wallboard upper portion fastener and wallboard upper portion mounting structure
CN214229040U (en) Planting device with connection structure
CN214785433U (en) Roof waterproof structure
CN219794441U (en) Building photovoltaic integration roof
CN220978406U (en) Basement antiseep structure adopting prefabricated assembly type drain plate
CN211734938U (en) Landscape corridor
CN216921156U (en) Detachable straight floor paving structure
CN218466961U (en) Cellular outdoor permeable floor
CN214195282U (en) Waterproof insulation construction of flat roofing
CN209780071U (en) Building roof heat insulation board

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200505