- CN111101583B CN111101583B CN201911383269.1A CN201911383269A CN111101583B CN 111101583 B CN111101583 B CN 111101583B CN 201911383269 A CN201911383269 A CN 201911383269A CN 111101583 B CN111101583 B CN 111101583B
- Authority
- CN
- China
- Prior art keywords
- plate
- fixedly connected
- electric push
- push rod
- supporting plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/06—Methods of, or installations for, laying sewer pipes
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/06—Methods of, or installations for, laying sewer pipes
- E03F2003/065—Refurbishing of sewer pipes, e.g. by coating, lining
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention relates to an operation vehicle for municipal pipeline updating, which comprises a vehicle body, a driving part, a supporting structure and a workpiece, wherein the vehicle body comprises an operation platform and a plurality of wheels; the supporting structure comprises a supporting plate, a bottom plate, two side plates and a top plate, wherein the supporting plate is vertically and fixedly connected to one end of the operation platform, the bottom plate is horizontally and fixedly connected to the bottom end of the supporting plate, the two side plates are symmetrically and horizontally and fixedly connected to the supporting plate, and the top plate is horizontally and fixedly connected to the top end of the supporting plate; the driving pieces are arranged on the bottom plate, the side plates and the top plate; the workpiece comprises a push plate, a clamping plate and a pressing plate, the push plate is fixedly connected with the driving piece on the bottom plate, the clamping plate is fixedly connected with the driving piece on the side plate, and the pressing plate is fixedly connected with the driving piece on the top plate. The invention has the effect that the concrete pipe does not need to be replaced when in overhaul and update.
Description
Technical Field
The invention relates to the technical field of constructional engineering equipment, in particular to an operation vehicle for municipal pipeline updating.
Background
The municipal pipeline refers to rainwater and sewage pipelines under municipal roads, namely a commonly-known sewer pipeline.
In daily life, the municipal pipeline is formed by connecting a plurality of sections of concrete pipes, and when the pipeline is laid under a municipal road, an inspection well can be built at a proper distance according to actual conditions so as to perform operations such as regular inspection, cleaning and dredging on the pipeline. After the pipeline is used for a long time, the pipe wall of the pipeline is easy to have cracks, cracks and other damaged parts, and the whole drainage effect of the pipeline is easily influenced by the damaged concrete pipe.
In the prior art, for the above situations, the whole concrete pipe with cracks or fissures needs to be taken out, and then a new concrete pipe is replaced.
The above prior art solutions have the following drawbacks: for the concrete pipe with cracks or fractures, the whole concrete pipe needs to be taken out when being overhauled and updated, and the project and the method can waste a large amount of manpower, material resources, financial resources and the like.
Disclosure of Invention
In view of the defects in the prior art, one of the purposes of the invention is to provide a working vehicle for municipal pipeline renovation, which has the effect that the concrete pipe does not need to be replaced during maintenance and renovation.
The above object of the present invention is achieved by the following technical solutions:
the utility model provides an operation car that municipal administration pipeline updated usefulness which characterized in that: the vehicle comprises a vehicle body, a driving part, a supporting structure and a workpiece, wherein the vehicle body comprises an operation platform and a plurality of wheels, and the wheels are arranged on the bottom surface of the operation platform; the supporting structure comprises a supporting plate, a bottom plate, two side plates and a top plate, wherein the supporting plate is vertically and fixedly connected to one end of the operation platform, the bottom plate is horizontally and fixedly connected to the bottom end of the supporting plate, the two side plates are symmetrically and horizontally and fixedly connected to the supporting plate on the basis of the axis of the supporting plate, and the top plate is horizontally and fixedly connected to the top end of the supporting plate; the driving piece comprises a first electric push rod, a second electric push rod and a third electric push rod, the first electric push rod is fixedly connected to the bottom plate, one second electric push rod is fixedly connected to each of the two side plates, and the third electric push rod is fixedly connected to the top plate; the workpiece comprises a push plate, a clamping plate and a pressing plate, the push plate is fixedly connected with the output end of the first electric push rod, one clamping plate is fixedly connected to each of the two second electric push rods, and the pressing plate is fixedly connected to the third electric push rod; the supporting plate is provided with an observation port.
Through adopting above-mentioned technical scheme, can put the rubber tube on the bottom plate, press the rubber tube to warping with splint and clamp plate simultaneously, the rubber tube that the rethread push pedal will warp pushes in the concrete pipe that has the crack or fissured on the bottom plate, and the rubber tube that enters into in the concrete pipe then can closely laminate with the inner wall of concrete pipe to seal the crack or the crack of concrete pipe. Compared with the method for overhauling the pipeline in the prior art, the mode that the rubber pipe is pushed into the pipeline by the operation vehicle does not need to replace the pipeline with cracks or fissures when overhauling is carried out, so that a large amount of manpower, material resources and financial resources can be saved.
The invention in a preferred example may be further arranged to: the clamp plate is arc setting, and the arc mouth orientation the roof setting.
Through adopting above-mentioned technical scheme, the clamp plate is the crooked rubber tube of laminating that the clamp plate that the arc set up can be better when bending the rubber tube downwards to make the both sides of clamp plate be difficult for the rubber tube scratch.
The invention in a preferred example may be further arranged to: and one end of the operation platform, which is far away from the supporting plate, is provided with a pushing handle.
Through adopting above-mentioned technical scheme, the operation car can be controlled to the staff to the pushing hands convenience.
The invention in a preferred example may be further arranged to: a pedal is arranged on the operation platform below the push handle.
Through adopting above-mentioned technical scheme, when the operation car removed inconvenience in the pipeline, staff's accessible pedal comes the application of force to the operation car to make things convenient for the removal of operation car.
The invention in a preferred example may be further arranged to: one end of the operation platform, which is close to the supporting plate, is fixedly connected with a bearing column, and the supporting plate is fixedly connected to the bearing column.
Through adopting above-mentioned technical scheme, the area of contact of multiplicable backup pad of carrier post and operation platform, and the structural strength who just bears the carrier post body is just great, so the carrier post can increase the installation intensity of backup pad to it is more stable firm at the during operation to make the backup pad.
The invention in a preferred example may be further arranged to: and a reinforcing column is fixedly connected between the bearing column and the operation platform.
Through adopting above-mentioned technical scheme, the enhancement post can make and form the triangle-shaped structure between carrier post and the operation platform to make the structural strength of carrier post on the operation platform more firm.
The invention in a preferred example may be further arranged to: one end of the push plate, which is far away from the first electric push rod, is horizontally provided with a flange.
Through adopting above-mentioned technical scheme, the flange can support the outer pipe wall of rubber tube to prevent that the push pedal when promoting the rubber tube, the top of push pedal and the end wall slippage of rubber tube.
The invention in a preferred example may be further arranged to: and a balancing weight is placed on the operation platform.
Through adopting above-mentioned technical scheme, the setting of balancing weight can make the removal of operation car more steady, also can make the operation car when promoting the rubber tube simultaneously, and the staff need not to hold the pushing hands and press in order to keep away from the one end of backup pad with the operation car.
In summary, the invention includes at least one of the following beneficial technical effects:
1. through the setting of operation car, can put the rubber tube on the bottom plate, press the rubber tube to warping with splint and clamp plate simultaneously, the rubber tube that the rethread push pedal will warp pushes in the concrete pipe that has crack or fissured on the bottom plate, and the rubber tube that enters into in the concrete pipe then can closely laminate with the inner wall of concrete pipe to seal the crack or the crack of living concrete pipe. Compared with the method for overhauling the pipeline in the prior art, the method has the advantages that the rubber pipe is pushed into the pipeline by the operation vehicle, and the pipeline with cracks or fissures does not need to be replaced during overhauling, so that a large amount of manpower, material resources and financial resources can be saved;
2. through the arrangement of the bearing column, the bearing column can increase the contact area between the support plate and the operation platform, and the structural strength of the bearing column body is higher, so that the bearing column can increase the installation strength of the support plate, and the support plate is more stable and firm in operation;
3. the setting of balancing weight can make the removal of operation car more steady, also can make the operation car simultaneously when promoting the rubber tube, and the staff need not to hold up the pushing hands and press the one end of keeping away from the backup pad with the operation car.
Drawings
Fig. 1 is a schematic structural view of the present invention.
Fig. 2 is a schematic view of the present invention showing placement of a rubber tube.
FIG. 3 is a schematic view of the rubber tube of the present invention after placement.
Reference numerals: 1. a vehicle body; 11. an operation platform; 12. a wheel; 13. a load bearing column; 131. a reinforcement column; 14. a pushing handle; 15. a pedal; 2. a drive member; 21. a first electric push rod; 22. a second electric push rod; 23. a third electric push rod; 3. a support structure; 31. a support plate; 311. a viewing port; 32. a base plate; 33. a top plate; 34. a side plate; 4. a workpiece; 41. pushing the plate; 411. blocking edges; 42. a splint; 43. pressing a plate; 5. a rubber tube; 6. and a balancing weight.
Detailed Description
Example (b):
the present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, the present invention discloses a working vehicle for municipal pipeline renovation, which comprises a vehicle body 1, a driving member 2, a supporting structure 3 and a working member 4.
As shown in fig. 2, the vehicle body 1 includes a rectangular work platform 11 and four wheels 12, the four wheels 12 are vertically mounted on the lower surface of the work platform 11 near four corners respectively, so as to facilitate the movement of the work vehicle, a rectangular bearing column 13 is vertically disposed at the center of the end surface of one end of the work platform 11, and the bearing column 13 is used for mounting the support structure 3. A reinforcing column 131 is arranged between the bearing column 13 and the operation platform 11, the reinforcing column 131 is obliquely arranged from one end close to the bearing column 13 to the operation platform 11, two ends of the reinforcing column 131 are respectively welded with the bearing column 13 and the operation platform 11, and the reinforcing column 131 is used for increasing the structural strength of the bearing column 13 after the supporting structure 3 is installed.
As shown in fig. 1, the support structure 3 comprises a circular support plate 31 and a mounting member, the support plate 31 is vertically welded to the side wall of the support column 13 facing away from the work platform 11, and the support column 13 is located at the diameter of the support plate 31. The installed part includes bottom plate 32, roof 33 and curb plate 34, and bottom plate 32 is an arc, and its level welding is at the least significant end of backup pad 31, and extends towards the direction that deviates from work platform 11, and the arc mouth of this place bottom plate 32 sets up upwards. The top plate 33 and the side plate 34 are both square rods, and the top plate 33 is horizontally welded at the topmost end of the support plate 31 and arranged in the same direction as the bottom plate 32. Two side plates 34 are arranged at the position, the two side plates are symmetrically welded on the support plate 31 based on the axis of the support plate 31, the two side plates 34 are arranged in the same direction with the top plate 33, and the plane formed by the two side plates 34 is parallel to the operation platform 11.
The driving member 2 includes a first electric push rod 21, a second electric push rod 22 and a third electric push rod 23, the first electric push rod 21 is fixedly connected to the upper surface of the bottom plate 32 at a position close to the supporting plate 31, and the output end is arranged towards the length direction of the bottom plate 32. The second electric push rods 22 are fixedly connected to the opposite side walls of the two side plates 34 at intervals, and the output ends of the second electric push rods 22 on the two side plates 34 are arranged oppositely. Two third electric push rods 23 are fixedly connected to the lower surface of the top plate 33 at intervals, and the output ends of the two third electric push rods 23 are arranged downward.
The working member 4 includes a pushing plate 41, a clamping plate 42 and a pressing plate 43, wherein the pushing plate 41 is a rectangular plate vertically fixed at the output end of the first electric pushing rod 21. The top end of the push plate 41 is horizontally and fixedly connected with a rectangular flange 411, the flange 411 and the push plate 41 are distributed in an L shape, and the flange 411 is located on one side of the push plate 41 departing from the first electric push rod 21. The clamping plates 42 are arc-shaped plates, two clamping plates 42 are arranged at the position, the two clamping plates 42 are fixedly connected with the output ends of the two second electric push rods 22 on the two side plates 34 respectively, and the arc-shaped openings of the two clamping plates 42 are arranged oppositely. The pressing plate 43 is also an arc-shaped plate, and is fixedly connected to the output ends of the two third electric push rods 23, and the arc-shaped opening of the pressing plate 43 is arranged towards the top plate 33.
Two transparent rectangular observation ports 311 are symmetrically formed in the support plate 31 based on the diameter of the support plate 31, and the two observation ports 311 are respectively arranged close to the two side plates 34.
As shown in fig. 2, a U-shaped pushing handle 14 is vertically disposed at an end of the vehicle body 1 away from the bearing column 13, two ends of the pushing handle 14 are fixedly connected to an upper surface of the working platform 11, and a plane of the pushing handle 14 is parallel to the supporting plate 31. A rectangular pedal 15 is fixedly connected to the center of the end face, close to the push handle 14, of the working platform 11, the pedal 15 is arranged in a downward inclined mode from one end, fixedly connected to the working platform 11, to one end, far away from the working platform 11, and anti-skid grains are printed on the upper surface of the pedal 15.
The implementation principle of the embodiment is as follows: as shown in fig. 1, 2 and 3, when the device is used (the municipal pipes are cleaned), a vertical shaft is dug between any two adjacent sections of municipal pipes, a cylindrical and elastic rubber pipe 5 is placed on the bottom plate 32 in the vertical shaft, after the rubber pipe 5 is placed in the vertical shaft, all the second electric push rods 22 are driven so as to control the two clamping plates 42 to clamp the two sides of the rubber pipe 5 (the rubber pipe 5 is clamped to be slightly deformed), then the third electric push rods 23 are driven so as to control the pressing plates 43 to move downwards to extrude the rubber pipe 5, and the rubber pipe 5 is pressed to be U-shaped in cross section by the pressing plates 43.
After the work is finished, the worker can push the working vehicle into the pipeline by pushing the pushing handle 14, the worker can carry a flashlight in the pipeline to observe the condition of the pipeline wall through the observation port 311, when observing the concrete pipe with cracks or cracks on the pipeline wall, the worker pushes the working vehicle to one end of the section of the concrete pipe, aligns one end of the working vehicle where the rubber pipe 5 is arranged with the section of the concrete pipe, then drives the first electric push rod 21 to drive the push plate 41 to move so as to push the rubber pipe 5 into the concrete pipe, when pushing, the push plate 41 abuts against the end wall of the rubber pipe 5, the baffle abuts against the outer pipe wall of the part where the rubber pipe 5 is pressed by the pressing plate 43, during the pushing process, the part where the rubber pipe 5 leaves the bottom plate 32 can gradually recover to deform and is attached to the inner wall of the concrete pipe, when the rubber pipe 5 is completely pushed out from the bottom plate 32, the rubber pipe 5 can be filled with the whole concrete pipe, meanwhile, the thrust which needs to restore the deformation is applied to the inner wall of the concrete pipe, so that cracks or fissures on the wall of the concrete pipe can be blocked.
As shown in fig. 2, a weight 6 made of concrete may be placed on the work platform 11 near the pushing handle 14 in order to make the work vehicle more stable in operation.
Adopt this embodiment, through this operation car, can push into behind the 5 extrusion of rubber tube in having the pipeline of crack or fissures, compare traditional processing pipeline and have crack or fissured mode, new concrete pipe is laid again after this mode need not all taking out every section concrete pipe, need not to change the concrete pipe promptly to can save a large amount of manpowers, material resources and financial resources.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.
Claims (7)
1. The utility model provides an operation car that municipal administration pipeline updated usefulness which characterized in that: the automatic lifting device comprises a vehicle body (1), a driving part (2), a supporting structure (3) and a workpiece (4), wherein the vehicle body (1) comprises an operation platform (11) and a plurality of wheels (12), and the wheels (12) are arranged on the bottom surface of the operation platform (11); the supporting structure (3) comprises a supporting plate (31), a bottom plate (32), a top plate (33) and two side plates (34), the supporting plate (31) is vertically and fixedly connected to one end of the operating platform (11), the bottom plate (32) is horizontally and fixedly connected to the bottom end of the supporting plate (31), the two side plates (34) are symmetrically and horizontally and fixedly connected to the supporting plate (31) based on the axis of the supporting plate (31), and the top plate (33) is horizontally and fixedly connected to the top end of the supporting plate (31); the driving piece (2) comprises a first electric push rod (21), a second electric push rod (22) and a third electric push rod (23), the first electric push rod (21) is fixedly connected to the bottom plate (32), the second electric push rod (22) is fixedly connected to the two side plates (34), and the third electric push rod (23) is fixedly connected to the top plate (33); the working piece (4) comprises a push plate (41), a clamping plate (42) and a pressing plate (43), the push plate (41) is fixedly connected with the output end of the first electric push rod (21), the clamping plate (42) is fixedly connected to two second electric push rods (22), and the pressing plate (43) is fixedly connected to the third electric push rod (23); the observation port (311) is formed in the supporting plate (31), the pressing plate (43) is arranged in an arc shape, and the arc-shaped port faces the top plate (33).
2. The utility vehicle of claim 1, wherein: one end of the operation platform (11) far away from the supporting plate (31) is provided with a pushing handle (14).
3. The utility vehicle of claim 2, wherein: a pedal (15) is arranged on the operation platform (11) below the push handle (14).
4. The utility vehicle of claim 1, wherein: the operation platform (11) is close to one end of the supporting plate (31) is fixedly connected with a bearing column (13), and the supporting plate (31) is fixedly connected to the bearing column (13).
5. The utility vehicle of claim 4, wherein: a reinforcing column (131) is fixedly connected between the bearing column (13) and the operation platform (11).
6. The utility vehicle of claim 1, wherein: one end, far away from the first electric push rod (21), of the push plate (41) is horizontally provided with a flange (411).
7. The utility vehicle of claim 1, wherein: and a balancing weight (6) is placed on the operation platform (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911383269.1A CN111101583B (en) | 2019-12-27 | 2019-12-27 | Operation car of municipal administration pipeline renewal usefulness |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911383269.1A CN111101583B (en) | 2019-12-27 | 2019-12-27 | Operation car of municipal administration pipeline renewal usefulness |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111101583A CN111101583A (en) | 2020-05-05 |
CN111101583B true CN111101583B (en) | 2021-02-09 |
Family
ID=70424030
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911383269.1A Expired - Fee Related CN111101583B (en) | 2019-12-27 | 2019-12-27 | Operation car of municipal administration pipeline renewal usefulness |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111101583B (en) |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7258141B2 (en) * | 2004-12-13 | 2007-08-21 | Catha Stephen C | Pipe liner apparatus and method |
CN201218383Y (en) * | 2008-06-16 | 2009-04-08 | 濮阳市中拓管道清洗修复工程有限公司 | Old pipe renovated by inner lining insertion method |
CN207132021U (en) * | 2017-03-23 | 2018-03-23 | 安徽恒生科技发展集团有限公司 | Lined pipeline patching device |
CN206958389U (en) * | 2017-07-31 | 2018-02-02 | 刘雪梅 | A kind of water supply and sewerage pipeline lays processing unit |
CN208138579U (en) * | 2018-03-12 | 2018-11-23 | 南安市信隆智能家居有限公司 | A kind of RC pipejacking device |
CN209638531U (en) * | 2018-12-19 | 2019-11-15 | 刘恒 | A kind of hydraulic engineering piping laying device |
-
2019
- 2019-12-27 CN CN201911383269.1A patent/CN111101583B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN111101583A (en) | 2020-05-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111101583B (en) | Operation car of municipal administration pipeline renewal usefulness | |
CN113250050B (en) | Airport pavement assembled plate replacement updating technical method | |
CN112008154B (en) | Diamond rope saw | |
CN209760422U (en) | Dredging device for pipeline | |
CN203890904U (en) | Assembly construction platform equipment for steel pipe sheets of large-diameter corrugated steel pipe culvert | |
JP5072661B2 (en) | Partial repairing method for main pillar material of existing hollow steel tube tower | |
CN216665082U (en) | Leveling device for prefabricated floor slab | |
CN215104799U (en) | Town road bridge crack reinforced structure | |
CN215249228U (en) | Simple large-scale pipeline installation adjusting device | |
CN214133310U (en) | Soil ecological remediation equipment | |
CN212377454U (en) | Positioning and fixing device for small-diameter circular pipeline | |
CN210713133U (en) | Socket joint formula corrugated pipe installs auxiliary device | |
CN220008175U (en) | Precast slab hole mud jacking frock | |
CN214192387U (en) | Sewer handling device that municipal works were used | |
CN220449749U (en) | Manhole cover opening tool | |
CN219386363U (en) | Automatic side slope frame beam mounting equipment | |
CN100554754C (en) | Method for maintaining is contained in highway damage pipe culvert, side | |
KR102313430B1 (en) | Assistant equipment for reinforcement of superannuated pipe | |
CN213806172U (en) | Temporary tool column for multi-size steel pipe column rear-inserting construction | |
CN218440966U (en) | Supporting device for installing glass fiber reinforced plastic sand inclusion pipe jacking pipe | |
CN216140688U (en) | Curb transport fixture | |
CN211496746U (en) | Tool for dismounting cement concrete precast pipe | |
CN219450981U (en) | Concrete pipe rubber circle installation device | |
CN216915961U (en) | A material handling equipment for municipal works | |
CN212926157U (en) | Prefabricated piping lane turning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210209 Termination date: 20211227 |