CN111062503B - Power grid monitoring alarm processing method, system, terminal and storage medium - Google Patents

Power grid monitoring alarm processing method, system, terminal and storage medium Download PDF

Info

Publication number
CN111062503B
CN111062503B CN201911317020.0A CN201911317020A CN111062503B CN 111062503 B CN111062503 B CN 111062503B CN 201911317020 A CN201911317020 A CN 201911317020A CN 111062503 B CN111062503 B CN 111062503B
Authority
CN
China
Prior art keywords
monitoring
fluctuation
value
item
alarm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201911317020.0A
Other languages
Chinese (zh)
Other versions
CN111062503A (en
Inventor
王晓存
刘宏建
张鹏鹏
王璐
李盼盼
刘倩倩
翟静媛
张美英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shandong Electric Power Co Feicheng Power Supply Co
State Grid Corp of China SGCC
TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Shandong Electric Power Co Feicheng Power Supply Co
State Grid Corp of China SGCC
TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shandong Electric Power Co Feicheng Power Supply Co, State Grid Corp of China SGCC, TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Shandong Electric Power Co Feicheng Power Supply Co
Priority to CN201911317020.0A priority Critical patent/CN111062503B/en
Publication of CN111062503A publication Critical patent/CN111062503A/en
Application granted granted Critical
Publication of CN111062503B publication Critical patent/CN111062503B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The invention provides a power grid monitoring alarm processing method, a system, a terminal and a storage medium, comprising the following steps: setting up the upstream-downstream relation of the monitoring item; collecting upstream item monitoring data of an alarm monitoring item; judging whether the upstream item monitoring data has abnormal fluctuation in a preset period or not: and if abnormal fluctuation exists in the monitoring data, generating an associated alarm of the upstream item. The invention provides data support for maintaining the power grid, improves the power grid maintenance efficiency and saves the power grid maintenance time.

Description

Power grid monitoring alarm processing method, system, terminal and storage medium
Technical Field
The invention relates to the technical field of power grid maintenance, in particular to a power grid monitoring alarm processing method, a system, a terminal and a storage medium.
Background
At present, most of monitoring of the power grid is that after monitoring data gives an alarm, a manager carries out fault processing according to the alarm. This treatment-only approach is isolated, and the correlation between grid devices is quite tight. The monitoring item with alarm only characterizes the abnormal monitoring data of the corresponding power grid equipment, but the cause of the abnormal monitoring data is judged by power grid maintenance personnel according to maintenance experience, and the dependence on manual experience is large. And the cause of the anomaly is likely to be associated with the associated equipment, which also requires judgment by maintenance personnel.
The existing power grid monitoring alarm processing method is seriously dependent on personal experience of maintenance personnel, and has low processing efficiency and long time consumption.
Disclosure of Invention
Aiming at the defects in the prior art, the invention provides a power grid monitoring alarm processing method, a system, a terminal and a storage medium, so as to solve the technical problems.
In a first aspect, the present invention provides a method for processing a power grid monitoring alarm, including:
setting up the upstream-downstream relation of the monitoring item;
collecting upstream item monitoring data of an alarm monitoring item;
judging whether the upstream item monitoring data has abnormal fluctuation in a preset period or not:
and if abnormal fluctuation exists in the monitoring data, generating an associated alarm of the upstream item.
Further, the method further comprises:
taking the power grid equipment name as a monitoring item;
and setting the upstream and downstream relation of the corresponding monitoring items according to the connection relation of the power grid equipment.
Further, the collecting the upstream item monitoring data of the alarm monitoring item includes:
setting a monitoring period;
collecting alarm generation time of an alarm monitoring item;
and collecting monitoring data in the upstream project monitoring period by taking the alarm generation time as a starting point.
Further, the determining whether the upstream item monitoring data has abnormal fluctuation in the preset period includes:
screening out the maximum value and the minimum value of the monitoring data;
calculating an average value of the remaining data after removing the maximum value and the minimum value from the monitoring data;
taking the difference value between the maximum value and the average value as a first fluctuation value;
taking the difference value between the minimum value and the average value as a second fluctuation value;
judging whether the first fluctuation value and the second fluctuation value are both within a preset fluctuation threshold value range or not:
if yes, judging that the monitoring data do not have abnormal fluctuation;
if not, judging that the monitoring data have abnormal fluctuation.
Further, the method further comprises:
storing the manager information of the monitoring project;
monitoring the duration of the alert;
and pushing the alarm to an administrator according to the corresponding monitoring project administrator information if the duration reaches the preset time threshold.
In a second aspect, the present invention provides a power grid monitoring alarm processing system, including:
a relationship setting unit configured to set an upstream-downstream relationship of the monitoring item;
the data acquisition unit is configured to acquire upstream item monitoring data of the alarm monitoring item;
an abnormality determination unit configured to determine whether or not the upstream item monitoring data has abnormal fluctuations within a preset period:
and the association alarm unit is configured to generate an association alarm of the upstream item if the monitoring data have abnormal fluctuation.
Further, the abnormality determination unit includes:
the data screening module is configured to screen out the maximum value and the minimum value of the monitoring data;
an average calculation module configured to calculate an average value of remaining data after removing a maximum value and a minimum value from the monitoring data;
a first calculation module configured to take a difference between the maximum value and the average value as a first fluctuation value;
a second calculation module configured to take a difference between the minimum value and the average value as a second fluctuation value;
the fluctuation judging module is configured to judge whether the first fluctuation value and the second fluctuation value are both within a preset fluctuation threshold range;
the first judging module is configured to judge that the monitoring data does not have abnormal fluctuation if the first fluctuation value and the second fluctuation value are both in a preset fluctuation threshold range;
and if the first fluctuation value or the second fluctuation value is not in the preset fluctuation threshold range, judging that abnormal fluctuation exists in the monitoring data.
Further, the system further comprises:
an information storage unit configured to store administrator information of the monitoring item;
a time monitoring unit configured to monitor a duration of the alarm;
and the alarm pushing unit is configured to push the alarm to an administrator according to the corresponding monitoring project administrator information if the duration reaches the preset time threshold.
In a third aspect, a terminal is provided, including:
a processor, a memory, wherein,
the memory is used for storing a computer program,
the processor is configured to call and run the computer program from the memory, so that the terminal performs the method of the terminal as described above.
In a fourth aspect, there is provided a computer storage medium having instructions stored therein which, when run on a computer, cause the computer to perform the method of the above aspects.
The invention has the advantages that,
according to the power grid monitoring alarm processing method, the system, the terminal and the storage medium, the upstream item monitoring data of the alarm monitoring item are subjected to abnormal investigation by setting the upstream-downstream relation of the monitoring item, if the upstream item monitoring data are abnormal, the associated alarm of the alarm monitoring item is generated, data support is provided for maintaining the power grid, the power grid maintenance efficiency is improved, and the power grid maintenance time is saved.
In addition, the invention has reliable design principle, simple structure and very wide application prospect.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings that are required to be used in the description of the embodiments or the prior art will be briefly described below, and it will be obvious to those skilled in the art that other drawings can be obtained from these drawings without inventive effort.
FIG. 1 is a schematic flow chart of a method of one embodiment of the invention.
FIG. 2 is a schematic block diagram of a system of one embodiment of the present invention.
Fig. 3 is a schematic structural diagram of a terminal according to an embodiment of the present invention.
Detailed Description
In order to make the technical solution of the present invention better understood by those skilled in the art, the technical solution of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is apparent that the described embodiments are only some embodiments of the present invention, not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the present invention without making any inventive effort, shall fall within the scope of the present invention.
FIG. 1 is a schematic flow chart of a method of one embodiment of the invention. The execution body of fig. 1 may be a power grid monitoring alarm processing system.
As shown in fig. 1, the method 100 includes:
step 110, setting up the upstream and downstream relation of the monitoring item;
step 120, collecting upstream project monitoring data of the alarm monitoring project;
step 130, judging whether the upstream item monitoring data has abnormal fluctuation in a preset period:
and 140, if abnormal fluctuation exists in the monitoring data, generating an associated alarm of the upstream item.
Optionally, as an embodiment of the present invention, the method further includes:
taking the power grid equipment name as a monitoring item;
and setting the upstream and downstream relation of the corresponding monitoring items according to the connection relation of the power grid equipment.
Optionally, as an embodiment of the present invention, the collecting the upstream item monitoring data of the alarm monitoring item includes:
setting a monitoring period;
collecting alarm generation time of an alarm monitoring item;
and collecting monitoring data in the upstream project monitoring period by taking the alarm generation time as a starting point.
Optionally, as an embodiment of the present invention, the determining whether the upstream item monitoring data has abnormal fluctuations within a preset period includes:
screening out the maximum value and the minimum value of the monitoring data;
calculating an average value of the remaining data after removing the maximum value and the minimum value from the monitoring data;
taking the difference value between the maximum value and the average value as a first fluctuation value;
taking the difference value between the minimum value and the average value as a second fluctuation value;
judging whether the first fluctuation value and the second fluctuation value are both within a preset fluctuation threshold value range or not:
if yes, judging that the monitoring data do not have abnormal fluctuation;
if not, judging that the monitoring data have abnormal fluctuation.
Optionally, as an embodiment of the present invention, the method further includes:
storing the manager information of the monitoring project;
monitoring the duration of the alert;
and pushing the alarm to an administrator according to the corresponding monitoring project administrator information if the duration reaches the preset time threshold.
In order to facilitate understanding of the present invention, the principle of the power grid monitoring alarm processing method of the present invention is used in the following to further describe the power grid monitoring alarm processing method provided by the present invention in combination with the process of processing the power grid monitoring alarm in the embodiment.
Specifically, the power grid monitoring alarm processing method comprises the following steps:
s1, setting up the upstream-downstream relation of the monitoring items.
And taking the power grid equipment name as a monitoring project. And setting upstream and downstream topological relations of corresponding monitoring items according to the connection relation of the power grid equipment, and storing the topological relations to the shared storage service.
S2, collecting upstream project monitoring data of the alarm monitoring project.
The monitoring period T is set. And if the alarm monitoring item is monitored, immediately acquiring the alarm generation time of the alarm monitoring item. And collecting historical monitoring data in an upstream project monitoring period T by taking the alarm generation time as a starting point.
S3, judging whether the upstream item monitoring data have abnormal fluctuation in a preset period or not: and if abnormal fluctuation exists in the monitoring data, generating an associated alarm of the upstream item.
And screening out the maximum value and the minimum value of the monitoring data, and calculating the average value of the residual data after removing the maximum value and the minimum value from the monitoring data. And taking the difference value between the maximum value and the average value as a first fluctuation value, and taking the difference value between the minimum value and the average value as a second fluctuation value. Judging whether the first fluctuation value and the second fluctuation value are both within a preset fluctuation threshold value range or not: if the first fluctuation value and the second fluctuation value are both in the preset fluctuation threshold range, judging that abnormal fluctuation does not exist in the monitoring data; if the first fluctuation value or the second fluctuation value is not in the preset fluctuation threshold range (three conditions are that the first fluctuation value is not in the fluctuation threshold range, the second fluctuation value is not in the fluctuation threshold range and neither the first fluctuation value nor the second fluctuation value is in the fluctuation threshold range), abnormal fluctuation of the monitoring data is judged. If abnormal fluctuation exists in the monitoring data, generating an associated alarm of the upstream item, wherein the associated alarm comprises the monitoring data with the abnormal fluctuation.
As shown in fig. 2, the system 200 includes:
a relationship setting unit 210 configured to set an upstream-downstream relationship of the monitoring item;
a data collection unit 220 configured to collect upstream item monitoring data of the alarm monitoring item;
an anomaly determination unit 230 configured to determine whether the upstream item monitoring data has an anomaly fluctuation within a preset period:
and an association alarm unit 240 configured to generate an association alarm for the upstream item if the monitoring data has abnormal fluctuation.
Alternatively, as an embodiment of the present invention, the abnormality determination unit includes:
the data screening module is configured to screen out the maximum value and the minimum value of the monitoring data;
an average calculation module configured to calculate an average value of remaining data after removing a maximum value and a minimum value from the monitoring data;
a first calculation module configured to take a difference between the maximum value and the average value as a first fluctuation value;
a second calculation module configured to take a difference between the minimum value and the average value as a second fluctuation value;
the fluctuation judging module is configured to judge whether the first fluctuation value and the second fluctuation value are both within a preset fluctuation threshold range;
the first judging module is configured to judge that the monitoring data does not have abnormal fluctuation if the first fluctuation value and the second fluctuation value are both in a preset fluctuation threshold range;
and if the first fluctuation value or the second fluctuation value is not in the preset fluctuation threshold range, judging that abnormal fluctuation exists in the monitoring data.
Optionally, as an embodiment of the present invention, the system further includes:
an information storage unit configured to store administrator information of the monitoring item;
a time monitoring unit configured to monitor a duration of the alarm;
and the alarm pushing unit is configured to push the alarm to an administrator according to the corresponding monitoring project administrator information if the duration reaches the preset time threshold.
Fig. 3 is a schematic structural diagram of a terminal system 300 according to an embodiment of the present invention, where the terminal system 300 may be used to execute the power grid monitoring alarm processing method according to the embodiment of the present invention.
The terminal system 300 may include: a processor 310, a memory 320 and a communication unit 330. The components may communicate via one or more buses, and it will be appreciated by those skilled in the art that the configuration of the server as shown in the drawings is not limiting of the invention, as it may be a bus-like structure, a star-like structure, or include more or fewer components than shown, or may be a combination of certain components or a different arrangement of components.
The memory 320 may be used to store instructions for execution by the processor 310, and the memory 320 may be implemented by any type of volatile or non-volatile memory terminal or combination thereof, such as Static Random Access Memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, magnetic disk, or optical disk. The execution of the instructions in memory 320, when executed by processor 310, enables terminal 300 to perform some or all of the steps in the method embodiments described below.
The processor 310 is a control center of the storage terminal, connects various parts of the entire electronic terminal using various interfaces and lines, and performs various functions of the electronic terminal and/or processes data by running or executing software programs and/or modules stored in the memory 320, and invoking data stored in the memory. The processor may be comprised of an integrated circuit (Integrated Circuit, simply referred to as an IC), for example, a single packaged IC, or may be comprised of a plurality of packaged ICs connected to the same function or different functions. For example, the processor 310 may include only a central processing unit (Central Processing Unit, simply CPU). In the embodiment of the invention, the CPU can be a single operation core or can comprise multiple operation cores.
And a communication unit 330 for establishing a communication channel so that the storage terminal can communicate with other terminals. Receiving user data sent by other terminals or sending the user data to other terminals.
The present invention also provides a computer storage medium in which a program may be stored, which program may include some or all of the steps in the embodiments provided by the present invention when executed. The storage medium may be a magnetic disk, an optical disk, a read-only memory (ROM), a random-access memory (random access memory, RAM), or the like.
Therefore, the invention performs abnormality investigation on the upstream project monitoring data of the alarm monitoring project by setting the upstream and downstream relations of the monitoring project, and generates the associated alarm of the alarm monitoring project if the upstream project monitoring data is abnormal, thereby providing data support for maintaining the power grid, improving the power grid maintenance efficiency, saving the power grid maintenance time, and the technical effects achieved by the embodiment can be seen from the description above and are not repeated here.
It will be apparent to those skilled in the art that the techniques of embodiments of the present invention may be implemented in software plus a necessary general purpose hardware platform. Based on such understanding, the technical solution in the embodiments of the present invention may be embodied essentially or in a part contributing to the prior art in the form of a software product stored in a storage medium such as a U-disc, a mobile hard disc, a Read-Only Memory (ROM), a random access Memory (RAM, random Access Memory), a magnetic disk or an optical disk, etc. various media capable of storing program codes, including several instructions for causing a computer terminal (which may be a personal computer, a server, or a second terminal, a network terminal, etc.) to execute all or part of the steps of the method described in the embodiments of the present invention.
The same or similar parts between the various embodiments in this specification are referred to each other. In particular, for the terminal embodiment, since it is substantially similar to the method embodiment, the description is relatively simple, and reference should be made to the description in the method embodiment for relevant points.
In the several embodiments provided by the present invention, it should be understood that the disclosed systems and methods may be implemented in other ways. For example, the system embodiments described above are merely illustrative, e.g., the division of the elements is merely a logical functional division, and there may be additional divisions when actually implemented, e.g., multiple elements or components may be combined or integrated into another system, or some features may be omitted or not performed. Alternatively, the coupling or direct coupling or communication connection shown or discussed with each other may be through some interface, system or unit indirect coupling or communication connection, which may be in electrical, mechanical or other form.
The units described as separate units may or may not be physically separate, and units shown as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
In addition, each functional unit in the embodiments of the present invention may be integrated in one processing unit, or each unit may exist alone physically, or two or more units may be integrated in one unit.
Although the present invention has been described in detail by way of preferred embodiments with reference to the accompanying drawings, the present invention is not limited thereto. Various equivalent modifications and substitutions may be made in the embodiments of the present invention by those skilled in the art without departing from the spirit and scope of the present invention, and it is intended that all such modifications and substitutions be within the scope of the present invention/be within the scope of the present invention as defined by the appended claims. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (8)

1. The utility model provides a power grid monitoring alarm processing method which is characterized by comprising the following steps:
setting up the upstream-downstream relation of the monitoring item;
collecting upstream item monitoring data of an alarm monitoring item;
judging whether the upstream item monitoring data has abnormal fluctuation in a preset period or not:
if abnormal fluctuation exists in the monitoring data, generating an associated alarm of the upstream item;
taking the power grid equipment name as a monitoring item;
the determining whether the upstream item monitoring data has abnormal fluctuation in a preset period includes:
screening out the maximum value and the minimum value of the monitoring data;
calculating an average value of the remaining data after removing the maximum value and the minimum value from the monitoring data;
taking the difference value between the maximum value and the average value as a first fluctuation value;
taking the difference value between the minimum value and the average value as a second fluctuation value;
judging whether the first fluctuation value and the second fluctuation value are both within a preset fluctuation threshold value range or not:
if yes, judging that the monitoring data do not have abnormal fluctuation;
if not, judging that the monitoring data have abnormal fluctuation.
2. The method according to claim 1, wherein the method further comprises:
and setting the upstream and downstream relation of the corresponding monitoring items according to the connection relation of the power grid equipment.
3. The method of claim 1, wherein the collecting upstream item monitoring data of an alert monitoring item comprises:
setting a monitoring period;
collecting alarm generation time of an alarm monitoring item;
and collecting monitoring data in the upstream project monitoring period by taking the alarm generation time as a starting point.
4. The method according to claim 1, wherein the method further comprises:
storing the manager information of the monitoring project;
monitoring the duration of the alert;
and pushing the alarm to an administrator according to the corresponding monitoring project administrator information if the duration reaches the preset time threshold.
5. A grid monitoring alarm processing system, comprising:
a relationship setting unit configured to set an upstream-downstream relationship of the monitoring item;
the data acquisition unit is configured to acquire upstream item monitoring data of the alarm monitoring item;
an abnormality determination unit configured to determine whether or not the upstream item monitoring data has abnormal fluctuations within a preset period:
an association alarm unit configured to generate an association alarm of the upstream item if the monitoring data has abnormal fluctuation;
the system is configured to: taking the power grid equipment name as a monitoring item;
the abnormality determination unit includes:
the data screening module is configured to screen out the maximum value and the minimum value of the monitoring data;
an average calculation module configured to calculate an average value of remaining data after removing a maximum value and a minimum value from the monitoring data;
a first calculation module configured to take a difference between the maximum value and the average value as a first fluctuation value;
a second calculation module configured to take a difference between the minimum value and the average value as a second fluctuation value;
the fluctuation judging module is configured to judge whether the first fluctuation value and the second fluctuation value are both within a preset fluctuation threshold range;
the first judging module is configured to judge that the monitoring data does not have abnormal fluctuation if the first fluctuation value and the second fluctuation value are both in a preset fluctuation threshold range;
and if the first fluctuation value or the second fluctuation value is not in the preset fluctuation threshold range, judging that abnormal fluctuation exists in the monitoring data.
6. The system of claim 5, wherein the system further comprises:
an information storage unit configured to store administrator information of the monitoring item;
a time monitoring unit configured to monitor a duration of the alarm;
and the alarm pushing unit is configured to push the alarm to an administrator according to the corresponding monitoring project administrator information if the duration reaches the preset time threshold.
7. A terminal, comprising:
a processor;
a memory for storing execution instructions of the processor;
wherein the processor is configured to perform the method of any of claims 1-4.
8. A computer readable storage medium storing a computer program, which when executed by a processor implements the method of any one of claims 1-4.
CN201911317020.0A 2019-12-19 2019-12-19 Power grid monitoring alarm processing method, system, terminal and storage medium Active CN111062503B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911317020.0A CN111062503B (en) 2019-12-19 2019-12-19 Power grid monitoring alarm processing method, system, terminal and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911317020.0A CN111062503B (en) 2019-12-19 2019-12-19 Power grid monitoring alarm processing method, system, terminal and storage medium

Publications (2)

Publication Number Publication Date
CN111062503A CN111062503A (en) 2020-04-24
CN111062503B true CN111062503B (en) 2023-08-18

Family

ID=70302421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911317020.0A Active CN111062503B (en) 2019-12-19 2019-12-19 Power grid monitoring alarm processing method, system, terminal and storage medium

Country Status (1)

Country Link
CN (1) CN111062503B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113779328B (en) * 2021-08-11 2023-10-31 邹平市供电有限公司 Power supply monitoring data integration processing method, system, terminal and storage medium
CN113627627A (en) * 2021-08-11 2021-11-09 北京互金新融科技有限公司 Abnormity monitoring method, abnormity monitoring device, computer readable medium and processor

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102638100A (en) * 2012-04-05 2012-08-15 华北电力大学 District power network equipment abnormal alarm signal association analysis and diagnosis method
EP2650651A1 (en) * 2012-04-13 2013-10-16 Virtual Electric, Inc. Method and apparatus to form a virtual power generation collective from a distributed network of local generation facilities
CN104239437A (en) * 2014-08-28 2014-12-24 国家电网公司 Power-network-dispatching-oriented intelligent warning analysis method
CN108520370A (en) * 2018-08-06 2018-09-11 中国能源建设集团湖南省电力设计院有限公司 Based on the integrated alarm merger of main distribution net and source tracing method
CN108846669A (en) * 2018-05-29 2018-11-20 中国建设银行股份有限公司 Method for safety monitoring, system, device and the storage medium of transaction
CN109615817A (en) * 2018-10-30 2019-04-12 珠海派诺科技股份有限公司 Monitoring system combines alarm method, device, electronic equipment and storage medium
CN109829833A (en) * 2018-12-07 2019-05-31 国网浙江省电力有限公司 Power distribution network alarm method and system, electronic equipment and computer readable storage medium
CN110413483A (en) * 2019-07-30 2019-11-05 中国工商银行股份有限公司 Monitoring method, device, electronic equipment and the storage medium of batch jobs data

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11635796B2 (en) * 2021-03-03 2023-04-25 Florida Power & Light Company Power grid lateral trouble ticket cause determination and ticket management

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102638100A (en) * 2012-04-05 2012-08-15 华北电力大学 District power network equipment abnormal alarm signal association analysis and diagnosis method
EP2650651A1 (en) * 2012-04-13 2013-10-16 Virtual Electric, Inc. Method and apparatus to form a virtual power generation collective from a distributed network of local generation facilities
CN104239437A (en) * 2014-08-28 2014-12-24 国家电网公司 Power-network-dispatching-oriented intelligent warning analysis method
CN108846669A (en) * 2018-05-29 2018-11-20 中国建设银行股份有限公司 Method for safety monitoring, system, device and the storage medium of transaction
CN108520370A (en) * 2018-08-06 2018-09-11 中国能源建设集团湖南省电力设计院有限公司 Based on the integrated alarm merger of main distribution net and source tracing method
CN109615817A (en) * 2018-10-30 2019-04-12 珠海派诺科技股份有限公司 Monitoring system combines alarm method, device, electronic equipment and storage medium
CN109829833A (en) * 2018-12-07 2019-05-31 国网浙江省电力有限公司 Power distribution network alarm method and system, electronic equipment and computer readable storage medium
CN110413483A (en) * 2019-07-30 2019-11-05 中国工商银行股份有限公司 Monitoring method, device, electronic equipment and the storage medium of batch jobs data

Also Published As

Publication number Publication date
CN111062503A (en) 2020-04-24

Similar Documents

Publication Publication Date Title
CN113176978B (en) Monitoring method, system, equipment and readable storage medium based on log file
CN106997314B (en) Exception handling method, device and system for distributed system
CN112311617A (en) Configured data monitoring and alarming method and system
CN110851320A (en) Server downtime supervision method, system, terminal and storage medium
EP2800024A1 (en) System and methods for identifying applications in mobile networks
CN111062503B (en) Power grid monitoring alarm processing method, system, terminal and storage medium
CN110727556A (en) BMC health state monitoring method, system, terminal and storage medium
CN116049146B (en) Database fault processing method, device, equipment and storage medium
CN107590016A (en) Power-down rebooting recognition methods and device
CN110739637A (en) power transmission line monitoring method, system, terminal and storage medium
CN104866296A (en) Data processing method and device
CN113779328B (en) Power supply monitoring data integration processing method, system, terminal and storage medium
CN114691662A (en) Data quality inspection rule self-adaption method, storage medium and system
CN106294364B (en) Method and device for realizing web crawler to capture webpage
CN109818808A (en) Method for diagnosing faults, device and electronic equipment
CN109150626A (en) FTP service monitoring method, device, terminal and computer readable storage medium
CN115420988B (en) Method, device, equipment and storage medium for identifying abnormal electricity consumption user
CN111147542A (en) Secret-free access setting method, device, equipment and medium
CN116055291A (en) Method and device for determining abnormal prompt information of node
CN111327487A (en) Power communication network running state monitoring method and device based on deep learning
CN116416764A (en) Alarm threshold generation method and device, electronic equipment and storage medium
CN112994976A (en) Gateway testing method and device, electronic equipment and storage medium
CN107957942B (en) SQL script fault repairing method and terminal thereof
CN116626540B (en) Method, system, terminal and storage medium for judging broken line fault interval
CN112152878B (en) Monitoring and management method, system, terminal and storage medium for digital channel of transformer substation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant