CN111042117A - 一种旋喷锚杆桩施工方法 - Google Patents

一种旋喷锚杆桩施工方法 Download PDF

Info

Publication number
CN111042117A
CN111042117A CN201911224599.6A CN201911224599A CN111042117A CN 111042117 A CN111042117 A CN 111042117A CN 201911224599 A CN201911224599 A CN 201911224599A CN 111042117 A CN111042117 A CN 111042117A
Authority
CN
China
Prior art keywords
anchor rod
construction method
pile
construction
jet grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911224599.6A
Other languages
English (en)
Inventor
陈爽
杜贵新
王凯
崔建
高始军
房新胜
刘鹏程
徐公允
方勇
刘磊
刘善福
高延辉
何川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zhangjiakou Intercity Railway Co.,Ltd.
Southwest Jiaotong University
China State Railway Group Co Ltd
China Railway 14th Bureau Group Shield Engineering Co Ltd
Original Assignee
Southwest Jiaotong University
China Railway 14th Bureau Group Shield Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University, China Railway 14th Bureau Group Shield Engineering Co Ltd filed Critical Southwest Jiaotong University
Priority to CN201911224599.6A priority Critical patent/CN111042117A/zh
Publication of CN111042117A publication Critical patent/CN111042117A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种旋喷锚杆桩施工方法,包括以下步骤:步骤1:施工准备;步骤2:布置钻机,钻孔至设计深度;步骤3:旋喷至设计标高;步骤4:在浆液初凝前下放组合锚杆;步骤5:待浆液终凝即形成锚杆桩;本发明施工过程简单、操作过程方便,能有效提升施工效率,大大降低施工成本。

Description

一种旋喷锚杆桩施工方法
技术领域
本发明涉及锚杆桩施工方法,具体涉及一种旋喷锚杆桩施工方法。
背景技术
近年来城市轨道交通等地下空间的开发所带来的环境问题受到广泛关注。其中盾构近距离穿越地表结构桩基等问题尤为突出。为了降低盾构施工对周围桩基的不良影响,需要在既有桩基和盾构隧道之间设立隔离桩。目前,隔离桩的形式多采用钻孔灌注桩和旋喷锚杆桩等。现有的旋喷锚杆桩施工方法过程繁琐,涉及二次开孔及二次注浆,大大降低施工效率。
发明内容
本发明提供一种工艺简单的旋喷锚杆桩施工方法。
本发明采用的技术方案是:一种旋喷锚杆桩施工方法,包括以下步骤:
步骤1:施工准备;
步骤2:布置钻机,钻孔至设计深度;
步骤3:旋喷至设计标高;
步骤4:在浆液初凝前下放组合锚杆;
步骤5:待浆液终凝即形成锚杆桩。
进一步的,所述步骤3中喷浆前首先检查喷射和灌浆系统是否畅通。
进一步的,所述步骤3中用卷扬机将输浆管插入钻孔设计深度,开始喷射灌浆作业。
进一步的,所述步骤3中喷射灌浆作业中边提升喷灌管边旋转,待喷灌管达到设计长度范围内停止喷浆,将输浆管提出孔口,在钻孔内进行静压灌浆。
进一步的,所述步骤2中钻孔口径大于喷灌管外径20~50mm。
本发明的有益效果是:
本发明施工过程简单、操作过程方便,能有效提升施工效率,大大降低施工成本。
附图说明
图1为本发明工艺流程图。
具体实施方式
下面结合附图和具体实施例对本发明做进一步说明。
如图1所示,一种旋喷锚杆桩施工方法,包括以下步骤:
步骤1:施工准备;
步骤2:布置钻机,钻孔至设计深度;
步骤3:旋喷至设计标高;
步骤4:在浆液初凝前下放组合锚杆;
步骤5:待浆液终凝即形成锚杆桩。
喷浆前首先检查喷射和灌浆系统是否畅通。用卷扬机将输浆管插入钻孔设计深度,开始喷射灌浆作业。喷射灌浆作业中边提升喷灌管边旋转,待喷灌管达到设计长度范围内停止喷浆,将输浆管提出孔口,在钻孔内进行静压灌浆。钻孔口径大于喷灌管外径20~50mm。
本发明施工过程简单、操作过程方便,能有效提升施工效率,大大降低施工成本。

Claims (5)

1.一种旋喷锚杆桩施工方法,其特征在于,包括以下步骤:
步骤1:施工准备;
步骤2:布置钻机,钻孔至设计深度;
步骤3:旋喷至设计标高;
步骤4:在浆液初凝前下放组合锚杆;
步骤5:待浆液终凝即形成锚杆桩。
2.根据权利要求1所述的一种旋喷锚杆桩施工方法,其特征在于,所述步骤3中喷浆前首先检查喷射和灌浆系统是否畅通。
3.根据权利要求1所述的一种旋喷锚杆桩施工方法,其特征在于,所述步骤3中用卷扬机将输浆管插入钻孔设计深度,开始喷射灌浆作业。
4.根据权利要求3所述的一种旋喷锚杆桩施工方法,其特征在于,所述步骤3中喷射灌浆作业中边提升喷灌管边旋转,待喷灌管达到设计长度范围内停止喷浆,将输浆管提出孔口,在钻孔内进行静压灌浆。
5.根据权利要求4所述的一种旋喷锚杆桩施工方法,其特征在于,所述步骤2中钻孔口径大于喷灌管外径20~50mm。
CN201911224599.6A 2019-12-04 2019-12-04 一种旋喷锚杆桩施工方法 Pending CN111042117A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911224599.6A CN111042117A (zh) 2019-12-04 2019-12-04 一种旋喷锚杆桩施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911224599.6A CN111042117A (zh) 2019-12-04 2019-12-04 一种旋喷锚杆桩施工方法

Publications (1)

Publication Number Publication Date
CN111042117A true CN111042117A (zh) 2020-04-21

Family

ID=70234524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911224599.6A Pending CN111042117A (zh) 2019-12-04 2019-12-04 一种旋喷锚杆桩施工方法

Country Status (1)

Country Link
CN (1) CN111042117A (zh)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3608070B2 (ja) * 1998-02-13 2005-01-05 株式会社設計室ソイル 柱状改良体の構築方法
JP3672478B2 (ja) * 2000-05-29 2005-07-20 東日本旅客鉄道株式会社 筒状鋼材入り二重構造固化杭及びその造成方法
CN101575854A (zh) * 2009-06-10 2009-11-11 陕西中机岩土工程有限责任公司 一种高压旋喷扩大头锚杆及其施工方法
CN105089081A (zh) * 2015-07-20 2015-11-25 龙元建设集团股份有限公司 抗浮锚杆施工方法
CN105178328A (zh) * 2015-07-30 2015-12-23 葛加君 高压喷射扩张热熔锚杆基坑支护方法
CN106522213A (zh) * 2016-11-01 2017-03-22 浙江省岩土基础公司 一种旋喷插筋式微型桩施工方法
CN109339070A (zh) * 2018-11-05 2019-02-15 黄灿 一种旋喷植锚桩及其施工方法
CN110173004A (zh) * 2019-06-12 2019-08-27 湖北中南岩土工程有限公司 用于建筑物抗浮的高压旋喷锚索结构及其施工方法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3608070B2 (ja) * 1998-02-13 2005-01-05 株式会社設計室ソイル 柱状改良体の構築方法
JP3672478B2 (ja) * 2000-05-29 2005-07-20 東日本旅客鉄道株式会社 筒状鋼材入り二重構造固化杭及びその造成方法
CN101575854A (zh) * 2009-06-10 2009-11-11 陕西中机岩土工程有限责任公司 一种高压旋喷扩大头锚杆及其施工方法
CN105089081A (zh) * 2015-07-20 2015-11-25 龙元建设集团股份有限公司 抗浮锚杆施工方法
CN105178328A (zh) * 2015-07-30 2015-12-23 葛加君 高压喷射扩张热熔锚杆基坑支护方法
CN106522213A (zh) * 2016-11-01 2017-03-22 浙江省岩土基础公司 一种旋喷插筋式微型桩施工方法
CN109339070A (zh) * 2018-11-05 2019-02-15 黄灿 一种旋喷植锚桩及其施工方法
CN110173004A (zh) * 2019-06-12 2019-08-27 湖北中南岩土工程有限公司 用于建筑物抗浮的高压旋喷锚索结构及其施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
阎明礼: "《地基处理技术》", 28 February 1996, 中国环境科学出版社 *

Similar Documents

Publication Publication Date Title
CN106640120B (zh) 地表定点深孔分层注浆施工方法
CN102852141B (zh) 一种桩芯灌注混凝土桩侧静压注浆的嵌岩管桩基础及其施工方法
CN107975375B (zh) 一种城市隧道微型钢管桩加固软弱地基施工方法
CN109024719B (zh) 一种桩侧扰动降阻建筑物纠倾法
CN111622217A (zh) 一种旋喷施工后注浆预制管桩及其施工工艺
CN104563099A (zh) 多孔管法大直径高压旋喷桩施工方法
CN110700853A (zh) 基于软弱地层的浅覆土盾构隧道加固方法
CN110725305B (zh) 一种提高斜向钢管桩承载力的施工方法
CN108265720A (zh) 一种控制土体变形的单点囊式注浆装置及其方法
CN111424653A (zh) 一种薄壁溶洞组合管桩的施工方法及结构
CN201704688U (zh) 一种隔离桩土接触的钻孔灌注桩双套管
CN101358529A (zh) 短导管及短导管固砂剂加固施工工艺
CN205062810U (zh) 一种端承型螺纹芯组合桩的施工设备
CN111910626A (zh) 一种土层锚杆施工工艺
CN111042117A (zh) 一种旋喷锚杆桩施工方法
CN112252312B (zh) 一种增强phc管桩整体受力性能的施工方法
CN103306280A (zh) 一种钻杆内孔植入搅拌式锚桩及锚固方法
CN113323031A (zh) 一种高压旋喷及布袋扩体抗浮锚杆施工工法
KR101112149B1 (ko) 마이크로 파일 공법
CN110629757A (zh) 一种smw工法桩型钢拔除方法
CN112901203A (zh) 一种盾构和顶管隧道周边地层加固结构与加固方法
CN107023008B (zh) 护壁及反力用沉井平台拔桩方法及系统
CN204825859U (zh) 一种钻式基础桩
CN110952541A (zh) 一种振动沉管与高压旋喷组合的大直径抗浮锚杆施工方法
CN105970921A (zh) 一种斜向钢管水泥土受力体的一体化施工方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210624

Address after: No. 120, Xinpu Road, Jiangpu street, Pukou District, Nanjing City, Jiangsu Province

Applicant after: CHINA RAILWAY 14TH BUREAU GROUP SHIELD ENGINEERING Co.,Ltd.

Applicant after: SOUTHWEST JIAOTONG University

Applicant after: China National Railway Group Co.,Ltd.

Applicant after: Beijing Zhangjiakou Intercity Railway Co.,Ltd.

Address before: No. 120, Xinpu Road, Jiangpu street, Pukou District, Nanjing City, Jiangsu Province

Applicant before: CHINA RAILWAY 14TH BUREAU GROUP SHIELD ENGINEERING Co.,Ltd.

Applicant before: SOUTHWEST JIAOTONG University

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200421