CN111022793A - 用于树脂塔的管道连接结构 - Google Patents
用于树脂塔的管道连接结构 Download PDFInfo
- Publication number
- CN111022793A CN111022793A CN201911334309.3A CN201911334309A CN111022793A CN 111022793 A CN111022793 A CN 111022793A CN 201911334309 A CN201911334309 A CN 201911334309A CN 111022793 A CN111022793 A CN 111022793A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- pipe
- connecting pipe
- resin tower
- stabilizing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L21/00—Joints with sleeve or socket
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Quick-Acting Or Multi-Walled Pipe Joints (AREA)
Abstract
本发明公开了一种用于树脂塔的管道连接结构,包括:管道,用于连通树脂塔与外界,端部开设有外螺纹;连接管,两端用于与管道连接,两端开设有与所述管道外螺纹匹配的内螺纹;稳定部,用于密封所述连接管两端,包括有两个稳定套;其中,所述管道外套设有第一密封圈,所述第一密封圈用于防止所述连接管与所述管道之间泄漏,所述稳定套设置有限制所述第一密封圈位移的第一限位部。通过将连接管将两根管道连接,稳定部密封连接管与管道的连接处,通过两根调节螺钉使稳定部稳固连接,提高连接密封性,同时安装方便,无需使用多根螺钉,提高安装效率。
Description
技术领域
本发明涉及一种管道连接结构,特别涉及一种用于树脂塔的管道连接结构。
背景技术
树脂塔,是一种可以通过吸附金属离子用于净化液体物质的净化装置,通常使用的树脂塔工作时,液体物质从塔的进液口进入塔体,通过树脂层后流出塔体,以便除去液体内杂质,达到净化目的。现时树脂塔的管道主要是使用法兰连接的,使用法兰连接安装时需要使用多根的螺钉,安装效率较低。
发明内容
本发明旨在至少解决现有技术中存在的技术问题之一。为此,本发明提出一种用于树脂塔的管道连接结构,能够将管道快速连接,提高效率。
根据本发明的第一方面实施例的用于树脂塔的管道连接结构,包括:管道,用于连通树脂塔与外界,端部开设有外螺纹;连接管,两端用于与管道连接,两端开设有与所述管道外螺纹匹配的内螺纹;稳定部,用于密封所述连接管两端,包括有两个稳定套,其中一个所述稳定套套接在所述连接管的一端,另外一个所述稳定套套接在所述连接管的另一端,两个所述稳定套之间设置有两根调节螺钉,两根所述调节螺钉沿Y方向设置,两个所述稳定套与通过两根所述调节螺钉连接;其中,所述管道外套设有第一密封圈,所述第一密封圈用于防止所述连接管与所述管道之间泄漏,所述稳定套设置有限制所述第一密封圈位移的第一限位部。
根据本发明实施例的用于树脂塔的管道连接结构,至少具有如下有益效果:通过将连接管将两根管道连接,稳定部密封连接管与管道的连接处,通过两根调节螺钉使稳定部稳固连接,提高连接密封性,同时安装方便,无需使用多根螺钉,提高安装效率。
根据本发明的一些实施例,所述连接管设置有第二限位部,所述第二限位部与所述管道的端部抵接。
根据本发明的一些实施例,所述第二限位部与所述管道之间设置有第二密封圈,所述第二限位部与所述管道的端面共同夹紧第二密封圈。
根据本发明的一些实施例,所述稳定套包括有两个对称设置的上半套件和下半套件,所述上半套件与所述下半套件之间对称连接有连接螺钉,所述上半套件与所述下半套件均设置有密封面,所述密封面与所诉管道的表面抵接。
根据本发明的一些实施例,所述连接螺钉套设有弹簧,所述弹簧的一端与所述连接螺钉抵接,所述弹簧的另一端与所述稳定套抵接。
本发明的附加方面和优点将在下面的描述中部分给出,部分将从下面的描述中变得明显,或通过本发明的实践了解到。
附图说明
本发明的上述和/或附加的方面和优点从结合下面附图对实施例的描述中将变得明显和容易理解,其中:
图1为本发明实施例的用于树脂塔的管道连接结构的剖视图;;
图2为图1示出的用于树脂塔的管道连接结构的正视图。
附图标记说明:
管道110、
连接管210、第二限位部211、第二密封圈212、
上半套件311、下半套件312、第一限位部313、第一密封圈314、调节螺钉411、连接螺钉412、弹簧413。
具体实施方式
下面详细描述本发明的实施例,所述实施例的示例在附图中示出,其中自始至终相同或类似的标号表示相同或类似的元件或具有相同或类似功能的元件。下面通过参考附图描述的实施例是示例性的,仅用于解释本发明,而不能理解为对本发明的限制。
在本发明的描述中,需要理解的是,涉及到方位描述,例如上、下、前、后、左、右等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。
在本发明的描述中,若干的含义是一个或者多个,多个的含义是两个以上,大于、小于、超过等理解为不包括本数,以上、以下、以内等理解为包括本数。如果有描述到第一、第二只是用于区分技术特征为目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量或者隐含指明所指示的技术特征的先后关系。
本发明的描述中,除非另有明确的限定,设置、安装、连接等词语应做广义理解,所属技术领域技术人员可以结合技术方案的具体内容合理确定上述词语在本发明中的具体含义。
在一些实施例中,参照图1和图2,用于树脂塔的管道110连接结构,包括:管道110,用于连通树脂塔与外界,端部开设有外螺纹;连接管210,两端用于与管道110连接,两端开设有与所述管道110外螺纹匹配的内螺纹;稳定部,用于密封所述连接管210两端,包括有两个稳定套,其中一个所述稳定套套接在所述连接管210的一端,另外一个所述稳定套套接在所述连接管210的另一端,两个所述稳定套之间设置有两根调节螺钉411,两根所述调节螺钉411沿Y方向设置,两个所述稳定套与通过两根所述调节螺钉411连接;其中,所述管道110外套设有第一密封圈314,所述第一密封圈314用于防止所述连接管210与所述管道110之间泄漏,所述稳定套设置有限制所述第一密封圈314位移的第一限位部313。
管道110为树脂塔向外延伸连通外界的通道,管道110与连接管210螺纹连接,使连接管210将管道110包裹在内,提高密封性;稳定套设置在连接管210 与管道110连接处,并同时包裹连接管210和管道110,拧动两根调节螺钉411 使两个稳定套相互靠近,同时第一限位部313驱动第一密封圈314靠近连接管 210,并封堵连接管210与管道110之间的间隙,防止泄漏。同时第一限位部313 紧逼第一密封圈314,使第一密封圈314始终贴合封堵连接管210与管道110之间的间隙,提高连接密封性,同时安装方便,无需使用多根螺钉,提高安装效率。
在一些实施例中,参照图1和图2,所述连接管210设置有第二限位部211,所述第二限位部211与所述管道110的端部抵接,防止管道110过于伸入连接管 210内,管道110的外螺纹脱离连接管210的内螺纹范围,使连接管210与管道 110之间连接失效。所述第二限位部211与所述管道110之间设置有第二密封圈 212,所述第二限位部211与所述管道110的端面共同夹紧第二密封圈212。第二密封圈212防止连接管210或管道110内的化学成分通过间隙泄漏出去,提高连接管210与管道110之间的气密性。
在一些实施例中,参照图1和图2,所述稳定套包括有两个对称设置的上半套件311和下半套件312,所述上半套件311与所述下半套件312之间对称连接有连接螺钉412,所述上半套件311与所述下半套件312均设置有密封面,所述密封面与所诉管道110的表面抵接。安装时分别将上半套件311以及下半套件 312扣合,然后通过连接螺钉412将上半套件311与下半套件312连接在一起,并锁死,上半套件311以及下半套件312共同包裹管道110与连接管210的的连接处,使管道110与连接之间的间隙位于稳定套内,提高密封性。
在一些实施例中,参照图1和图2,所述连接螺钉412套设有弹簧413,所述弹簧413的一端与所述连接螺钉412抵接,所述弹簧413的另一端与所述稳定套抵接,弹簧413处于压缩状态,使连接螺钉412受到轴向力,增大连接螺钉4 12与稳定套之间的摩擦力,防止连接螺钉412松动。
上面结合附图对本发明实施例作了详细说明,但是本发明不限于上述实施例,在所述技术领域普通技术人员所具备的知识范围内,还可以在不脱离本发明宗旨的前提下作出各种变化。
Claims (5)
1.用于树脂塔的管道连接结构,其特征在于,包括:
管道,用于连通树脂塔与外界,端部开设有外螺纹;
连接管,两端用于与管道连接,两端开设有与所述管道外螺纹匹配的内螺纹;
稳定部,用于密封所述连接管两端,包括有两个稳定套,其中一个所述稳定套套接在所述连接管的一端,另外一个所述稳定套套接在所述连接管的另一端,两个所述稳定套之间设置有两根调节螺钉,两根所述调节螺钉沿Y方向设置,两个所述稳定套与通过两根所述调节螺钉连接;
其中,所述管道外套设有第一密封圈,所述第一密封圈用于防止所述连接管与所述管道之间泄漏,所述稳定套设置有限制所述第一密封圈位移的第一限位部。
2.根据权利要求1所述的用于树脂塔的管道连接结构,其特征在于,所述连接管设置有第二限位部,所述第二限位部与所述管道的端部抵接。
3.根据权利要求2所述的用于树脂塔的管道连接结构,其特征在于,所述第二限位部与所述管道之间设置有第二密封圈,所述第二限位部与所述管道的端面共同夹紧第二密封圈。
4.根据权利要求1所述的用于树脂塔的管道连接结构,其特征在于,所述稳定套包括有两个对称设置的上半套件和下半套件,所述上半套件与所述下半套件之间对称连接有连接螺钉,所述上半套件与所述下半套件均设置有密封面,所述密封面与所诉管道的表面抵接。
5.根据权利要求1所述的用于树脂塔的管道连接结构,其特征在于,所述连接螺钉套设有弹簧,所述弹簧的一端与所述连接螺钉抵接,所述弹簧的另一端与所述稳定套抵接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911334309.3A CN111022793A (zh) | 2019-12-23 | 2019-12-23 | 用于树脂塔的管道连接结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911334309.3A CN111022793A (zh) | 2019-12-23 | 2019-12-23 | 用于树脂塔的管道连接结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111022793A true CN111022793A (zh) | 2020-04-17 |
Family
ID=70211524
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911334309.3A Pending CN111022793A (zh) | 2019-12-23 | 2019-12-23 | 用于树脂塔的管道连接结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111022793A (zh) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000234684A (ja) * | 1999-02-17 | 2000-08-29 | Japan Engineering Kk | 管継手の締付け表示装置 |
CN101147026A (zh) * | 2005-03-22 | 2008-03-19 | 利塞加股份公司 | 绝热保冷的固定点管支承 |
US20110121567A1 (en) * | 2008-05-19 | 2011-05-26 | Gentile Jr Zachary J | Split joint restraint device with dual pipe size capability |
US20130020795A1 (en) * | 2011-07-20 | 2013-01-24 | Consolidated Edison Company Of New York, Inc. | Pipe coupling assembly and method for preventing longitudinal movement of coupling rings |
CN103277603A (zh) * | 2013-05-06 | 2013-09-04 | 中国长江电力股份有限公司 | 一种弹簧预紧管箍 |
CN206377388U (zh) * | 2017-01-04 | 2017-08-04 | 杭州彰钰不锈钢有限公司 | 一种三通管 |
CN107676556A (zh) * | 2017-10-31 | 2018-02-09 | 山东亿佰通机械股份有限公司 | 一种管道抗震连接结构 |
CN208764495U (zh) * | 2018-09-25 | 2019-04-19 | 西安安道云科环保科技有限公司 | 一种用于软水器水管的连接装置 |
CN109667997A (zh) * | 2018-12-06 | 2019-04-23 | 中国建筑第五工程局有限公司 | 管件 |
-
2019
- 2019-12-23 CN CN201911334309.3A patent/CN111022793A/zh active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000234684A (ja) * | 1999-02-17 | 2000-08-29 | Japan Engineering Kk | 管継手の締付け表示装置 |
CN101147026A (zh) * | 2005-03-22 | 2008-03-19 | 利塞加股份公司 | 绝热保冷的固定点管支承 |
US20110121567A1 (en) * | 2008-05-19 | 2011-05-26 | Gentile Jr Zachary J | Split joint restraint device with dual pipe size capability |
US20130020795A1 (en) * | 2011-07-20 | 2013-01-24 | Consolidated Edison Company Of New York, Inc. | Pipe coupling assembly and method for preventing longitudinal movement of coupling rings |
CN103277603A (zh) * | 2013-05-06 | 2013-09-04 | 中国长江电力股份有限公司 | 一种弹簧预紧管箍 |
CN206377388U (zh) * | 2017-01-04 | 2017-08-04 | 杭州彰钰不锈钢有限公司 | 一种三通管 |
CN107676556A (zh) * | 2017-10-31 | 2018-02-09 | 山东亿佰通机械股份有限公司 | 一种管道抗震连接结构 |
CN208764495U (zh) * | 2018-09-25 | 2019-04-19 | 西安安道云科环保科技有限公司 | 一种用于软水器水管的连接装置 |
CN109667997A (zh) * | 2018-12-06 | 2019-04-23 | 中国建筑第五工程局有限公司 | 管件 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7862090B1 (en) | Plug-in fitting for direct connection to housing | |
US20020182005A1 (en) | Low-permeability connecting device | |
RU2691206C2 (ru) | Уплотнительная система | |
US7415997B2 (en) | Seal assembly for fuel fill pipes | |
GB2396188A (en) | I.c engine air intake tube assembly with evaporative emission control device | |
CN106287041A (zh) | 节气门体转接器上的螺纹件 | |
CN111022793A (zh) | 用于树脂塔的管道连接结构 | |
KR200395248Y1 (ko) | 파이프 커플링의 고무밴드 구조 | |
JP7223647B2 (ja) | 継手 | |
JPH10103581A (ja) | 内挿式逆止弁構造、および内挿式逆止弁ユニット | |
EP3763983A1 (en) | Joint pipe having one-touch coupling structure and release prevention structure | |
US2452057A (en) | Flexible leakproof coupling | |
EP3171015B1 (en) | Terminal sealing structure for fuel rail for gasoline direct-injection engine | |
CN107143708A (zh) | 密封连接装置 | |
KR100532555B1 (ko) | 배관 연결장치 | |
CN205578978U (zh) | 一种直角旋转接头 | |
US9553440B2 (en) | Wire seal assembly | |
CA2589842A1 (en) | Universal fluid valve body | |
CN202580368U (zh) | 在螺纹接头上使用的密封组件 | |
CN219606290U (zh) | 一种不锈钢波纹管机械套筒 | |
JP4557932B2 (ja) | 流体デバイスどうしの接続構造 | |
US2592848A (en) | Sight glass fitting for piping systems | |
JP2006234129A (ja) | 樹脂配管の接続端部構造 | |
CN109844299B (zh) | 箱组件的管路以及车辆的箱组件 | |
US20120285570A1 (en) | Pipe joint capable of absorbing water hammer shock |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200417 |
|
RJ01 | Rejection of invention patent application after publication |