CN111021364A - Foundation pit supporting device - Google Patents

Foundation pit supporting device Download PDF

Info

Publication number
CN111021364A
CN111021364A CN201911251915.9A CN201911251915A CN111021364A CN 111021364 A CN111021364 A CN 111021364A CN 201911251915 A CN201911251915 A CN 201911251915A CN 111021364 A CN111021364 A CN 111021364A
Authority
CN
China
Prior art keywords
embedded
reinforcement
steel bars
steel
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911251915.9A
Other languages
Chinese (zh)
Inventor
杨智贵
上官兵
袁卫国
方万进
曲研
何钟瑜
秦永康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Metallurgical Architectural Design Research Institute Co Ltd
Original Assignee
Guangdong Metallurgical Architectural Design Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Metallurgical Architectural Design Research Institute Co Ltd filed Critical Guangdong Metallurgical Architectural Design Research Institute Co Ltd
Priority to CN201911251915.9A priority Critical patent/CN111021364A/en
Publication of CN111021364A publication Critical patent/CN111021364A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/48Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a foundation pit supporting device which comprises a supporting pile and a bracket, wherein a reinforcement cage is arranged in the supporting pile, a reinforcement member is arranged in the reinforcement cage, a first reinforcement which is connected with the reinforcement member is arranged in the bracket, the reinforcement member comprises a first embedded reinforcement and a first embedded spare reinforcement, and a distance S is vertically arranged between a connection end of the first embedded reinforcement corresponding to the same connection end of the first reinforcement and a connection end of the first embedded spare reinforcement. The problem of vertical difficult when underground space reinforcing bar is pre-buried has been solved to first embedded reinforcing bar of design and first pre-buried reserve reinforcing bar, and the deviation appears in pre-buried reinforcing bar position, can change into reserve reinforcing bar to plug into, effectively solves the adverse effect that the vertical positioning deviation of steel reinforcement cage brought. The invention has reasonable structure and convenient construction, and can be widely applied to the technical field of building foundation pit engineering.

Description

Foundation pit supporting device
Technical Field
The invention relates to the technical field of building foundation pit engineering, in particular to a foundation pit supporting device.
Background
In recent years, with the rapid development of urban construction, the rapid development of domestic high-rise buildings and the full utilization of underground space, the design and construction problems of deep foundation pit supporting engineering become hot problems in foundation engineering. The scale of deep foundation pit engineering is also increasing year by year, so that various problems related to the design of deep foundation pit supporting structures are also developed. In most cases, a supporting pile supporting structure belongs to a common supporting form, and generally, the supporting pile supporting structure has the characteristics of quick construction and simple construction process so as to shorten the construction period to a great extent. By far, a support pile support structure has become one of the preferred schemes for a deep foundation pit support structure.
For underground structures that use pile foundations as the foundation, more foundation piles are often deployed on the floor of the structure. When the support pile is used as a foundation pit support form, the pile foundation at the edge of a pile foundation bearing platform of the structure is often very close to the support pile, the support pile is often buried underground as a permanent structure, and if the support pile is used as the permanent pile foundation at the edge of a bottom plate of the structure, the construction cost of foundation engineering of the structure is effectively reduced, and good economic benefit is brought. Therefore, in order to fully utilize the support piles as the foundation of the structure, the invention needs to invent a bracket supporting system which can provide vertical support for the structure, fully utilize the support piles and save the total construction cost of the project.
However, the embedded steel bars in the commonly used supporting piles are difficult to solve the problem of deviation of the steel bars during embedding, if the steel bars are deviated, the supporting piles cannot be adjusted after pouring, and if the supporting piles are connected with brackets, later-stage bar planting can be relied on, but the bar planting can possibly damage the supporting structure, the service life of the bar planting glue is 50 years at most, and the service life of some engineering designs is 100 years, so that the scheme of later-stage bar planting cannot meet the requirement of the design life.
Disclosure of Invention
In order to solve at least one of the technical problems and avoid the inconvenience of connection caused by the embedded deviation of the steel bars, the invention provides a foundation pit supporting device, which adopts the following technical scheme:
the foundation pit supporting device provided by the invention comprises a supporting pile and a bracket, wherein a reinforcement cage is arranged in the supporting pile, a reinforcement member is arranged in the reinforcement cage, a first reinforcement which is connected with the reinforcement member is arranged in the bracket, the reinforcement member comprises a first embedded reinforcement and a first embedded spare reinforcement, and a distance S is vertically arranged between a connection end of the first embedded reinforcement corresponding to the same connection end of the first reinforcement and a connection end of the first embedded spare reinforcement.
Furthermore, the first reinforcing steel bar is provided with two connection ends, and the two connection ends of the first reinforcing steel bar are arranged up and down.
Furthermore, the number of the first embedded steel bars corresponding to each connection end of the first steel bars is one, the number of the first embedded spare steel bars corresponding to each connection end of the first steel bars is two, and the connection end of each first embedded steel bar is located between the connection ends of the two first embedded spare steel bars.
Furthermore, the first embedded steel bars and the first embedded spare steel bars are bent into L shapes.
Furthermore, the chiseling surface is used as a boundary, the horizontal anchoring depth of the first embedded steel bar is not less than 15d, the length of the vertical hook is not less than 20d, and d is the diameter of the first embedded steel bar.
Furthermore, a second embedded steel bar is arranged in the steel bar cage, a second steel bar which is connected with the second embedded steel bar is arranged in the bracket, the second steel bar is provided with two connecting ends, and the two connecting ends of the second steel bar are arranged in a left-right mode.
Further, the second embedded steel bar is provided with two connection ends.
Has the advantages that: the problem of vertical positioning difficulty when underground space reinforcing bar is pre-buried has been solved to first pre-buried reinforcing bar of design and first pre-buried reserve reinforcing bar, and the deviation appears in pre-buried reinforcing bar position, can change into reserve reinforcing bar to plug into, effectively solves the adverse effect that the vertical positioning deviation of steel reinforcement cage brought. The invention has reasonable structure and convenient construction, and can be widely applied to the technical field of building foundation pit engineering.
Drawings
FIG. 1 is a schematic structural view of a foundation pit supporting device;
fig. 2 is a layout view of a first embedded steel bar, a first embedded spare steel bar and a first steel bar;
fig. 3 is a layout diagram of the connection ends of the first embedded steel bars, the first embedded spare steel bars and the second embedded steel bars on the side surface of the support pile;
FIG. 4 is a layout view of first and second reinforcing bars;
fig. 5 is a schematic structural view of a second embedded steel bar and a second steel bar;
fig. 6 is a schematic structural diagram of the first embedded steel bar, the first embedded spare steel bar and the first steel bar.
Detailed Description
The present invention will be further described with reference to fig. 1 to 6.
The invention relates to a foundation pit supporting device which comprises a supporting pile 11 and a bracket 12, wherein the bracket 12 is used for supporting a structure, the bracket 12 is hung on the side surface of the supporting pile 11, the supporting pile 11 and the bracket 12 bear vertical force together, the bearing force is clear, and the rigidity is higher. Arrange steel reinforcement cage 13 in the fender pile 11, steel reinforcement cage 13 has arranged the steel reinforcement component, and the steel reinforcement component passes through positioning reinforcement and steel reinforcement cage 13 ligature fixed. The bracket 12 is provided with a first reinforcing bar 14 connected with the reinforcing bar members, and the number of the first reinforcing bar 14 and the reinforcing bar members is multiple. The first reinforcing bar 14 is a top-bottom main reinforcing bar, the first reinforcing bar 14 has two connection ends, and the two connection ends of the first reinforcing bar 14 are arranged one above the other, that is, the first reinforcing bar 14 is bent in a vertical plane.
Second embedded steel bars 18 are arranged in the steel reinforcement cage 13, the second embedded steel bars 18 are side steel bars, second steel bars 17 connected with the second embedded steel bars 18 are arranged in the brackets 12, the second steel bars 17 are side steel bars, the second steel bars 17 are provided with two connecting ends, the two connecting ends of the second steel bars 17 are arranged in a left-right mode, and the second steel bars 17 are bent in the horizontal plane. The second embedded steel bars 18 have two connection ends, and the two connection ends of the second embedded steel bars 18 are respectively connected with the two connection ends of the second steel bars 17. The first reinforcing steel bars 14 and the second reinforcing steel bars 17 combined transversely and longitudinally form a reinforcing steel bar framework of the bracket 12.
The reinforcing bar component includes first embedded steel bar 15 and first embedded spare reinforcing bar 16, and first embedded steel bar 15 is top end owner muscle, and first embedded spare reinforcing bar 16 is reserve top end owner muscle, and reinforcing bar component is constituteed through the mode of spot welding to first embedded steel bar 15 and first embedded spare reinforcing bar 16. The connection end of the first embedded steel bar 15 and the connection end of the first embedded spare steel bar 16 corresponding to the same connection end of the first steel bar 14 are vertically provided with a space S, and the space S can be adjusted according to construction errors. Typically, the first reinforcement bar 14 is connected to the first embedded reinforcement bar 15, and if the reinforcement cage 13 is vertically positioned, the first reinforcement bar 14 may be connected to the first embedded spare reinforcement bar 16 instead.
During construction, the steel bar component sinks along with the steel bar cage 13, after the supporting pile 11 is poured, a foundation pit is excavated, then the connection ends of the first embedded steel bars 15, the first embedded spare steel bars 16 and the second embedded steel bars 18 are chiseled out from the side surface of the supporting pile 11, the first steel bars 14 and the second steel bars 17 are respectively connected, and steel bar connection of the bracket 12 is completed. And then the bracket 12 is poured, so that the foundation scale can be effectively reduced, and the total construction cost of the project is reduced.
The number of the first embedded steel bars 15 corresponding to each connection end of the first steel bars 14 is one, the number of the first embedded spare steel bars 16 corresponding to each connection end of the first steel bars 14 is two, and the connection end of the first embedded steel bar 15 is located between the connection ends of the two first embedded spare steel bars 16. The first reinforcement 14 can be docked with the corresponding first embedded spare reinforcement 16 regardless of whether the reinforcement cage 13 is biased upwardly or downwardly.
And reinforcing steel bar connectors 19 are respectively arranged at the connection ends of the reinforcing steel bars.
The first embedded steel bars 15 and the first embedded spare steel bars 16 are bent into an L shape and welded into an integral steel bar component. The chiseling surface is used as a boundary, the horizontal anchoring depth of the first embedded steel bars 15 is not less than 15d, the length of the vertical hooks is not less than 20d, d is the diameter of the first embedded steel bars 15, and the chiseling depth is 5 cm.
During construction, a first embedded steel bar 15, a first embedded spare steel bar 16, a second embedded steel bar 18 and a steel bar connector 19 are embedded in advance, wherein the embedding depth of the first embedded steel bar 15, the first embedded spare steel bar 16 and the second embedded steel bar 18 is as small as possible on the premise that the standard anchoring requirement is met, a lower conduit space which is not less than 50cm is ensured in the steel bar cage 13, and a sufficient space is reserved for conduit concrete pouring construction.
While the embodiments of the present invention have been described in detail with reference to the drawings, the present invention is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present invention within the knowledge of those skilled in the art.

Claims (7)

1. The utility model provides a foundation ditch strutting arrangement which characterized in that: including fender pile (11) and bracket (12), arranged steel reinforcement cage (13) in fender pile (11), the reinforcing bar component has been arranged in steel reinforcement cage (13), arrange first reinforcing bar (14) of plugging into with the reinforcing bar component in bracket (12), the reinforcing bar component includes first embedded steel bar (15) and first pre-buried spare reinforcement (16), the end of plugging into of the first embedded steel bar (15) that corresponds the same end of plugging into of first reinforcing bar (14) and the end of plugging into of first pre-buried spare reinforcement (16) have interval S in the vertical.
2. The foundation pit supporting device according to claim 1, wherein: the first reinforcing steel bar (14) is provided with two connection ends, and the two connection ends of the first reinforcing steel bar (14) are arranged up and down.
3. The foundation pit supporting device according to claim 2, wherein: the number of the first embedded steel bars (15) corresponding to each connection end of the first steel bars (14) is one, the number of the first embedded spare steel bars (16) corresponding to each connection end of the first steel bars (14) is two, and the connection end of each first embedded steel bar (15) is located between the connection ends of the two first embedded spare steel bars (16).
4. The foundation pit supporting device according to claim 1, wherein: the first embedded steel bars (15) and the first embedded spare steel bars (16) are bent into L shapes.
5. The foundation pit supporting device according to claim 4, wherein: the chiseling surface is used as a boundary, the horizontal anchoring depth of the first embedded steel bars (15) is not less than 15d, the length of the vertical hooks is not less than 20d, and d is the diameter of the first embedded steel bars (15).
6. The foundation pit supporting device according to claim 1, wherein: second embedded steel bars (18) are arranged in the steel bar cage (13), second steel bars (17) connected with the second embedded steel bars (18) are arranged in the brackets (12), the second steel bars (17) are provided with two connecting ends, and the two connecting ends of the second steel bars (17) are arranged in a left-right mode.
7. The foundation pit supporting device according to claim 6, wherein: the second embedded steel bar (18) is provided with two connection ends.
CN201911251915.9A 2019-12-09 2019-12-09 Foundation pit supporting device Pending CN111021364A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911251915.9A CN111021364A (en) 2019-12-09 2019-12-09 Foundation pit supporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911251915.9A CN111021364A (en) 2019-12-09 2019-12-09 Foundation pit supporting device

Publications (1)

Publication Number Publication Date
CN111021364A true CN111021364A (en) 2020-04-17

Family

ID=70208820

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911251915.9A Pending CN111021364A (en) 2019-12-09 2019-12-09 Foundation pit supporting device

Country Status (1)

Country Link
CN (1) CN111021364A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207092107U (en) * 2017-07-06 2018-03-13 中铁第四勘察设计院集团有限公司 A kind of anti-subsidence structure using diaphram wall
JP2018091107A (en) * 2016-12-07 2018-06-14 鹿島建設株式会社 Method for constructing underground structure
CN108487316A (en) * 2018-05-16 2018-09-04 中铁第四勘察设计院集团有限公司 It is a kind of to reduce underground structure grand heavy device and its construction method using building enclosure
CN211948447U (en) * 2019-12-09 2020-11-17 广东省冶金建筑设计研究院有限公司 Foundation pit supporting device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018091107A (en) * 2016-12-07 2018-06-14 鹿島建設株式会社 Method for constructing underground structure
CN207092107U (en) * 2017-07-06 2018-03-13 中铁第四勘察设计院集团有限公司 A kind of anti-subsidence structure using diaphram wall
CN108487316A (en) * 2018-05-16 2018-09-04 中铁第四勘察设计院集团有限公司 It is a kind of to reduce underground structure grand heavy device and its construction method using building enclosure
CN211948447U (en) * 2019-12-09 2020-11-17 广东省冶金建筑设计研究院有限公司 Foundation pit supporting device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孙大朋;: "型钢混凝土组合结构梁柱节点钢筋施工技术", 城市建设理论研究(电子版), vol. 2018, no. 04, 5 February 2018 (2018-02-05), pages 121 *

Similar Documents

Publication Publication Date Title
CN207228617U (en) A kind of concrete-pouring template float Structure for basement barricade single side formwork
CN206298900U (en) A kind of diaphram wall built-in type steel encloses purlin plug system
CN105240018A (en) Vertical shaft construction device and method
CN211948447U (en) Foundation pit supporting device
CN111155535A (en) Underground continuous wall and foundation slab's pre-buried steel sheet connection structure
CN106436721B (en) The construction method of diaphram wall built-in type steel purlin plug system
CN107299640A (en) A kind of variable cross-section well shaft type ground continuous wall base and its construction method
CN102433894B (en) Construction method for station side wall by covered top-down excavation method
CN111021364A (en) Foundation pit supporting device
CN211948464U (en) Underground continuous wall and foundation slab's pre-buried steel sheet connection structure
CN105274997A (en) Rib type brackets and method for constructing top way steel pipe support and top plate through brackets
CN205046560U (en) Muscle formula bracket
CN216108526U (en) Underground continuous wall structure for foundation pit support
CN215594030U (en) Deep foundation pit division construction foundation slab and structural floor connection structure
CN212801554U (en) Civil engineering weak soil deep basal pit step type slope form backplate
CN210368935U (en) Miniature pile structure, crown beam structure and miniature pile foundation pit supporting system
CN209339172U (en) A kind of novel peg board composite foundation
CN209260748U (en) A kind of stepped tower crane
CN202644590U (en) Foundation trench anti-floating structure for underground construction
CN212001161U (en) Local pit structure that falls in deep basal pit
JP4749858B2 (en) Method for enhancing bearing capacity in extension or reconstruction of superstructures of existing buildings
CN215330689U (en) Prefabricated wall panel for underground structure
CN211421151U (en) Double-walled steel cofferdam based on picture peg
CN218373981U (en) Suspended steel structure column in super-thick raft foundation
CN219794019U (en) Construction structure for realizing anti-floating of structure by utilizing existing support piles

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination