CN111007535A CN201911187234.0A CN201911187234A CN111007535A CN 111007535 A CN111007535 A CN 111007535A CN 201911187234 A CN201911187234 A CN 201911187234A CN 111007535 A CN111007535 A CN 111007535A
Authority
CN
China
Prior art keywords
base
cement column
reference station
observation pier
system reference
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911187234.0A
Other languages
Chinese (zh)
Inventor
付振霄
张�浩
张勇
张鹍
王德祥
毕晓伟
李菁竹
孔德秋
王振坤
牛华忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Jingwei Electric Power Engineering Consulting Co ltd
Shandong Zhiyuan Electric Power Design Consulting Co ltd
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Shandong Electric Power Co Ltd
Original Assignee
Jinan Jingwei Electric Power Engineering Consulting Co ltd
Shandong Zhiyuan Electric Power Design Consulting Co ltd
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Jingwei Electric Power Engineering Consulting Co ltd, Shandong Zhiyuan Electric Power Design Consulting Co ltd, State Grid Corp of China SGCC, Economic and Technological Research Institute of State Grid Shandong Electric Power Co Ltd filed Critical Jinan Jingwei Electric Power Engineering Consulting Co ltd
Priority to CN201911187234.0A priority Critical patent/CN111007535A/en
Publication of CN111007535A publication Critical patent/CN111007535A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S19/00Satellite radio beacon positioning systems; Determining position, velocity or attitude using signals transmitted by such systems
    • G01S19/01Satellite radio beacon positioning systems transmitting time-stamped messages, e.g. GPS [Global Positioning System], GLONASS [Global Orbiting Navigation Satellite System] or GALILEO
    • G01S19/02Details of the space or ground control segments
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2253Mounting poles or posts to the holder
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2284Means for adjusting the orientation of the post or pole

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses an observation pier for a Beidou foundation reinforcement system reference station, which comprises a base and a cement column, wherein I-shaped steel is arranged at the lower end of the base and is in a crossed cross shape, a jack is arranged at the end part of the I-shaped steel, the output end of the jack is connected with the I-shaped steel, a clamping groove is formed in the upper end of the base, a buckle is arranged at the lower end of the cement column, the clamping groove is matched with the buckle, the base is processed and finished in a factory, pre-support concrete is utilized for on-site assembly, on-site concrete pouring is not needed, the construction period is shortened, meanwhile, the horizontal position of the observation pier can be quickly and conveniently adjusted, the adjustment of the levelness of the base can be realized through the adjusted.

Description

Beidou foundation enhancement system reference station observation pier
Technical Field
The invention relates to the technical field of electric power facilities, in particular to an observation pier of a Beidou foundation enhancement system reference station.
Background
The Beidou satellite navigation system can provide functions of positioning, navigation, time service and the like, and the Beidou foundation enhancement system can improve Beidou positioning accuracy to centimeter level, so that satellite navigation service with higher accuracy and higher reliability is realized. The Beidou foundation enhancement system reference station is a facility for erecting equipment on a control point and processing data, and consists of an observation pier, a receiver, power supply, lightning protection equipment and the like. The observation pier needs to meet the requirements of BD440013-2017 Beidou foundation reinforcement system reference station construction technical specifications, the existing observation pier basically adopts a reinforced concrete structure, concrete pouring is needed on site, the influence of environmental factors is large, the construction period is long, the personnel safety risk is high, and the quality stability is poor.
Disclosure of Invention
The invention aims to solve the problems and provides an observation pier of a Beidou foundation enhancement system reference station, which can realize that concrete does not need to be poured in situ, shorten the construction period and quickly and conveniently adjust the horizontal position of the observation pier.
The technical scheme adopted by the invention for solving the technical problems is as follows:
a Beidou foundation enhancement system reference station observation pier comprises a base and a cement column, wherein I-shaped steel is arranged at the lower end of the base and is in a crossed cross shape, a jack is arranged at the end part of the I-shaped steel, the output end of the jack is connected with the I-shaped steel, a clamping groove is formed in the upper end of the base, a buckle is arranged at the lower end of the cement column and is matched with the buckle, four welding spots are arranged at the upper end of the base, reinforcing steel bars are arranged in the cement column and penetrate through the cement column, the reinforcing steel bars and the welding spots are in one-to-one correspondence, a first cable hole is formed in the base, a second cable hole is formed in the cement column and is matched with the first cable hole, levelness detection devices are arranged on the front side face and the right side face of the base respectively and comprise a semicircular ruler and an indication block, a connecting rod is arranged in the center of the semicircular ruler, the indication, the antenna is connected with the cement column through a connecting flange.
Further, the base lower extreme is equipped with the recess, and the I-steel is located the recess.
Furthermore, the jack output end is provided with a connecting plate, and the connecting plate is connected with the I-shaped steel.
Further, a pvc pipe is arranged in the first cable hole and the second cable hole.
Furthermore, a drain hole is formed in the base.
Furthermore, the base is connected with the upper end of the cement column through four steel strands, and the four steel strands are in one-to-one correspondence with four corners of the base respectively.
The invention has the beneficial effects that:
1. the levelness detection device is used for detecting the levelness of the base, the base is processed in a factory, precast concrete is used for on-site assembly, on-site concrete pouring is not needed, the construction period is shortened, the horizontal position of the observation pier can be quickly and conveniently adjusted, the adjustment of the levelness of the base can be realized by adjusting the jack, the device is simple and convenient, and the adjustment of the position of the observation pier is convenient.
2. According to the invention, the groove is formed in the lower end of the base, the I-shaped steel is positioned in the groove, the base is placed on the I-shaped steel and is fixed through the bolt, and the groove is used for positioning the position of the I-shaped steel, so that the mounting is convenient and the practicability is good.
3. The base is connected with the upper end of the cement column through the steel stranded wires, the number of the steel stranded wires is four, the four steel stranded wires are respectively in one-to-one correspondence with the four corners of the base, the antenna of the reference station is fixed above the cement column, the cable is led to the lower part of the reference station through the cable channel, and meanwhile, the four steel stranded wires are fixed at the top end of the cement column at the top and connected with precast concrete below to achieve the fixing effect, so that the cement column is firmer.
Drawings
In order to more clearly illustrate the embodiments or technical solutions in the prior art of the present invention, the drawings used in the description of the embodiments or prior art will be briefly described below, and it is obvious for those skilled in the art that other drawings can be obtained based on these drawings without creative efforts.
FIG. 1 is a first schematic structural diagram of the present invention;
FIG. 2 is a second schematic structural view of the present invention;
FIG. 3 is a schematic view of the structure of the base and the concrete column of the present invention;
FIG. 4 is a schematic view of the antenna and concrete column of the present invention;
FIG. 5 is a first schematic view of a base structure according to the present invention;
FIG. 6 is a second schematic view of the base structure of the present invention.
In the figure: the device comprises a base 1, a cement column 2, I-shaped steel 3, a jack 4, a clamping groove 5, a buckle 6, a reinforcing steel bar 7, a welding spot 8, a first cable hole 9, a second cable hole 10, a semicircular ruler 11, an indicating block 12, a connecting rod 13, a connecting rope 14, an antenna 15, a connecting flange 16, a groove 17, a connecting plate 18, a water drainage hole 19 and a steel strand 20.
Detailed Description
In order to make those skilled in the art better understand the technical solution of the present invention, the technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the drawings in the embodiment of the present invention, and it is obvious that the described embodiment is only a part of the embodiment of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
For convenience of description, a coordinate system is now defined as shown in fig. 1.
As shown in fig. 1 to 6, the Beidou foundation enhancement system reference station observation pier comprises a base 1 and a cement column 2, wherein i-beams 3 are arranged at the lower end of the base 1, the i-beams 3 are in a crossed cross shape, jacks 4 are arranged at the end parts of the i-beams 3, the output ends of the jacks 4 are connected with the i-beams 3, a clamping groove 5 is arranged at the upper end of the base 1, buckles 6 are arranged at the lower end of the cement column 2, the clamping groove 5 is matched with the buckles 6, the cement column 2 is overlapped in multiple layers, four welding spots 8 are arranged at the upper end of the base 1, reinforcing steel bars 7 are arranged in the cement column 2, the cement column 2 is longitudinally arranged and connected through four reinforcing steel bars 7, the reinforcing steel bars 7 penetrate through the cement column 2, the reinforcing steel bars 7 correspond to the welding spots 8 one by one, the buckles 6 at the lower end of the cement column 2 are inserted into the clamping grooves, the base 1 is provided with a first cable hole 9, the cement column 2 is internally provided with a second cable hole 10, the first cable hole 9 is matched with the second cable hole 10, the front side surface and the right side surface of the base 1 are respectively provided with a levelness detection device, the levelness detection device comprises a semicircular ruler 11 and an indication block 12, the center of the semicircular ruler 11 is provided with a connecting rod 13, the indication block 12 is connected with the connecting rod 13 through a connecting rope 14, the indication block 12 is conical, the indication block on the front side surface is used for indicating the angle of left and right inclination, the indication block on the right side surface is used for indicating the angle of front and back inclination so as to judge whether the base is horizontal, the upper end of the cement column 2 is provided with an antenna 15, the antenna 15 is connected with the cement column 2 through a connecting flange 16, in the working process, the levelness of the base is detected through the levelness detection device, the base is processed in a factory and, need not cast in situ concrete, shorten construction cycle, simultaneously can conveniently adjust observation mound horizontal position fast, can realize the regulation of base levelness through adjusting the jack, it is simple and convenient, it is convenient to observe mound position control simultaneously.
As shown in fig. 1 and 6, the lower end of the base 1 is provided with a groove 17, the i-steel 3 is positioned in the groove 17, the base 1 is placed on the i-steel 3 and fixed by bolts, and the groove 17 is used for positioning the position of the i-steel 3, so that the installation is convenient and the practicability is good.
As shown in fig. 1, the output end of the jack 4 is provided with a connecting plate 18, and the connecting plate 18 is connected with the i-steel 3 through a bolt.
A pvc pipe is arranged in the first cable hole 9 and the second cable hole 10.
As shown in fig. 1, the base 1 is provided with a drain hole 19.
As shown in figure 1, base 1 is connected through steel strand wires 20 with cement column 2 upper end, and steel strand wires 20 are equipped with four, and four steel strand wires 20 respectively with four angle one-to-one in base 1, the fixed base station antenna in cement column top is led the cable to the base station below through the cable passageway, and four steel strand wires are fixed simultaneously at the top of the cement column top and are connected with the precast concrete in below and reach fixed effect, make the cement column more firm.
In the description of the present invention, it should be noted that the terms "left", "right", "upper", "lower", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience in describing the present invention and simplifying the description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; they may be mechanically or electrically connected, directly or indirectly through intervening media, or may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.

Claims (6)

1. The Beidou foundation enhancement system reference station observation pier is characterized by comprising a base (1) and a cement column (2), wherein I-shaped steel (3) is arranged at the lower end of the base (1), the I-shaped steel (3) is in a crossed cross shape, a jack (4) is arranged at the end part of the I-shaped steel (3), the output end of the jack (4) is connected with the I-shaped steel (3), a clamping groove (5) is arranged at the upper end of the base (1), a buckle (6) is arranged at the lower end of the cement column (2), the clamping groove (5) is matched with the buckle (6), four welding points (8) are arranged at the upper end of the base (1), a reinforcing steel bar (7) is arranged in the cement column (2), the reinforcing steel bar (7) penetrates through the cement column (2), the reinforcing steel bar (7) corresponds to the welding points (8) one by one, a first cable hole (9) is arranged on the base (1), a second cable hole (10) is arranged in the cement, base (1) leading flank and right flank all are equipped with levelness detection device, levelness detection device includes semicircle chi (11) and instruction piece (12), and semicircle chi (11) center department is equipped with connecting rod (13), instructs piece (12) to be connected with connecting rod (13) through connecting rope (14), it is the toper to instruct piece (12), cement column (2) upper end is equipped with antenna (15), is connected through flange (16) between antenna (15) and cement column (2).
2. The observation pier of the Beidou foundation enhancement system reference station as set forth in claim 1, wherein a groove (17) is formed in the lower end of the base (1), and the I-shaped steel (3) is located in the groove (17).
3. The observation pier for the Beidou foundation enhancement system reference station as set forth in claim 1, characterized in that the output end of the jack (4) is provided with a connecting plate (18), and the connecting plate (18) is connected with the I-shaped steel (3).
4. The observation pier of the Beidou foundation enhancement system reference station as set forth in claim 1, wherein pvc pipes are arranged in the first cable hole (9) and the second cable hole (10).
5. The observation pier of the Beidou foundation enhancement system reference station as set forth in claim 1, characterized in that a drain hole (19) is formed on the base (1).
6. The observation pier of the Beidou foundation enhancement system reference station as set forth in claim 1, wherein the base (1) is connected with the upper end of the cement column (2) through steel strands (20), the number of the steel strands (20) is four, and the four steel strands (20) are in one-to-one correspondence with the four corners of the base (1).
CN201911187234.0A 2019-11-28 2019-11-28 Beidou foundation enhancement system reference station observation pier Pending CN111007535A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911187234.0A CN111007535A (en) 2019-11-28 2019-11-28 Beidou foundation enhancement system reference station observation pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911187234.0A CN111007535A (en) 2019-11-28 2019-11-28 Beidou foundation enhancement system reference station observation pier

Publications (1)

Publication Number Publication Date
CN111007535A true CN111007535A (en) 2020-04-14

Family

ID=70112095

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911187234.0A Pending CN111007535A (en) 2019-11-28 2019-11-28 Beidou foundation enhancement system reference station observation pier

Country Status (1)

Country Link
CN (1) CN111007535A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112229383A (en) * 2020-09-29 2021-01-15 上海铁大建设工程质量检测有限公司 Observation pier
JP6882629B1 (en) * 2020-03-17 2021-06-02 株式会社テクノスヤシマ Positioning reference station
CN112900474A (en) * 2021-01-26 2021-06-04 山东电力工程咨询院有限公司 Beidou reference station observation pier construction method and observation pier

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10197652A (en) * 1997-01-13 1998-07-31 Tokyo Electric Power Co Inc:The Thunder observation system for distribution line
CN105547266A (en) * 2016-01-13 2016-05-04 上海朗勒工贸有限公司 GPS monitoring instrument mounting and fixing device
CN205374746U (en) * 2016-01-28 2016-07-06 陕西省地震局 GPS observation pier that can remote monitoring gradient
US20170331194A1 (en) * 2016-05-10 2017-11-16 Wistron Neweb Corp. Communication device
CN207987714U (en) * 2018-03-09 2018-10-19 江苏省建筑园林设计院有限公司 A kind of architectural vibration-insulation bearing
CN109167170A (en) * 2018-08-23 2019-01-08 四川莱源科技有限公司 A kind of fixed device of new antenna
CN109235330A (en) * 2018-09-21 2019-01-18 国家电网有限公司 A kind of convenient Anti-bumping protection pier
CN209159718U (en) * 2018-10-18 2019-07-26 山东北斗华宸导航技术股份有限公司 Base station pier for high-speed railway rail detection

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10197652A (en) * 1997-01-13 1998-07-31 Tokyo Electric Power Co Inc:The Thunder observation system for distribution line
CN105547266A (en) * 2016-01-13 2016-05-04 上海朗勒工贸有限公司 GPS monitoring instrument mounting and fixing device
CN205374746U (en) * 2016-01-28 2016-07-06 陕西省地震局 GPS observation pier that can remote monitoring gradient
US20170331194A1 (en) * 2016-05-10 2017-11-16 Wistron Neweb Corp. Communication device
CN207987714U (en) * 2018-03-09 2018-10-19 江苏省建筑园林设计院有限公司 A kind of architectural vibration-insulation bearing
CN109167170A (en) * 2018-08-23 2019-01-08 四川莱源科技有限公司 A kind of fixed device of new antenna
CN109235330A (en) * 2018-09-21 2019-01-18 国家电网有限公司 A kind of convenient Anti-bumping protection pier
CN209159718U (en) * 2018-10-18 2019-07-26 山东北斗华宸导航技术股份有限公司 Base station pier for high-speed railway rail detection

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6882629B1 (en) * 2020-03-17 2021-06-02 株式会社テクノスヤシマ Positioning reference station
CN112229383A (en) * 2020-09-29 2021-01-15 上海铁大建设工程质量检测有限公司 Observation pier
CN112900474A (en) * 2021-01-26 2021-06-04 山东电力工程咨询院有限公司 Beidou reference station observation pier construction method and observation pier
CN112900474B (en) * 2021-01-26 2022-08-09 山东电力工程咨询院有限公司 Beidou reference station observation pier construction method and observation pier

Similar Documents

Publication Publication Date Title
CN111007535A (en) Beidou foundation enhancement system reference station observation pier
CN102733545B (en) Section steel column for high-rise building section steel concrete combination structure, and construction method thereof
CN103034224B (en) Multi-point remote monitoring system for settlement
CN111851565B (en) Steel structure stand column alignment structure with cup-mouth type foundation and construction method thereof
CN107090775A (en) A kind of full framing space beam-ends cable guide pipe construction localization method
CN210507148U (en) Positioning and adjusting device for main tower cable guide pipe of cable-stayed bridge
CN203768941U (en) Fast installation mould for foundation bolt set
CN105297731A (en) Reverse construction method steel stand column positioning device and positioning method
CN104594317A (en) Working platform, single pile foundation, offshore working platform and installing method of offshore working platform
CN108843024B (en) Construction method for pretensioning and binding longitudinal distribution ribs of prefabricated small box girder steel reinforcement framework
CN102995570A (en) Stiffening steel truss lower node location die
CN105735228A (en) Construction method and installation accuracy control method of rack systems of high-lift rack climbing type ship lift
CN214615043U (en) Prefabricated component reserved steel bar positioning and correcting device
CN205444228U (en) Framework column base rag bolt of transformer substation
CN202627326U (en) Section steel column for high-rise building steel reinforced concrete composite structures
CN212742614U (en) Foundation inner stand column positioning and mounting structure
CN109038232B (en) Embedded part structure for lightning rod
CN210529741U (en) Independent foundation embedded bolt mounting structure
CN206815191U (en) A kind of full framing space beam-ends cable guide pipe positioner
CN210482011U (en) Pre-buried positioner of cable-stay bridge cable steel pipe
CN211312623U (en) Miniature steel-pipe pile body displacement monitoring devices
CN218626110U (en) Bridge drilling-free radar flow measurement system mounting bracket
CN209011589U (en) A kind of pinner anchor hole accurate positioning fixture with adjustment height conduit
CN111005581A (en) Assembly type operation platform capable of adjusting vertical degree of shell and operation method
CN218265235U (en) GNSS automatic monitoring equipment and lightning rod fixing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200414