CN110969399A CN201811136736.6A CN201811136736A CN110969399A CN 110969399 A CN110969399 A CN 110969399A CN 201811136736 A CN201811136736 A CN 201811136736A CN 110969399 A CN110969399 A CN 110969399A
Authority
CN
China
Prior art keywords
contract
settlement
target
progress
determining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811136736.6A
Other languages
Chinese (zh)
Inventor
黄好军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Gridsum Technology Co Ltd
Original Assignee
Beijing Gridsum Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Gridsum Technology Co Ltd filed Critical Beijing Gridsum Technology Co Ltd
Priority to CN201811136736.6A priority Critical patent/CN110969399A/en
Publication of CN110969399A publication Critical patent/CN110969399A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a method and a device for judging contract settlement progress lag, which are used for acquiring contract settlement lag judgment parameters of a target contract after the target contract is determined; determining standard parameters corresponding to contract settlement lagging judgment parameters of the target contract; and judging whether the contract settlement hysteresis judgment parameter of the target contract is larger than the standard parameter, if so, delaying the contract settlement progress of the target contract, and if not, not delaying the contract settlement progress of the target contract. By the method and the device, related personnel can determine whether the contract settlement progress is delayed in time, so that the contract settlement progress is promoted.

Description

Method and device for judging contract settlement progress lag
Technical Field
The invention relates to the technical field of contract settlement, in particular to a method and a device for judging the progress delay of contract settlement.
Background
With the development and progress of the society, large-scale enterprise engineering projects are more and more, and contract settlement control nodes of each engineering project are more, so that the contract settlement period of an enterprise is long and complicated, and in addition, due to the influence of other factors such as serious lags in contract signing, insufficient contract settlement basis, incomplete contract settlement system and the like, the contract settlement can not be completed on time, and the normal production and operation activities of the enterprise are seriously influenced.
At present, a main department defines an overall annual contract settlement progress plan, requires each implementation unit to strictly execute the contract settlement progress, and examines the contract settlement progress executed by each implementation unit according to monthly degrees through an Enterprise Resource Planning (ERP) system, a contract management system and other information systems so as to promote the contract settlement progress.
However, the progress difference of contract settlement executed by each implementing unit is large, so that the check basis of the contract settlement progress is insufficient, and the effect of promoting the contract settlement progress is not ideal.
Disclosure of Invention
In view of the above problems, the present invention has been made to provide a method and apparatus for determining a contract settlement progress lag that overcomes or at least partially solves the above problems. The scheme is as follows:
a method for determining a contract settlement progress lag, the method comprising:
determining a target contract;
acquiring a contract settlement hysteresis judgment parameter of the target contract;
determining standard parameters corresponding to contract settlement lagging judgment parameters of the target contract;
and judging whether the contract settlement hysteresis judgment parameter of the target contract is larger than the standard parameter, if so, delaying the contract settlement progress of the target contract, and if not, not delaying the contract settlement progress of the target contract.
Optionally, after determining whether the contract settlement hysteresis determination parameter of the target contract is greater than the criterion parameter, the method further comprises:
and outputting a judgment result of the delayed contract settlement progress of the target contract.
Optionally, after outputting the determination result of the contract settlement progress hysteresis of the target contract, the method further includes:
receiving manual verification information of a judgment result of delayed contract settlement of the target contract;
and adjusting the judgment result of the contract settlement lag of the target contract according to the manual verification information to generate a final judgment result.
Optionally, after the adjusting the determination result of the delayed contract settlement of the target contract according to the manual verification information to generate a final determination result, the method further includes:
and optimizing standard parameters corresponding to contract settlement lagging judgment parameters of the target contract according to the final judgment result based on a machine learning algorithm.
Optionally, the obtaining of the contract settlement hysteresis judgment parameter of the target contract includes:
extracting engineering management data and contract settlement data corresponding to the contract number of the target contract from an enterprise management system;
determining the state of the project corresponding to the target contract according to the project management data;
and determining a contract settlement hysteresis judgment parameter of the target contract according to the state of the project corresponding to the target contract and the contract settlement data.
Optionally, the determining a contract settlement hysteresis judgment parameter of the target contract according to the state of the project corresponding to the target contract and the contract settlement data includes:
when the project state corresponding to the target contract is the starting work, determining that the contract settlement lag judgment parameter of the target contract is the time difference between the project starting work date and the contract signing date;
when the project state corresponding to the target contract is construction, determining contract settlement hysteresis judgment parameters of the target contract as a progress difference between contract settlement plan progress and contract settlement actual progress and a progress difference between project progress and contract settlement actual progress;
when the project state corresponding to the target contract is completion, determining that the contract settlement hysteresis judgment parameter of the target contract is the time difference between the contract settlement completion date and the project completion date and the progress difference between the contract settlement plan progress and the contract settlement actual progress;
and when the project state corresponding to the target contract is production, determining that the contract settlement hysteresis judgment parameter of the target contract is the time difference between the contract settlement completion date and the project production date, and the progress difference between the contract settlement plan progress and the contract settlement actual progress.
Optionally, the determining a standard parameter corresponding to the contract settlement hysteresis judgment parameter of the target contract includes:
determining a type of the target contract;
and determining standard parameters corresponding to the contract settlement hysteresis judgment parameters of the target contract from preset settlement hysteresis judgment standard parameters of different types of contracts according to the type of the target contract.
An apparatus for determining a progress lag of contract settlement, the apparatus comprising:
a determination unit for determining a target contract;
an acquisition unit configured to acquire a contract settlement hysteresis judgment parameter of the target contract;
the determining unit is further used for determining a standard parameter corresponding to the contract settlement lagging judgment parameter of the target contract;
and the judging unit is used for judging whether the contract settlement delay judging parameter of the target contract is larger than the standard parameter, if so, the contract settlement progress of the target contract is delayed, and if not, the contract settlement progress of the target contract is not delayed.
A storage medium having stored thereon a program which, when executed by a processor, implements the method of determining contract settlement progress lag as described above.
An electronic device comprising a memory for storing a program and a processor for executing the program, wherein the program executes to execute the method for determining a contract settlement progress lag as described above.
By means of the technical scheme, the method and the device for judging the contract settlement progress lag acquire the contract settlement lag judgment parameters of the target contract after the target contract is determined; determining standard parameters corresponding to contract settlement lagging judgment parameters of the target contract; and judging whether the contract settlement hysteresis judgment parameter of the target contract is larger than the standard parameter, if so, delaying the contract settlement progress of the target contract, and if not, not delaying the contract settlement progress of the target contract. By the method and the device, related personnel can determine whether the contract settlement progress is delayed in time, so that the contract settlement progress is promoted.
The foregoing description is only an overview of the technical solutions of the present invention, and the embodiments of the present invention are described below in order to make the technical means of the present invention more clearly understood and to make the above and other objects, features, and advantages of the present invention more clearly understandable.
Drawings
Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The drawings are only for purposes of illustrating the preferred embodiments and are not to be construed as limiting the invention. Also, like reference numerals are used to refer to like parts throughout the drawings. In the drawings:
fig. 1 is a schematic flow chart of a method for determining a contract settlement progress lag according to an embodiment of the present invention;
fig. 2 is a schematic diagram of a specific process for obtaining a contract settlement hysteresis judgment parameter of the target contract according to the embodiment of the present invention;
FIG. 3 is a schematic diagram of a specific process for determining a standard parameter corresponding to a post-contract settlement determination parameter of the target contract according to an embodiment of the present invention;
FIG. 4 is a schematic flow chart illustrating a method for determining a contract settlement progress lag according to another embodiment of the present invention;
fig. 5 is a schematic structural diagram of a device for determining a contract settlement progress delay according to an embodiment of the present invention.
Detailed Description
Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art.
Referring to fig. 1, fig. 1 is a schematic flowchart illustrating a method for determining a contract settlement progress delay according to an embodiment of the present invention, where the method includes the following steps:
step S100: determining a target contract;
in this step, the determining the target contract includes: determining a target contract list according to contract information input by a user, wherein the contract information comprises any one or more of contract type information, supplier information, associated transaction information, engineering state information, contract signing time information and contract number information; a target contract is determined from the target contract manifest.
It should be noted that, according to different contract information input by the user, the determined target contract lists may be the same or different, and in addition, according to the contract information input by the user, the target contract list including only one target contract may be determined, or the target contract lists including a plurality of target contracts may be determined, and when the target contract lists including a plurality of target contracts are determined, for each target contract in the lists, whether the target contract settlement progress is delayed or not is determined according to the method for determining the contract settlement progress delay disclosed in the present application.
Step S110: acquiring a contract settlement hysteresis judgment parameter of the target contract;
referring to fig. 2, fig. 2 is a schematic diagram of a specific process for obtaining a contract settlement hysteresis judgment parameter of the target contract according to an embodiment of the present invention, which specifically includes:
step S1101: and extracting project management data and contract settlement data corresponding to the contract number of the target contract from the enterprise management system.
Wherein the engineering management data comprises: the contract settlement data comprises any one or more of project starting date, project progress data, project completion date and project production date, and comprises: any one or more of contract signing date, contract settlement plan progress data, contract settlement actual progress data and contract settlement completion date; the enterprise management system comprises an Enterprise Resource Planning (ERP) system, a contract management system, a settlement system and the like.
Step S1102: determining the state of the project corresponding to the target contract according to the project management data;
step S1103, determining a contract settlement hysteresis judgment parameter of the target contract according to the state of the project corresponding to the target contract and the contract settlement data;
wherein the determining of the contract settlement hysteresis judgment parameter of the target contract according to the state of the project corresponding to the target contract and the contract settlement data comprises:
when the project state corresponding to the target contract is the starting work, determining that the contract settlement lag judgment parameter of the target contract is the time difference between the project starting work date and the contract signing date;
when the project state corresponding to the target contract is construction, determining contract settlement hysteresis judgment parameters of the target contract as a progress difference between contract settlement plan progress and contract settlement actual progress and a progress difference between project progress and contract settlement actual progress;
when the project state corresponding to the target contract is completion, determining that the contract settlement hysteresis judgment parameter of the target contract is the time difference between the contract settlement completion date and the project completion date and the progress difference between the contract settlement plan progress and the contract settlement actual progress;
and when the project state corresponding to the target contract is production, determining that the contract settlement hysteresis judgment parameter of the target contract is the time difference between the contract settlement completion date and the project production date, and the progress difference between the contract settlement plan progress and the contract settlement actual progress.
Step S120: determining standard parameters corresponding to contract settlement lagging judgment parameters of the target contract;
in the application, settlement delay judgment standard parameters of contracts of different types (for example, construction project investigation contracts, construction project design contracts, construction project construction contracts and the like) are preset, and the settlement delay judgment standard parameters of the contracts of different types all comprise standard time difference between project starting date and contract signing date, standard time difference between contract settlement plan progress and contract settlement actual progress, standard time difference between project progress and contract settlement actual progress, standard time difference between contract settlement completion date and project completion date, and standard time difference between contract settlement completion date and project production date.
Referring to fig. 3, fig. 3 is a schematic diagram of a specific process for determining a standard parameter corresponding to a post-contract settlement determination parameter of the target contract according to an embodiment of the present invention, which specifically includes:
step S1201: determining a type of the target contract;
step S1202: and determining standard parameters corresponding to the contract settlement hysteresis judgment parameters of the target contract from preset settlement hysteresis judgment standard parameters of different types of contracts according to the type of the target contract.
Step S130: and judging whether the contract settlement hysteresis judgment parameter of the target contract is larger than the standard parameter, if so, delaying the contract settlement progress of the target contract, and if not, not delaying the contract settlement progress of the target contract.
In the method for judging contract settlement progress lag provided by this embodiment, after a target contract is determined, a contract settlement lag judgment parameter of the target contract is obtained; determining standard parameters corresponding to contract settlement lagging judgment parameters of the target contract; and judging whether the contract settlement hysteresis judgment parameter of the target contract is larger than the standard parameter, if so, delaying the contract settlement progress of the target contract, and if not, not delaying the contract settlement progress of the target contract. By the method and the device, related personnel can determine whether the contract settlement progress is delayed in time, so that the contract settlement progress is promoted.
On the basis of the foregoing embodiment, the present invention further discloses a method for determining contract settlement progress lag, specifically referring to fig. 4, where fig. 4 is a schematic flow chart of another method for determining contract settlement progress lag disclosed in the embodiment of the present invention, and the method specifically includes the following steps:
step S200, determining a target contract;
step S210, acquiring contract settlement lag judgment parameters of the target contract;
step S220, determining standard parameters corresponding to contract settlement lag judgment parameters of the target contract;
step S230, judging whether the contract settlement delay judgment parameter of the target contract is larger than the standard parameter, if so, the contract settlement progress of the target contract is delayed, and if not, the contract settlement progress of the target contract is not delayed;
it should be noted that the specific implementation of steps S200 to S230 can refer to steps S100 to S130 in the above embodiment, and this embodiment is not described again.
And step S240, outputting a judgment result of the contract settlement progress lag of the target contract.
It should be noted that the determination result includes a hysteresis reason, and the hysteresis reason may specifically be that a certain contract settlement hysteresis determination parameter of the target contract is greater than a corresponding standard parameter.
Step S250, receiving manual verification information of a judgment result of the delayed contract settlement of the target contract;
step S260, adjusting the judgment result of the delayed contract settlement of the target contract according to the manual verification information to generate a final judgment result;
and step S270, based on a machine learning algorithm, optimizing standard parameters corresponding to contract settlement lag judgment parameters of the target contract according to the final judgment result.
In an implementation manner, the final determination result may be learned through any one of machine learning algorithms such as decision tree, random forest, logistic regression, support vector machine, naive bayes, K-neighbor algorithm, K-means algorithm, Adaboost, neural network, markov, and the like, so as to optimize the standard parameter corresponding to the contract settlement hysteresis determination parameter of the target contract.
In this embodiment, by outputting the determination result of the delayed contract settlement progress of the target contract, the relevant person can determine whether the contract settlement progress is delayed more intuitively. Moreover, the judgment result can be adjusted through the manual verification information, and the standard parameters are optimized according to the adjusted judgment result, so that the judgment accuracy of the delayed contract settlement progress can be further improved, and the contract settlement is further promoted.
Referring to fig. 5, fig. 5 is a schematic structural diagram of a device for determining a contract settlement progress delay according to an embodiment of the present invention, where the device includes:
a determination unit 10 for determining a target contract;
an obtaining unit 11, configured to obtain a contract settlement hysteresis judgment parameter of the target contract;
the determining unit 10 is further configured to determine a standard parameter corresponding to the contract settlement hysteresis judgment parameter of the target contract;
and the judging unit 12 is configured to judge whether the contract settlement hysteresis judgment parameter of the target contract is greater than the standard parameter, if so, the contract settlement progress of the target contract is delayed, and if not, the contract settlement progress of the target contract is not delayed.
The device for judging the contract settlement progress lag comprises a processor and a memory, wherein the determining unit, the acquiring unit, the judging unit and the like are stored in the memory as program units, and the processor executes the program units stored in the memory to realize corresponding functions.
The processor comprises a kernel, and the kernel calls the corresponding program unit from the memory. The kernel can be set to be one or more than one, and relevant personnel can determine whether the contract settlement progress is delayed in time by adjusting kernel parameters, so that the progress of the contract settlement is promoted.
The memory may include volatile memory in a computer readable medium, Random Access Memory (RAM) and/or nonvolatile memory such as Read Only Memory (ROM) or flash memory (flash RAM), and the memory includes at least one memory chip.
An embodiment of the present invention provides a storage medium on which a program is stored, the program implementing the method for determining a contract settlement progress lag when executed by a processor.
The embodiment of the invention provides a processor, which is used for running a program, wherein the judgment method of contract settlement progress lag is executed when the program runs.
The embodiment of the invention provides equipment, which comprises a processor, a memory and a program which is stored on the memory and can run on the processor, wherein the processor executes the program and realizes the following steps:
determining a target contract;
acquiring a contract settlement hysteresis judgment parameter of the target contract;
determining standard parameters corresponding to contract settlement lagging judgment parameters of the target contract;
and judging whether the contract settlement hysteresis judgment parameter of the target contract is larger than the standard parameter, if so, delaying the contract settlement progress of the target contract, and if not, not delaying the contract settlement progress of the target contract.
Optionally, after determining whether the contract settlement hysteresis determination parameter of the target contract is greater than the criterion parameter, the method further comprises:
and outputting a judgment result of the delayed contract settlement progress of the target contract.
Optionally, after outputting the determination result of the contract settlement progress hysteresis of the target contract, the method further includes:
receiving manual verification information of a judgment result of delayed contract settlement of the target contract;
and adjusting the judgment result of the contract settlement lag of the target contract according to the manual verification information to generate a final judgment result.
Optionally, after the adjusting the determination result of the delayed contract settlement of the target contract according to the manual verification information to generate a final determination result, the method further includes:
and optimizing standard parameters corresponding to contract settlement lagging judgment parameters of the target contract according to the final judgment result based on a machine learning algorithm.
Optionally, the obtaining of the contract settlement hysteresis judgment parameter of the target contract includes:
extracting engineering management data and contract settlement data corresponding to the contract number of the target contract from an enterprise management system;
determining the state of the project corresponding to the target contract according to the project management data;
and determining a contract settlement hysteresis judgment parameter of the target contract according to the state of the project corresponding to the target contract and the contract settlement data.
Optionally, the determining a contract settlement hysteresis judgment parameter of the target contract according to the state of the project corresponding to the target contract and the contract settlement data includes:
when the project state corresponding to the target contract is the starting work, determining that the contract settlement lag judgment parameter of the target contract is the time difference between the project starting work date and the contract signing date;
when the project state corresponding to the target contract is construction, determining contract settlement hysteresis judgment parameters of the target contract as a progress difference between contract settlement plan progress and contract settlement actual progress and a progress difference between project progress and contract settlement actual progress;
when the project state corresponding to the target contract is completion, determining that the contract settlement hysteresis judgment parameter of the target contract is the time difference between the contract settlement completion date and the project completion date and the progress difference between the contract settlement plan progress and the contract settlement actual progress;
and when the project state corresponding to the target contract is production, determining that the contract settlement hysteresis judgment parameter of the target contract is the time difference between the contract settlement completion date and the project production date, and the progress difference between the contract settlement plan progress and the contract settlement actual progress.
Optionally, the determining a standard parameter corresponding to the contract settlement hysteresis judgment parameter of the target contract includes:
determining a type of the target contract;
and determining standard parameters corresponding to the contract settlement hysteresis judgment parameters of the target contract from preset settlement hysteresis judgment standard parameters of different types of contracts according to the type of the target contract.
The device herein may be a server, a PC, a PAD, a mobile phone, etc.
The present application further provides a computer program product adapted to perform a program for initializing the following method steps when executed on a data processing device:
determining a target contract;
acquiring a contract settlement hysteresis judgment parameter of the target contract;
determining standard parameters corresponding to contract settlement lagging judgment parameters of the target contract;
and judging whether the contract settlement hysteresis judgment parameter of the target contract is larger than the standard parameter, if so, delaying the contract settlement progress of the target contract, and if not, not delaying the contract settlement progress of the target contract.
Optionally, after determining whether the contract settlement hysteresis determination parameter of the target contract is greater than the criterion parameter, the method further comprises:
and outputting a judgment result of the delayed contract settlement progress of the target contract.
Optionally, after outputting the determination result of the contract settlement progress hysteresis of the target contract, the method further includes:
receiving manual verification information of a judgment result of delayed contract settlement of the target contract;
and adjusting the judgment result of the contract settlement lag of the target contract according to the manual verification information to generate a final judgment result.
Optionally, after the adjusting the determination result of the delayed contract settlement of the target contract according to the manual verification information to generate a final determination result, the method further includes:
and optimizing standard parameters corresponding to contract settlement lagging judgment parameters of the target contract according to the final judgment result based on a machine learning algorithm.
Optionally, the obtaining of the contract settlement hysteresis judgment parameter of the target contract includes:
extracting engineering management data and contract settlement data corresponding to the contract number of the target contract from an enterprise management system;
determining the state of the project corresponding to the target contract according to the project management data;
and determining a contract settlement hysteresis judgment parameter of the target contract according to the state of the project corresponding to the target contract and the contract settlement data.
Optionally, the determining a contract settlement hysteresis judgment parameter of the target contract according to the state of the project corresponding to the target contract and the contract settlement data includes:
when the project state corresponding to the target contract is the starting work, determining that the contract settlement lag judgment parameter of the target contract is the time difference between the project starting work date and the contract signing date;
when the project state corresponding to the target contract is construction, determining contract settlement hysteresis judgment parameters of the target contract as a progress difference between contract settlement plan progress and contract settlement actual progress and a progress difference between project progress and contract settlement actual progress;
when the project state corresponding to the target contract is completion, determining that the contract settlement hysteresis judgment parameter of the target contract is the time difference between the contract settlement completion date and the project completion date and the progress difference between the contract settlement plan progress and the contract settlement actual progress;
and when the project state corresponding to the target contract is production, determining that the contract settlement hysteresis judgment parameter of the target contract is the time difference between the contract settlement completion date and the project production date, and the progress difference between the contract settlement plan progress and the contract settlement actual progress.
Optionally, the determining a standard parameter corresponding to the contract settlement hysteresis judgment parameter of the target contract includes:
determining a type of the target contract;
and determining standard parameters corresponding to the contract settlement hysteresis judgment parameters of the target contract from preset settlement hysteresis judgment standard parameters of different types of contracts according to the type of the target contract.
As will be appreciated by one skilled in the art, embodiments of the present application may be provided as a method, system, or computer program product. Accordingly, the present application may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
The present application is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the application. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
In a typical configuration, a computing device includes one or more processors (CPUs), input/output interfaces, network interfaces, and memory.
The memory may include forms of volatile memory in a computer readable medium, Random Access Memory (RAM) and/or non-volatile memory, such as Read Only Memory (ROM) or flash memory (flash RAM). The memory is an example of a computer-readable medium.
Computer-readable media, including both non-transitory and non-transitory, removable and non-removable media, may implement information storage by any method or technology. The information may be computer readable instructions, data structures, modules of a program, or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), Static Random Access Memory (SRAM), Dynamic Random Access Memory (DRAM), other types of Random Access Memory (RAM), Read Only Memory (ROM), Electrically Erasable Programmable Read Only Memory (EEPROM), flash memory or other memory technology, compact disc read only memory (CD-ROM), Digital Versatile Discs (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices, or any other non-transmission medium that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include transitory computer readable media (trans entity med ia) such as modulated data signals and carrier waves.
It should also be noted that the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in the process, method, article, or apparatus that comprises the element.
As will be appreciated by one skilled in the art, embodiments of the present application may be provided as a method, system, or computer program product. Accordingly, the present application may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
The above are merely examples of the present application and are not intended to limit the present application. Various modifications and changes may occur to those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of the claims of the present application.

Claims (10)

1. A method for judging contract settlement progress lag is characterized by comprising the following steps:
determining a target contract;
acquiring a contract settlement hysteresis judgment parameter of the target contract;
determining standard parameters corresponding to contract settlement lagging judgment parameters of the target contract;
and judging whether the contract settlement hysteresis judgment parameter of the target contract is larger than the standard parameter, if so, delaying the contract settlement progress of the target contract, and if not, not delaying the contract settlement progress of the target contract.
2. The method of claim 1, wherein after determining whether the contract settlement hysteresis determination parameter of the target contract is greater than the criterion parameter, the method further comprises:
and outputting a judgment result of the delayed contract settlement progress of the target contract.
3. The method according to claim 2, wherein after outputting a judgment result of a contract settlement progress lag of the target contract, the method further comprises:
receiving manual verification information of a judgment result of delayed contract settlement of the target contract;
and adjusting the judgment result of the contract settlement lag of the target contract according to the manual verification information to generate a final judgment result.
4. The method of claim 3, wherein after the adjusting the determination result of the contract settlement hysteresis of the target contract according to the manual verification information to generate a final determination result, the method further comprises:
and optimizing standard parameters corresponding to contract settlement lagging judgment parameters of the target contract according to the final judgment result based on a machine learning algorithm.
5. The method according to any one of claims 1 to 4, wherein the obtaining of the contract settlement hysteresis judgment parameter of the target contract comprises:
extracting engineering management data and contract settlement data corresponding to the contract number of the target contract from an enterprise management system;
determining the state of the project corresponding to the target contract according to the project management data;
and determining a contract settlement hysteresis judgment parameter of the target contract according to the state of the project corresponding to the target contract and the contract settlement data.
6. The method of claim 5, wherein determining the contract settlement hysteresis judgment parameter of the target contract according to the status of the project corresponding to the target contract and the contract settlement data comprises:
when the project state corresponding to the target contract is the starting work, determining that the contract settlement lag judgment parameter of the target contract is the time difference between the project starting work date and the contract signing date;
when the project state corresponding to the target contract is construction, determining contract settlement hysteresis judgment parameters of the target contract as a progress difference between contract settlement plan progress and contract settlement actual progress and a progress difference between project progress and contract settlement actual progress;
when the project state corresponding to the target contract is completion, determining that the contract settlement hysteresis judgment parameter of the target contract is the time difference between the contract settlement completion date and the project completion date and the progress difference between the contract settlement plan progress and the contract settlement actual progress;
and when the project state corresponding to the target contract is production, determining that the contract settlement hysteresis judgment parameter of the target contract is the time difference between the contract settlement completion date and the project production date, and the progress difference between the contract settlement plan progress and the contract settlement actual progress.
7. The method of claim 5, wherein determining the criteria parameter corresponding to the contract settlement hysteresis decision parameter for the target contract comprises:
determining a type of the target contract;
and determining standard parameters corresponding to the contract settlement hysteresis judgment parameters of the target contract from preset settlement hysteresis judgment standard parameters of different types of contracts according to the type of the target contract.
8. An apparatus for judging a progress delay of contract settlement, comprising:
a determination unit for determining a target contract;
an acquisition unit configured to acquire a contract settlement hysteresis judgment parameter of the target contract;
the determining unit is further used for determining a standard parameter corresponding to the contract settlement lagging judgment parameter of the target contract;
and the judging unit is used for judging whether the contract settlement delay judging parameter of the target contract is larger than the standard parameter, if so, the contract settlement progress of the target contract is delayed, and if not, the contract settlement progress of the target contract is not delayed.
9. A storage medium having stored thereon a program which, when executed by a processor, implements the method of determining a contract settlement progress lag according to any one of claims 1 to 7.
10. An electronic device comprising a memory for storing a program and a processor for executing the program, wherein the program executes to execute the method for determining a contract settlement progress lag according to any one of claims 1 to 7.
CN201811136736.6A 2018-09-28 2018-09-28 Method and device for judging contract settlement progress lag Pending CN110969399A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811136736.6A CN110969399A (en) 2018-09-28 2018-09-28 Method and device for judging contract settlement progress lag

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811136736.6A CN110969399A (en) 2018-09-28 2018-09-28 Method and device for judging contract settlement progress lag

Publications (1)

Publication Number Publication Date
CN110969399A true CN110969399A (en) 2020-04-07

Family

ID=70027105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811136736.6A Pending CN110969399A (en) 2018-09-28 2018-09-28 Method and device for judging contract settlement progress lag

Country Status (1)

Country Link
CN (1) CN110969399A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009037309A (en) * 2007-07-31 2009-02-19 Nippon Digital Kenkyusho:Kk Progress display device, progress display method and progress display program
CN103136623A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for project progress payment application
CN105159706A (en) * 2015-08-07 2015-12-16 北京思特奇信息技术股份有限公司 Workflow program page configuration execution method and system
CN105184471A (en) * 2015-08-27 2015-12-23 北京国电通网络技术有限公司 Method and device for online monitoring of project construction period
CN206363377U (en) * 2016-12-30 2017-07-28 江苏苏科建设项目管理有限公司 A kind of engineering progress management system
CN107832951A (en) * 2017-11-10 2018-03-23 上海建工五建集团有限公司 Application processes and system of the BIM in precast concrete supply chain

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009037309A (en) * 2007-07-31 2009-02-19 Nippon Digital Kenkyusho:Kk Progress display device, progress display method and progress display program
CN103136623A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for project progress payment application
CN105159706A (en) * 2015-08-07 2015-12-16 北京思特奇信息技术股份有限公司 Workflow program page configuration execution method and system
CN105184471A (en) * 2015-08-27 2015-12-23 北京国电通网络技术有限公司 Method and device for online monitoring of project construction period
CN206363377U (en) * 2016-12-30 2017-07-28 江苏苏科建设项目管理有限公司 A kind of engineering progress management system
CN107832951A (en) * 2017-11-10 2018-03-23 上海建工五建集团有限公司 Application processes and system of the BIM in precast concrete supply chain

Similar Documents

Publication Publication Date Title
CN110768912B (en) API gateway current limiting method and device
CN107358247B (en) Method and device for determining lost user
EP3312787A1 (en) Method and device for obtaining payment threshold
CN106897342B (en) Data verification method and equipment
CN110019298B (en) Data processing method and device
KR20180002758A (en) DATA PROCESSING METHOD AND SYSTEM
CN111401766A (en) Model, service processing method, device and equipment
CN110889272A (en) Data processing method, device, equipment and storage medium
CN109684381A (en) Data hot statistics method and device
CN110019260B (en) User data updating method and related equipment
CN109582396B (en) Task state processing method, device and system and storage medium
CN111177562A (en) Recommendation and sorting processing method and device for target objects and server
CN110969399A (en) Method and device for judging contract settlement progress lag
CN117763024A (en) Data fragment extraction method and device
CN111177093A (en) Method, device and medium for sharing scientific and technological resources
CN109600245B (en) Automatic configuration method and device for server
CN107562533B (en) Data loading processing method and device
CN111125087A (en) Data storage method and device
CN114817209A (en) Monitoring rule processing method and device, processor and electronic equipment
CN107203545B (en) Data processing method and device
CN113296951A (en) Resource allocation scheme determination method and equipment
CN109614386B (en) Data processing method, device, server and computer readable storage medium
CN113449433A (en) Constraint optimization method and device for objective function corresponding to cement production process model
CN112580915A (en) Project milestone determination method and device, storage medium and electronic equipment
CN111198846A (en) Data exchange method and device based on block chain

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination