CN110956368A - Monitoring, early warning and analyzing system for running state of coal mine in-use important equipment - Google Patents
Monitoring, early warning and analyzing system for running state of coal mine in-use important equipment Download PDFInfo
- Publication number
- CN110956368A CN110956368A CN201911114993.4A CN201911114993A CN110956368A CN 110956368 A CN110956368 A CN 110956368A CN 201911114993 A CN201911114993 A CN 201911114993A CN 110956368 A CN110956368 A CN 110956368A
- Authority
- CN
- China
- Prior art keywords
- server
- configuration
- module
- equipment
- working parameters
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000003245 coal Substances 0.000 title claims abstract description 25
- 238000012544 monitoring process Methods 0.000 title claims abstract description 24
- 238000013500 data storage Methods 0.000 claims abstract description 20
- 238000007619 statistical method Methods 0.000 claims description 28
- 238000006243 chemical reaction Methods 0.000 claims description 13
- 238000007726 management method Methods 0.000 claims description 8
- 238000009423 ventilation Methods 0.000 claims description 3
- 230000007547 defect Effects 0.000 abstract description 5
- 238000004519 manufacturing process Methods 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/02—Agriculture; Fishing; Mining
Abstract
The invention relates to a monitoring, early warning and analyzing system, in particular to a monitoring, early warning and analyzing system for the running state of important equipment used in a coal mine, which comprises a server, wherein the server is connected with a configuration data acquisition module used for acquiring the real-time working parameters of the configuration of each equipment, the server is connected with a standard data storage module used for storing the normal running working parameters of the configuration of each equipment, the server analyzes the running state and running faults of the configuration of each equipment according to the real-time working parameters of the configuration of the equipment and the normal running working parameters of the configuration of the equipment, the server is connected with a configuration data storage module used for storing the real-time working parameters of the configuration of each equipment, and the server is connected with a; the technical scheme provided by the invention can effectively overcome the defects of low informatization level, incapability of visually displaying the equipment configuration operation condition and monitoring and early warning results in the prior art.
Description
Technical Field
The invention relates to a monitoring, early warning and analyzing system, in particular to a monitoring, early warning and analyzing system for the running state of important equipment used in a coal mine.
Background
With the rapid development of national economy, the demand for energy is increasing, and the dependence on main energy coal resources serving as the basis of important substances in China is increasing. However, in recent years, coal mine production safety accidents frequently occur, great loss is caused to national economy, and the contradiction between continuous expansion of the production scale of coal resources and coal mine production safety is increasingly prominent.
In order to further improve the informatization application level of the coal mine important equipment, the existing office automation system is integrated and improved on the basis of the established safety production remote supervision and accident emergency rescue system based on the Internet of things, the information network technology is fully utilized to realize online real-time monitoring according to the actual requirements of coal mine safety supervision work, and a coal mine important equipment operation state monitoring and early warning analysis system is urgently needed to be researched.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects in the prior art, the invention provides a monitoring, early warning and analyzing system for the running state of important equipment used in a coal mine, which can effectively overcome the defects of low informatization level and incapability of visually displaying the running state of the equipment and the monitoring and early warning results in the prior art.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme:
the monitoring, early warning and analyzing system for the running state of the important equipment for the coal mine comprises a server, wherein the server is connected with a configuration data acquisition module for acquiring real-time working parameters of the configuration of each equipment, the server is connected with a standard data storage module for storing the normal running working parameters of the configuration of each equipment, and the server analyzes the running state and running faults of the configuration of each equipment according to the real-time working parameters of the configuration of the equipment and the normal running working parameters of the configuration of the equipment;
the server is connected with a configuration data storage module for storing real-time working parameters of each equipment configuration, the server is connected with a display module for displaying each equipment configuration working model, the server is connected with a working parameter marking module for marking the real-time working parameters on each displayed equipment configuration working model, and the server is connected with a fault marking module for marking the running state and the running fault on each displayed equipment configuration working model according to the analysis result of the server;
the server is connected with a statistical analysis module used for performing statistical analysis on the frequency and reasons of the faults of each equipment configuration, and the server is connected with a chart conversion module used for converting the statistical analysis results of the statistical analysis module into charts.
Preferably, the server is connected to a historical data query module for querying historical data related to real-time working parameters of each device configuration in the configuration data storage module, and the historical data query module provides device configuration names and data acquisition time retrieval query conditions.
Preferably, the configuration data storage module is configured to divide a storage space for storing real-time working parameters of different device configurations, and each storage space stores the real-time working parameters hierarchically according to data acquisition time.
Preferably, the server is connected to a system role management unit for managing system roles.
Preferably, the system role management unit includes a system role setting module for adding and deleting system roles, and an authority setting module for setting access authorities of the system roles.
Preferably, the equipment configuration comprises a lifting system, a transportation system, a main ventilation system, a power supply system, a drainage system, an overhead man-car system and a compressed air system.
Preferably, the statistical analysis module and the chart conversion module are connected with a data uploading module which is used for uploading the statistical analysis result and the conversion chart to an upper computer.
Preferably, the server is connected with the user login module.
(III) advantageous effects
Compared with the prior art, the monitoring, early warning and analyzing system for the running state of the coal mine in-use important equipment has the following beneficial effects:
1. the configuration data acquisition module acquires real-time working parameters of each equipment configuration, the standard data storage module stores normal operation working parameters of each equipment configuration, the server analyzes the operation state and operation faults of each equipment configuration according to the real-time working parameters of the equipment configuration and the normal operation working parameters of the equipment configuration, the working parameter marking module marks the real-time working parameters on each displayed equipment configuration working model, and the fault marking module marks the operation state and the operation faults on each displayed equipment configuration working model according to the analysis result of the server, so that the equipment configuration operation condition and the monitoring and early warning result can be visually displayed;
2. the statistical analysis module is used for performing statistical analysis on the frequency and reasons of faults of each equipment configuration, the chart conversion module is used for converting the statistical analysis result of the statistical analysis module into a chart, and the data uploading module is used for uploading the statistical analysis result and the conversion chart to an upper computer, so that a supervisor can know the daily operation condition of important coal mine equipment and the fault defects in time;
3. the configuration data storage module is divided into storage spaces for storing real-time working parameters of different equipment configurations, each storage space stores the real-time working parameters in a layered mode according to data acquisition time, and the historical data query module queries historical data related to the real-time working parameters of each equipment configuration in the configuration data storage module, so that the historical data can be queried more conveniently and rapidly.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below. It is obvious that the drawings in the following description are only some embodiments of the invention, and that for a person skilled in the art, other drawings can be derived from them without inventive effort.
FIG. 1 is a schematic diagram of the system of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention. It is to be understood that the embodiments described are only a few embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
An operation state monitoring, early warning and analyzing system for important equipment used in a coal mine comprises a server, wherein the server is connected with a configuration data acquisition module for acquiring real-time operation parameters of the configuration of each equipment, the server is connected with a standard data storage module for storing the normal operation parameters of the configuration of each equipment, and the server analyzes the operation state and operation faults of the configuration of each equipment according to the real-time operation parameters of the configuration of the equipment and the normal operation parameters of the configuration of the equipment;
the server is connected with a configuration data storage module for storing real-time working parameters of each equipment configuration, the server is connected with a display module for displaying each equipment configuration working model, the server is connected with a working parameter marking module for marking the real-time working parameters on each displayed equipment configuration working model, and the server is connected with a fault marking module for marking the running state and the running fault on each displayed equipment configuration working model according to the analysis result of the server;
the server is connected with a statistical analysis module used for performing statistical analysis on the frequency and reasons of the faults of each equipment configuration, and the server is connected with a chart conversion module used for converting the statistical analysis results of the statistical analysis module into charts.
The server is connected with a historical data query module used for querying historical data related to real-time working parameters of each device configuration in the configuration data storage module, and the historical data query module provides device configuration names and data acquisition time retrieval query conditions.
The configuration data storage module is used for dividing storage spaces for storing real-time working parameters of different equipment configurations, and each storage space stores the real-time working parameters in a layered mode according to data acquisition time.
The server is connected to a system role management unit for managing system roles.
The system role management unit comprises a system role setting module for adding and deleting system roles and an authority setting module for setting access authority of each system role.
The equipment configuration comprises a lifting system, a transportation system, a main ventilation system, a power supply system, a drainage system, an overhead man car system and a compressed air system.
The statistical analysis module and the chart conversion module are connected with a data uploading module which is used for uploading the statistical analysis result and the conversion chart to an upper computer.
The server is connected with the user login module.
The configuration data acquisition module acquires real-time working parameters of each equipment configuration, the standard data storage module stores normal operation working parameters of each equipment configuration, the server analyzes the operation state and operation faults of each equipment configuration according to the real-time working parameters of the equipment configuration and the normal operation working parameters of the equipment configuration, the working parameter marking module marks the real-time working parameters on each displayed equipment configuration working model, and the fault marking module marks the operation state and the operation faults on each displayed equipment configuration working model according to the analysis result of the server, so that the equipment configuration operation condition and the monitoring and early warning result can be visually displayed.
The statistical analysis module carries out statistical analysis on the frequency and reasons of faults of each equipment configuration, the chart conversion module converts the statistical analysis result of the statistical analysis module into a chart, and the data uploading module uploads the statistical analysis result and the conversion chart to an upper computer, so that a supervisor can know the daily operation condition of important equipment in a coal mine and the fault defects in time.
The configuration data storage module is divided into storage spaces for storing real-time working parameters of different equipment configurations, each storage space stores the real-time working parameters in a layered mode according to data acquisition time, and the historical data query module queries historical data related to the real-time working parameters of each equipment configuration in the configuration data storage module, so that the historical data can be queried more conveniently and rapidly. The historical data query module provides a device configuration name and a data acquisition time retrieval query condition.
The server is connected with a system role management unit for managing system roles and a user login module. The system role management unit comprises a system role setting module for adding and deleting system roles and an authority setting module for setting access authority of each system role.
The above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the corresponding technical solutions.
Claims (8)
1. The coal mine is with important equipment running state monitoring early warning analytic system, its characterized in that: the system comprises a server, wherein the server is connected with a configuration data acquisition module for acquiring real-time working parameters of each equipment configuration, the server is connected with a standard data storage module for storing the normal operation working parameters of each equipment configuration, and the server analyzes the operation state and operation faults of each equipment configuration according to the real-time working parameters of the equipment configuration and the normal operation working parameters of the equipment configuration;
the server is connected with a configuration data storage module for storing real-time working parameters of each equipment configuration, the server is connected with a display module for displaying each equipment configuration working model, the server is connected with a working parameter marking module for marking the real-time working parameters on each displayed equipment configuration working model, and the server is connected with a fault marking module for marking the running state and the running fault on each displayed equipment configuration working model according to the analysis result of the server;
the server is connected with a statistical analysis module used for performing statistical analysis on the frequency and reasons of the faults of each equipment configuration, and the server is connected with a chart conversion module used for converting the statistical analysis results of the statistical analysis module into charts.
2. The coal mine important equipment operation state monitoring and early warning analysis system according to claim 1, characterized in that: the server is connected with a historical data query module used for querying historical data related to real-time working parameters of each device configuration in the configuration data storage module, and the historical data query module provides device configuration names and data acquisition time retrieval query conditions.
3. The coal mine important equipment operation state monitoring and early warning analysis system according to claim 2, characterized in that: the configuration data storage module is used for dividing storage spaces for storing real-time working parameters of different equipment configurations, and each storage space stores the real-time working parameters in a layered mode according to data acquisition time.
4. The coal mine important equipment operation state monitoring and early warning analysis system according to claim 1, characterized in that: the server is connected with a system role management unit for managing system roles.
5. The coal mine important equipment operation state monitoring and early warning analysis system according to claim 4, characterized in that: the system role management unit comprises a system role setting module for adding and deleting system roles and a permission setting module for setting access permission of each system role.
6. The coal mine important equipment operation state monitoring and early warning analysis system according to claim 1, characterized in that: the equipment configuration comprises a lifting system, a transportation system, a main ventilation system, a power supply system, a drainage system, an overhead man car system and a compressed air system.
7. The coal mine important equipment operation state monitoring and early warning analysis system according to claim 1, characterized in that: the statistical analysis module and the chart conversion module are connected with a data uploading module which is used for uploading statistical analysis results and conversion charts to an upper computer.
8. The coal mine important equipment operation state monitoring and early warning analysis system according to claim 1, characterized in that: the server is connected with the user login module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911114993.4A CN110956368A (en) | 2019-11-14 | 2019-11-14 | Monitoring, early warning and analyzing system for running state of coal mine in-use important equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911114993.4A CN110956368A (en) | 2019-11-14 | 2019-11-14 | Monitoring, early warning and analyzing system for running state of coal mine in-use important equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110956368A true CN110956368A (en) | 2020-04-03 |
Family
ID=69977304
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911114993.4A Pending CN110956368A (en) | 2019-11-14 | 2019-11-14 | Monitoring, early warning and analyzing system for running state of coal mine in-use important equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110956368A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20140025061A (en) * | 2012-08-21 | 2014-03-04 | 주식회사 빅파워솔루션 | Realtime mine safety and work management system |
CN106408192A (en) * | 2016-09-23 | 2017-02-15 | 东北大学 | Mineral processing equipment operating state monitoring system and method |
CN108843399A (en) * | 2018-07-12 | 2018-11-20 | 煤科集团沈阳研究院有限公司 | A kind of mining motor fault early warning system |
CN108873830A (en) * | 2018-05-31 | 2018-11-23 | 华中科技大学 | A kind of production scene online data collection analysis and failure prediction system |
-
2019
- 2019-11-14 CN CN201911114993.4A patent/CN110956368A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20140025061A (en) * | 2012-08-21 | 2014-03-04 | 주식회사 빅파워솔루션 | Realtime mine safety and work management system |
CN106408192A (en) * | 2016-09-23 | 2017-02-15 | 东北大学 | Mineral processing equipment operating state monitoring system and method |
CN108873830A (en) * | 2018-05-31 | 2018-11-23 | 华中科技大学 | A kind of production scene online data collection analysis and failure prediction system |
CN108843399A (en) * | 2018-07-12 | 2018-11-20 | 煤科集团沈阳研究院有限公司 | A kind of mining motor fault early warning system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107748546B (en) | Intelligent factory inspection system based on LoRa technology | |
CN110728443A (en) | Motor full life cycle management and control system | |
CN109359950B (en) | Method for overall process control of power grid monitoring information | |
CN105430091A (en) | Cloud storage based remote equipment health management method and system using same | |
CN105574593B (en) | Track state static detection and control system and method based on cloud computing and big data | |
CN112785458A (en) | Intelligent management and maintenance system for bridge health big data | |
CN102193555A (en) | Panoramic-state monitoring system for centralized control centers | |
CN104978692A (en) | Handheld terminal collecting system | |
CN103427417A (en) | Power distribution network fault processing method based on multi-source information fusion | |
CN106341446A (en) | Cloud computing and big data-based visualized environmental protection equipment monitoring service system | |
CN106251240A (en) | Power transmission network method for early warning based on big data | |
CN111798029A (en) | Join in marriage net production safety risk early warning system | |
CN112613066B (en) | Internet information management system based on large-scale wind power plant | |
CN108448721A (en) | The method of electric system main station monitoring signal and standard signal Auto-matching | |
CN110932405A (en) | Intelligent monitoring and analyzing system for power transformation equipment based on big data | |
CN112558568A (en) | Raw rubber automatic production line information visualization system based on DCS data acquisition | |
CN202472920U (en) | Automatic monitoring system for transformer station | |
CN201654844U (en) | Energy monitoring and operating system | |
CN107942872A (en) | A kind of power scheduling operation management system | |
CN105550791A (en) | Railway locomotive maintenance fault management information system | |
CN107240162A (en) | A kind of electrolytic aluminium factory equipment spot checking system based on public cloud | |
CN110956368A (en) | Monitoring, early warning and analyzing system for running state of coal mine in-use important equipment | |
CN104281140A (en) | Manufacturing enterprise energy monitoring system | |
CN104539647A (en) | Integrated control platform for safe power supply and consumption of important and high-risk clients | |
CN116522746A (en) | Power distribution hosting method for high-energy-consumption enterprises |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200403 |