CN104539647A - Integrated control platform for safe power supply and consumption of important and high-risk clients - Google Patents

Integrated control platform for safe power supply and consumption of important and high-risk clients Download PDF

Info

Publication number
CN104539647A
CN104539647A CN201410716802.2A CN201410716802A CN104539647A CN 104539647 A CN104539647 A CN 104539647A CN 201410716802 A CN201410716802 A CN 201410716802A CN 104539647 A CN104539647 A CN 104539647A
Authority
CN
China
Prior art keywords
server
risk
analysis
engine
important
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410716802.2A
Other languages
Chinese (zh)
Inventor
王嘉明
冯应贵
王剑
何云峰
张艳梅
王岸
王谷
吴建
张苏华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Sichuan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410716802.2A priority Critical patent/CN104539647A/en
Publication of CN104539647A publication Critical patent/CN104539647A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to a safe power supply and consumption technology for important and high-risk clients, and particularly relates to an integrated control platform for safe power supply and consumption of important and high-risk clients. Through adoption of the integrated control platform, the problem of lack of reasonable network topology structure and unified efficient transmission medium in conventional safe power supply and consumption system for important and high-risk clients is solved. The integrated control platform comprises a data layer, an application interface layer, a core engine layer, an evaluation layer, an advanced application layer, a user interface layer and a transmission layer, wherein the data layer comprises a topology analysis data server, a fault and defect statistic data server, a geographic information system (GIS) intermediate data server and an expert knowledge base server, and the application interface layer comprises a data service interface, a GIS interface and an external service provision interface. The integrated control platform is applicable to an electric system.

Description

Very Important Person and high-risk client secure are for electricity consumption overall-in-one control schema platform
Technical field
The present invention relates to important and high-risk client secure electricity supply and use technology, specifically a kind of Very Important Person and high-risk client secure are for electricity consumption overall-in-one control schema platform.
Background technology
Important and high-risk client refers in society, politics, occupies critical role in economic life, to its interruption of power supply may cause loss of life or personal injury, compared with overall situation pollution, larger political fallout, larger economic loss user or power supply reliability is had to the electricity consumption place of particular/special requirement, as colliery, non-coal mine, metallurgy, chemical industry, electric railway etc.Important and high-risk client is the key object of electric power system service, be the key component of intelligent grid construction and service, its fail safe for electricity consumption is directly connected to (comprising the quality, stability, reliability, emergency guarantee measure etc. for electricity consumption) safety and stability of national product order and social development.At present, important and high-risk client mainly relies on important and high-risk client secure electricity supplying and using system to ensure for the fail safe of electricity consumption.Under prior art conditions, important and high-risk client secure electricity supplying and using system limit due to self structure, the following problem of ubiquity: one, existing important and high-risk client secure electricity supplying and using system generally lacks rational network topology structure, cause it to there is the problem of transfer of data instability, directly important the and high-risk client of impact supplies the fail safe of electricity consumption thus.Its two, existing important and high-risk client secure electricity supplying and using system generally lacks unified efficient transmission medium, and data transmission bauds is slow, the problem of data sharing difference to cause it to exist, and the important and high-risk client of same impact is for the fail safe of electricity consumption thus.Based on this, the problem of the unified efficient transmission medium that is necessary to invent a kind of important and high-risk client secure electricity supplying and using system completely newly, lacks rational network topology structure to solve existing important and high-risk client secure electricity supplying and using system, lacks.
Summary of the invention
The present invention lacking rational network topology structure to solve existing important and high-risk client secure electricity supplying and using system, lacking the problem unifying efficient transmission medium, provides a kind of Very Important Person and high-risk client secure confession electricity consumption overall-in-one control schema platform.
The present invention adopts following technical scheme to realize: Very Important Person and high-risk client secure, for electricity consumption overall-in-one control schema platform, comprise data Layer, application-interface layer, core engine layer, evaluation layer, senior application layer, user interface layer, transport layer;
Described data Layer comprises topological analysis data server, accident defect statistics server, GIS intermediate data server, expert knowledge library server;
Described application-interface layer comprises database service interface, GIS interface, externally provisioning interface;
Described core engine layer comprises visualization engine server, index calculate engine server, Business Rule Engine server, optimizes engine server, time series engine server, power network topology analysis engine server;
Described evaluation layer comprises safety evaluation server, reliability assessment server, unit status evaluating server;
Described senior application layer comprises important and high-risk client dynamic auto identification and analysis server, power supply plan Aided Generation server, important and high-risk customer risk Analysis server, risk transformation assistant analysis server, protects electric prediction scheme intelligent management server;
Described user interface layer is visual represents server, application displaying server;
Described transport layer comprises a PROFIBUS bus, the 2nd PROFIBUS bus, the 3rd PROFIBUS bus, the 4th PROFIBUS bus, the 5th PROFIBUS bus;
Wherein, topological analysis data server, accident defect statistics server, GIS intermediate data server, expert knowledge library server, database service interface, GIS interface, externally provisioning interface, visualization engine server, index calculate engine server, Business Rule Engine server, optimization engine server, time series engine server, power network topology analysis engine server are all connected with a PROFIBUS bus; Topological analysis data server, accident defect statistics server, GIS intermediate data server, expert knowledge library server, database service interface, GIS interface, externally provisioning interface, visualization engine server, index calculate engine server, Business Rule Engine server, optimization engine server, time series engine server, power network topology analysis engine server, a PROFIBUS bus form bus type topological structure jointly;
Visualization engine server, index calculate engine server, Business Rule Engine server, optimization engine server, time series engine server, power network topology analysis engine server, safety evaluation server, reliability assessment server, unit status evaluating server are all connected with the 2nd PROFIBUS bus; Visualization engine server, index calculate engine server, Business Rule Engine server, optimization engine server, time series engine server, power network topology analysis engine server, safety evaluation server, reliability assessment server, unit status evaluating server, the 2nd PROFIBUS bus form bus type topological structure jointly;
Safety evaluation server, reliability assessment server, unit status evaluating server, the dynamic auto identification and analysis server of important and high-risk client are all connected with the 3rd PROFIBUS bus; Safety evaluation server, reliability assessment server, unit status evaluating server, the dynamic auto identification and analysis server of important and high-risk client, the 3rd PROFIBUS bus form bus type topological structure jointly;
Important and high-risk client dynamic auto identification and analysis server, power supply plan Aided Generation server, important and high-risk customer risk Analysis server, risk transformation assistant analysis server, protect electric prediction scheme intelligent management server and be all connected with the 4th PROFIBUS bus; Important and high-risk client dynamic auto identification and analysis server, power supply plan Aided Generation server, important and high-risk customer risk Analysis server, risk transformation assistant analysis server, protect electric prediction scheme intelligent management server, the 4th PROFIBUS bus forms bus type topological structure jointly;
Power supply plan Aided Generation server, important and high-risk customer risk Analysis server, risk transformation assistant analysis server, protect electric prediction scheme intelligent management server, visually represent server, application shows that server is all connected with the 5th PROFIBUS bus; Power supply plan Aided Generation server, important and high-risk customer risk Analysis server, risk transformation assistant analysis server, protect electric prediction scheme intelligent management server, visually represent server, server is shown in application, the 5th PROFIBUS bus forms bus type topological structure jointly.
Specific works process is as follows: topological analysis data server carries out real-time topology analysis to important and high-risk client, and will be sent to a PROFIBUS bus during topological analysis fructufy.Accident defect statistics server carries out real time fail defect statistics to important and high-risk client, and accident defect statistics is sent to a PROFIBUS bus in real time.The GIS intermediate data of its storage inside is sent to a PROFIBUS bus by GIS intermediate data server in real time.The expert knowledge library of its storage inside is sent to a PROFIBUS bus by expert knowledge library server in real time.Database service interface real time access the one PROFIBUS bus also obtains topological analysis result, accident defect statistics, GIS intermediate data, expert knowledge library, then carries out Real-time Data Service according to topological analysis result, accident defect statistics, GIS intermediate data, expert knowledge library.GIS interface real time access the one PROFIBUS bus also obtains topological analysis result, accident defect statistics, GIS intermediate data, expert knowledge library, then carries out real-time GIS service according to topological analysis result, accident defect statistics, GIS intermediate data, expert knowledge library.External provisioning interface real time access the one PROFIBUS bus also obtains topological analysis result, accident defect statistics, GIS intermediate data, expert knowledge library, then carries out in real time externally service according to topological analysis result, accident defect statistics, GIS intermediate data, expert knowledge library.Visualization engine server real time access the one PROFIBUS bus also obtains topological analysis result, accident defect statistics, GIS intermediate data, expert knowledge library, then generate visualization interface in real time according to topological analysis result, accident defect statistics, GIS intermediate data, expert knowledge library, and visualization interface is sent in real time the 2nd PROFIBUS bus.Index calculate engine server real time access the one PROFIBUS bus also obtains topological analysis result, accident defect statistics, GIS intermediate data, expert knowledge library, then carry out real-time indicators calculating according to topological analysis result, accident defect statistics, GIS intermediate data, expert knowledge library, and the 2nd PROFIBUS bus will be sent to during index calculate fructufy.Business Rule Engine server real time access the one PROFIBUS bus also obtains topological analysis result, accident defect statistics, GIS intermediate data, expert knowledge library, then generate business rule in real time according to topological analysis result, accident defect statistics, GIS intermediate data, expert knowledge library, and business rule is sent in real time the 2nd PROFIBUS bus.Optimize engine server real time access the one PROFIBUS bus and obtain topological analysis result, accident defect statistics, GIS intermediate data, expert knowledge library, then carry out real-time optimization according to topological analysis result, accident defect statistics, GIS intermediate data, expert knowledge library, and optimum results is sent in real time the 2nd PROFIBUS bus.Time series engine server real time access the one PROFIBUS bus also obtains topological analysis result, accident defect statistics, GIS intermediate data, expert knowledge library, then according to topological analysis result, accident defect statistics, GIS intermediate data, the real-time rise time sequence of expert knowledge library, and time series is sent in real time the 2nd PROFIBUS bus.Power network topology analysis engine server real time access the one PROFIBUS bus also obtains topological analysis result, accident defect statistics, GIS intermediate data, expert knowledge library, then carry out real-time grid topological analysis according to topological analysis result, accident defect statistics, GIS intermediate data, expert knowledge library, and the 2nd PROFIBUS bus will be sent to during power network topology analysis fructufy.Safety evaluation server real time access the 2nd PROFIBUS bus also obtains visualization interface, index calculate result, business rule, optimum results, time series, power network topology analysis result, then carry out real time security assessment according to visualization interface, index calculate result, business rule, optimum results, time series, power network topology analysis result, and the 3rd PROFIBUS bus will be sent to during safety evaluation fructufy.Reliability assessment server real time access the 2nd PROFIBUS bus also obtains visualization interface, index calculate result, business rule, optimum results, time series, power network topology analysis result, then carry out reliability in time assessment according to visualization interface, index calculate result, business rule, optimum results, time series, power network topology analysis result, and the 3rd PROFIBUS bus will be sent to during reliability assessment fructufy.Unit status evaluating server real time access the 2nd PROFIBUS bus also obtains visualization interface, index calculate result, business rule, optimum results, time series, power network topology analysis result, then carry out real-time unit status assessment according to visualization interface, index calculate result, business rule, optimum results, time series, power network topology analysis result, and unit status assessment result is sent to the 3rd PROFIBUS bus in real time.Important and high-risk client dynamic auto identification and analysis server real time access the 3rd PROFIBUS bus also obtains safety evaluation result, reliability assessment result, unit status assessment result, then dynamically carry out automatic identification and analysis according to safety evaluation result, reliability assessment result, unit status assessment result to important and high-risk client's, and the 4th PROFIBUS bus will be sent to during identification and analysis fructufy.Power supply plan Aided Generation server real time access the 4th PROFIBUS bus also obtains identification and analysis result, then generates power supply plan according to during identification and analysis fructufy, and power supply plan is sent in real time the 5th PROFIBUS bus.Important and high-risk customer risk Analysis server real time access the 4th PROFIBUS bus also obtains identification and analysis result, then according to identification and analysis result, real-time risk analysis is carried out to important and high-risk client, and the 5th PROFIBUS bus will be sent to during risk analysis fructufy.Risk transformation assistant analysis server real time access the 4th PROFIBUS bus also obtains identification and analysis result, then carry out the transformation of real-time risk according to identification and analysis result to important and high-risk client to analyze, and risk is transformed analysis result and be sent to the 5th PROFIBUS bus in real time.Protect electric prediction scheme intelligent management server real time access the 4th PROFIBUS bus and obtain identification and analysis result, then protecting electric prediction scheme according to generating during identification and analysis fructufy, and electric for guarantor prediction scheme is sent to the 5th PROFIBUS bus in real time.Visually represent server real time access the 5th PROFIBUS bus and obtain power supply plan, risk analysis result, risk transformation analysis result, protect electric prediction scheme, then to power supply plan, risk analysis result, risk transformation analysis result, protect electric prediction scheme and carry out real-time visual and represent.Application is shown server real time access the 5th PROFIBUS bus and is obtained power supply plan, risk analysis result, risk transformation analysis result, protects electric prediction scheme, then to power supply plan, risk analysis result, risk transformation analysis result, protect electric prediction scheme and apply displaying in real time.
Based on said process, compared with important with existing and high-risk client secure electricity supplying and using system, Very Important Person of the present invention and high-risk client secure pass through to adopt brand new for electricity consumption overall-in-one control schema platform, possesses following advantage: one, Very Important Person of the present invention and high-risk client secure adopt topological analysis data server for electricity consumption overall-in-one control schema platform, accident defect statistics server, GIS intermediate data server, expert knowledge library server, database service interface, GIS interface, external provisioning interface, visualization engine server, index calculate engine server, Business Rule Engine server, optimize engine server, time series engine server, power network topology analysis engine server, PROFIBUS bus constitutes first bus type topological structure, visualization engine server, index calculate engine server, Business Rule Engine server, optimization engine server, time series engine server, power network topology analysis engine server, safety evaluation server, reliability assessment server, unit status evaluating server, PROFIBUS bus is adopted to constitute second bus type topological structure, safety evaluation server, reliability assessment server, unit status evaluating server, the dynamic auto identification and analysis server of important and high-risk client, PROFIBUS bus is adopted to constitute the 3rd bus type topological structure, adopt important and high-risk client dynamic auto identification and analysis server, power supply plan Aided Generation server, important and high-risk customer risk Analysis server, risk to transform assistant analysis server, protect electric prediction scheme intelligent management server, PROFIBUS bus constitutes the 4th bus type topological structure, adopt power supply plan Aided Generation server, important and high-risk customer risk Analysis server, risk transformation assistant analysis server, protect electric prediction scheme intelligent management server, visually represent server, server is shown in application, PROFIBUS bus constitutes the 5th bus type topological structure, it is by utilizing bus type topological structure structure simple, required transmission medium is few, non-stop layer node, the fault of any node all can not cause the whole network to paralyse, reliability is high, be easy to the advantage expanded, possesses rational network topology structure, therefore its transfer of data is more stable.They are two years old, Very Important Person of the present invention and high-risk client secure adopt PROFIBUS bus as transmission medium for electricity consumption overall-in-one control schema platform, it is by utilizing the advantage of PROFIBUS bus high speed, low cost, possessed unified efficient transmission medium, therefore its data transmission bauds is faster, data sharing is higher.In sum, Very Important Person of the present invention and high-risk client secure pass through to adopt brand new for electricity consumption overall-in-one control schema platform, efficiently solve the problem that existing important and high-risk client secure electricity supplying and using system lacks rational network topology structure, lacks unified efficient transmission medium, effectively ensure that the fail safe of important and high-risk client for electricity consumption thus.
The present invention efficiently solves the problem that existing important and high-risk client secure electricity supplying and using system lacks rational network topology structure, lacks unified efficient transmission medium, is applicable to electric power system.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Embodiment
Very Important Person and high-risk client secure, for electricity consumption overall-in-one control schema platform, comprise data Layer, application-interface layer, core engine layer, evaluation layer, senior application layer, user interface layer, transport layer;
Described data Layer comprises topological analysis data server, accident defect statistics server, GIS intermediate data server, expert knowledge library server;
Described application-interface layer comprises database service interface, GIS interface, externally provisioning interface;
Described core engine layer comprises visualization engine server, index calculate engine server, Business Rule Engine server, optimizes engine server, time series engine server, power network topology analysis engine server;
Described evaluation layer comprises safety evaluation server, reliability assessment server, unit status evaluating server;
Described senior application layer comprises important and high-risk client dynamic auto identification and analysis server, power supply plan Aided Generation server, important and high-risk customer risk Analysis server, risk transformation assistant analysis server, protects electric prediction scheme intelligent management server;
Described user interface layer is visual represents server, application displaying server;
Described transport layer comprises a PROFIBUS bus, the 2nd PROFIBUS bus, the 3rd PROFIBUS bus, the 4th PROFIBUS bus, the 5th PROFIBUS bus;
Wherein, topological analysis data server, accident defect statistics server, GIS intermediate data server, expert knowledge library server, database service interface, GIS interface, externally provisioning interface, visualization engine server, index calculate engine server, Business Rule Engine server, optimization engine server, time series engine server, power network topology analysis engine server are all connected with a PROFIBUS bus; Topological analysis data server, accident defect statistics server, GIS intermediate data server, expert knowledge library server, database service interface, GIS interface, externally provisioning interface, visualization engine server, index calculate engine server, Business Rule Engine server, optimization engine server, time series engine server, power network topology analysis engine server, a PROFIBUS bus form bus type topological structure jointly;
Visualization engine server, index calculate engine server, Business Rule Engine server, optimization engine server, time series engine server, power network topology analysis engine server, safety evaluation server, reliability assessment server, unit status evaluating server are all connected with the 2nd PROFIBUS bus; Visualization engine server, index calculate engine server, Business Rule Engine server, optimization engine server, time series engine server, power network topology analysis engine server, safety evaluation server, reliability assessment server, unit status evaluating server, the 2nd PROFIBUS bus form bus type topological structure jointly;
Safety evaluation server, reliability assessment server, unit status evaluating server, the dynamic auto identification and analysis server of important and high-risk client are all connected with the 3rd PROFIBUS bus; Safety evaluation server, reliability assessment server, unit status evaluating server, the dynamic auto identification and analysis server of important and high-risk client, the 3rd PROFIBUS bus form bus type topological structure jointly;
Important and high-risk client dynamic auto identification and analysis server, power supply plan Aided Generation server, important and high-risk customer risk Analysis server, risk transformation assistant analysis server, protect electric prediction scheme intelligent management server and be all connected with the 4th PROFIBUS bus; Important and high-risk client dynamic auto identification and analysis server, power supply plan Aided Generation server, important and high-risk customer risk Analysis server, risk transformation assistant analysis server, protect electric prediction scheme intelligent management server, the 4th PROFIBUS bus forms bus type topological structure jointly;
Power supply plan Aided Generation server, important and high-risk customer risk Analysis server, risk transformation assistant analysis server, protect electric prediction scheme intelligent management server, visually represent server, application shows that server is all connected with the 5th PROFIBUS bus; Power supply plan Aided Generation server, important and high-risk customer risk Analysis server, risk transformation assistant analysis server, protect electric prediction scheme intelligent management server, visually represent server, server is shown in application, the 5th PROFIBUS bus forms bus type topological structure jointly.
During concrete enforcement, described topological analysis data server, accident defect statistics server, GIS intermediate data server, expert knowledge library server, visualization engine server, index calculate engine server, Business Rule Engine server, optimize engine server, time series engine server, power network topology analysis engine server, safety evaluation server, reliability assessment server, unit status evaluating server, the dynamic auto identification and analysis server of important and high-risk client, power supply plan Aided Generation server, important and high-risk customer risk Analysis server, risk transformation assistant analysis server, protect electric prediction scheme intelligent management server, visually represent server, application shows that server is IBM x3650 type server, described database service interface, GIS interface, externally provisioning interface are RS485 interface.

Claims (2)

1. Very Important Person and high-risk client secure are for an electricity consumption overall-in-one control schema platform, it is characterized in that: comprise data Layer, application-interface layer, core engine layer, evaluation layer, senior application layer, user interface layer, transport layer;
Described data Layer comprises topological analysis data server, accident defect statistics server, GIS intermediate data server, expert knowledge library server;
Described application-interface layer comprises database service interface, GIS interface, externally provisioning interface;
Described core engine layer comprises visualization engine server, index calculate engine server, Business Rule Engine server, optimizes engine server, time series engine server, power network topology analysis engine server;
Described evaluation layer comprises safety evaluation server, reliability assessment server, unit status evaluating server;
Described senior application layer comprises important and high-risk client dynamic auto identification and analysis server, power supply plan Aided Generation server, important and high-risk customer risk Analysis server, risk transformation assistant analysis server, protects electric prediction scheme intelligent management server;
Described user interface layer is visual represents server, application displaying server;
Described transport layer comprises a PROFIBUS bus, the 2nd PROFIBUS bus, the 3rd PROFIBUS bus, the 4th PROFIBUS bus, the 5th PROFIBUS bus;
Wherein, topological analysis data server, accident defect statistics server, GIS intermediate data server, expert knowledge library server, database service interface, GIS interface, externally provisioning interface, visualization engine server, index calculate engine server, Business Rule Engine server, optimization engine server, time series engine server, power network topology analysis engine server are all connected with a PROFIBUS bus; Topological analysis data server, accident defect statistics server, GIS intermediate data server, expert knowledge library server, database service interface, GIS interface, externally provisioning interface, visualization engine server, index calculate engine server, Business Rule Engine server, optimization engine server, time series engine server, power network topology analysis engine server, a PROFIBUS bus form bus type topological structure jointly;
Visualization engine server, index calculate engine server, Business Rule Engine server, optimization engine server, time series engine server, power network topology analysis engine server, safety evaluation server, reliability assessment server, unit status evaluating server are all connected with the 2nd PROFIBUS bus; Visualization engine server, index calculate engine server, Business Rule Engine server, optimization engine server, time series engine server, power network topology analysis engine server, safety evaluation server, reliability assessment server, unit status evaluating server, the 2nd PROFIBUS bus form bus type topological structure jointly;
Safety evaluation server, reliability assessment server, unit status evaluating server, the dynamic auto identification and analysis server of important and high-risk client are all connected with the 3rd PROFIBUS bus; Safety evaluation server, reliability assessment server, unit status evaluating server, the dynamic auto identification and analysis server of important and high-risk client, the 3rd PROFIBUS bus form bus type topological structure jointly;
Important and high-risk client dynamic auto identification and analysis server, power supply plan Aided Generation server, important and high-risk customer risk Analysis server, risk transformation assistant analysis server, protect electric prediction scheme intelligent management server and be all connected with the 4th PROFIBUS bus; Important and high-risk client dynamic auto identification and analysis server, power supply plan Aided Generation server, important and high-risk customer risk Analysis server, risk transformation assistant analysis server, protect electric prediction scheme intelligent management server, the 4th PROFIBUS bus forms bus type topological structure jointly;
Power supply plan Aided Generation server, important and high-risk customer risk Analysis server, risk transformation assistant analysis server, protect electric prediction scheme intelligent management server, visually represent server, application shows that server is all connected with the 5th PROFIBUS bus; Power supply plan Aided Generation server, important and high-risk customer risk Analysis server, risk transformation assistant analysis server, protect electric prediction scheme intelligent management server, visually represent server, server is shown in application, the 5th PROFIBUS bus forms bus type topological structure jointly.
2. Very Important Person according to claim 1 and high-risk client secure are for electricity consumption overall-in-one control schema platform, it is characterized in that: described topological analysis data server, accident defect statistics server, GIS intermediate data server, expert knowledge library server, visualization engine server, index calculate engine server, Business Rule Engine server, optimize engine server, time series engine server, power network topology analysis engine server, safety evaluation server, reliability assessment server, unit status evaluating server, the dynamic auto identification and analysis server of important and high-risk client, power supply plan Aided Generation server, important and high-risk customer risk Analysis server, risk transformation assistant analysis server, protect electric prediction scheme intelligent management server, visually represent server, application shows that server is IBM x3650 type server, described database service interface, GIS interface, externally provisioning interface are RS485 interface.
CN201410716802.2A 2014-12-02 2014-12-02 Integrated control platform for safe power supply and consumption of important and high-risk clients Pending CN104539647A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410716802.2A CN104539647A (en) 2014-12-02 2014-12-02 Integrated control platform for safe power supply and consumption of important and high-risk clients

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410716802.2A CN104539647A (en) 2014-12-02 2014-12-02 Integrated control platform for safe power supply and consumption of important and high-risk clients

Publications (1)

Publication Number Publication Date
CN104539647A true CN104539647A (en) 2015-04-22

Family

ID=52855114

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410716802.2A Pending CN104539647A (en) 2014-12-02 2014-12-02 Integrated control platform for safe power supply and consumption of important and high-risk clients

Country Status (1)

Country Link
CN (1) CN104539647A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106602721A (en) * 2016-11-10 2017-04-26 国网浙江省电力公司湖州供电公司 Power consumer management system and method based on automatic scheduling
CN108520109A (en) * 2018-03-20 2018-09-11 国网安徽省电力有限公司淮北供电公司 A kind of high-risk graphical automatic drafting method of client's supply path of power grid
CN110287729A (en) * 2019-06-15 2019-09-27 复旦大学 A kind of privacy leakage methods of risk assessment of data-oriented use demand
CN110569802A (en) * 2019-09-10 2019-12-13 国网黑龙江省电力有限公司鹤岗供电公司 Unmanned aerial vehicle intelligent inspection system for power transmission line

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110106321A1 (en) * 2009-11-03 2011-05-05 Spirae, Inc. Dynamic distributed power grid control system
CN102215253A (en) * 2011-05-18 2011-10-12 中国电力科学研究院 Layered exchange and control method for real-time monitoring system data by power dispatching
CN103514501A (en) * 2012-06-28 2014-01-15 冀北电力有限公司秦皇岛电力公司 Regional power grid economic operation and energy saving total management system
CN103595127A (en) * 2013-09-18 2014-02-19 中国海洋石油总公司 Intelligent control method and intelligent control system for offshore petroleum platform power grid
CN104124756A (en) * 2013-04-27 2014-10-29 国家电网公司 Province-level power distribution network operation monitoring system based on network-wide data

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110106321A1 (en) * 2009-11-03 2011-05-05 Spirae, Inc. Dynamic distributed power grid control system
CN102215253A (en) * 2011-05-18 2011-10-12 中国电力科学研究院 Layered exchange and control method for real-time monitoring system data by power dispatching
CN103514501A (en) * 2012-06-28 2014-01-15 冀北电力有限公司秦皇岛电力公司 Regional power grid economic operation and energy saving total management system
CN104124756A (en) * 2013-04-27 2014-10-29 国家电网公司 Province-level power distribution network operation monitoring system based on network-wide data
CN103595127A (en) * 2013-09-18 2014-02-19 中国海洋石油总公司 Intelligent control method and intelligent control system for offshore petroleum platform power grid

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106602721A (en) * 2016-11-10 2017-04-26 国网浙江省电力公司湖州供电公司 Power consumer management system and method based on automatic scheduling
CN108520109A (en) * 2018-03-20 2018-09-11 国网安徽省电力有限公司淮北供电公司 A kind of high-risk graphical automatic drafting method of client's supply path of power grid
CN108520109B (en) * 2018-03-20 2021-07-30 国网安徽省电力有限公司淮北供电公司 Graphical automatic drawing method for power supply path of high-risk customer of power grid
CN110287729A (en) * 2019-06-15 2019-09-27 复旦大学 A kind of privacy leakage methods of risk assessment of data-oriented use demand
CN110569802A (en) * 2019-09-10 2019-12-13 国网黑龙江省电力有限公司鹤岗供电公司 Unmanned aerial vehicle intelligent inspection system for power transmission line

Similar Documents

Publication Publication Date Title
CN103646149B (en) The scheme of KBE generates automatically, evaluating system and method
CN102368610A (en) Evaluation method based on distribution system security region
CN104124756A (en) Province-level power distribution network operation monitoring system based on network-wide data
CN101751426A (en) Method and device for realizing information sharing between SCADA and GIS
CN108446396B (en) Power data processing method based on improved CIM model
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN104539647A (en) Integrated control platform for safe power supply and consumption of important and high-risk clients
CN103714401A (en) Method for predicting distribution and transformation fault frequency of electric network
CN105427041A (en) Standardized maintenance method for reconstruction and extension information point table of running substation
CN106651643A (en) Power security management and control method for whole process based on distribution and adjustment
CN105117532A (en) Modeling method for intelligent substation secondary equipment interval information model
CN103679545A (en) Power distribution network reliability theoretical evaluation system
CN104102790A (en) GIS (Geographic Information System)-based automatic diagram forming system and method of power supply diagram
CN106160218A (en) The real-time monitoring analysis system of electrical network distribution line
CN104091034A (en) Automatic circuit contact graph forming system and method based on graph matching
CN115792505A (en) Rail transit power supply management method and system
CN104732449A (en) Method for establishing operation mode model of information system
Li et al. Power system reliability analysis system based on PSASP and fault enumeration method and applications
Chen et al. Risk warning system based on big data applied in the power informatization of state grid
CN103607048A (en) An electric power network device fault diagnosis method and a system
CN106934538B (en) Power grid data fusion method based on data blood relationship and gene comparison
CN107301606A (en) A kind of energy management monitoring system
CN104881818A (en) Method for establishing transmission grid safety risk comprehensive evaluation index system
CN112330157A (en) Urban gas pipeline monitoring and management system
CN110110379A (en) Power grid full-view modeling method and system

Legal Events

Date Code Title Description
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned
AD01 Patent right deemed abandoned

Effective date of abandoning: 20180622