CN110940241A - Tunnel extremely soft rock deep hole cut peripheral hole isolation air column charging buffering blasting method - Google Patents
Tunnel extremely soft rock deep hole cut peripheral hole isolation air column charging buffering blasting method Download PDFInfo
- Publication number
- CN110940241A CN110940241A CN201911212255.3A CN201911212255A CN110940241A CN 110940241 A CN110940241 A CN 110940241A CN 201911212255 A CN201911212255 A CN 201911212255A CN 110940241 A CN110940241 A CN 110940241A
- Authority
- CN
- China
- Prior art keywords
- hole
- peripheral
- holes
- soft rock
- blasting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000011435 rock Substances 0.000 title claims abstract description 46
- 238000005422 blasting Methods 0.000 title claims abstract description 38
- 230000002093 peripheral effect Effects 0.000 title claims abstract description 34
- 238000000034 method Methods 0.000 title claims abstract description 22
- 238000002955 isolation Methods 0.000 title claims abstract description 16
- 230000003139 buffering effect Effects 0.000 title claims abstract description 9
- 239000002360 explosive Substances 0.000 claims abstract description 21
- 239000000843 powder Substances 0.000 claims abstract description 14
- 238000010276 construction Methods 0.000 claims abstract description 10
- 238000005553 drilling Methods 0.000 claims abstract description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 6
- 238000007667 floating Methods 0.000 claims abstract description 4
- 230000000903 blocking effect Effects 0.000 claims abstract description 3
- 238000004880 explosion Methods 0.000 claims description 4
- 150000001875 compounds Chemical class 0.000 claims description 2
- 238000005507 spraying Methods 0.000 claims description 2
- 238000009412 basement excavation Methods 0.000 abstract description 9
- 239000003814 drug Substances 0.000 abstract 1
- 229940079593 drug Drugs 0.000 abstract 1
- 239000011378 shotcrete Substances 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 6
- 238000011105 stabilization Methods 0.000 description 3
- 229910021532 Calcite Inorganic materials 0.000 description 2
- 238000005474 detonation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000002035 prolonged effect Effects 0.000 description 2
- 239000007921 spray Substances 0.000 description 2
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000839 emulsion Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D1/00—Blasting methods or apparatus, e.g. loading or tamping
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D3/00—Particular applications of blasting techniques
- F42D3/04—Particular applications of blasting techniques for rock blasting
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
The invention discloses a tunnel extremely soft rock deep hole undermining peripheral hole-isolating gas column charging buffering blasting method, which relates to the technical field of tunnel blasting excavation, and is constructed in a two-step deep hole undermining and peripheral hole-isolating charging double-plugging vibration-reduction self-stabilizing drilling blasting mode, wherein 60 undermining holes with the depth of 4.5m are formed; 32 inner ring holes with the depth of 4.2 m; 52 peripheral eyes with the depth of 4.2 m; 11 bottom eyes with the depth of 4.2 m; the total drug loading is 230.6 kg; continuously charging explosive into the cut hole, and blocking 1.0m of stemming at the hole opening; filling powder at hard positions of rock in peripheral holes at intervals, plugging a hole opening with 0.3m of water stemming, filling powder at the positions of soft rock at intervals of two holes, continuously filling powder in an auxiliary hole, an inner ring hole and a bottom hole, and plugging 1.0m of stemming at the hole opening; after blasting, the crowbar prizes floating gangue live stones, and the sprayed concrete is 70mm thick. According to the tunnel extremely soft rock deep hole undermining peripheral hole isolation air column charging buffering blasting method, the blasting circulation footage is increased to 4.0m under the condition that the tunnel face is kept stable, and the construction progress is accelerated.
Description
Technical Field
The invention relates to the technical field of tunnel blasting excavation, in particular to a tunnel extremely soft rock deep hole cut peripheral hole isolation air column charging buffering blasting method.
Background
A high-speed railway double-track tunnel is mainly composed of V-class surrounding rock affected by fault, joint crack development, rock mass breaking, and the crack surface filled with calcite film. The prior art adopts a two-step drilling and blasting method for construction. After excavation, the lithology is gray black sandy shale, the thin-medium-thick layers are formed, the arch rock mass is broken, local fracture water is exposed, the self-stability capability of surrounding rock is poor, the cut depth is limited, and the blasting circulation footage is difficult to break through 3.0 m. The rock quality of the face is uneven, the charging amount is not easy to control, the over-excavation and under-excavation conditions occur, the over-excavation spray anchor material is over-consumed, the under-excavation needs to be supplemented, the surrounding rock disturbance is more, the self-stability of the surrounding rock is not facilitated, the safety risk is high, the working procedure time is too long, and the construction speed is slow.
Disclosure of Invention
The invention aims to provide a tunnel extremely soft rock deep hole cut peripheral hole isolation air column charging buffering blasting method, which aims to solve the problems in the prior art, increase the blasting circulation footage to 4.0m under the condition of keeping the tunnel face stable, shorten the working procedure time and accelerate the construction progress.
In order to achieve the purpose, the invention provides the following scheme:
the invention provides a tunnel extremely soft rock deep hole cut peripheral hole isolation air column charging buffer blasting method, which comprises the following steps:
step one; the construction is carried out by adopting a double-plugging vibration-reduction self-stabilizing drilling explosion mode of deep hole undermining with two steps and hole isolation and charging of peripheral holes, a double-type wedge undermining is adopted for a tunnel face, the number of undermining holes is 60, and the depth of the eyeground is 4.5 m; 32 inner ring holes with the depth of 4.2 m; the peripheral eyes are 52 and are 4.2m deep; 11 bottom eyes with the depth of 4.2 m; the total number of blast holes is 155, and the total loading capacity is 230.6 kg;
step two; continuously charging explosive into the cut hole, and blocking 1.0m of stemming at the hole opening; filling powder at hard positions of rock in peripheral holes at intervals, plugging a hole opening with 0.3m of water stemming, filling powder at the positions of soft rock at intervals of two holes, continuously filling powder in an auxiliary hole, an inner ring hole and a bottom hole, and plugging 1.0m of stemming at the hole opening;
step three; blasting, prying floating gangue and live rocks by a crowbar after blasting, and spraying C30 concrete with the thickness of 50-70 mm.
Optionally, the explosive charges are explosive rolls which are identical in structure and are connected in series through detonating cords, the explosive roll positioned at the innermost part of the cut hole is connected with a detonator, and the detonator is communicated with the outside through a detonating tube; stemming is plugged at the hole opening at the outer side of the slotted hole.
Compared with the prior art, the invention has the following technical effects:
the invention provides a method for blasting, buffering and blasting through charging of hole-isolating gas columns at the periphery of tunnel ultra-soft rock deep hole cut, which increases blasting circulation footage to 4.0m under the condition of keeping tunnel face stable. Through the adjustment of the powder charge of the peripheral holes, the vibration reduction and the weak vibration are realized, the light explosion effect is improved, the ultra-short excavation is reduced, the spray anchor material is saved, the construction cost is reduced, the working procedure time is shortened, and the construction progress is accelerated.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without inventive exercise.
FIG. 1 is a schematic view of a blasthole arrangement of the present invention;
FIG. 2 is a schematic view of a drill-blast slotted hole of the present invention;
FIG. 3 is a schematic diagram of a perimeter eye spaced uncoupled charge configuration of the present invention;
wherein, 1 is detonating cord, 2 is cartridge, 3 is detonator, 4 is detonating tube, 5 is stemming.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The invention aims to provide a tunnel extremely soft rock deep hole cut peripheral hole isolation air column charging buffering blasting method, which aims to solve the problems in the prior art, increase the blasting circulation footage to 4.0m under the condition of keeping the tunnel face stable, shorten the working procedure time and accelerate the construction progress.
In order to make the aforementioned objects, features and advantages of the present invention comprehensible, embodiments accompanied with figures are described in further detail below.
Example one
The length of a high-speed railway double-track tunnel is 7827.8m, the exit section is 3907.3m, most of surrounding rocks are V-grade surrounding rocks, the surrounding rocks are influenced by a rural ditch fault, a joint crack develops, a rock mass is broken, a crack surface is filled with a calcite film, and the self-stability of the surrounding rocks is poor. The embodiment innovatively adopts a new double-plugging vibration-reduction self-stabilizing drilling and blasting technology of deep hole cutting with two steps and hole-isolation and explosive charging with peripheral holes.
Explosive: using No. 2 rock emulsion explosive with diameter of 32mm multiplied by 200 mm; detonator: adopting a non-electric millisecond detonator; a detonation network: the detonating tubes are connected in series and in parallel, and the differential detonation is adopted.
Drilling: an excavation rack and a pneumatic rock drill are adopted, the length of a drill rod is 5.0m, the diameter of a drill bit is 38mm, and the diameter of a drill hole is 40 mm.
The blasthole arrangement is shown in figures 1-3: the compound wedge-shaped underholing is adopted, 60 underholing holes are formed, and the fundus depth is 4.5 m; 32 inner ring holes with the depth of 4.2 m; the number of the peripheral holes is 52, the depth is 4.2m, and the peripheral holes are filled with powder at intervals of holes or at intervals of two holes; 11 bottom eyes, 4.2m deep. The total number of blast holes is 155, and the total loading is 230.6 kg. According to the setting position of the blast holes on the face, the blast holes are finely divided, the blast holes are positioned at the bottom and are bottom holes, the round arc blast holes positioned at the outer side are peripheral holes, and the inner side of the round arc blast holes is provided with two circles of holes, three circles of holes, four circles of holes, small holes, large holes and center holes in sequence, wherein the specific setting quantity refers to a circular footage blasting parameter table in the scheme of the embodiment shown in table 1.
Table 1 cyclic footage blasting parameter table of the invention
The peripheral holes are charged with 1 blasthole in a spacing mode when the rock is slightly hard, and are charged with 2 blastholes in a spacing mode when the rock is slightly soft. And the peripheral holes are filled with powder at intervals through reverse air columns, the water stemming is blocked at the hole opening by 0.8m, and the detonating cord is detonated. The explosive amount is reduced by detonating the detonators at the same section of the peripheral holes, so that the purposes of reducing vibration, regularly forming by light explosion, controlling a rock loose ring and prolonging the self-stabilization time of surrounding rock are achieved.
The charge structure: the cut hole is filled with powder continuously, and the hole opening is plugged with 1.0m of stemming. The peripheral hole rock is filled at a slightly hard position by adopting a separation hole and a spacing mode, the hole opening is blocked by 0.3m of water stemming, and the soft rock is filled at a spacing mode by adopting two holes. The explosive is filled with explosive sticks 2 which have the same structure and are connected in series through detonating cords 1, the explosive stick 2 positioned at the innermost part of the slotted hole is connected with a detonator 3, and the detonator 3 is communicated with the outside through a detonating tube 4; stemming 5 is plugged at the hole outside the cut hole, and a non-coupling explosive loading structure is arranged at the interval of peripheral holes in the figure 3. The auxiliary hole, the inner ring hole and the bottom hole are charged continuously, and 1.0m of stemming is plugged by adopting an orifice. The residual blast hole length after the continuous charging is used for completely plugging the stemming, the action time of high-temperature and high-pressure explosive gas in the blast hole is prolonged, the hole bottom explosive force is increased, the explosive energy loss is reduced, and the explosive effect of the undercut hole and the bottom hole is fully ensured. After blasting, the tunnel face is sprayed with concrete for the first time, the blasting footage is 4.0m, the smooth face effect is better, and the details are shown in a blasting effect statistical table in a table 2.
Table 2 statistical table of blasting effect of the present invention
After blasting, a crowbar is used for prying off floating gangue live rocks, concrete is primarily sprayed on the exposed surfaces of the tunnel face, the vault and the side walls, C30 concrete is sprayed for 50-70 mm thick, the self-stabilization time of the surrounding rock is prolonged, blocks are prevented from falling, collapse is avoided, the construction safety risk is reduced, the strength of the surrounding rock during self-stabilization is increased, and the safety risk is reduced.
The principle and the implementation mode of the invention are explained by applying a specific example, and the description of the embodiment is only used for helping to understand the method and the core idea of the invention; meanwhile, for a person skilled in the art, according to the idea of the present invention, the specific embodiments and the application range may be changed. In view of the above, the present disclosure should not be construed as limiting the invention.
Claims (6)
1. A tunnel extremely soft rock deep hole cut peripheral hole isolation gas column powder charge buffering blasting method is characterized in that: the method comprises the following steps:
step one; the construction is carried out by adopting a double-plugging vibration-reduction self-stabilizing drilling explosion mode of deep hole undermining with two steps and hole isolation and charging with peripheral holes, and the tunnel face adopts compound wedge undermining with 60 undermining holes; 32 inner ring holes are formed; 52 peripheral eyes; 11 bottom eyes; the total number of blast holes is 155, and the total loading capacity is 230.6 kg;
step two; continuously charging explosive into the cut hole, and blocking 1.0m of stemming at the hole opening; filling powder at hard positions of rock in peripheral holes at intervals, plugging a hole opening with 0.3m of water stemming, filling powder at the positions of soft rock at intervals of two holes, continuously filling powder in an auxiliary hole, an inner ring hole and a bottom hole, and plugging 1.0m of stemming at the hole opening;
step three; blasting, prying floating gangue and live rocks by a crowbar after blasting, and spraying C30 concrete with the thickness of 50-70 mm.
2. The tunnel extremely soft rock deep hole cut peripheral hole isolation air column charging buffer blasting method according to claim 1, characterized in that: the explosive is filled with explosive rolls which have the same structure and are connected in series through detonating cords, the explosive roll positioned at the innermost part of the cut hole is connected with a detonator, and the detonator is communicated with the outside through a detonating tube; stemming is plugged at the hole opening at the outer side of the slotted hole.
3. The tunnel extremely soft rock deep hole cut peripheral hole isolation air column charging buffer blasting method according to claim 1, characterized in that: the fundus depth of the slotted eye is 4.5 m.
4. The tunnel extremely soft rock deep hole cut peripheral hole isolation air column charging buffer blasting method according to claim 1, characterized in that: the depth of the inner ring hole is 4.2 m.
5. The tunnel extremely soft rock deep hole cut peripheral hole isolation air column charging buffer blasting method according to claim 1, characterized in that: the peripheral eye depth was 4.2 m.
6. The tunnel extremely soft rock deep hole cut peripheral hole isolation air column charging buffer blasting method according to claim 1, characterized in that: the bottom eye is 4.2m deep.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911212255.3A CN110940241B (en) | 2019-12-02 | 2019-12-02 | Tunnel extremely soft rock deep hole cut peripheral hole isolation air column charging buffering blasting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911212255.3A CN110940241B (en) | 2019-12-02 | 2019-12-02 | Tunnel extremely soft rock deep hole cut peripheral hole isolation air column charging buffering blasting method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110940241A true CN110940241A (en) | 2020-03-31 |
CN110940241B CN110940241B (en) | 2022-03-15 |
Family
ID=69908932
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911212255.3A Active CN110940241B (en) | 2019-12-02 | 2019-12-02 | Tunnel extremely soft rock deep hole cut peripheral hole isolation air column charging buffering blasting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110940241B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113108660A (en) * | 2021-03-05 | 2021-07-13 | 中铁十九局集团华东工程有限公司 | Tunnel contour fine control blasting method under bedding development condition |
CN113465460A (en) * | 2021-06-25 | 2021-10-01 | 嵩县山金矿业有限公司 | Two-step mining control blasting method for underground downward access of mine |
-
2019
- 2019-12-02 CN CN201911212255.3A patent/CN110940241B/en active Active
Non-Patent Citations (2)
Title |
---|
张华等: ""新碧鸡关隧道进口大断面软弱围岩爆破技术"", 《路基工程》 * |
范海军等: "暗挖地铁隧道减震爆破技术", 《广州建筑》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113108660A (en) * | 2021-03-05 | 2021-07-13 | 中铁十九局集团华东工程有限公司 | Tunnel contour fine control blasting method under bedding development condition |
CN113465460A (en) * | 2021-06-25 | 2021-10-01 | 嵩县山金矿业有限公司 | Two-step mining control blasting method for underground downward access of mine |
Also Published As
Publication number | Publication date |
---|---|
CN110940241B (en) | 2022-03-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108007285B (en) | A kind of efficient Cut Blasting method of stone head deep hole sublevel segmentation | |
CN111238328B (en) | Compound peripheral eye and tunnel efficient vibration reduction and smooth surface smooth bottom blasting method | |
CN106091848B (en) | It is a kind of to realize overlength, the method for high inclination-angle tunnel anchorage top bar explosion | |
CN103123247A (en) | Damping blasting method for steep dip small crossing angle layered surrounding rock small-distance tunnel excavation | |
CN110940241B (en) | Tunnel extremely soft rock deep hole cut peripheral hole isolation air column charging buffering blasting method | |
CN205262309U (en) | Compound undercutting blasting structure of big section of medium -length hole | |
KR20010039453A (en) | Tunnel Blasting Method for using Air Tube | |
CN112013733B (en) | Blast hole arrangement blasting method for dealing with complex surrounding rock conditions | |
CN107060773B (en) | A kind of underground chamber drilling and blasting method damping excavation method of static(al) explosion presplitting shock insulation | |
CN111023927B (en) | Soft rock single-step deep hole undercutting vibration-reduction flat-bottom light explosion structure in tunnel | |
CN111750752A (en) | Construction method for tunnel weak surrounding rock presplitting blasting | |
CN109211045A (en) | Quasi-conical energy-gathering cut construction method | |
CN110260735A (en) | A kind of diamond shape major diameter emptying aperture burn cut structure and lane construction technique | |
CN111043924B (en) | Efficient blasting method for blocking stemming of tunnel soft rock full-section multistage ultra-deep hole double-end stemming | |
CN111102892B (en) | Wedge-shaped cut blast hole arrangement method suitable for blasting excavation of deep-buried tunnel | |
CN110196002B (en) | Safe and efficient blasting construction method for vertical shaft wall beam nest | |
CN110030889B (en) | Method for forming well by deep hole partition triangular net cut through one-time blasting | |
CN102980453B (en) | Water injection drilling and blasting method for unloading stress of structural strong rock burst area of horizontal structural surface | |
CN216954239U (en) | Deep hole blasting interval charging structure and vibration reduction structure | |
CN108195242B (en) | Rock blasting method | |
CN114264202B (en) | Rock roadway deep hole layered slitting blasting method | |
CN114018112B (en) | Nuclear island and corridor foundation pit negative excavation blasting structure and blasting method | |
CN112964143B (en) | Three-time blasting method for hollow hole straight-hole cut | |
CN213543367U (en) | Raise descending section blasting structure | |
CN112945035B (en) | Construction method for pre-splitting blasting excavation of middle and lower layers of diversion tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200409 Address after: 300350 Tianjin city Jinnan District double Township Applicant after: CHINA RAILWAY 18 BUREAU GROUP Co.,Ltd. Address before: 410100 No. 88 East 7 Line, Changsha Economic and Technological Development Zone, Hunan Province Applicant before: China Railway Construction Heavy Industry Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |