CN110935985A - Method for welding auxiliary electrode in VAR smelting furnace - Google Patents

Method for welding auxiliary electrode in VAR smelting furnace Download PDF

Info

Publication number
CN110935985A
CN110935985A CN201911260217.5A CN201911260217A CN110935985A CN 110935985 A CN110935985 A CN 110935985A CN 201911260217 A CN201911260217 A CN 201911260217A CN 110935985 A CN110935985 A CN 110935985A
Authority
CN
China
Prior art keywords
auxiliary electrode
smelting furnace
var
welding
furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911260217.5A
Other languages
Chinese (zh)
Inventor
王怀柳
李露
翟信杰
陈鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pangang Group Chengdu Titanium Material Co Ltd Jiangyou Branch
Original Assignee
Pangang Group Chengdu Titanium Material Co Ltd Jiangyou Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pangang Group Chengdu Titanium Material Co Ltd Jiangyou Branch filed Critical Pangang Group Chengdu Titanium Material Co Ltd Jiangyou Branch
Priority to CN201911260217.5A priority Critical patent/CN110935985A/en
Publication of CN110935985A publication Critical patent/CN110935985A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/16Arc welding or cutting making use of shielding gas
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/0026Arc welding or cutting specially adapted for particular articles or work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/235Preliminary treatment

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Plasma & Fusion (AREA)
  • Mechanical Engineering (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

The invention belongs to the field of metallurgical smelting equipment, and particularly discloses a method for welding an auxiliary electrode in a VAR smelting furnace, which can quickly cool the welded auxiliary electrode. The method for welding the auxiliary electrode in the VAR smelting furnace comprises the steps of controlling the cold state vacuum degree in the VAR smelting furnace to be below 1.0Pa before welding the auxiliary electrode, controlling the cold state air leakage rate of the VAR smelting furnace to be below 5 Pa.L/s, introducing argon gas after welding the auxiliary electrode for cooling, controlling the pressure in the VAR smelting furnace to be 4500-6000 Pa, cooling for 30-60 min, rapidly completing cooling of the welded auxiliary electrode, increasing the cooling speed to be above 25 ℃/min from the original 15 ℃/min, reducing the waiting time of VAR smelting preparation for more than 30min, reducing the power consumption by at least 100 ℃ per furnace, and improving the production efficiency by more than 5%.

Description

Method for welding auxiliary electrode in VAR smelting furnace
Technical Field
The invention belongs to the field of metallurgical smelting equipment, and particularly relates to a method for welding an auxiliary electrode in a VAR smelting furnace.
Background
The VAR smelting furnace is a vacuum consumable arc smelting furnace for short, and is widely applied to smelting titanium and titanium alloy. With the reduction of the price of the titanium sponge, the cost performance of the product is improved, the initial investment is reduced, and the market demand for titanium and titanium alloy is gradually increased. Because the investment period of titanium and titanium alloy smelting equipment is long, the demand for improving the productivity is more and more increased at the present stage, and therefore, how to shorten the preparation time of VAR smelting becomes a concern of manufacturers. The preparation of VAR smelting comprises welding an auxiliary electrode in a VAR smelting furnace, wherein the auxiliary electrode is also called a false electrode, only plays a role of connecting a consumable electrode and a power supply loop in smelting and does not really participate in smelting; how to rapidly cool the auxiliary electrode in the process of welding the auxiliary electrode is the key for shortening the equipment thermal downtime and improving the work efficiency of VAR smelting preparation.
Disclosure of Invention
The invention aims to provide a method for welding an auxiliary electrode in a VAR smelting furnace, which can quickly cool the welded auxiliary electrode.
The technical scheme adopted by the invention for solving the technical problems is as follows: the method for welding the auxiliary electrode in the VAR smelting furnace comprises the following steps:
step one, charging the auxiliary electrode, sealing the furnace and vacuumizing; controlling the cold vacuum degree in the VAR smelting furnace to be below 1.0Pa, and controlling the cold air leakage rate of the VAR smelting furnace to be below 5 Pa.L/s;
step two, transmitting power for arcing, enabling the sections to be connected between the auxiliary electrode and the main electrode to be quickly butted together after being heated and melted, and controlling the highest temperature of the welding connection part to be more than 1300 ℃;
step three, introducing argon into the VAR smelting furnace, and stopping introducing the argon when the pressure in the furnace is detected to reach 4500-6000 Pa;
and step four, after cooling for 30-60 min, opening the VAR smelting furnace, and detecting the welding seam.
And further, in the third step, argon is introduced into the VAR smelting furnace through a sealing pipeline externally connected to the VAR smelting furnace.
Furthermore, the purity of the introduced argon is more than or equal to 99.9 percent.
The invention has the beneficial effects that: the method can rapidly finish cooling the welding auxiliary electrode by effectively controlling the cold vacuum degree and the cold gas leakage rate in the VAR smelting furnace before welding the auxiliary electrode, then introducing argon for cooling after welding the auxiliary electrode, and effectively controlling the pressure and the total cooling time in the VAR smelting furnace, so that the cooling speed is increased to more than 25 ℃/min from the original 15 ℃/min, the waiting time of VAR smelting preparation can be reduced by more than 30min, the power consumption can be reduced by at least 100 ℃ per furnace, and the production efficiency is increased by more than 5%.
Detailed Description
The present invention will be further described with reference to the following examples.
The method for welding the auxiliary electrode in the VAR smelting furnace comprises the following steps:
step one, charging the auxiliary electrode, sealing the furnace and vacuumizing; controlling the cold vacuum degree in the VAR smelting furnace to be below 1.0Pa, and controlling the cold air leakage rate of the VAR smelting furnace to be below 5 Pa.L/s;
step two, transmitting power for arcing, enabling the sections to be connected between the auxiliary electrode and the main electrode to be quickly butted together after being heated and melted, and controlling the highest temperature of the welding connection part to be more than 1300 ℃; the welding connection part is the part of the auxiliary electrode and the main electrode after the end faces to be connected are butted;
step three, introducing argon into the VAR smelting furnace, and stopping introducing the argon when the pressure in the furnace is detected to reach 4500-6000 Pa; in the step, argon is generally introduced into the VAR smelting furnace through a sealing pipeline which is externally connected to the VAR smelting furnace, a valve is generally arranged on the sealing pipeline, and the VAR smelting furnace is closed by closing the valve after the introduction of the argon is finished; the purity of the introduced argon is usually more than or equal to 99.9 percent; the pressure in the VAR smelting furnace is detected by a vacuum gauge;
and step four, after cooling for 30-60 min, opening the VAR smelting furnace, and detecting the welding seam.
According to the method for welding the auxiliary electrode in the VAR smelting furnace, after the auxiliary electrode is welded, the argon gas filling pipeline and the sealing valve are introduced into the VAR smelting furnace, the auxiliary electrode welded in the VAR smelting furnace can be effectively prevented from being oxidized, the pressure intensity and the cooling time of the argon gas filling are controlled, and the cooling time of the auxiliary electrode is finally shortened on the premise of ensuring the air tightness of the VAR smelting furnace.
Example 1
An auxiliary electrode with the diameter of phi 400mm is welded in a certain VAR smelting furnace, and the process is as follows:
1) charging the auxiliary electrode into a furnace, sealing the furnace and vacuumizing; controlling the cold vacuum degree in the VAR smelting furnace to be below 0.9Pa, and controlling the cold air leakage rate of the VAR smelting furnace to be below 4 Pa.L/s;
2) feeding power to start arc, so that the sections to be connected of the auxiliary electrode and the main electrode are quickly butted together after being heated and melted, and the highest temperature of the welding connection part is controlled to be more than 1300 ℃;
3) introducing argon into the VAR smelting furnace, and stopping introducing the argon when the pressure in the furnace is detected to reach 4800-4900 Pa;
4) and after cooling for 35min, opening the VAR smelting furnace and detecting the welding line.
Compared with the existing welding process, the welding process has the advantages that the cooling speed is increased to 29 ℃/min, the waiting time for preparation is reduced by 50min, the power consumption is reduced by 130 degrees/furnace, and the production efficiency is increased by 7%.
Example 2
An auxiliary electrode with the diameter of phi 600mm is welded in a certain VAR smelting furnace, and the process is as follows:
1) charging the auxiliary electrode into a furnace, sealing the furnace and vacuumizing; controlling the cold vacuum degree in the VAR smelting furnace to be below 0.9Pa, and controlling the cold air leakage rate of the VAR smelting furnace to be below 4 Pa.L/s;
2) feeding power to start arc, so that the sections to be connected of the auxiliary electrode and the main electrode are quickly butted together after being heated and melted, and the highest temperature of the welding connection part is controlled to be more than 1500 ℃;
3) introducing argon into the VAR smelting furnace, and stopping introducing the argon when the pressure in the furnace reaches 5500-5600 Pa;
4) and after cooling for 55min, opening the VAR smelting furnace and detecting the welding seam.
Compared with the existing welding process, the welding process has the advantages that the cooling speed is increased to 27 ℃/min, the waiting time for preparation is reduced by 45min, the power consumption is reduced by 105 degrees/furnace, and the production efficiency is increased by 6%.

Claims (3)

  1. A method for welding an auxiliary electrode in a VAR smelting furnace, comprising the steps of:
    step one, charging the auxiliary electrode, sealing the furnace and vacuumizing; controlling the cold vacuum degree in the VAR smelting furnace to be below 1.0Pa, and controlling the cold air leakage rate of the VAR smelting furnace to be below 5 Pa.L/s;
    step two, transmitting power for arcing, enabling the sections to be connected between the auxiliary electrode and the main electrode to be quickly butted together after being heated and melted, and controlling the highest temperature of the welding connection part to be more than 1300 ℃;
    step three, introducing argon into the VAR smelting furnace, and stopping introducing the argon when the pressure in the furnace is detected to reach 4500-6000 Pa;
    and step four, after cooling for 30-60 min, opening the VAR smelting furnace, and detecting the welding seam.
  2. 2. The method for welding an auxiliary electrode in a VAR melting furnace according to claim 1, wherein: and in the third step, introducing argon into the VAR smelting furnace through a sealing pipeline externally connected to the VAR smelting furnace.
  3. 3. The method for welding the auxiliary electrode in the VAR melting furnace according to claim 1 or 2, wherein: the purity of the introduced argon is more than or equal to 99.9 percent.
CN201911260217.5A 2019-12-10 2019-12-10 Method for welding auxiliary electrode in VAR smelting furnace Pending CN110935985A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911260217.5A CN110935985A (en) 2019-12-10 2019-12-10 Method for welding auxiliary electrode in VAR smelting furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911260217.5A CN110935985A (en) 2019-12-10 2019-12-10 Method for welding auxiliary electrode in VAR smelting furnace

Publications (1)

Publication Number Publication Date
CN110935985A true CN110935985A (en) 2020-03-31

Family

ID=69910611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911260217.5A Pending CN110935985A (en) 2019-12-10 2019-12-10 Method for welding auxiliary electrode in VAR smelting furnace

Country Status (1)

Country Link
CN (1) CN110935985A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55106679A (en) * 1979-02-13 1980-08-15 Hitachi Ltd Arc welding method
CN101214571A (en) * 2007-12-27 2008-07-09 西北有色金属研究院 Method of welding electrode for vacuum consumable arc-melting
CN102586648A (en) * 2012-03-09 2012-07-18 华北电力大学 Zirconium alloy material for cathode of direct current arc air plasma torch and preparation method thereof
CN102806426A (en) * 2012-08-06 2012-12-05 攀钢集团江油长城特殊钢有限公司 Welding process of auxiliary electrode for vacuum arc remelting furnace
CN102912152A (en) * 2012-09-19 2013-02-06 攀钢集团江油长城特殊钢有限公司 Vacuum arc remelting method for inhibiting macrosegregation of high-temperature alloy with high content of Nb
CN107584183A (en) * 2017-08-19 2018-01-16 江苏标新工业有限公司 A kind of welding procedure of electroslag furnace dummy electrode
CN109702292A (en) * 2018-12-30 2019-05-03 西部超导材料科技股份有限公司 A kind of welding procedure of VAR titan alloy casting ingot

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55106679A (en) * 1979-02-13 1980-08-15 Hitachi Ltd Arc welding method
CN101214571A (en) * 2007-12-27 2008-07-09 西北有色金属研究院 Method of welding electrode for vacuum consumable arc-melting
CN102586648A (en) * 2012-03-09 2012-07-18 华北电力大学 Zirconium alloy material for cathode of direct current arc air plasma torch and preparation method thereof
CN102806426A (en) * 2012-08-06 2012-12-05 攀钢集团江油长城特殊钢有限公司 Welding process of auxiliary electrode for vacuum arc remelting furnace
CN102912152A (en) * 2012-09-19 2013-02-06 攀钢集团江油长城特殊钢有限公司 Vacuum arc remelting method for inhibiting macrosegregation of high-temperature alloy with high content of Nb
CN107584183A (en) * 2017-08-19 2018-01-16 江苏标新工业有限公司 A kind of welding procedure of electroslag furnace dummy electrode
CN109702292A (en) * 2018-12-30 2019-05-03 西部超导材料科技股份有限公司 A kind of welding procedure of VAR titan alloy casting ingot

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
稀有金属手册编委会: "《稀有金属手册 下册》", 31 December 1995 *

Similar Documents

Publication Publication Date Title
CN109702292B (en) Welding process of VAR titanium alloy ingot
CN108866433B (en) Steel for high-carbon low-aluminum low-oxygen cutting steel wire and vacuum induction melting method thereof
CN102851456A (en) Method for on-line removing cold steel in RH vacuum chamber
CN101476016B (en) Stainless steel smelting method
CN110964932B (en) Arc-extinguishing process of VAR titanium alloy primary ingot
CN110935985A (en) Method for welding auxiliary electrode in VAR smelting furnace
CN103614582A (en) Method for producing manganese nitride product
CN113215354B (en) Electric furnace full scrap steel smelting process
CN100364678C (en) Manufacturing method for roller-shell smelting and casting for aluminium-casted mill
CN106755709A (en) Chromium method is matched somebody with somebody in a kind of converter of low-carbon (LC) containing Cr steel alloys
CN111014877B (en) Method for welding titanium alloy ingot casting in furnace
CN112760449B (en) Smelting method of slag steel used by Considel electric furnace
CN212476800U (en) Device for promoting rapid temperature rise of blast furnace hearth
CN110904341B (en) Cooling method of titanium alloy ingot
CN103276306A (en) Method for controlling billet flat bulb steel rolling cracks
CN108637532B (en) Method for resisting softening of slag welding joint
CN106181113A (en) A kind of soldering composite aluminium alloy solder silk and preparation method thereof
CN111961792A (en) Control method for efficiently producing steel for wind power fasteners
CN103911474B (en) Blast-furnace smelting is containing the method changing slag tuyere during sefstromite
CN101323927B (en) Method for producing high-temperature alloy by induction heating vacuum refining
CN1307945A (en) Silver soldering method for red copper crucible
CN218723040U (en) Electrode air sealing and air insulating mechanism of electric arc furnace
CN111947456A (en) Continuous casting vacuum induction smelting furnace
CN105983758A (en) Gray cast iron welding process
CN115449654B (en) Low-cost short-process titanium and titanium alloy residue recycling method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200331