CN110908345A - Monitoring feedback system for server cabinet production - Google Patents
Monitoring feedback system for server cabinet production Download PDFInfo
- Publication number
- CN110908345A CN110908345A CN201911073574.0A CN201911073574A CN110908345A CN 110908345 A CN110908345 A CN 110908345A CN 201911073574 A CN201911073574 A CN 201911073574A CN 110908345 A CN110908345 A CN 110908345A
- Authority
- CN
- China
- Prior art keywords
- module
- production
- information
- unit
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 73
- 238000012544 monitoring process Methods 0.000 title claims abstract description 24
- 238000001514 detection method Methods 0.000 claims abstract description 18
- 238000000034 method Methods 0.000 claims description 12
- 238000006243 chemical reaction Methods 0.000 claims description 11
- 230000002159 abnormal effect Effects 0.000 claims description 6
- 238000013500 data storage Methods 0.000 claims description 6
- 238000004458 analytical method Methods 0.000 claims description 4
- 238000005452 bending Methods 0.000 claims description 3
- 239000000284 extract Substances 0.000 claims description 3
- 238000005507 spraying Methods 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 claims 1
- 230000033228 biological regulation Effects 0.000 abstract description 3
- 230000001276 controlling effect Effects 0.000 description 4
- 230000005540 biological transmission Effects 0.000 description 2
- 238000002955 isolation Methods 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 230000003044 adaptive effect Effects 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000017525 heat dissipation Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000005855 radiation Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41875—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by quality surveillance of production
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32368—Quality control
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- General Factory Administration (AREA)
Abstract
The invention discloses a monitoring feedback system for server cabinet production, which comprises a data acquisition system, a flow tracking system, a fault reporting system and a feedback processing center, wherein the data acquisition system is used for acquiring a data file; the invention monitors the on-off information of the circuit, the running parameters of the equipment and the network quality data in the production system in real time through the data acquisition system, and can automatically switch when the circuit or the network fails according to the requirement; meanwhile, early warning reminding is carried out when the equipment is abnormally changed, so that a stable production system is conveniently provided; the dynamic production flow direction and the production progress state of the unbatched orders are mastered in real time through a flow tracking system, and meanwhile, quality detection data of each link are acquired, so that a macroscopic quality detection report is generated conveniently, and the production flow direction, the production progress and the production quality of the product are mastered in real time; the system is convenient to provide timely and effective feedback information, provides comprehensive monitoring information for producers, and is convenient to carry out macroscopic regulation and control on a production system.
Description
Technical Field
The invention relates to the field of server cabinet production, in particular to a monitoring feedback system for server cabinet production.
Background
The server cabinet is used for combining and installing a panel, a plug-in box, electronic elements, devices, mechanical parts and components to form an integral installation box. The server cabinet is composed of a frame and a cover plate (door), generally has a cuboid shape, and is placed on the ground. It provides adaptive environment and safety protection for normal operation of electronic equipment. This is next to the system level one level assembly. Cabinets without an enclosure structure are referred to as racks. The server cabinet has good technical performance. The structure of the cabinet should have good rigidity and strength and good performance of electromagnetic isolation, grounding, noise isolation, ventilation and heat dissipation, etc. In addition, the server cabinet should have vibration resistance, impact resistance, corrosion resistance, dust prevention, water prevention, radiation protection and other properties so as to ensure stable and reliable operation of the equipment.
At present, the independence among all production links on a server cabinet production line is large, and the progress and the yield of each link cannot be macroscopically regulated according to the order quantity; meanwhile, in the whole production system, the fault of each link cannot be effectively fed back in time.
Disclosure of Invention
The present invention is directed to a monitoring feedback system for server rack production, which solves the above problems in the prior art.
In order to achieve the purpose, the invention provides the following technical scheme: a monitoring feedback system for server cabinet production comprises a data acquisition system, a flow tracking system, a fault reporting system and a feedback processing center;
the data acquisition system comprises a line on-off signal acquisition module, an equipment operation parameter acquisition module and a network quality monitoring module; the circuit on-off signal acquisition module is used for acquiring on-off state information of each circuit in the production process in real time and sending the on-off state information to the fault reporting system; the equipment operation parameter acquisition module is connected with an equipment monitoring system in the production workshop and used for acquiring operation parameters of each equipment in the operation process and sending the operation parameters to the fault reporting system; the network quality monitoring module is used for diagnosing the network on-off state and the network signal quality information in the production area in real time and sending the information to the fault reporting system;
the process tracking system comprises a production link tracking module, a progress tracking module and a quality detection module, wherein:
the production link tracking module is used for tracking and recording the flow direction of each link in the production process of the server cabinet and comprises an order entry unit, a drawing unit, a blanking unit, a stamping unit, a bending forming unit, a welding forming unit, a surface processing unit, a plastic spraying unit and an assembling forming unit;
the progress tracking module is used for acquiring the production progress of each link and comprises a finished output recording unit, a production time recording unit and a residual product amount reporting unit;
the quality detection module is used for acquiring quality detection information after each production link is finished and sending the quality detection information to the feedback processing center;
the fault reporting system comprises a data receiving module, a central processing module and an early warning module; the data receiving module is connected with the output end of the data acquisition system and is used for acquiring data information submitted by each system; the central processing module analyzes and processes the network big data, identifies and extracts abnormal data information, and sends the abnormal data information to the early warning module and the feedback processing center; the early warning module makes corresponding early warning reminding according to the fault information;
the feedback processing center comprises a data storage module, an information conversion module and an execution driving and controlling module; the data storage module and the information conversion module are used for receiving data information in each system and performing conversion analysis processing; the execution driving and controlling module is used for issuing an execution command according to the reported information.
As a preferred scheme of the present invention, the data acquisition system includes a standby switching module, specifically including a standby circuit switching unit and a standby network switching unit, for performing automatic switching when a circuit or network fails.
As a preferred scheme of the present invention, the process tracking system includes a GPRS positioning sensor circulating with each batch of orders and a photoelectric counter arranged on a production line of each link.
As a preferred scheme of the present invention, the feedback processing center further includes a large screen display module for performing large screen display on data fed back by each system, and specifically includes a model building unit for performing visual display in a form of generating a chart from data fed back by the process tracking system.
As a preferred scheme of the present invention, the early warning module includes an acousto-optic flashing unit, a voice broadcasting unit and an early warning mode switching unit, and is configured to switch different early warning modes according to different fault information.
Compared with the prior art, the invention has the beneficial effects that:
1. the invention monitors the on-off information of the circuit, the running parameters of the equipment and the network quality data in the production system in real time through the data acquisition system, can automatically switch when the circuit or the network fails according to the requirement, keeps the good working state of the production line and ensures the good data transmission state in the system; meanwhile, the early warning is carried out when the equipment is abnormally changed, so that a stable production system is convenient to provide.
2. The invention uses the flow tracking system to master the production dynamic flow direction and the production progress state of the unbatched orders in real time, and simultaneously obtains the quality detection data of each link, thereby being convenient for generating a macroscopic quality detection report and mastering the production behavior, progress and production quality of the product in real time.
3. The invention reports the problems in the production process in time by arranging the fault reporting system to be matched with the feedback processing center, and simultaneously, the feedback processing center makes a feedback execution command in time after analyzing and processing, thereby being convenient to provide timely and effective feedback information, providing comprehensive monitoring information for producers and being convenient to carry out macroscopic regulation and control on the production system.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, the present invention provides a technical solution: a monitoring feedback system for server cabinet production comprises a data acquisition system, a flow tracking system, a fault reporting system and a feedback processing center;
the data acquisition system comprises a line on-off signal acquisition module, an equipment operation parameter acquisition module and a network quality monitoring module; the circuit on-off signal acquisition module is used for acquiring on-off state information of each circuit in the production process in real time and sending the on-off state information to the fault reporting system; the equipment operation parameter acquisition module is connected with an equipment monitoring system in the production workshop and used for acquiring operation parameters of each equipment in the operation process and sending the operation parameters to the fault reporting system; the network quality monitoring module is used for diagnosing the network on-off state and the network signal quality information in the production area in real time and sending the information to the fault reporting system;
the process tracking system comprises a production link tracking module, a progress tracking module and a quality detection module, wherein:
the production link tracking module is used for tracking and recording the flow direction of each link in the production process of the server cabinet and comprises an order entry unit, a drawing unit, a blanking unit, a stamping unit, a bending forming unit, a welding forming unit, a surface processing unit, a plastic spraying unit and an assembling forming unit;
the progress tracking module is used for acquiring the production progress of each link and comprises a finished output recording unit, a production time recording unit and a residual product amount reporting unit;
the quality detection module is used for acquiring quality detection information after each production link is finished and sending the quality detection information to the feedback processing center;
the fault reporting system comprises a data receiving module, a central processing module and an early warning module; the data receiving module is connected with the output end of the data acquisition system and is used for acquiring data information submitted by each system; the central processing module analyzes and processes the network big data, identifies and extracts abnormal data information, and sends the abnormal data information to the early warning module and the feedback processing center; the early warning module makes corresponding early warning reminding according to the fault information;
the feedback processing center comprises a data storage module, an information conversion module and an execution driving and controlling module; the data storage module and the information conversion module are used for receiving data information in each system and performing conversion analysis processing; the execution driving and controlling module is used for issuing an execution command according to the reported information.
Further, the data acquisition system comprises a standby switching module, specifically comprises a standby circuit switching unit and a standby network switching unit, and is used for automatically switching when a circuit or network fails.
Furthermore, the flow tracking system comprises a GPRS positioning sensor circulating along with each batch of orders and a photoelectric counter arranged on a production line of each link.
Further, the feedback processing center further comprises a large screen display module for displaying the data fed back by each system on a large screen, and specifically comprises a model building unit for visually displaying the data fed back by the flow tracking system in a chart generating mode.
Further, the early warning module comprises an acousto-optic flashing unit, a voice broadcasting unit and an early warning mode conversion unit, and is used for switching different early warning modes according to different fault information.
The invention monitors the on-off information of the circuit, the running parameters of the equipment and the network quality data in the production system in real time through the data acquisition system, can automatically switch when the circuit or the network fails according to the requirement, keeps the good working state of the production line and ensures the good data transmission state in the system; meanwhile, the early warning is carried out when the equipment is abnormally changed, so that a stable production system is convenient to provide. The dynamic production flow direction and the production progress state of the unbatched orders are mastered in real time through the flow tracking system, and meanwhile, quality detection data of all links are acquired, so that a macroscopic quality detection report can be generated conveniently, and the production flow direction, the production progress and the production quality of the product can be mastered in real time. Through setting up trouble report system, cooperate with feedback processing center, in time report the problem that appears in the production process, feedback processing center analysis processes the back simultaneously and in time makes feedback execution command, is convenient for provide timely effectual feedback information, for the producer provides comprehensive monitoring information, be convenient for carry out the macroscopical regulation and control to the production system and be worth noticing: the whole device realizes control over the device through the master control button, and the device matched with the control button is common equipment, belongs to the existing mature technology, and is not repeated for the electrical connection relation and the specific circuit structure.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. A monitoring feedback system for server cabinet production is characterized by comprising a data acquisition system, a flow tracking system, a fault reporting system and a feedback processing center;
the data acquisition system comprises a line on-off signal acquisition module, an equipment operation parameter acquisition module and a network quality monitoring module; the circuit on-off signal acquisition module is used for acquiring on-off state information of each circuit in the production process in real time and sending the on-off state information to the fault reporting system; the equipment operation parameter acquisition module is connected with an equipment monitoring system in the production workshop and used for acquiring operation parameters of each equipment in the operation process and sending the operation parameters to the fault reporting system; the network quality monitoring module is used for diagnosing the network on-off state and the network signal quality information in the production area in real time and sending the information to the fault reporting system;
the process tracking system comprises a production link tracking module, a progress tracking module and a quality detection module, wherein:
the production link tracking module is used for tracking and recording the flow direction of each link in the production process of the server cabinet and comprises an order entry unit, a drawing unit, a blanking unit, a stamping unit, a bending forming unit, a welding forming unit, a surface processing unit, a plastic spraying unit and an assembling forming unit;
the progress tracking module is used for acquiring the production progress of each link and comprises a finished output recording unit, a production time recording unit and a residual product amount reporting unit;
the quality detection module is used for acquiring quality detection information after each production link is finished and sending the quality detection information to the feedback processing center;
the fault reporting system comprises a data receiving module, a central processing module and an early warning module; the data receiving module is connected with the output end of the data acquisition system and is used for acquiring data information submitted by each system; the central processing module analyzes and processes the network big data, identifies and extracts abnormal data information, and sends the abnormal data information to the early warning module and the feedback processing center; the early warning module makes corresponding early warning reminding according to the fault information;
the feedback processing center comprises a data storage module, an information conversion module and an execution driving and controlling module; the data storage module and the information conversion module are used for receiving data information in each system and performing conversion analysis processing; the execution driving and controlling module is used for issuing an execution command according to the reported information.
2. A monitoring feedback system for server rack production as claimed in claim 1, wherein: the data acquisition system comprises a standby switching module, specifically comprises a standby circuit switching unit and a standby network switching unit, and is used for automatically switching when a circuit or network fails.
3. A monitoring feedback system for server rack production as claimed in claim 1, wherein: the flow tracking system comprises a GPRS positioning sensor circulating along with each batch of orders and photoelectric counters arranged on production lines of all links.
4. A monitoring feedback system for server rack production as claimed in claim 1, wherein: the feedback processing center also comprises a large-screen display module which is used for displaying data fed back by each system on a large screen, and specifically comprises a model construction unit which is used for generating a chart from the data fed back by the flow tracking system and visually displaying the chart.
5. A monitoring feedback system for server rack production as claimed in claim 1, wherein: the early warning module comprises an acousto-optic flashing unit, a voice broadcasting unit and an early warning mode conversion unit and is used for switching different early warning modes according to different fault information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911073574.0A CN110908345B (en) | 2019-11-06 | 2019-11-06 | Monitoring feedback system for server cabinet production |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911073574.0A CN110908345B (en) | 2019-11-06 | 2019-11-06 | Monitoring feedback system for server cabinet production |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110908345A true CN110908345A (en) | 2020-03-24 |
CN110908345B CN110908345B (en) | 2022-08-05 |
Family
ID=69814778
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911073574.0A Active CN110908345B (en) | 2019-11-06 | 2019-11-06 | Monitoring feedback system for server cabinet production |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110908345B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117519039A (en) * | 2023-11-28 | 2024-02-06 | 滨州泽郦精密金属科技有限公司 | Metal part production management system |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2320012A1 (en) * | 1999-09-20 | 2001-03-20 | Cellemetry Llc | System for communicating messages via a forward overhead control channel for a programmable logic control device |
US20020198686A1 (en) * | 2001-06-08 | 2002-12-26 | Wei Te Chung Of Foxconn International, Inc. | Method and system for collecting and monitoring shop floor information |
US20030195646A1 (en) * | 2002-04-10 | 2003-10-16 | Hao-Ching Yang | Production cell information system based on activity costs and an architecture therefor |
CN101771275A (en) * | 2008-12-31 | 2010-07-07 | 中国神华能源股份有限公司 | Electric energy monitoring system |
CN101792836A (en) * | 2010-03-25 | 2010-08-04 | 济南领航机械设备有限公司 | Blast furnace bell-less furnace top failure diagnosis forecasting system |
CN101833328A (en) * | 2010-06-01 | 2010-09-15 | 无锡科尔华电子有限公司 | Wireless sensor network smt manufacturing execution control system |
CN102291617A (en) * | 2011-09-03 | 2011-12-21 | 四川公用信息产业有限责任公司 | End-to-end fault diagnosing and positioning platform of IPTV (Internet Protocol Television) business |
CN102917062A (en) * | 2012-10-22 | 2013-02-06 | 中国移动通信集团湖南有限公司湘潭分公司 | Method and system for remotely controlling mobile phone blocker based on control module |
CN103558818A (en) * | 2013-10-28 | 2014-02-05 | 国家电网公司 | Cable 10kV high voltage ring main unit remote monitoring and control system |
BR102015015690A2 (en) * | 2014-07-02 | 2016-01-05 | Schneider Electric Ind Sas | modular remote equipment |
CN105867326A (en) * | 2016-04-08 | 2016-08-17 | 浙江中烟工业有限责任公司 | Forming machine process quality parameter tracking system and tracking method thereof |
CN107682662A (en) * | 2017-09-01 | 2018-02-09 | 中车青岛四方机车车辆股份有限公司 | A kind of acquisition system for manufacturing data |
CN107870600A (en) * | 2017-10-17 | 2018-04-03 | 广东工业大学 | A kind of transparent monitoring method in intelligent workshop and system |
CN109062165A (en) * | 2018-08-30 | 2018-12-21 | 东莞广宇精密电子有限公司 | A kind of production line data monitoring analysis system |
CN109624188A (en) * | 2018-12-25 | 2019-04-16 | 天津华夏联盛汽车部件有限公司 | A kind of bumper assembly intelligence production technology |
-
2019
- 2019-11-06 CN CN201911073574.0A patent/CN110908345B/en active Active
Patent Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2320012A1 (en) * | 1999-09-20 | 2001-03-20 | Cellemetry Llc | System for communicating messages via a forward overhead control channel for a programmable logic control device |
US20020198686A1 (en) * | 2001-06-08 | 2002-12-26 | Wei Te Chung Of Foxconn International, Inc. | Method and system for collecting and monitoring shop floor information |
US20030195646A1 (en) * | 2002-04-10 | 2003-10-16 | Hao-Ching Yang | Production cell information system based on activity costs and an architecture therefor |
CN101771275A (en) * | 2008-12-31 | 2010-07-07 | 中国神华能源股份有限公司 | Electric energy monitoring system |
CN101792836A (en) * | 2010-03-25 | 2010-08-04 | 济南领航机械设备有限公司 | Blast furnace bell-less furnace top failure diagnosis forecasting system |
CN101833328A (en) * | 2010-06-01 | 2010-09-15 | 无锡科尔华电子有限公司 | Wireless sensor network smt manufacturing execution control system |
CN102291617A (en) * | 2011-09-03 | 2011-12-21 | 四川公用信息产业有限责任公司 | End-to-end fault diagnosing and positioning platform of IPTV (Internet Protocol Television) business |
CN102917062A (en) * | 2012-10-22 | 2013-02-06 | 中国移动通信集团湖南有限公司湘潭分公司 | Method and system for remotely controlling mobile phone blocker based on control module |
CN103558818A (en) * | 2013-10-28 | 2014-02-05 | 国家电网公司 | Cable 10kV high voltage ring main unit remote monitoring and control system |
BR102015015690A2 (en) * | 2014-07-02 | 2016-01-05 | Schneider Electric Ind Sas | modular remote equipment |
CN105867326A (en) * | 2016-04-08 | 2016-08-17 | 浙江中烟工业有限责任公司 | Forming machine process quality parameter tracking system and tracking method thereof |
CN107682662A (en) * | 2017-09-01 | 2018-02-09 | 中车青岛四方机车车辆股份有限公司 | A kind of acquisition system for manufacturing data |
CN107870600A (en) * | 2017-10-17 | 2018-04-03 | 广东工业大学 | A kind of transparent monitoring method in intelligent workshop and system |
WO2019076234A1 (en) * | 2017-10-17 | 2019-04-25 | 广东工业大学 | Transparent monitoring method and system for intelligent workshop |
CN109062165A (en) * | 2018-08-30 | 2018-12-21 | 东莞广宇精密电子有限公司 | A kind of production line data monitoring analysis system |
CN109624188A (en) * | 2018-12-25 | 2019-04-16 | 天津华夏联盛汽车部件有限公司 | A kind of bumper assembly intelligence production technology |
Non-Patent Citations (9)
Title |
---|
HATAIWAN SRIYAKUL: "Cyber-Physical System Based Production Monitoring for Tapioca Starch Production", <2017 4TH INTERNATIONAL CONFERENCE ON INFORMATION SCIENCE AND CONTROL ENGINEERING (ICISCE)> * |
YANG LVQING: "The analysis and design of machinery production monitoring system based on Internet of Things", <2011 INTERNATIONAL CONFERENCE ON ELECTRONICS, COMMUNICATIONS AND CONTROL (ICECC)> * |
冷晟等: "生产线中的实时监控技术", 《机械设计与制造工程》 * |
寇海平: "浅析计算机网络常见故障处理及维护方法", 《祖国》 * |
张金阔: "油气生产物联网在油田生产中的应用", 《电脑知识与技术》 * |
李智等: "面向制造过程的车间实时监控系统设计", 《机械设计与制造》 * |
李超等: "基于MES的离散型车间生产管理系统设计", 《组合机床与自动化加工技术》 * |
谭树人等: "显像管生产线质量跟踪系统", 《计算机集成制造系统-CIMS》 * |
郑黎辉: "网络故障短信报警在地震信息网络中的实现与应用", 《华南地震》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117519039A (en) * | 2023-11-28 | 2024-02-06 | 滨州泽郦精密金属科技有限公司 | Metal part production management system |
CN117519039B (en) * | 2023-11-28 | 2024-05-24 | 滨州泽郦精密金属科技有限公司 | Metal part production management system |
Also Published As
Publication number | Publication date |
---|---|
CN110908345B (en) | 2022-08-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103023695A (en) | Master station system monitoring model based on power dispatching automation | |
CN110908345B (en) | Monitoring feedback system for server cabinet production | |
CN111766829A (en) | Intelligent detection management system and method for power distribution room environment | |
CN114815726A (en) | Remote centralized control management system for electric control cabinet | |
CN212991649U (en) | Infrared early warning management system is synthesized to switch board | |
CN106569461A (en) | Distributed power control device | |
CN214044475U (en) | Power distribution cabinet with operation monitoring alarm structure | |
CN110988584A (en) | Intelligent monitoring and automatic control system for electric power system | |
CN213024039U (en) | Intelligent detection and management system for power distribution room environment | |
CN214849641U (en) | Main transformer air cooling control box with intelligent electric leakage monitoring function | |
CN213633684U (en) | Partial discharge and temperature rise online monitoring system for switch cabinet | |
CN210625728U (en) | Cubical switchboard running state monitoring facilities | |
CN111158274B (en) | Aging monitoring system for server cabinet | |
CN204131223U (en) | Intelligent integral comprehensive protector | |
CN112729527A (en) | Control system for monitoring electroplating cylinder vibration automatic alarm for processing printed circuit board | |
CN105487002A (en) | Substation protection press plate position on-line monitoring system | |
CN219917958U (en) | Uninterrupted automatic power distribution equipment | |
CN113049031A (en) | Intelligent analysis system and method for hidden danger of communication power supply simulation training | |
CN111189496A (en) | Lightning protection information on-line monitoring and early warning system for central air-conditioning product | |
CN218514795U (en) | Accurate alarm equipment for monitoring seed leakage of seeding machine | |
CN212138082U (en) | Anti-static electric appliance control cabinet | |
CN216819005U (en) | Electric control cabinet for weak current system | |
CN201226457Y (en) | High voltage intelligent monitoring apparatus | |
CN217522532U (en) | Wiring device for distribution box | |
CN218298860U (en) | Intelligent integrated front-end control box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||