CN110821561A - Pressure pouring composite airtight wall for underground coal mine and construction method thereof - Google Patents

Pressure pouring composite airtight wall for underground coal mine and construction method thereof Download PDF

Info

Publication number
CN110821561A
CN110821561A CN201911275280.6A CN201911275280A CN110821561A CN 110821561 A CN110821561 A CN 110821561A CN 201911275280 A CN201911275280 A CN 201911275280A CN 110821561 A CN110821561 A CN 110821561A
Authority
CN
China
Prior art keywords
arched
wallboard
arch
reinforcing mesh
coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201911275280.6A
Other languages
Chinese (zh)
Other versions
CN110821561B (en
Inventor
张军
周霖
王九红
谷允鹏
王昊阳
孔军
周帅
王强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yankuang Group Corp Ltd
Yanzhou Coal Industry Co Ltd
Original Assignee
Yankuang Group Corp Ltd
Yanzhou Coal Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yankuang Group Corp Ltd, Yanzhou Coal Industry Co Ltd filed Critical Yankuang Group Corp Ltd
Priority to CN201911275280.6A priority Critical patent/CN110821561B/en
Publication of CN110821561A publication Critical patent/CN110821561A/en
Application granted granted Critical
Publication of CN110821561B publication Critical patent/CN110821561B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/103Dams, e.g. for ventilation

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention relates to a pressure pouring composite airtight wall for an underground coal mine and a construction method thereof. The airtight wall constructed by the prior art is easy to leak water and air. The front arched reinforcing mesh and the rear arched reinforcing mesh which are oppositely arranged are fixed in a roadway to be closed, concrete mortar is sprayed on the front arched reinforcing mesh and the rear arched reinforcing mesh to form a front arched wallboard and a rear arched wallboard, the concrete mortar is filled between the front arched wallboard and the rear arched wallboard, the rear arched reinforcing mesh is further provided with a pressurizing cylinder, a thin metal sealing disc is arranged at the inner end of the pressurizing cylinder, a round base disc and a screw rod with a hand wheel are arranged, and the hand wheel is rotated to extrude two ends of the concrete mortar into two side coal walls between the front arched wallboard and the rear arched wallboard. The pressurized pouring composite sealing wall for the underground coal mine disclosed by the invention fully utilizes the original anchor rods and the support nets of the roadway, does not need to dig additional embedded grooves, has the advantages of tight joint of the sealing wall body and the coal walls on the two sides and good waterproof effect, and is suitable for constructing a permanent sealing wall in the underground coal mine.

Description

Pressure pouring composite airtight wall for underground coal mine and construction method thereof
Technical Field
The invention relates to a pressure pouring composite airtight wall for an underground coal mine and a construction method thereof.
Background
During underground construction, a connecting roadway is always arranged between two adjacent crossheading roadways of adjacent working faces, one crossheading roadway on two sides of each working face is an air inlet roadway, and the other crossheading roadway is an air return roadway. In order to ensure the ventilation effect of the working face, when the coal mining operation is carried out on the working face, the connection roadway must be quickly sealed.
At present, a permanent sealing wall is constructed in a coal mine, a metal net originally supported on a coal wall is cut off, an embedded groove is excavated, and then a sealing wall body is constructed.
In the construction process, the metal mesh originally supported by the coal wall is manually cut off, the advantages of the reinforced concrete are not exerted, and the workload is increased.
When the embedded groove is excavated on the coal wall by using the impact drill, the vibration of the impact drill in the excavation process aggravates the looseness of the local coal wall; the supporting strength of the original coal wall is damaged.
Most importantly, there is a large gap between the constructed containment wall 20 and the coal wall of the embedment channel 21 even if the concrete mortar 16 is poured, as shown in fig. 1. After the concrete mortar 16 is solidified into concrete, the concrete and the loosened coal wall cannot be well combined, and water and air leakage is easy to occur.
Disclosure of Invention
The invention aims to overcome the defects in the prior art and provides a pressurized casting composite airtight wall for an underground coal mine and a construction method thereof.
In order to solve the technical problem, the pressure pouring composite airtight wall for the underground coal mine comprises a reinforcing mesh and a sprayed concrete layer, and is characterized in that: the reinforcing mesh comprises a front arch reinforcing mesh and a rear arch reinforcing mesh, the front and rear arch reinforcing meshes comprise arch frames and wire netting welded on the arch frames, each arch frame is formed by welding a plurality of horizontally bent transverse rods and two vertical side rods, two rows of opposite anchor rods which are vertically arranged are respectively arranged on the coal walls on two sides of the roadway to be sealed, the front and rear arch reinforcing meshes are oppositely arranged in the roadway to be sealed under a matched coal mine,
the front arched reinforcing steel bar net and the rear arched reinforcing steel bar net are provided with through holes on two vertical side rods of an arched frame, the arched frames are sleeved on exposed anchor rod heads on two side coal walls in a one-to-one correspondence mode through the through holes, the anchor rod heads are also provided with fastening nuts, the arched frames are firmly fixed on the coal walls on two sides of a roadway to be sealed through the fastening nuts, the front arched reinforcing steel bar net is positioned on one side close to an old pond, the rear arched reinforcing steel bar net is positioned on one side far away from the old pond, the top of the arched frame of the rear arched reinforcing steel bar net is also provided with a grouting pipe and an air pipe in a welding mode, the grouting pipe and the air pipe are respectively provided with a ball valve, the middle part of the rear arched reinforcing steel bar net is also provided with a pressurizing cylinder, the inner end of the pressurizing cylinder is provided with a thin metal sealing disc with annular ripples, the pressurizing cylinder is also internally provided with a circular base disc, the inner end of the screw rod is abutted to the center of the circular base plate, the circular base plate is pressed on the thin metal sealing plate, the sprayed concrete layer is formed by quick-setting concrete mortar sprayed on the front arched reinforcing mesh and the rear arched reinforcing mesh, the quick-setting concrete mortar forms a front arched wallboard and a rear arched wallboard which are opposite to each other in the roadway to be sealed, concrete mortar is filled between the front arched wallboard and the rear arched wallboard, and two ends of the concrete mortar are squeezed into coal walls on two sides between the front arched wallboard and the rear arched wallboard.
With such a design, the following advantages are provided: the concrete mortar is extruded through the pressurizing cylinder during pouring, so that the concrete can be better extruded into gaps between the coal walls on two sides, and meanwhile, under the extrusion of the concrete mortar on the coal walls on two sides, the concrete mortar is uniformly stressed, is firmer and more compact, and the waterproof sealing effect is greatly improved.
Preferably, a metal pipe is welded on the arched frame of the rear arched reinforcing mesh, the inner end of the metal pipe is communicated with the space between the front arched wallboard and the rear arched wallboard, and a pressure gauge is arranged at the outer end of the metal pipe. So design, when being convenient for aerify and leak hunting, the control is aerifyd pressure, and aerifys the back, if in certain time, the pressure numerical value that the manometer shows does not have obvious change, also can prove that the sealed effect of two tunnel arch wallboards is good.
Preferably, the upper edges of the arched frames of the front and rear arched reinforcing meshes are fixed on the anchor rod heads of the top plate of the roadway to be closed. By the design, the front and rear arch reinforcing steel bar nets are fixed more firmly, and the top-contacting effect and the sealing effect are good when mixed soil is sprayed.
Preferably, a plurality of straight steel wire rope inhales are arranged between the two vertical side rods of the front arch-shaped steel bar net, a plurality of straight steel wire rope inhales are arranged between the two vertical side rods of the rear arch-shaped steel bar net, and a turn buckle with hooks at two ends is arranged. So design, be convenient for install preceding, back arch reinforcing bar net.
The construction method for the underground coal mine pressurized pouring composite airtight wall comprises the following steps:
①, selecting proper coal walls with two rows of anchor rods on two sides of the coal walls in the roadway to be sealed as installation positions, cleaning loose coal blocks on the coal walls around the anchor rods,
②, taking the front arch-shaped reinforcing mesh, making the concave surface of the front arch-shaped reinforcing mesh face the old pond of the roadway to be sealed, sleeving the through holes of the vertical side rods on one side of the arch-shaped frame of the front arch-shaped reinforcing mesh on the exposed anchor rod heads on the coal wall on one side of the installation position in a one-to-one correspondence manner, hanging one hook of the turn buckle on the middle section of the adjacent steel wire rope stay cable, connecting the other hook of the turn buckle with the middle section of the horizontal bent cross rod in the middle of the front arch-shaped reinforcing mesh through thick iron wires, adjusting the turn buckle to tighten the steel wire rope stay cable, thereby drawing the two vertical side rods of the front arch-shaped reinforcing mesh close,
then, aligning the through hole of the other side vertical side rod of the arched frame of the front arched steel bar net with the exposed anchor rod head on the other side coal wall, then loosening, taking down the turn buckle bolt, making the two side vertical rods of the front arched steel bar net reset under the elastic rebound action of the horizontal rod which is horizontally bent and sleeved on the anchor rod head on the other side coal wall, fastening the nut on the exposed anchor rod head sleeve, and screwing,
the arch frame is firmly fixed on the coal walls at two sides of the roadway to be sealed by the fastening nut, then the upper edge of the arch frame of the front arch reinforcing bar net is fixed on the anchor rod head of the top plate of the roadway to be sealed by thick iron wires,
③, spraying concrete with accelerating agent on the front arch reinforcing mesh and the coarse iron wire, after the concrete is solidified, the front arch reinforcing mesh and the concrete sprayed on the front arch reinforcing mesh form a front arch wallboard;
④, taking the rear arched steel bar net, arranging the rear arched steel bar net and the front arched steel bar net in a back-to-back manner, sleeving the through holes of the vertical side rods on one side of the arched frame of the rear arched steel bar net on the exposed anchor rod heads on the adjacent coal walls in a one-to-one correspondence manner, hanging one hook of the turn buckle on the middle section of the adjacent steel wire rope stay, connecting the other hook of the turn buckle with the cross of the pressurizing cylinder in the middle of the rear arched steel bar net through thick iron wires, adjusting the turn buckle to tension the steel wire rope stay, thereby drawing the two vertical side rods of the rear arched steel bar net close,
then, aligning the through hole of the other side vertical side rod of the arched frame of the rear arched reinforcing mesh with the exposed anchor rod head on the other side coal wall, then loosening, taking down the turn buckle bolt, making the two side vertical rods of the rear arched reinforcing mesh reset under the elastic rebound action of the horizontally bent cross rod and sleeved on the anchor rod head on the other side coal wall, fastening the nut on the exposed anchor rod head sleeve, and screwing,
the arch frame is firmly fixed on the coal walls at two sides of the roadway to be sealed by the fastening nuts, then the upper edge of the arch frame of the rear arch reinforcing mesh is fixed on the anchor rod head of the top plate of the roadway to be sealed by thick iron wires,
the hand wheel on the pressurizing cylinder of the arched reinforcing mesh is adjusted to prevent the thin metal sealing disc with the annular corrugation from being pressed,
⑤, spraying concrete mortar with accelerator on the rear arch reinforcing mesh and the coarse iron wire, forming a rear arch wallboard by the rear arch reinforcing mesh and the sprayed concrete layer thereon, wherein the grouting pipe and an air pipe are positioned at the top of the rear arch wallboard;
⑥, after the sprayed concrete layer is solidified, closing the ball valve on the grouting pipe at the top of the back arched wallboard, opening the ball valve on the air pipe, inflating air between the front arched wallboard and the back arched wallboard through the air pipe, when the pressure displayed by the pressure gauge reaches 0.2MPa, closing the ball valve on the air pipe, checking whether there is air leakage point at the periphery of the front arched wallboard and the back arched wallboard,
⑦, if there is leakage point, opening the ball valve on the air pipe, deflating, spraying concrete mortar with accelerating agent to the leakage point, after the sprayed concrete is solidified, inflating and checking leakage according to the method of step ⑥ until there is no obvious leakage point around the front arched wallboard and the back arched wallboard, proceeding to the next step,
⑧, opening the ball valve on the grouting pipe and the air pipe on the top of the back arched wallboard, injecting concrete mortar between the front arched wallboard and the back arched wallboard through the grouting pipe, closing the ball valve on the grouting pipe and the air pipe after the concrete mortar is filled, rotating the hand wheel on the pressurizing cylinder before the concrete mortar is initially set, making the screw rod prop on the circular base plate, the circular base plate extrudes the thin metal sealing plate, making the thin metal sealing plate indent, extruding the concrete mortar between the front arched wallboard and the back arched wallboard until the pressure displayed by the pressure gauge reaches 0.2MPa, extruding the coal wall between the front arched wallboard and the back arched wallboard by the extruded concrete mortar, compacting the coal wall, and filling the coal wall into the gap,
⑨, after the concrete mortar between the front and the rear arched wall boards is completely solidified, the pressure casting composite sealing wall for the underground coal mine is obtained.
The pressurized pouring composite sealing wall for the underground coal mine disclosed by the invention fully utilizes the original anchor rods and the support nets of the roadway, no additional embedded groove needs to be dug, the sealing wall body is tightly jointed with the coal walls on the two sides, the waterproof effect is good, and the pressurized pouring composite sealing wall is suitable for constructing a permanent sealing wall in the underground coal mine.
Drawings
The invention further discloses a pressurized pouring composite sealing wall for underground coal mines and a construction method thereof by combining the accompanying drawings:
FIG. 1 is a schematic horizontal sectional structure of a conventional sealing wall for a downhole coal mine;
FIG. 2 is a drawing-in of two vertical side rods of a front arch reinforcing mesh of the press-cast composite containment wall for an underground coal mine by means of a turnbuckle to facilitate the fixing of the two vertical side rods to anchor rods on both sides;
fig. 3 is a schematic structural view of a front arch-shaped reinforcing mesh and a rear arch-shaped reinforcing mesh of the pressure cast composite airtight wall for underground coal mines;
FIG. 4 is a schematic horizontal sectional view (taken along a horizontal plane passing through the axis of the screw) of the press-cast composite bulkhead for underground coal mine.
In the figure: the concrete grouting device comprises a concrete spraying layer 1, a front arch reinforcing mesh 2, a rear arch reinforcing mesh 3, an arch frame 4, a cross rod 41, a vertical side rod 42, a roadway to be sealed 5, a coal wall 6, an anchor rod head 7, a fastening nut 8, a old pond 9, a grouting pipe 43, an air pipe 44, a pressurizing cylinder 10, a thin metal sealing disc 11, a circular base disc 12, a cross 13, a lead screw 14, a hand wheel 15, concrete mortar 16, a metal pipe 45, a pressure gauge 46, a steel wire rope 17, a basket bolt 18, a thick iron wire 19, a sealing wall constructed by the prior art 20 and an embedded groove in the prior art 21.
Detailed Description
The first implementation mode comprises the following steps: as shown in fig. 2-4, the pressure-casting composite airtight wall for underground coal mine comprises a reinforcing mesh and a sprayed concrete layer 1, and is characterized in that: the reinforcing mesh comprises a front arched reinforcing mesh 2 and a rear arched reinforcing mesh 3, the front arched reinforcing mesh 2 and the rear arched reinforcing mesh 3 both comprise arched frames 4 and wire netting welded on the arched frames, each arched frame is formed by welding a plurality of horizontally bent cross rods 41 and two vertical side rods 42, two rows of opposite anchor rods which are vertically arranged are respectively arranged on coal walls 6 at two sides of a roadway 5 to be sealed, the front arched reinforcing mesh 2 and the rear arched reinforcing mesh 3 are arranged in the roadway 5 to be sealed under a coal mine in a back-to-back manner for matching,
the two vertical side rods 42 of the arched frames 4 of the front arched reinforcing mesh and the rear arched reinforcing mesh are provided with through holes which are sleeved on the exposed anchor rod heads 7 on the coal walls 6 on the two sides in a one-to-one correspondence way, the anchor rod heads 6 are also provided with fastening nuts 8, the arched frames 4 are firmly fixed on the coal walls 6 on the two sides of the roadway 5 to be sealed, the front arched reinforcing mesh 2 is positioned on one side close to the old pond 9 (the old pond refers to a mined area and a abandoned roadway under a mine), the rear arched reinforcing mesh 3 is positioned on one side far away from the old pond 9, the top of the arched frame 4 of the rear arched reinforcing mesh 3 is also provided with a grouting pipe 43 and an air pipe 44 in a welding way, the grouting pipe 43 and the air pipe 44 are respectively provided with ball valves, the middle part of the rear arched reinforcing mesh 3 is also provided with a pressurizing cylinder 10, the inner end of the pressurizing cylinder 10 is provided with a thin metal sealing disc 11 with annular corrugation, the, the outer end of the pressurizing cylinder is connected with a cross 13, the center of the cross 13 is provided with a threaded through hole, the threaded through hole is provided with a lead screw 14, the outer end of the lead screw is provided with a hand wheel 15, the inner end of the lead screw 14 is abutted against the center of a circular base plate 12, the circular base plate 12 is pressed on a thin metal sealing plate 11, the sprayed concrete layer 1 is formed by quick-setting concrete mortar sprayed on a front arched reinforcing mesh 2 and a rear arched reinforcing mesh 3, the quick-setting concrete mortar forms a front arched wallboard and a rear arched wallboard which are opposite to each other in a roadway 5 to be sealed, concrete mortar 16 is filled between the front arched wallboard and the rear arched wallboard, and two ends of the concrete mortar 16 are extruded into coal walls 6 on two sides between the front arched wallboard and the rear arched wallboard.
The arch frame 4 of the rear arch reinforcing mesh 3 is welded with a metal pipe 45, the inner end of the metal pipe 45 is communicated with the space between the front arch wallboard and the rear arch wallboard, and the outer end of the metal pipe 45 is provided with a pressure gauge 46.
The upper edges of the arch frames 4 of the front and the rear arch reinforcing meshes 2 and 3 are fixed on an anchor rod head 7 of a top plate of the roadway to be closed.
A plurality of straight steel wire rope inhaul cables 17 are arranged between the two vertical side rods 42 of the front arched steel bar net 2, a plurality of straight steel wire rope inhaul cables 17 are arranged between the two vertical side rods of the rear arched steel bar net, and a turn buckle 18 with hooks at two ends is arranged.
The construction method of the pressurized pouring composite airtight wall for the underground coal mine comprises the following steps:
①, selecting proper coal walls with two rows of anchor rods on the coal walls 6 on two sides in the laneway 5 to be sealed as installation positions, and cleaning loose coal blocks on the coal walls on the periphery of the anchor rods.
②, taking the front arch-shaped reinforcing mesh 2, making the concave surface of the front arch-shaped reinforcing mesh 2 face the old pond of the roadway 5 to be closed, sleeving the through holes of the vertical side rod 42 at one side of the arch-shaped frame 4 of the front arch-shaped reinforcing mesh 2 on the exposed anchor rod head 7 on the coal wall 6 at one side of the installation position in a one-to-one correspondence manner, hanging one hook of the turn buckle 18 on the middle section of the adjacent steel wire rope stay 17, connecting the other hook of the turn buckle 18 with the middle section of the horizontal bent cross rod 41 at the middle part of the front arch-shaped reinforcing mesh 2 through the thick iron wire 19, adjusting the turn buckle 18 to tighten the steel wire rope stay 17, thereby drawing the two vertical side rods 42 of the front arch-shaped reinforcing mesh 2 close to each other, as shown in fig. 2.
Then, the through hole of the other side vertical side lever 42 of the arch frame 4 of the front arch-shaped reinforcing bar net 2 is aligned to the exposed anchor rod head 7 on the other side coal wall 6, then the turn buckle 18 is loosened, the two vertical side levers 42 of the front arch-shaped reinforcing bar net 2 are reset under the elastic rebound action of the horizontally bent cross rod 41 and are sleeved on the anchor rod head on the other side coal wall 6, the exposed anchor rod head 7 is sleeved with the fastening nut 8 and is screwed,
the arch frames 4 of the front arch-shaped reinforcing mesh 2 are firmly fixed on the coal walls 6 at two sides of the roadway 5 to be sealed by the fastening nuts 8, and then the upper edge of the arch frame 4 of the front arch-shaped reinforcing mesh 2 is fixed on the anchor rod head 7 of the top plate of the roadway 5 to be sealed by thick iron wires. (not shown in the figure)
③, spraying concrete with accelerating agent on the front arch reinforcing mesh 2 and the coarse iron wire, after the concrete is solidified, the front arch reinforcing mesh 2 and the concrete sprayed on the front arch reinforcing mesh form a front arch wallboard;
④, taking the rear arched reinforcing mesh 3, putting the rear arched reinforcing mesh 3 opposite to the front arched reinforcing mesh 2 (as shown in fig. 3), sleeving the through holes of the vertical side rods 42 on one side of the arched frame 4 of the rear arched reinforcing mesh 2 on the exposed anchor heads 7 on the adjacent coal wall 6 in one-to-one correspondence, hanging one hook of the turn buckle 18 on the middle section of the adjacent steel wire rope 17, connecting the other hook of the turn buckle 18 with the cross 13 of the pressurizing cylinder 10 in the middle of the rear arched reinforcing mesh 2 through the thick iron wire 19, adjusting the turn buckle 18 to make the steel wire rope tension the stay 17, thereby drawing the two vertical side rods 4 of the rear arched reinforcing mesh 3 close.
Then, the through holes of the other side vertical side rods 42 of the arched frames 4 of the rear arched reinforcing mat 3 are aligned with the exposed anchor heads 7 on the other side coal wall 6, and then the turn buckle 18 is released, so that the two vertical side rods 42 of the rear arched reinforcing mat 2 are restored by the elastic rebound of the horizontally bent cross bar 41 and are fitted over the anchor heads 7 on the other side coal wall 6, the exposed anchor heads 7 are fitted over the fastening nuts 8 and tightened,
the fastening nuts 8 firmly fix the arch frames of the rear arch-shaped reinforcing meshes 3 to the coal walls on both sides of the roadway to be closed, and then the upper edges of the arch frames 4 of the rear arch-shaped reinforcing meshes are fixed to the anchor heads 7 of the roof of the roadway 5 to be closed by using thick iron wires.
The hand wheel 15 on the pressurizing cylinder 10 of the arched reinforcing mesh 3 is adjusted to make the thin metal sealing disc 11 with the annular corrugation not be pressed.
⑤, spraying concrete mortar with accelerator on the rear arch reinforcing mesh 3 and the coarse iron wires, forming a rear arch wallboard by the rear arch reinforcing mesh 3 and the sprayed concrete layer thereon, wherein the grouting pipe 43 and an air pipe 44 are positioned at the top of the rear arch wallboard;
⑥, after the sprayed concrete layer is solidified, closing the ball valve on the grouting pipe 43 at the top of the back arched wallboard, opening the ball valve of the air pipe 44, inflating air between the front arched wallboard and the back arched wallboard through the air pipe 44, when the pressure displayed by the pressure gauge reaches 0.2MPa, closing the ball valve on the air pipe 44, checking whether there is air leakage point at the periphery of the front arched wallboard and the back arched wallboard,
⑦, if there is leakage point, opening the ball valve on the air pipe 44, deflating, spraying concrete mortar with accelerating agent to the leakage point, after the sprayed concrete is solidified, inflating and checking leakage according to the method of step ⑥ until there is no obvious leakage point around the front arched wallboard and the back arched wallboard, proceeding to the next step,
⑧, opening the ball valve on the grouting pipe 43 and the air pipe 44 on the top of the back arched wall board 2, injecting concrete mortar between the front arched wall board and the back arched wall board through the grouting pipe 43, closing the ball valve on the grouting pipe 43 and the air pipe 44 after the concrete mortar is filled, before the concrete mortar is initially set, rotating the hand wheel 15 on the pressurizing cylinder 10 to make the screw rod prop on the circular base plate, the circular base plate extrudes the thin metal sealing plate to make the thin metal sealing plate 11 indent, and the concrete mortar between the front arched wall board and the back arched wall board is extruded until the pressure displayed by the pressure gauge reaches 0.2MPa, the coal wall 6 between the front arched wall board and the back arched wall board is extruded by the extruded concrete mortar, compacted, and filled into the gap on the coal wall 6,
⑨, after the concrete mortar between the front and the rear arched wall boards is completely solidified, the pressure casting composite sealing wall for the underground coal mine is obtained.
The core of the invention is that a front arch wallboard and a rear arch wallboard are constructed in a roadway to be closed, then pressurized concrete is poured between the front arch wallboard and the rear arch wallboard by means of a pressurizing cylinder 10 and other devices, so that the concrete is pressurized to coal walls 6 at two ends, and the coal walls 6 at two sides are fully filled and compacted. The design of the front and rear arched wall boards increases the combination area of the composite airtight wall and the coal walls on two sides, the coal walls at the combination part are pressed more evenly, the coal stress condition is close to the center of the coal walls, and the steel wire rope stay ropes 17 increase the compression resistance of the front and rear arched wall boards.
The composite airtight wall formed in this way is tightly combined with the coal walls on two sides, and has good waterproof and sealing effects.

Claims (5)

1. The utility model provides a compound seal wall is pour with pressurization in colliery in pit, includes reinforcing bar net and spraying concrete layer, its characterized in that: the reinforcing mesh comprises a front arch reinforcing mesh and a rear arch reinforcing mesh, the front and rear arch reinforcing meshes comprise arch frames and wire netting welded on the arch frames, each arch frame is formed by welding a plurality of horizontally bent transverse rods and two vertical side rods, two rows of opposite anchor rods which are vertically arranged are respectively arranged on the coal walls on two sides of the roadway to be sealed, the front and rear arch reinforcing meshes are oppositely arranged in the roadway to be sealed under a matched coal mine,
the front arched reinforcing steel bar net and the rear arched reinforcing steel bar net are provided with through holes on two vertical side rods of an arched frame, the arched frame is fixedly fixed on the coal walls on two sides of a roadway to be sealed through the through holes and sleeved on exposed anchor rod heads on the coal walls on two sides in a one-to-one correspondence mode, the anchor rod heads are also provided with fastening nuts, the arched frame is fixedly fixed on the coal walls on two sides of the roadway to be sealed through the fastening nuts, the front arched reinforcing steel bar net is positioned on one side close to an old pond, the rear arched reinforcing steel bar net is positioned on one side far away from the old pond, a grouting pipe and an air pipe are welded on the top of the arched frame of the rear arched reinforcing steel bar net, ball valves are respectively arranged on the grouting pipe and the air pipe, a pressurizing cylinder is further arranged in the middle of the rear arched reinforcing steel bar net, a thin metal sealing disc with annular ripples is arranged at the inner end of the pressurizing cylinder, the inner end of the screw rod is abutted to the center of the circular base plate, the circular base plate is pressed on the thin metal sealing plate, the sprayed concrete layer is formed by quick-setting concrete mortar sprayed on the front arched reinforcing mesh and the rear arched reinforcing mesh, the quick-setting concrete mortar forms a front arched wallboard and a rear arched wallboard which are opposite to each other in the roadway to be sealed, concrete mortar is filled between the front arched wallboard and the rear arched wallboard, and two ends of the concrete mortar are squeezed into coal walls on two sides between the front arched wallboard and the rear arched wallboard.
2. The press-cast composite containment wall for underground coal mines according to claim 1, wherein: the arched frame of the rear arched reinforcing mesh is also welded with a metal pipe, the inner end of the metal pipe is communicated with the space between the front arched wallboard and the rear arched wallboard, and the outer end of the metal pipe is provided with a pressure gauge.
3. The underground coal mine pressure casting composite closing wall according to claim 2, characterized in that: the upper edges of the arched frames of the front and rear arched reinforcing meshes are fixed on the anchor rod heads of the top plate of the roadway to be sealed.
4. The press-cast composite containment wall for underground coal mines according to claim 3, wherein: a plurality of straight steel wire rope inhaul cables are arranged between the two vertical side rods of the front arched steel bar net, a plurality of straight steel wire rope inhaul cables are arranged between the two vertical side rods of the rear arched steel bar net, and a turn buckle with hooks at two ends is arranged.
5. The method of claim 4, comprising the steps of:
①, selecting proper coal walls with two rows of anchor rods on two sides of the coal walls in the roadway to be sealed as installation positions, cleaning loose coal blocks on the coal walls around the anchor rods,
②, taking the front arch reinforcing bar net of claim 4, making the concave surface of the front arch reinforcing bar net face the old pond of the roadway to be closed, sleeving the through holes of the vertical side bars at one side of the arch frame of the front arch reinforcing bar net on the exposed anchor heads on the coal wall at one side of the installation place in a one-to-one correspondence manner, hanging one hook of the flower basket bolt on the middle section of the adjacent steel wire rope stay, passing the other hook of the flower basket bolt on the middle section of the horizontal bar bent horizontally at the middle part of the front arch reinforcing bar net through the thick iron wire, adjusting the flower basket bolt to tighten the steel wire rope stay, thereby drawing the two vertical side bars of the front arch reinforcing bar net close,
then, aligning the through hole of the other side vertical side rod of the arched frame of the front arched steel bar net with the exposed anchor rod head on the other side coal wall, then loosening, taking down the turn buckle bolt, making the two side vertical rods of the front arched steel bar net reset under the elastic rebound action of the horizontal rod which is horizontally bent and sleeved on the anchor rod head on the other side coal wall, fastening the nut on the exposed anchor rod head sleeve, and screwing,
the arch frame is firmly fixed on the coal walls at two sides of the roadway to be sealed by the fastening nut, then the upper edge of the arch frame of the front arch reinforcing bar net is fixed on the anchor rod head of the top plate of the roadway to be sealed by thick iron wires,
③, spraying concrete with accelerating agent on the front arch reinforcing mesh and the coarse iron wire, after the concrete is solidified, the front arch reinforcing mesh and the concrete sprayed on the front arch reinforcing mesh form a front arch wallboard;
④, taking the rear arched reinforcing mesh of claim 4, arranging the rear arched reinforcing mesh opposite to the front arched reinforcing mesh, sleeving the through holes of the vertical side rods on one side of the arched frame of the rear arched reinforcing mesh on the exposed anchor heads on the adjacent coal walls in one-to-one correspondence, hanging one hook of the turn buckle on the middle section of the adjacent steel wire rope stay, connecting the other hook of the turn buckle with the cross of the pressurizing cylinder in the middle of the rear arched reinforcing mesh through thick iron wires, adjusting the turn buckle to tighten the steel wire rope stay, thereby drawing the two vertical side rods of the rear arched reinforcing mesh closer,
then, aligning the through hole of the other side vertical side rod of the arched frame of the rear arched reinforcing mesh with the exposed anchor rod head on the other side coal wall, then loosening, taking down the turn buckle bolt, making the two side vertical rods of the rear arched reinforcing mesh reset under the elastic rebound action of the horizontally bent cross rod and sleeved on the anchor rod head on the other side coal wall, fastening the nut on the exposed anchor rod head sleeve, and screwing,
the arch frame is firmly fixed on the coal walls at two sides of the roadway to be sealed by the fastening nuts, then the upper edge of the arch frame of the rear arch reinforcing mesh is fixed on the anchor rod head of the top plate of the roadway to be sealed by thick iron wires,
the hand wheel on the pressurizing cylinder of the arched reinforcing mesh is adjusted to prevent the thin metal sealing disc with the annular corrugation from being pressed,
⑤, spraying concrete mortar with accelerator on the rear arch reinforcing mesh and the coarse iron wire, forming a rear arch wallboard by the rear arch reinforcing mesh and the sprayed concrete layer thereon, wherein the grouting pipe and an air pipe are positioned at the top of the rear arch wallboard;
⑥, after the sprayed concrete layer is solidified, closing the ball valve on the grouting pipe at the top of the back arched wallboard, opening the ball valve on the air pipe, inflating air between the front arched wallboard and the back arched wallboard through the air pipe, when the pressure displayed by the pressure gauge reaches 0.2MPa, closing the ball valve on the air pipe, checking whether there is air leakage point at the periphery of the front arched wallboard and the back arched wallboard,
⑦, if there is leakage point, opening the ball valve on the air pipe, deflating, spraying concrete mortar with accelerating agent to the leakage point, after the sprayed concrete is solidified, inflating and checking leakage according to the method of step ⑥ until there is no obvious leakage point around the front arched wallboard and the back arched wallboard, proceeding to the next step,
⑧, opening the ball valve on the grouting pipe and the air pipe on the top of the back arched wallboard, injecting concrete mortar between the front arched wallboard and the back arched wallboard through the grouting pipe, closing the ball valve on the grouting pipe and the air pipe after the concrete mortar is filled, rotating the hand wheel on the pressurizing cylinder before the concrete mortar is initially set, making the screw rod prop on the circular base plate, the circular base plate extrudes the thin metal sealing plate, making the thin metal sealing plate indent, extruding the concrete mortar between the front arched wallboard and the back arched wallboard until the pressure displayed by the pressure gauge reaches 0.2MPa, extruding the coal wall between the front arched wallboard and the back arched wallboard by the extruded concrete mortar, compacting the coal wall, and filling the coal wall into the gap,
⑨, after the concrete mortar between the front and the rear arched wall boards is completely solidified, the pressure casting composite sealing wall for the underground coal mine is obtained.
CN201911275280.6A 2019-12-12 2019-12-12 Pressurized pouring composite sealing wall for underground coal mine and construction method thereof Active CN110821561B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911275280.6A CN110821561B (en) 2019-12-12 2019-12-12 Pressurized pouring composite sealing wall for underground coal mine and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911275280.6A CN110821561B (en) 2019-12-12 2019-12-12 Pressurized pouring composite sealing wall for underground coal mine and construction method thereof

Publications (2)

Publication Number Publication Date
CN110821561A true CN110821561A (en) 2020-02-21
CN110821561B CN110821561B (en) 2024-05-28

Family

ID=69545058

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911275280.6A Active CN110821561B (en) 2019-12-12 2019-12-12 Pressurized pouring composite sealing wall for underground coal mine and construction method thereof

Country Status (1)

Country Link
CN (1) CN110821561B (en)

Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0996197A (en) * 1995-09-29 1997-04-08 Shimizu Corp Structure of support wall and construction method therefor
WO2002033221A2 (en) * 2000-08-15 2002-04-25 Sean Philip Brennan Explosion proof walls
KR20100074610A (en) * 2008-12-24 2010-07-02 양효식 Method for constructing arch-shaped concrete structure capable of collecting screen cast and arch-shaped structure constructed by the same
CN201972707U (en) * 2010-12-20 2011-09-14 惠兴田 Reinforced concrete gob-side isolation wall of sandwich anchor
KR101439400B1 (en) * 2014-03-31 2014-09-12 우경기술주식회사 A hinged base structure of arch-shaped composite structure with the precast concrete pannel and the steel frame using the open trench tunnel and method for constructing arch-shaped open trench tunnel
CN204098954U (en) * 2014-08-08 2015-01-14 西北矿冶研究院 Dehydration barricade
CN104314614A (en) * 2014-10-16 2015-01-28 山东科技大学 Mining cambered anti-impact sealing wall and construction method of mining cambered anti-impact sealing wall
CA2892348A1 (en) * 2014-05-22 2015-11-22 John J. Breedlove Retainment wall for underground mine and method of construction
CN205135708U (en) * 2015-11-13 2016-04-06 西安科技大学 Novel withstand voltage fire seal in collecting space area
CN105507950A (en) * 2015-12-17 2016-04-20 大同煤矿集团有限责任公司 Waterproof airtight structure with arched cushion wall
CN205422813U (en) * 2016-03-07 2016-08-03 马钢(集团)控股有限公司 Detachable filling and retaining wall
CN106050302A (en) * 2016-07-19 2016-10-26 河南理工大学 Constructing system and method for coal mine permanent sealing wall
CN106837419A (en) * 2017-04-07 2017-06-13 兖州煤业股份有限公司 Face sky old working compound closure wall and its method of construction
WO2018009970A1 (en) * 2016-07-14 2018-01-18 Strata Linings Pty Ltd Seal, seal forming system, method of forming a seal and associated formwork support
CN108590751A (en) * 2018-06-26 2018-09-28 中南大学 A kind of mine down-hole tailings water in-situ treatment method and permeable reaction filling counterfort
CN108757024A (en) * 2018-05-30 2018-11-06 贵州锦丰矿业有限公司 A kind of efficient filling counterfort in mine and its construction method
CN109083682A (en) * 2018-08-28 2018-12-25 辽宁工程技术大学 A kind of construction method of mine working antiseepage high intensity fire dam
CN208294566U (en) * 2018-03-16 2018-12-28 河北钢铁集团矿业有限公司 A kind of high concentration tailing cemented filling metal mesh structure barricade
CN110273700A (en) * 2019-08-01 2019-09-24 贵州大学 It is a kind of to control red shale tunnel strength bolt-grouting support structure and its construction method
CN211116124U (en) * 2019-12-12 2020-07-28 兖矿集团有限公司 Pressure pouring composite airtight wall for underground coal mine

Patent Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0996197A (en) * 1995-09-29 1997-04-08 Shimizu Corp Structure of support wall and construction method therefor
WO2002033221A2 (en) * 2000-08-15 2002-04-25 Sean Philip Brennan Explosion proof walls
KR20100074610A (en) * 2008-12-24 2010-07-02 양효식 Method for constructing arch-shaped concrete structure capable of collecting screen cast and arch-shaped structure constructed by the same
CN201972707U (en) * 2010-12-20 2011-09-14 惠兴田 Reinforced concrete gob-side isolation wall of sandwich anchor
KR101439400B1 (en) * 2014-03-31 2014-09-12 우경기술주식회사 A hinged base structure of arch-shaped composite structure with the precast concrete pannel and the steel frame using the open trench tunnel and method for constructing arch-shaped open trench tunnel
US20160333543A1 (en) * 2014-05-22 2016-11-17 Sturda, Inc. Retainment wall for underground mine and method of construction
CA2892348A1 (en) * 2014-05-22 2015-11-22 John J. Breedlove Retainment wall for underground mine and method of construction
CN204098954U (en) * 2014-08-08 2015-01-14 西北矿冶研究院 Dehydration barricade
CN104314614A (en) * 2014-10-16 2015-01-28 山东科技大学 Mining cambered anti-impact sealing wall and construction method of mining cambered anti-impact sealing wall
CN205135708U (en) * 2015-11-13 2016-04-06 西安科技大学 Novel withstand voltage fire seal in collecting space area
CN105507950A (en) * 2015-12-17 2016-04-20 大同煤矿集团有限责任公司 Waterproof airtight structure with arched cushion wall
CN205422813U (en) * 2016-03-07 2016-08-03 马钢(集团)控股有限公司 Detachable filling and retaining wall
WO2018009970A1 (en) * 2016-07-14 2018-01-18 Strata Linings Pty Ltd Seal, seal forming system, method of forming a seal and associated formwork support
CN106050302A (en) * 2016-07-19 2016-10-26 河南理工大学 Constructing system and method for coal mine permanent sealing wall
CN106837419A (en) * 2017-04-07 2017-06-13 兖州煤业股份有限公司 Face sky old working compound closure wall and its method of construction
CN208294566U (en) * 2018-03-16 2018-12-28 河北钢铁集团矿业有限公司 A kind of high concentration tailing cemented filling metal mesh structure barricade
CN108757024A (en) * 2018-05-30 2018-11-06 贵州锦丰矿业有限公司 A kind of efficient filling counterfort in mine and its construction method
CN108590751A (en) * 2018-06-26 2018-09-28 中南大学 A kind of mine down-hole tailings water in-situ treatment method and permeable reaction filling counterfort
CN109083682A (en) * 2018-08-28 2018-12-25 辽宁工程技术大学 A kind of construction method of mine working antiseepage high intensity fire dam
CN110273700A (en) * 2019-08-01 2019-09-24 贵州大学 It is a kind of to control red shale tunnel strength bolt-grouting support structure and its construction method
CN211116124U (en) * 2019-12-12 2020-07-28 兖矿集团有限公司 Pressure pouring composite airtight wall for underground coal mine

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李国为;姬文龙;: "快速封闭技术在综采工作面顺槽联络巷的应用", 陕西煤炭, no. 06, 15 December 2017 (2017-12-15) *

Also Published As

Publication number Publication date
CN110821561B (en) 2024-05-28

Similar Documents

Publication Publication Date Title
CN108316941B (en) Broken surrounding rock and soft rock roadway U-shaped steel canopy supporting method
CN104878948B (en) A kind of reinforcement means of rc-frame-beam hogging moment area
CN105937407B (en) A kind of construction method of gob-side entry retaining concrete filling wall annular air-pocket
CN203742612U (en) Rapid construction supporting system for deep coal mine roadway with weak and broken surrounding rock
CN103352582B (en) The method of inner prestressed reinforcement bolt anchorage Concrete Hollow Block Masonry Structures
WO2014182074A1 (en) Method for reinforcing pillar part of adjacently constructed parallel tunnels with reinforcing rods and excavation method
CN114635720A (en) Large-section deep-buried soft rock tunnel combined supporting system and construction method
CN201486566U (en) Device for pouring concrete continuous wall through gob-side entry retaining of mining working surface
CN210562163U (en) Prefabricated prestressed anchor rod piece
CN205117376U (en) A novel anchor bolt support structure for shallow unsymmetrial loading tunnel that buries
CN211116124U (en) Pressure pouring composite airtight wall for underground coal mine
CN109236322A (en) It a kind of artificial bottom plate preventing soft-rock tunnel pucking and its constructs and method for maintaining
CN111119928A (en) Novel tunnel primary support structure and construction method
CN112302685B (en) Tunnel lining vault belt mold grouting system and construction method
CN110513129B (en) Advanced roof-protecting supporting structure and method for roadway of soft and thick coal seam working face
CN110821561B (en) Pressurized pouring composite sealing wall for underground coal mine and construction method thereof
CN102979572B (en) Active reinforced filling wall and construction method
KR102079563B1 (en) Compression friction type anchor panel ground reinforcement system
CN112483732A (en) Construction method for suspension packaging combined protection pipeline
CN210317328U (en) Tunnel segment anti-floating structure under ultra-shallow burying earthing condition of shield tunnel in operation period
CN114673527B (en) Progressive roadway and tunnel broken surrounding rock reinforcing method
CN112901226A (en) Ultra-thin roof roadway supporting method under goaf
CN103557007B (en) Cross the construction method of geological anomaly zone soft-rock tunnel smashed to pieces
CN112252169B (en) Hollow box-rock anchor combined light ground anchor bridge abutment and construction process thereof
CN212272218U (en) Anchor-support combined supporting system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Country or region after: China

Address after: No. 28 Shunhua Road, High tech Zone, Jinan City, Shandong Province, 250101

Applicant after: SHANDONG ENERGY GROUP Co.,Ltd.

Applicant after: Yankuang Energy Group Co.,Ltd.

Address before: 273500 Shandong city of Jining province Zoucheng City Fushan Road No. 298

Applicant before: YANKUANG GROUP Co.,Ltd.

Country or region before: China

Applicant before: YANZHOU COAL MINING Co.,Ltd.

GR01 Patent grant
GR01 Patent grant