CN110820809A - Construction method and structure for preventing ground from being wetted - Google Patents

Construction method and structure for preventing ground from being wetted Download PDF

Info

Publication number
CN110820809A
CN110820809A CN201911077036.9A CN201911077036A CN110820809A CN 110820809 A CN110820809 A CN 110820809A CN 201911077036 A CN201911077036 A CN 201911077036A CN 110820809 A CN110820809 A CN 110820809A
Authority
CN
China
Prior art keywords
layer
retaining wall
backfill
foundation
preventing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911077036.9A
Other languages
Chinese (zh)
Inventor
苗恩新
龙敏健
张志远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201911077036.9A priority Critical patent/CN110820809A/en
Publication of CN110820809A publication Critical patent/CN110820809A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/06Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against corrosion by soil or water

Abstract

The invention discloses a structure for preventing ground from being wetted, which comprises a foundation pit (1); a group of bearing platforms (2) are arranged in the foundation pit, and the bottoms of the adjacent bearing platforms are connected through a foundation beam (3); the bearing platform is provided with a wall column (4); the adjacent wall columns are connected through a first-layer structural beam (5); a first floor slab (6) is laid on the first-layer structural beam; a retaining wall (7) is arranged in a rectangular frame formed by the foundation beam, the wall column, the foundation beam and the first-layer structural beam (5); a group of water drainage holes (8) are arranged on the retaining wall; a backfill layer (9) is arranged in a rectangular frame surrounded by the retaining walls; a cavity (10) is arranged between the top surface of the backfill layer and the first floor slab. The invention carries out earth backfill by methods of slurry layered pumping, bleeding and consolidation, and reserves a cavity, thereby avoiding the first floor slab from contacting with the soil body to generate tide. The invention has the advantages of convenient material acquisition and simple operation, saves the cost, can achieve the effect of preventing the ground from being wetted, and is suitable for general popularization.

Description

Construction method and structure for preventing ground from being wetted
Technical Field
The invention relates to a structure for preventing the ground from being wetted, belonging to the technical field of building construction.
Background
With the continuous development of social economy in China, people in coastal areas are dense, living land is less and less, and building land is continuously developed to coastal alluvial beach areas. The coastal beach area water level is high, receives the plum rain season influence great, leads to the first floor ground to flood tide, and traditional way generally sets up basement or built on stilts layer to guarantee the comfort level that the first floor lives. The method is a key for improving the habitability of buildings by solving the problem that basements or overhead floors are not generally arranged in residences such as multi-storey foreign houses, villas and the like and the problem that the ground of the first floor in a high water level area is wet. The prior art sets up the overhead floor or basement, has the wasting of resources great, and the building utilization ratio is lower, drawback such as cost is higher. Therefore, the existing technologies are not perfect enough and are expected to be further improved.
Disclosure of Invention
The invention aims to provide a structure and a construction method for preventing the ground from being wetted, so as to overcome the defects of great resource waste, low building utilization rate, high cost and the like when an overhead floor or a basement is arranged, and further overcome the defects in the prior art.
In order to achieve the purpose, the invention adopts the following technical scheme:
the invention relates to a structure for preventing ground from being wetted, which comprises a foundation pit; a group of bearing platforms are arranged in the foundation pit, and the bottoms of the adjacent bearing platforms are connected through a foundation beam; the bearing platform is provided with a wall column; the adjacent upright columns are connected through a first-layer structural beam; a first floor slab is laid on the first-layer structural beam; a retaining wall is arranged in a rectangular frame formed by the foundation beam, the wall column, the foundation beam and the first-layer structural beam; a group of water drainage holes are arranged on the retaining wall; a backfill layer is arranged in a rectangular frame surrounded by the retaining walls; a cavity is arranged between the top surface of the backfill layer and the first floor slab.
In the structure for preventing the ground from being wetted, the backfill layer is slurry formed by adding water into sandy silt and stirring, and the slurry is pumped and discharged into the retaining wall layer by layer through a slurry pump; forming soil body through bleeding, precipitation and consolidation.
In the aforementioned structure that prevents ground flood tide, backfill layer top elevation is higher than outdoor terrace elevation and is not less than 150 mm.
In the aforesaid prevent the structure that ground floods the tide, backfill layer top surface elevation is less than first floor bottom surface elevation and is greater than 300 mm.
In the structure for preventing the ground from getting damp, the hole opening of the water filtering hole on the inner side of the retaining wall is provided with the filter screen.
In the structure for preventing the ground from being wetted, the filter screen is formed by wrapping a steel plate mesh with geotextile.
Due to the adoption of the technical scheme, compared with the prior art, the top surface of the backfill layer is 150mm higher than the outdoor terrace, and a cavity with the height not less than 300mm is reserved between the top surface of the backfill layer and the bottom surface elevation of the first floor slab. The invention adopts the methods of slurry layered pumping drainage, water bleeding and consolidation to backfill the earthwork and reserve the cavity, thereby avoiding the tide generated by the contact between the first-layer structure floor and the soil body. The invention has the advantages of convenient material acquisition and simple operation, saves the cost, can achieve the effect of preventing the ground from being wetted, and is suitable for general popularization.
Drawings
Fig. 1 is a schematic structural view of the present invention.
The labels in the figures are: 1-foundation pit, 2-bearing platform, 3-foundation beam, 4-wall column, 5-first-layer structural beam, 6-first-layer floor slab, 7-retaining wall, 8-drainage hole, 9-backfill layer, 10-cavity and 11-filter screen.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples.
The structure for preventing the ground from being wetted of the present invention, as shown in fig. 1, includes a foundation pit 1; a group of bearing platforms 2 are arranged in the foundation pit 1, and the bottoms of the adjacent bearing platforms 2 are connected through a foundation beam 3; the bearing platform 2 is provided with a wall column 4; the adjacent upright columns 4 are connected through a first-layer structural beam 5; a first floor slab 6 is laid on the first-layer structural beam 5; a retaining wall 7 is arranged in a rectangular frame formed by the foundation beam 3, the wall column 4, the foundation beam 3 and the first-layer structural beam 5; a group of water drainage holes 8 are arranged on the retaining wall 7; a backfill layer 9 is arranged in a rectangular frame enclosed by the retaining walls 7; a cavity 10 is arranged between the top surface of the backfill layer 9 and the first floor 6. The backfill layer 9 is slurry formed by adding water into sandy silt and stirring, and the slurry is pumped and discharged into the retaining wall 7 layer by layer through a slurry pump; forming soil body through bleeding, precipitation and consolidation. The top level of the backfill layer 9 is not less than 150mm higher than the level of the outdoor terrace. The elevation of the top surface of the backfill layer 9 is larger than 300mm lower than the elevation of the bottom surface of the first floor 6. The hole of the water filtering hole 8 at the inner side of the retaining wall 7 is provided with a filter screen 11. The filter screen 11 is formed by wrapping a steel plate net with geotextile.
The construction method of the structure for preventing the ground from being wetted comprises the following steps:
step one, performing earthwork excavation of a foundation pit 1 after pile foundation construction is completed, and excavating the earthwork to a designed elevation;
step two, constructing a bearing platform 2 and a foundation beam 3 at the bottom of the foundation pit 1;
thirdly, pouring a wall column 4 and a first-layer structural beam 5 on the bearing platform 2;
fourthly, building a retaining wall 7 on the surface of the foundation beam 3 and the bearing platform 2 along the periphery of the building, and reserving drain holes 8 on the retaining wall 7;
fifthly, installing a filter screen 11 at the orifice of the bleeding hole 8 on the inner side of the retaining wall 7;
step six, adding water into sandy silty soil by adopting stirring equipment and stirring the sandy silty soil into slurry, pumping the slurry into the retaining wall 7 layer by using a slurry pump, and forming a backfill layer 9 after bleeding, precipitation and soil body consolidation;
seventhly, laying a first floor slab 6 on the first-layer structural beam 5;
and step eight, backfilling the soil dug out of the foundation pit 1 to the outside of the retaining wall 7, and leveling the soil with the elevation of the outdoor terrace.
The concrete embodiment is shown in fig. 1, and the structure of the embodiment comprises a bearing platform 2, a foundation beam 3, a wall column 4 and a first floor 6. In the embodiment, water drainage holes 8 are arranged on a retaining wall 7 and a retaining wall 7 which are built by bricks in a rectangular frame surrounded by a foundation beam 3, a wall column 4 and a first floor 6; a backfill layer 9 is arranged in a rectangular frame enclosed by the retaining walls 7, and a cavity 10 is arranged between the backfill layer 9 and the first floor 6. The construction method is completed according to design drawings and specification requirements; the retaining wall 7 is formed by bonding and building standard concrete blocks by cement mortar, and a certain number of bleeding holes 8 are reserved at the upper part of the retaining wall 7; the water bleeding hole 8 is a water discharging port reserved on the retaining wall 7, and a filter screen 11 is arranged on the inner side of the water bleeding hole 8. The filter screen 11 is composed of a 30mm x 30mm steel plate screen and geotextile. So as to achieve the effect of soil body consolidation by soil retaining and bleeding; the backfill layer 9 is formed by adding water into the sand silt and stirring to form slurry, pumping and discharging the slurry into the retaining wall 7 layer by layer through a sewage pump, pumping and discharging the backfill of the first layer, bleeding and solidifying the slurry, pumping and discharging the backfill of the second layer, bleeding and solidifying the backfill of the third layer, and finally pumping and discharging the backfill of the third layer, bleeding and solidifying the backfill until the solidification reaches a certain compactness, wherein the backfill can be carried out next time; the cavity 10 is a gap between the backfilled soil surface and the bottom of the first floor 6, and a drainage and exhaust hole is reserved on the retaining wall 7 within the height range of the cavity 10.
The working principle of the invention is to backfill the earthwork by means of slurry layered pumping, bleeding and consolidation, and reserve a cavity, so as to avoid the flood tide caused by the contact between the first floor and the soil body. The invention has the advantages of convenient material acquisition and simple operation, saves the cost, can achieve the effect of preventing the ground from being wetted, and is suitable for general popularization.

Claims (6)

1. A structure for preventing the ground from being wetted comprises a foundation pit (1); the method is characterized in that: a group of bearing platforms (2) are arranged in the foundation pit (1), and the bottoms of the adjacent bearing platforms (2) are connected through a foundation beam (3); the bearing platform (2) is provided with a wall column (4); the adjacent upright posts (4) are connected through a first-layer structural beam (5); a first floor slab (6) is laid on the first-layer structural beam (5); a retaining wall (7) is arranged in a rectangular frame formed by the foundation beam (3), the wall column (4), the foundation beam (3) and the first-layer structural beam (5); a group of water drainage holes (8) are arranged on the retaining wall (7); a backfill layer (9) is arranged in a rectangular frame enclosed by the retaining walls (7); a cavity (10) is arranged between the top surface of the backfill layer (9) and the first floor slab (6).
2. The structure for preventing flood tide on the ground according to claim 1, wherein: the backfill layer (9) is a slurry formed by adding water into sandy silt and stirring, and the slurry is pumped into the retaining wall (7) layer by a slurry pump and is subjected to bleeding, precipitation and consolidation to form a soil body.
3. The structure for preventing flood tide on the ground according to claim 1, wherein: the top surface of the backfill layer (9) is higher than the elevation of the outdoor terrace by not less than 150 mm.
4. The structure for preventing flood tide on the ground according to claim 1, wherein: the elevation of the top surface of the backfill layer (9) is less than that of the bottom surface of the first floor slab (6) and is more than 300 mm.
5. The structure for preventing flood tide on the ground according to claim 1, wherein: and a filter screen (11) is arranged at the orifice of the water filtering hole (8) at the inner side of the retaining wall (7).
6. The structure for preventing flood tide on the ground according to claim 1, wherein: the filter screen (11) is formed by wrapping a steel plate net with geotextile.
CN201911077036.9A 2019-11-06 2019-11-06 Construction method and structure for preventing ground from being wetted Pending CN110820809A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911077036.9A CN110820809A (en) 2019-11-06 2019-11-06 Construction method and structure for preventing ground from being wetted

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911077036.9A CN110820809A (en) 2019-11-06 2019-11-06 Construction method and structure for preventing ground from being wetted

Publications (1)

Publication Number Publication Date
CN110820809A true CN110820809A (en) 2020-02-21

Family

ID=69552892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911077036.9A Pending CN110820809A (en) 2019-11-06 2019-11-06 Construction method and structure for preventing ground from being wetted

Country Status (1)

Country Link
CN (1) CN110820809A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3731493A (en) * 1971-04-26 1973-05-08 Archer W Gary Water repellent sand
US5890845A (en) * 1995-11-30 1999-04-06 Ftf Crawlspace Specialists, Inc. Method and means for sealing crawlspace surfaces
US20030054753A1 (en) * 2000-03-23 2003-03-20 Bengt Steneby Method and apparatus for ventilation of foundations
US20050005567A1 (en) * 2003-07-11 2005-01-13 Bondo Corporation Moisture barriers for building construction
EP1653008A1 (en) * 2004-11-02 2006-05-03 Ubbink B.V. Building with radon protection
CN206408802U (en) * 2016-12-12 2017-08-15 南京利国建筑装饰工程有限公司 Damp-proofing ground floor
CN206844173U (en) * 2017-05-10 2018-01-05 北京筑田建筑装饰工程有限公司 A kind of moisture-proof construction for basement
CN208312629U (en) * 2018-03-22 2019-01-01 南昌大学 A kind of active control ventilating system for false work vacant lot surface layer
CN209397705U (en) * 2018-11-26 2019-09-17 重庆朴生瑞合建筑设计有限公司 A kind of first layer ground Damp proof dew retardation framework
CN211547830U (en) * 2019-11-06 2020-09-22 中国建筑第四工程局有限公司 Structure for preventing ground from being wetted

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3731493A (en) * 1971-04-26 1973-05-08 Archer W Gary Water repellent sand
US5890845A (en) * 1995-11-30 1999-04-06 Ftf Crawlspace Specialists, Inc. Method and means for sealing crawlspace surfaces
US20030054753A1 (en) * 2000-03-23 2003-03-20 Bengt Steneby Method and apparatus for ventilation of foundations
US20050005567A1 (en) * 2003-07-11 2005-01-13 Bondo Corporation Moisture barriers for building construction
EP1653008A1 (en) * 2004-11-02 2006-05-03 Ubbink B.V. Building with radon protection
CN206408802U (en) * 2016-12-12 2017-08-15 南京利国建筑装饰工程有限公司 Damp-proofing ground floor
CN206844173U (en) * 2017-05-10 2018-01-05 北京筑田建筑装饰工程有限公司 A kind of moisture-proof construction for basement
CN208312629U (en) * 2018-03-22 2019-01-01 南昌大学 A kind of active control ventilating system for false work vacant lot surface layer
CN209397705U (en) * 2018-11-26 2019-09-17 重庆朴生瑞合建筑设计有限公司 A kind of first layer ground Damp proof dew retardation framework
CN211547830U (en) * 2019-11-06 2020-09-22 中国建筑第四工程局有限公司 Structure for preventing ground from being wetted

Similar Documents

Publication Publication Date Title
CN102535488B (en) Waterproof construction method for bottom plate of high-water-level basement
CN103741714A (en) Construction method for full cover-excavation reverse method of underground engineering
CN103510528A (en) Blind trench water discharging structure used for underground structure up-floating prevention
CN207003499U (en) A kind of anti-floating lifting device of underground tunnel upper excavation of foundation pit
CN111236284A (en) Basement bottom and periphery underground water drainage method and structure
CN212477844U (en) Basement drainage decompression anti-floating structure
CN103741715A (en) Novel waterproof hydrophobic construction method for basement
CN110206039B (en) Construction method of Larsen steel sheet pile in pit under complex geological conditions
CN202730785U (en) Anti-floating blind ditch water drainage structure for underground structure
CN100575616C (en) Vacuum curtain water stop and atmospheric pressure support deep pit digging construction method
CN207659986U (en) A kind of building or structures foundation stabilization underpin pier
CN211547830U (en) Structure for preventing ground from being wetted
CN112681376A (en) Construction method of shaft type underground stereo garage
CN107700521A (en) One kind is built(Structure)Build thing foundation stabilization and underpin pier and its construction method
CN217870559U (en) Inclined wall geomembrane earth-rock cofferdam structure suitable for higher manger plate flood peak of geomembrane
CN217760383U (en) Enclosure structure arranged on slope support
CN202850062U (en) Water buoyant control device for construction or for structures
CN214245855U (en) Water-proof pressure-control anti-floating structure
CN110820809A (en) Construction method and structure for preventing ground from being wetted
CN114045848A (en) Construction method for pit foundation in water inrush pit
CN112195980A (en) Water-resisting pressure-controlling anti-floating structure and construction method
CN203654332U (en) Novel water prevention and dredge construction structure of basement
CN113026778A (en) Submersible sandy gravel stratum foundation pit bottom sealing structure and construction method
CN212052829U (en) Basement bottom and groundwater all around draw row structure
CN215977583U (en) High water level basement bottom plate lower floor drainage area rainwater reuse integration circulation system's structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination