CN110820803B - Open excavation construction method for transverse connection channel of shield tunnel - Google Patents

Open excavation construction method for transverse connection channel of shield tunnel Download PDF

Info

Publication number
CN110820803B
CN110820803B CN201911097475.6A CN201911097475A CN110820803B CN 110820803 B CN110820803 B CN 110820803B CN 201911097475 A CN201911097475 A CN 201911097475A CN 110820803 B CN110820803 B CN 110820803B
Authority
CN
China
Prior art keywords
tunnel
shield
shield tunnel
line
transverse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201911097475.6A
Other languages
Chinese (zh)
Other versions
CN110820803A (en
Inventor
刘明高
李建林
陈仁东
庞康
王霞
陈明奎
毕强
吴金刚
陈兵
蔡东明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zhiyuan Engineering Construction Supervision Co ltd
Beijing General Municipal Engineering Design and Research Institute Co Ltd
Original Assignee
Beijing General Municipal Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing General Municipal Engineering Design and Research Institute Co Ltd filed Critical Beijing General Municipal Engineering Design and Research Institute Co Ltd
Priority to CN201911097475.6A priority Critical patent/CN110820803B/en
Publication of CN110820803A publication Critical patent/CN110820803A/en
Application granted granted Critical
Publication of CN110820803B publication Critical patent/CN110820803B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/04Making large underground spaces, e.g. for underground plants, e.g. stations of underground railways; Construction or layout thereof
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • E02D29/05Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Sustainable Development (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses an open cut construction method of a transverse connection channel of a shield tunnel, comprising the following steps of firstly, constructing a first underground continuous wall and a second underground continuous wall in the range of the transverse connection channel which is planned to be excavated and extending to the surrounding periphery of a left-line shield tunnel and a right-line shield tunnel; secondly, cutting and breaking underground continuous walls II in the left line shield tunnel and the right line shield tunnel by adopting a shield machine, and erecting spliced shield segment structures in the left line shield tunnel and the right line shield tunnel; step three, constructing foundation pit support layer by the foundation pit dug openly from the ground surface; fourthly, removing the shield segments on the left line and the shield segments on the right line; constructing a main tunnel frame structure and a transverse connection channel inner frame structure in the left-line shield tunnel and the right-line shield tunnel; and step six, backfilling earthwork above the main tunnel frame structure and the transverse communication channel frame structure, and dismantling the foundation pit support to recover the existing ground. The invention has small construction risk and low construction cost.

Description

Open excavation construction method for transverse connection channel of shield tunnel
Technical Field
The invention belongs to the technical field of tunnel transverse connection channel construction, and particularly relates to an open cut construction method of a shield tunnel transverse connection channel.
Background
At present, according to the design specifications and related technical standard requirements of the current highway, municipal and subway tunnels, communication channels are required to be arranged between the double-hole tunnels, and the arrangement types and the intervals are as follows: 1) the first volume civil engineering of highway Tunnel design Specification JTG 3370.1-2018 clause 4.5.1 specifies that a transverse channel is arranged between an upper highway tunnel and a lower highway tunnel, and the following specifications are met: firstly, the arrangement distance of the pedestrian transverse channels is preferably 250m and is not more than 350 m; secondly, the distance between the transverse channels is preferably 750m and not more than 1000 m. 2) City underground road engineering design Specification CJJ221-2015, article 8.3.5: firstly, a pedestrian transverse channel or a pedestrian evacuation channel is arranged on the double-hole underground road; secondly, the distance between the pedestrian transverse channels and the distance between the underground road and the entrance of the pedestrian evacuation channel are preferably 250-300 m. Article 8.3.6 specifies: firstly, urban underground roads of first, second and third types of passing motor vehicles, non-underwater underground roads are provided with a vehicle-driving transverse channel or a vehicle-driving evacuation channel, and the spacing of the vehicle-driving transverse channels and the distance between entrances leading to the vehicle-driving evacuation channel are preferably 200 m-500 m; secondly, underground roads at the bottom of the water are preferably provided with vehicle transverse channels or vehicle evacuation channels, and the spacing between the vehicle transverse channels and the distance between the underground roads and the entrances of the vehicle evacuation channels are preferably 500-1500 m. 3) The subway design Specification GB50157-2013 article 28.2.4 provides: two single line interval tunnels are provided with communication channels, and the distance between two adjacent communication channels is not more than 600 m. 4) Building design fire code GB50016-2014(2018 edition) article 12.1.6 provides: the arrangement of the cross-traffic passage or evacuation passage of the double-hole tunnel for passing motor vehicles shall conform to the following regulations: firstly, a vehicle transverse channel or a vehicle evacuation channel is preferably arranged in the underwater tunnel. The spacing between the vehicle transverse channels and the spacing between the tunnels and the entrance of the vehicle evacuation channels are preferably 1000-1500 m; secondly, a transverse vehicle channel or an evacuation vehicle channel is arranged in the non-underwater tunnel, and the interval between the transverse vehicle channels and the interval between the tunnel and the entrance of the evacuation vehicle channel are not larger than 1000 m. Article 12.1.7 specifies: the double-hole tunnel should be provided with a pedestrian crossing channel or a pedestrian evacuation channel, and should meet the following regulations: the spacing between the pedestrian transverse channels and the spacing between the tunnels and the entrance of the pedestrian evacuation channels are preferably 250-300 m. The regulations 1) to 4) indicate that different types of transverse communication channels, such as pedestrian transverse channels, pedestrian evacuation channels or vehicle transverse channels, should be arranged between the double-hole tunnels in order to meet the disaster prevention and rescue requirements of the double-hole tunnels. Different standard standards only slightly differ in the requirement of the arrangement distance of the transverse connection channel, and the arrangement of the transverse connection channel is irrelevant to the construction method adopted by the main line tunnel and the transverse connection channel.
The existing shield tunnel connection channel construction method comprises a mine method, a pipe jacking method and a shield method, and different methods have different characteristics and applicability. 1) A mine method: the technology of the contact channel constructed by the mine method is relatively mature, the application is extremely wide, and the mine method is mostly adopted for construction particularly in the construction of the contact channel of the urban subway tunnel in China. But the defects are obvious, such as low construction efficiency, poor economy and high safety risk, and meanwhile, the reinforcement effect of the soil around the contact channel has great influence on the success of construction. At present, ground reinforcing methods, in-hole grouting reinforcing methods and freezing methods are used for soil body reinforcing methods, wherein particularly the freezing method has the defects of numerous control influence factors of construction effects, great safety risks, long construction period, high cost, prominent operation and maintenance diseases, and many cases of construction failures caused by the freezing method are adopted in China. 2) Pipe jacking method: the pipe jacking method is used as a modern underground pipeline construction method, and during construction, the pipe is pressed into a soil layer through a force transmission jacking iron and a guide rail and a hydraulic jack supported on a back wall, and soil on the front side of the pipe is dug and carried away. And after the first pipe joint is completely jacked into the soil layer, connecting the second pipe joint behind the first pipe joint and jacking continuously, and jacking the first pipe joint in such a way to make a joint, thereby constructing a channel. The pipe jacking method has small influence on the environment, high mechanization degree and short construction period, but special equipment and a jacking rack need to be equipped during construction, the internal space of the finished structure of the main line shield tunnel is occupied, the influence on construction organization and construction period is large, and the stress and the influence on the structure are not clear in the construction process. At present, the domestic application cases are few. 3) A shield method: the shield method is adopted to directly cut and break the segments of the main line tunnel structure and apply the segments to the contact channel, and has the advantages of strong stratum adaptability, high mechanization degree, long tunneling distance, short construction period and the like. Meanwhile, the shield construction method also needs to be matched with a special small shield machine, a muddy water treatment system and a backup rack, occupies larger internal space of the finished structure of the main line shield tunnel, and has larger influence on construction organization and construction period. On the other hand, the construction of the small shield machine has the engineering risks of starting and receiving, and the construction cost is relatively high.
At present, no case report is found in the construction of a transverse connection channel of a main line shield tunnel section by adopting an open excavation method.
Disclosure of Invention
The invention provides an open excavation construction method for a transverse connection channel of a shield tunnel, and aims to solve the problems that the construction cost of the conventional transverse connection channel of the shield tunnel is high and the engineering risk is relatively high.
The invention adopts the following technical scheme:
an open excavation construction method for a transverse connection channel of a shield tunnel comprises the following construction steps:
step one, constructing a first underground continuous wall in a direction parallel to the tunnel line position and a second underground continuous wall in a direction vertical to the tunnel line position around the left line shield tunnel and the right line shield tunnel in the range of the horizontal communication channel planned to be excavated and extending to the left line shield tunnel and the right line shield tunnel, and enclosing to form a closed annular shaft;
cutting and breaking the second underground continuous wall in the direction perpendicular to the tunnel line position in the left line shield tunnel and the right line shield tunnel by using a shield machine, and erecting assembled shield segment structures in the left line shield tunnel and the right line shield tunnel;
step three, performing foundation pit support on the foundation pit dug by the ground surface downwards in the area surrounded by the first underground continuous wall and the second underground continuous wall layer by layer until the bottom elevation position of the transverse communication channel;
fourthly, dismantling the shield segments on the left line and the shield segments on the right line in the left line shield tunnel and the right line shield tunnel in the surrounding area and above the bottom elevation of the transverse communication channel;
constructing a main tunnel frame structure and a transverse connection channel inner frame structure in the left-line shield tunnel and the right-line shield tunnel;
and sixthly, backfilling earthwork above the main tunnel frame structure and the transverse connection channel frame structure, removing the foundation pit support, recovering the ground in the current situation, and completing construction of the transverse connection channel.
The invention has the following advantages:
the method of the invention is adopted to carry out the construction of the transverse connection channel of the shield tunnel, which not only can meet the requirement of the double-hole tunnel for arranging the transverse connection channel specified by the tunnel design specification, but also can reduce the risk and the construction cost of the connection channel adopting the mining method, the pipe jacking method and the shield method, and provides a good choice for the safe and effective construction of the transverse connection channel of the shield tunnel.
Description of the drawings:
FIG. 1 is a schematic plan view of the present invention.
Fig. 2 is a schematic cross-sectional structure of the present invention.
FIG. 3 is a schematic diagram of the structure of the invention in a vertical section.
Reference numerals:
1 underground diaphragm wall, 1-1 underground diaphragm wall I, 1-2 underground diaphragm wall II, 2 left line shield tunnel, 3 right line shield tunnel, 4 shield segment structure, 4-1 left line lower shield segment, 4-2 left line upper shield segment, 5-1 right line lower shield segment, 5-2 right line upper shield segment, 6 main tunnel frame structure, 7 transverse communication channel, 8 foundation pit support, 8-1 foundation pit support first cross brace, 8-2 foundation pit support Nth cross brace, 9 on-site ground surface support
The specific implementation mode is as follows:
the following further describes the embodiments of the present invention with reference to the drawings.
As shown in fig. 1, 2 and 3, an open excavation construction method for a transverse communication channel of a shield tunnel comprises the following construction steps:
step one, constructing an underground continuous wall 1-1 in a direction parallel to the tunnel line position and an underground continuous wall 2 in a direction vertical to the tunnel line position in the surrounding of the left line shield tunnel 2 and the right line shield tunnel 3 in the range of the horizontal communication channel 7 to be excavated and extending to the left line shield tunnel 2 and the right line shield tunnel 3, and enclosing to form a closed annular shaft, wherein the role of the closed annular shaft is to form a soil retaining and water stopping structure which is beneficial to forming later-stage excavation safety and stability, and the enclosed annular shaft is shown in the attached drawing 1;
secondly, cutting and breaking the underground continuous wall II 1-2 in the direction vertical to the tunnel line position in the left line shield tunnel 2 and the right line shield tunnel 3 by using a shield machine, erecting an assembled shield segment structure 4 in the left line shield tunnel 2 and the right line shield tunnel 3, and resisting the action of soil layer pressure and some special loads, and referring to the attached drawing 1;
step three, constructing foundation pit supports 8 layer by layer in the areas surrounded by the underground continuous walls I1-1 and the underground continuous walls II 1-2 from the ground surface to the bottom elevation position of the transverse communication channel 7, and referring to the attached figure 2;
fourthly, dismantling the shield segments 4-2 on the left line and the shield segments 5-2 on the right line in the shield tunnels 2 and 3 on the left line and the shield segments 5-2 on the right line in the surrounding area, wherein the shield segments are positioned above the bottom elevation of the transverse communication channel 7, and refer to the attached drawing 2;
constructing a main tunnel frame structure 6 in the left shield tunnel 2 and the right shield tunnel 3 and an inner frame structure in the transverse communication channel 7, and referring to the attached drawing 2;
and sixthly, backfilling earthwork above the main tunnel frame structure 6 and the transverse connection channel 7 frame structure, removing the foundation pit support 8, recovering the existing ground 9, and completing construction of the transverse connection channel 7, wherein the construction is shown in the attached drawing 3.
The underground continuous wall is constructed by adopting a conventional method, and the following construction method can be adopted: excavating along the periphery of a foundation pit under the condition of slurry wall protection to form a groove with a certain length, then placing the manufactured reinforcement cage into the groove section, performing underwater concrete pouring by adopting a conduit method to form a unit wall section, and mutually connecting all the wall sections by adopting a specific joint mode (such as a joint made of a joint pipe or a joint box) to form a continuous underground reinforced concrete wall.

Claims (1)

1. An open excavation construction method of a transverse connection channel of a shield tunnel is characterized in that: the method comprises the following construction steps:
step one, constructing an underground continuous wall I (1-1) parallel to the tunnel line position direction and an underground continuous wall II (1-2) vertical to the tunnel line position direction around the periphery of a left line shield tunnel (2) and a right line shield tunnel (3) in the range of a horizontal communication channel (7) planned to be excavated, and enclosing to form a closed annular shaft;
secondly, cutting and breaking the second underground continuous wall (1-2) in the direction vertical to the tunnel line position in the left line shield tunnel (2) and the right line shield tunnel (3) by using a shield machine, and erecting an assembled shield segment structure (4) in the left line shield tunnel (2) and the right line shield tunnel (3);
step three, constructing foundation pit supports (8) layer by layer in the areas surrounded by the underground continuous walls I (1-1) and the underground continuous walls II (1-2) from the ground surface to the bottom elevation position of the transverse communication channel (7);
fourthly, dismantling the shield segments (4-2) on the left line and the shield segments (5-2) on the right line in the shield tunnels (2, 3) on the left line and the shield segments (5-2) on the right line in the surrounding area and above the bottom elevation of the transverse communication channel (7);
constructing a main tunnel frame structure (6) in the left shield tunnel (2) and the right shield tunnel (3) and an inner frame structure in the transverse communication channel (7);
and sixthly, backfilling earthwork above the main tunnel frame structure (6) and the transverse connection channel (7) frame structure, removing the foundation pit support (8), recovering the existing ground (9), and completing construction of the transverse connection channel (7).
CN201911097475.6A 2019-11-11 2019-11-11 Open excavation construction method for transverse connection channel of shield tunnel Active CN110820803B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911097475.6A CN110820803B (en) 2019-11-11 2019-11-11 Open excavation construction method for transverse connection channel of shield tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911097475.6A CN110820803B (en) 2019-11-11 2019-11-11 Open excavation construction method for transverse connection channel of shield tunnel

Publications (2)

Publication Number Publication Date
CN110820803A CN110820803A (en) 2020-02-21
CN110820803B true CN110820803B (en) 2021-06-22

Family

ID=69554148

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911097475.6A Active CN110820803B (en) 2019-11-11 2019-11-11 Open excavation construction method for transverse connection channel of shield tunnel

Country Status (1)

Country Link
CN (1) CN110820803B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113187491A (en) * 2021-05-17 2021-07-30 中铁十二局集团第四工程有限公司 Subway tunnel transverse passage small shield construction process
CN115162408B (en) * 2022-06-14 2024-02-02 长江勘测规划设计研究有限责任公司 Construction method for repairing collapse tunnel

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5341025A (en) * 1976-09-24 1978-04-14 Kubota Ltd Underground structure
CN101598027A (en) * 2009-07-10 2009-12-09 广东华隧建设股份有限公司 The tunnel connection channel construction method in a kind of shield structure interval
CN105089670A (en) * 2015-07-26 2015-11-25 北京工业大学 Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5341025A (en) * 1976-09-24 1978-04-14 Kubota Ltd Underground structure
CN101598027A (en) * 2009-07-10 2009-12-09 广东华隧建设股份有限公司 The tunnel connection channel construction method in a kind of shield structure interval
CN105089670A (en) * 2015-07-26 2015-11-25 北京工业大学 Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
国内结合盾构法修建地铁车站的技术方案分析;杨慧林;《铁道标准设计》;20091031;全文 *
浅埋盾构隧道联络通道明挖施工;赵璞琪;《隧道建设》;20121130;第32卷(第增刊1期);第50-54页 *

Also Published As

Publication number Publication date
CN110820803A (en) 2020-02-21

Similar Documents

Publication Publication Date Title
CN110485470B (en) Rectangular working well with pre-arranged jacking pipe door opening and sliding type rear wall in water-rich stratum and construction method of rectangular working well
CN110821503B (en) Construction method for main body of ultra-deep shield section air shaft after tunnel advance
CN109736827B (en) Method for excavating urban subway hard rock stratum communication channel by high-pressure gas expansion fracturing
CN104452809A (en) Ultra-shallow buried tunnel cover-excavation construction method
CN103485790A (en) Shallow tunneling method for pipe-proof-supporting structure combined system
CN103061777A (en) Method for building urban underground tunnel shield cutter repairing space with preset reinforcing pile groups
CN112647956B (en) Construction method for short-distance underpass subway station of water-rich composite stratum shield
CN107090851B (en) The inverted side-wall construction method of downtown area open cut groove
CN106049532A (en) Supporting and retaining device for open excavation construction of comprehensive pipe gallery and construction method thereof
CN112160755B (en) Subway line construction method for expanding excavation station after shield tunnel construction in advance
CN105240024A (en) Parallel shield tunneling method for extended construction of subway station
CN111395391B (en) Construction method for multi-hole rectangular jacking pipe and light and dark excavation joint pipe gallery joint
CN110820803B (en) Open excavation construction method for transverse connection channel of shield tunnel
CN109578014B (en) Anti-surging bottom sealing structure and construction method
CN102182464A (en) Construction structure and construction method of channel structure
CN107514262A (en) The construction method of shield piping lane
CN112502734A (en) Construction method of shield interval contact channel of water-rich sand layer
CN103670448A (en) Underground pipeline protection device and support method applying underground pipeline protection device
CN205036380U (en) Block of four encircles PBA and secretly digs subway station major structure
CN109505611A (en) It is a kind of to realize the inverse construction method made of tunneling using combination push pipe
CN110735641B (en) Construction method of transfer passage of underpass pipeline
CN104895100B (en) Building close quarters builds underground space Caisson method
CN110486062B (en) Method for mechanically underground excavating multi-layer multi-span underground engineering in soft soil
CN116398165A (en) New tunnel penetrating through existing station at zero distance and construction method thereof
Zhang et al. Construction applicability of mechanical methods for connecting aisle in the bohai mudstone stratum with high water pressure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240229

Address after: 100082, building 32, No. 3 North Main Street, Haidian District, Beijing, Xizhimen

Patentee after: BEIJING GENERAL MUNICIPAL ENGINEERING DESIGN & RESEARCH INSTITUTE Co.,Ltd.

Country or region after: China

Patentee after: BEIJING ZHIYUAN ENGINEERING CONSTRUCTION SUPERVISION CO.,LTD.

Address before: 100082, building 32, No. 3 North Main Street, Haidian District, Beijing, Xizhimen

Patentee before: BEIJING GENERAL MUNICIPAL ENGINEERING DESIGN & RESEARCH INSTITUTE Co.,Ltd.

Country or region before: China