CN110805218A - Thin plastering construction method for junction of shear wall and brick wall - Google Patents

Thin plastering construction method for junction of shear wall and brick wall Download PDF

Info

Publication number
CN110805218A
CN110805218A CN201910908385.4A CN201910908385A CN110805218A CN 110805218 A CN110805218 A CN 110805218A CN 201910908385 A CN201910908385 A CN 201910908385A CN 110805218 A CN110805218 A CN 110805218A
Authority
CN
China
Prior art keywords
wall
base layer
junction
shear wall
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910908385.4A
Other languages
Chinese (zh)
Inventor
郑刚
陈烨
舒成贵
徐文超
韩林春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Giant Construction Group Co Ltd
Original Assignee
Giant Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Giant Construction Group Co Ltd filed Critical Giant Construction Group Co Ltd
Priority to CN201910908385.4A priority Critical patent/CN110805218A/en
Publication of CN110805218A publication Critical patent/CN110805218A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a thin plastering construction method for a junction of a shear wall and a brick wall, which comprises the following steps of firstly, cleaning a base layer, and spraying water on the shear wall surface to moisten the surface after cleaning; step two, treating the base layer, checking the base layer before construction, and performing rust prevention treatment on the part of the base layer with the exposed steel bars by using paint or polymer mortar; the uneven parts on the surface are chiseled and leveled; after the water stain of the wall surface is dried, coating a cement binding agent mixed by 108 glue on the surface of the wall body; and step three, pasting the grid cloth, arranging a glass fiber net with the width of more than 200mm at the junction of the shear wall and the brick wall, fixing by adopting adhesive cement, pressing the glass fiber net after full scraping, and sticking the beautiful grain paper at the position of 50mm of the stretch line outside the grid cloth on the plastering surface for division. The thin plastering construction method at the junction of the shear wall and the brick wall has the advantages of convenient and quick construction, reduction of hollowing and cracking and reduction of mortar consumption.

Description

Thin plastering construction method for junction of shear wall and brick wall
The technical field is as follows:
the invention relates to the field of buildings, in particular to a thin plastering construction method at the junction of a shear wall and a brick wall.
Background art:
at present, the traditional common plastering construction adopted by industrial and civil building engineering in China is low in speed particularly at the junction of a shear wall and a brick wall, and contradicts with the modern industrial situation of high turnover, high efficiency and quick delivery, the traditional plastering mortar is large in dosage and inconsistent with the strategic target of green energy-saving and environment-friendly buildings advocated by the nation, and in addition, the appearance and the flatness of the constructed wall surface are poor.
The invention content is as follows:
the invention aims to solve the technical problem of providing a thin plastering construction method at the junction of a shear wall and a brick wall, which has the advantages of convenient and quick construction, reduced hollowing cracking and reduced mortar consumption.
The technical proposal of the invention is to provide a thin plastering construction method at the junction of a shear wall and a brick wall, which comprises the following steps,
cleaning a base layer, and spraying water on a shear wall surface to moisten the surface after cleaning;
step two, treating the base layer, checking the base layer before construction, and performing rust prevention treatment on the part of the base layer with the exposed steel bars by using paint or polymer mortar; the uneven parts on the surface are chiseled and leveled; after the water stain of the wall surface is dried, coating a cement binding agent mixed by 108 glue on the surface of the wall body;
thirdly, pasting the grid cloth, arranging a glass fiber net with the width of more than 200mm at the junction of the shear wall and the brick wall, fixing by adopting adhesive cement, pressing the glass fiber net after full scraping, and cutting by using elastic line attaching masking paper at the position of 50mm outside the grid cloth of the plastering surface;
step four, hanging vertically, sleeving square, splicing and punching ribs;
and fifthly, leveling the anti-crack mortar.
Preferably, in the fourth step, the running rule is used for detecting the vertical flatness of different parts of the wall surface, the tape measure is used for detecting the geometric dimension and the squareness of the room, the number of the sticking cakes and the punching ribs is determined according to the actual height of the wall surface, the interval between the punching ribs is 1.2 meters, and the thickness of the ash cake is controlled to be 5 mm.
Compared with the prior art, the invention has the following advantages after adopting the scheme: the method is suitable for the construction of concrete structure wall column templates of various public buildings, industrial and civil buildings, is particularly suitable for the construction of multi-layer of frame shear wall structures and standard layers of small high-rise buildings, and has the advantages of convenient and quick construction, reduced hollowing and cracking, reduced mortar consumption and reduced environmental pollution.
The specific implementation mode is as follows:
the invention is further illustrated with respect to specific embodiments below:
example 1
A thin plastering construction method for the junction of a shear wall and a brick wall comprises the following steps,
cleaning a base layer, and spraying water on a shear wall surface to moisten the surface after cleaning;
step two, treating the base layer, checking the base layer before construction, and performing rust prevention treatment on the part of the base layer with the exposed steel bars by using paint or polymer mortar; the uneven parts on the surface are chiseled and leveled; after the water stain of the wall surface is dried, coating a cement binding agent mixed by 108 glue on the surface of the wall body;
thirdly, pasting the grid cloth, arranging a glass fiber net with the width of more than 200mm at the junction of the shear wall and the brick wall, fixing by adopting adhesive cement, pressing the glass fiber net after full scraping, and cutting by using elastic line attaching masking paper at the position of 50mm outside the grid cloth of the plastering surface;
hanging vertical parts, sleeving square parts, splicing and punching ribs, detecting the vertical and flat conditions of different parts of the wall surface by using a guiding ruler, detecting the geometric dimension and the square condition of a room by using a measuring tape, determining the quantity of the cakes and the punching ribs according to the actual height of the wall surface, controlling the interval of the punching ribs to be 1.2 m, and controlling the thickness of the ash cake to be 5 mm;
and fifthly, leveling the anti-crack mortar.
The invention has the following advantages that the invention is suitable for the construction of concrete structure wall column templates of various public buildings, industrial and civil buildings, is particularly suitable for the construction of multi-layer of frame shear wall structures and standard layers of small high-rise buildings, and has convenient and rapid construction, reduced hollowing cracking, reduced mortar consumption and reduced environmental pollution.
The foregoing is illustrative of the preferred embodiments of the present invention only and is not to be construed as limiting the claims. All the equivalent structures or equivalent process changes made by the description of the invention are included in the scope of the patent protection of the invention.

Claims (2)

1. A thin plastering construction method for a junction of a shear wall and a brick wall is characterized by comprising the following steps: comprises the following steps of (a) carrying out,
cleaning a base layer, and spraying water on a shear wall surface to moisten the surface after cleaning;
step two, treating the base layer, checking the base layer before construction, and performing rust prevention treatment on the part of the base layer with the exposed steel bars by using paint or polymer mortar; the uneven parts on the surface are chiseled and leveled; after the water stain of the wall surface is dried, coating a cement binding agent mixed by 108 glue on the surface of the wall body;
thirdly, pasting the grid cloth, arranging a glass fiber net with the width of more than 200mm at the junction of the shear wall and the brick wall, fixing by adopting adhesive cement, pressing the glass fiber net after full scraping, and cutting by using elastic line attaching masking paper at the position of 50mm outside the grid cloth of the plastering surface;
step four, hanging vertically, sleeving square, splicing and punching ribs;
and fifthly, leveling the anti-crack mortar.
2. The thin plastering construction method for the junction of the shear wall and the brick wall as claimed in claim 1, wherein: in the fourth step, the running rule is used for detecting the vertical flatness of different parts of the wall surface, the tape measure is used for detecting the geometric dimension and the squareness of the room, the number of the sticking cakes and the punching ribs is determined according to the actual height of the wall surface, the interval between the punching ribs is 1.2 meters, and the thickness of the ash cake is controlled to be 5 mm.
CN201910908385.4A 2019-09-25 2019-09-25 Thin plastering construction method for junction of shear wall and brick wall Pending CN110805218A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910908385.4A CN110805218A (en) 2019-09-25 2019-09-25 Thin plastering construction method for junction of shear wall and brick wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910908385.4A CN110805218A (en) 2019-09-25 2019-09-25 Thin plastering construction method for junction of shear wall and brick wall

Publications (1)

Publication Number Publication Date
CN110805218A true CN110805218A (en) 2020-02-18

Family

ID=69487621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910908385.4A Pending CN110805218A (en) 2019-09-25 2019-09-25 Thin plastering construction method for junction of shear wall and brick wall

Country Status (1)

Country Link
CN (1) CN110805218A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113482285A (en) * 2021-07-21 2021-10-08 济南观唐装饰设计有限公司 Arc plastering construction process for internal corner of waterproof ground

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009051987A (en) * 2007-08-29 2009-03-12 Nichiei-Yoshida Co Ltd Brick repairing material
CN101575899A (en) * 2009-06-01 2009-11-11 潍坊昌大建设集团有限公司 Construction process for internal wall surface of building wall body
CN103866877A (en) * 2012-12-11 2014-06-18 中建四局第三建筑工程有限公司 Connecting method and structure of masonry wall and shear wall
CN105525726A (en) * 2015-05-26 2016-04-27 中建四局第一建筑工程有限公司 Aerated brick wall plastering construction method
CN106193624A (en) * 2016-08-05 2016-12-07 轩重建筑节能科技(上海)有限公司 A kind of wall of aerated concrete block cracking-proof construction technology of improvement

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009051987A (en) * 2007-08-29 2009-03-12 Nichiei-Yoshida Co Ltd Brick repairing material
CN101575899A (en) * 2009-06-01 2009-11-11 潍坊昌大建设集团有限公司 Construction process for internal wall surface of building wall body
CN103866877A (en) * 2012-12-11 2014-06-18 中建四局第三建筑工程有限公司 Connecting method and structure of masonry wall and shear wall
CN105525726A (en) * 2015-05-26 2016-04-27 中建四局第一建筑工程有限公司 Aerated brick wall plastering construction method
CN106193624A (en) * 2016-08-05 2016-12-07 轩重建筑节能科技(上海)有限公司 A kind of wall of aerated concrete block cracking-proof construction technology of improvement

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113482285A (en) * 2021-07-21 2021-10-08 济南观唐装饰设计有限公司 Arc plastering construction process for internal corner of waterproof ground

Similar Documents

Publication Publication Date Title
CN103046709B (en) Building construction method of inner wall surface
CN104088416A (en) Gypsum heat preservation painting mortar construction process
CN105525726A (en) Aerated brick wall plastering construction method
CN102505762A (en) Sand aerated concrete heat-insulation block outer wall outer heat-insulation system and construction method thereof
CN101713250A (en) Process for pasting construction of floor tiles
CN205776884U (en) A kind of assembled Novel light wall body
CN113006397A (en) Construction method for square leveling of kitchen and bathroom space
CN104120860A (en) Construction method for cement mortar ground leveling
CN110805218A (en) Thin plastering construction method for junction of shear wall and brick wall
CN104594950A (en) Coal mine underground flexible spray coating temporary sealing wall and building method thereof
CN102383507A (en) Light steel keel and plasterboard vitrified tile decoration wall and method for constructing same
CN201180323Y (en) Polyurethane support mold pouring heat preservation wall
CN102417370A (en) Interface agent for reducing surface water absorption of aerated concrete
CN202248387U (en) Lightgage steel joist gypsum plate vetrified tile decorative wall body
CN211949245U (en) Roof stone flashing structure
CN208347208U (en) A kind of new indoor walling system
CN110792191A (en) Construction method of foam concrete heat-insulation plate building exterior wall external heat-insulation system
CN103790386A (en) Method for controlling cracks in process of plastering aerated concrete block wall
CN207144359U (en) A kind of exquisite log wall decorative cover structure
CN219080836U (en) Integrated assembly type wallboard structure
CN220247470U (en) Anti-bulging industrial brick paving structure
CN105297950A (en) Infilled wall and horizontal load-bearing structure gap wall surface crack-controlling construction method
CN109133756A (en) A kind of aerated blocks adhesive
CN110565886A (en) Anti-hollowing and cracking plastering gypsum structure and construction method thereof
CN217680218U (en) Wet connection structure that hangs of vitrified tile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200218

RJ01 Rejection of invention patent application after publication