CN110744100A - Drilling equipment for construction - Google Patents

Drilling equipment for construction Download PDF

Info

Publication number
CN110744100A
CN110744100A CN201910971008.5A CN201910971008A CN110744100A CN 110744100 A CN110744100 A CN 110744100A CN 201910971008 A CN201910971008 A CN 201910971008A CN 110744100 A CN110744100 A CN 110744100A
Authority
CN
China
Prior art keywords
pressure sensor
drilling
key
control module
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910971008.5A
Other languages
Chinese (zh)
Other versions
CN110744100B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linqing Zhongke Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910971008.5A priority Critical patent/CN110744100B/en
Publication of CN110744100A publication Critical patent/CN110744100A/en
Application granted granted Critical
Publication of CN110744100B publication Critical patent/CN110744100B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B45/00Hand-held or like portable drilling machines, e.g. drill guns; Equipment therefor
    • B23B45/02Hand-held or like portable drilling machines, e.g. drill guns; Equipment therefor driven by electric power
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B45/00Hand-held or like portable drilling machines, e.g. drill guns; Equipment therefor
    • B23B45/003Attachments
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • B28D1/14Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by boring or drilling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D7/00Accessories specially adapted for use with machines or devices of the preceding groups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D7/00Accessories specially adapted for use with machines or devices of the preceding groups
    • B28D7/005Devices for the automatic drive or the program control of the machines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The invention relates to drilling equipment, in particular to drilling equipment for building construction. The invention provides drilling equipment for building construction, which can enable workers to be easier. A drilling device for building construction comprises a mounting plate, a sealing gasket, a fixing frame, a handle and the like; the upper side and the lower side of the left side of the mounting plate are both connected with sealing gaskets, the upper part of the right side of the mounting plate is connected with a fixing frame, and the top of the fixing frame is connected with a handle. According to the invention, the control module can control the drilling mechanism to work to drill the wall body, so that the wall body can be automatically drilled, and workers can feel easier; the wastewater collection mechanism can prevent water from falling to the ground; the equipment can be conveniently installed on the wall by workers through the marking mechanism; the pressing plate on the front side can be hooked through the locking mechanism, and looseness of the pressing plate on the front side is avoided.

Description

Drilling equipment for construction
Technical Field
The invention relates to drilling equipment, in particular to drilling equipment for building construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, and is a construction process of various buildings, or a process of changing lines on a design drawing into a real object, and in the building construction process, a wall body is often required to be drilled.
Now generally be that the staff is holding the water and electricity and is bored hole to the wall body, and the electric water drill during operation can produce great vibrations, and needs the staff to push the electric water drill, so, the staff is harder, and is more tired.
Aiming at the existing problems, the equipment which can lead the working personnel to be easier is designed.
Disclosure of Invention
In order to overcome the defects that the electric water drill can generate larger vibration when working and needs a worker to push the electric water drill, so that the worker is labor-consuming and tired, the invention has the technical problems that: the drilling equipment for building construction is capable of enabling workers to be easier.
The technical scheme is as follows: the utility model provides a drilling equipment for construction, including the mounting panel, sealed the pad, the mount, the handle, drilling mechanism, bolt and third pressure sensor, both sides all are connected with sealed the pad about the mounting panel is left, mounting panel right side upper portion is connected with the mount, the mount top is connected with the handle, open at the mounting panel middle part has the through-hole, the mount bottom is equipped with drilling mechanism, drilling mechanism is used for driling the wall body, mounting panel left side upper portion is equipped with third pressure sensor, third pressure sensor is located the sealed below of top, mounting panel upper portion and lower part all are equipped with the bolt.
More preferably, the portable electronic device further comprises a control module, a setting key, an adding key, a subtracting key, a confirming key, an LCD display screen, a buzzer, a first indicator light and a second indicator light, wherein the LCD display screen, the buzzer, the first indicator light and the second indicator light are electrically connected with the control module.
More preferably, drilling mechanism is including electric putter, the horizontal pole, the slider, the trompil is bored, the drill bit, the connecting rod, the guide block, first pressure sensor and second pressure sensor, electric putter is installed to the mount bottom, the electric putter bottom is connected with the horizontal pole, horizontal pole and mounting panel are connected, open the spout that has the guide effect bottom the horizontal pole, spout inward sliding type is equipped with guide block and two sliders, the guide block is located between two sliders, the trompil is bored to install bottom two sliders, the output that the trompil bored is equipped with the drill bit, guide block and electric putter pass through the connecting rod and connect, the guide block left side is equipped with first pressure sensor, second pressure sensor sets up on the guide block right side.
More preferably, still including wastewater collection mechanism, wastewater collection mechanism is including collecting pipe, fixed plate, clamp plate, shell fragment, gear and slipmat, and mounting panel right side sub-unit connection has collecting pipe and fixed plate, and the fixed plate is located the collecting pipe below, and fixed plate right side rotary type is connected with two clamp plates, and the gear is all installed at two clamp plate tops, two gear engagement, is connected with the shell fragment between the clamp plate of front side and the fixed plate, and the clamp plate inboard is connected with the slipmat.
More preferably, the paint spraying machine further comprises a marking mechanism, the marking mechanism comprises a compression cylinder, a guide sleeve, a guide rod, a spring, a liquid adding pipe, a one-way valve, a liquid outlet pipe, a sealing ring, an electromagnetic valve and a piston, the compression cylinder is installed on the front side of the fixing frame, the piston is arranged in the compression cylinder, the guide sleeve is installed at the top of the compression cylinder in an embedded mode, the guide rod is arranged in the guide sleeve, the guide rod is connected with the piston, the spring is wound on the guide rod, one end of the spring is connected with the guide sleeve, the other end of the spring is connected with the piston, the liquid adding pipe used for enabling paint to flow in a one-way mode is connected to the lower portion of the right side of the compression cylinder, the one-way valve used.
More preferably, the locking mechanism comprises an elastic hook and a pull ring, the right side of the pressing plate on the rear side is connected with the elastic hook, the right side of the pressing plate on the front side is provided with a clamping groove, the elastic hook is clamped in the clamping groove, and the pull ring is connected to the elastic hook.
More preferably, the device also comprises a control box and a control panel, the right side of the fixing frame is connected with the control panel, the control panel is connected with the cross rod, a setting key, an adding key, a subtracting key, a confirming key, an LCD display screen, a buzzer, a first indicator lamp and a second indicator lamp are arranged on the control panel, the right side of the top of the fixing frame is connected with the control box, a control module is arranged in the control box, the control box comprises a switching power supply and a power supply module, the switching power supply can supply power to the device, the output end of the switching power supply is electrically connected with the power supply module, the control module is electrically connected with the power supply module, and the power supply module is connected with a power supply main switch through a circuit; the control module is connected with a 24C02 circuit and a DS1302 clock circuit, the 24C02 circuit is used for storing parameters, the set parameters are stored in the 24C02 circuit, relevant parameters are called out during work, the DS1302 clock circuit provides a time reference, timing can be carried out, and the leap year compensation function is achieved; the third pressure sensor, the first pressure sensor and the second pressure sensor are electrically connected with the control module; the electric push rod, the hole drilling drill and the electromagnetic valve are all connected with the control module through a peripheral circuit.
The invention has the beneficial effects that: according to the invention, the control module can control the drilling mechanism to work to drill the wall, so that the wall can be automatically drilled, and workers can feel easier; the wastewater collection mechanism can prevent water from falling to the ground; the equipment can be conveniently installed on the wall by workers through the marking mechanism; the pressing plate on the front side can be hooked through the locking mechanism, and looseness of the pressing plate on the front side is avoided.
Drawings
Fig. 1 is a schematic front view of the present invention.
Fig. 2 is an enlarged schematic view of part a of the present invention.
Fig. 3 is an enlarged schematic view of part B of the present invention.
Fig. 4 is an enlarged schematic view of the part C of the present invention.
Fig. 5 is a partial top view of the present invention.
Fig. 6 is an enlarged schematic view of the portion D of the present invention.
Fig. 7 is a circuit diagram of the present invention.
Fig. 8 is a schematic circuit diagram of the present invention.
The parts are labeled as follows: 1 mounting plate, 2 sealing gasket, 3 fixing frame, 4 handles, 5 through holes, 6 drilling mechanisms, 61 electric push rod, 62 cross bar, 63 sliding groove, 64 sliding block, 65 hole drilling drill, 66 drill bit, 67 connecting rod, 68 guide block, 69 first pressure sensor, 610 second pressure sensor, 7 bolt, 8 third pressure sensor, 91 control box, 92 control panel, 93LCD display screen, 94 buzzer, 95 first indicator light, 96 second indicator light, 10 waste water collecting mechanism, 101 collecting pipe, 102 fixing plate, 103 pressing plate, 104 shrapnel, 105 gear, 106 non-slip mat, 11 marking mechanism, 111 compression cylinder, 112 guide sleeve, 113 guide rod, 114 spring, 115 liquid feeding pipe, 116 one-way valve, 117 liquid outlet pipe, 118 sealing ring, 119 electromagnetic valve, 1110 piston, 12 locking mechanism, 121 elastic hook, 122 clamping groove, 123 pull ring.
Detailed Description
Embodiments of the present invention will be described below with reference to the drawings.
Example 1
The utility model provides a drilling equipment for construction, as shown in fig. 1 and 3, including mounting panel 1, sealed pad 2, mount 3, handle 4, drilling mechanism 6, bolt 7 and third pressure sensor 8, 1 left upper and lower both sides of mounting panel all are connected with sealed pad 2, mounting panel 1 is connected with sealed pad 2 through the mode that bonds, 1 right side upper portion of mounting panel is connected with mount 3, mounting panel 1 is connected with mount 3 through bolted connection's mode, 3 tops of mount are connected with handle 4, 1 middle part of mounting panel is opened there is through- hole 5, 3 bottoms of mount are equipped with drilling mechanism 6, drilling mechanism 6 is used for driling the wall body, 1 left side upper portion of mounting panel is equipped with third pressure sensor 8, third pressure sensor 8 is located the sealed below of pad 2 in top, 1 upper portion of mounting panel and lower part all are equipped with.
As shown in fig. 2, 7 and 8, the portable electronic device further includes a control module, a set key, an add key, a subtract key, a confirm key, an LCD display 93, a buzzer 94, a first indicator light 95 and a second indicator light 96, wherein the LCD display 93, the buzzer 94, the first indicator light 95 and the second indicator light 96 are all electrically connected with the control module.
The staff presses the power master switch, power on this equipment, use or when needing to adjust relevant parameter for the first time, the staff sets up the operational parameter of relevant automatically controlled equipment and sensor through the set key, add a key, subtract a key and enter the set interface by the enter of set key, the interface is displayed on LCD display screen 93, then press and add a key and subtract a key and set up relevant parameter or trade, after having set up the parameter, the staff presses the confirm key and confirms and withdraws from setting up the interface, the parameter that has set up passes through control module and saves in 24C02 circuit, the staff presses the power master switch once more, cut off the power supply with this equipment. When drilling is needed, a worker presses a power supply main switch to electrify the equipment, the control module controls the third pressure sensor 8 to work, the first indicator lamp 95 is lightened to illustrate that the equipment normally works, then the mounting plate 1 is fixed on the wall through the bolt 7, the third pressure sensor 8 detects a pressure value, the pressure value is displayed on the LCD display screen 93, the setting key is pressed for 3 seconds, then the additional key is pressed, the control module controls the second indicator lamp 96 to be lightened, meanwhile, the control module controls the drilling mechanism 6 to work to drill the wall, therefore, the wall can be drilled automatically, the worker can feel easier, when the pressure value detected by the third pressure sensor 8 is lower than a preset value in the control module, the equipment is loosened, the third pressure sensor 8 sends a signal, the control module controls the buzzer 94 to sound three times after receiving the signal, and reminding the staff to explain that the equipment is loose. When the drilling is completed, the second indicator light 96 is turned off, the worker presses the power main switch again to power off the equipment, the third pressure sensor 8 stops working, the first indicator light 95 is turned off, and then the equipment is detached.
As shown in fig. 1 and fig. 2, the drilling mechanism 6 includes an electric push rod 61, a cross rod 62, a sliding block 64, a hole drilling drill 65, a drill 66, a connecting rod 67, a guide block 68, a first pressure sensor 69 and a second pressure sensor 610, the electric push rod 61 is installed at the bottom of the fixed mount 3, the fixed mount 3 is connected with the electric push rod 61 through a bolt connection mode, the cross rod 62 is connected with the electric push rod 61, the cross rod 62 is connected with the mounting plate 1 through a bolt connection mode, a sliding groove 63 for guiding is opened at the bottom of the cross rod 62, the guide block 68 and two sliding blocks 64 are arranged in the sliding mode in the sliding groove 63, the guide block 68 is located between the two sliding blocks 64, the hole drilling drill 65 is installed at the bottom of the two sliding blocks 64, the drill 66 is arranged at the output end of the hole drilling drill 65, a second pressure sensor 610 is disposed to the right of the guide block 68.
When the equipment is powered on, the control module controls the first pressure sensor 69 and the second pressure sensor 610 to work, a worker presses the set key for 3 seconds for a long time, then presses the additional key, the control module controls the second indicator light 96 to light, the control module controls the hole drilling drill 65 to work, the hole drilling drill 65 drives the drill bit 66 to rotate, the control module controls the electric push rod 61 to shorten, the electric push rod 61 drives the connecting rod 67 to move leftwards, so as to drive the guide block 68 to move leftwards, further drive the first pressure sensor 69 and the second pressure sensor 610 to move leftwards, the first pressure sensor 69 pushes the left slide block 64 to move leftwards, the first pressure sensor 69 detects a pressure value, the left slide block 64 moves leftwards to drive the hole drilling drill 65 to move leftwards, the drill bit 66 moves leftwards along with the left to drill a wall body, when the pressure value detected by the first pressure sensor 69 reaches the highest preset value in the, the first pressure sensor 69 sends out a signal, the control module receives the signal and controls the electric push rod 61 to extend for 3 seconds and then to continue to shorten, the electric push rod 61 drives the drill bit 66 to move rightwards, after 3 seconds, the control module controls the electric push rod 61 to continue to shorten and drive the drill bit 66 to continue to move leftwards, when the pressure value detected by the first pressure sensor 69 reaches the lowest preset value in the control module, the first pressure sensor 69 sends out a signal, the control module receives the signal and controls the electric push rod 61 to extend, the electric push rod 61 drives the guide block 68 to move rightwards, thereby driving the second pressure sensor 610 to move rightwards, the second pressure sensor 610 pushes the right slide block 64 to move rightwards, the second pressure sensor 610 detects the pressure value, the drill bit 66 moves rightwards along with the pressure value, when the pressure value detected by the second pressure sensor 610 reaches the preset value, the control module receives the signal and controls the electric push rod 61 to stop extending, meanwhile, the control module controls the hole drilling drill 65 to stop working, and meanwhile, the control module controls the second indicator lamp 96 to be turned off.
Example 2
On the basis of embodiment 1, as shown in fig. 4, 5 and 6, the present embodiment further includes a wastewater collection mechanism 10, the wastewater collection mechanism 10 includes a collection pipe 101, a fixing plate 102, a pressing plate 103, a spring sheet 104, a gear 105 and a non-slip mat 106, the collection pipe 101 and the fixing plate 102 are connected to the lower portion of the right side of the mounting plate 1, the fixing plate 102 is located below the collection pipe 101, two pressing plates 103 are rotatably connected to the right side of the fixing plate 102, the gear 105 is installed at the tops of the two pressing plates 103, the two gears 105 are engaged, the spring sheet 104 is connected between the pressing plate 103 and the fixing plate 102 at the front side, the non-slip mat 106 is connected to the inner side of the pressing plate.
The staff stirs the clamp plate 103 of front side forward, drive the gear 105 clockwise rotation of front side, thereby drive the gear 105 anticlockwise rotation of rear side, and then drive the clamp plate 103 of rear side backward swing, shell fragment 104 is extruded this moment, then overlap the plastic bag on collecting pipe 101, loosen the clamp plate 103 of front side again, under the effect of shell fragment 104, the clamp plate 103 of front side backward swing, thereby can drive the clamp plate 103 of rear side forward swing, and then fix the plastic bag. The water when drilling falls into the header pipe 101 and then flows into the plastic bag through the header pipe 101, so that the water can be prevented from falling to the ground.
As shown in fig. 3 and 4, the paint marking device further comprises a marking mechanism 11, the marking mechanism 11 comprises a compression cylinder 111, a guide sleeve 112, a guide rod 113, a spring 114, a liquid feeding pipe 115, a one-way valve 116, a liquid outlet pipe 117, a sealing ring 118, an electromagnetic valve 119 and a piston 1110, the compression cylinder 111 is installed on the front side of the fixed frame 3, the fixed frame 3 is connected with the compression cylinder 111 through a bolt connection mode, the piston 1110 is installed in the compression cylinder 111, the guide sleeve 112 is installed on the top of the compression cylinder 111 in an embedded mode, the guide rod 113 is installed in the guide sleeve 112, the guide rod 113 is connected with the piston 1110, the spring 114 is wound on the guide rod 113, one end of the spring 114 is connected with the guide sleeve 112, the other end of the spring 114 is connected with the piston 1110, the liquid feeding pipe 115 for flowing paint is connected to the lower portion of the right side of the compression cylinder, an electromagnetic valve 119 is arranged in the liquid outlet pipe 117, and sealing rings 118 are arranged on the sealing gaskets 2 on the upper side and the lower side.
The staff connects the filler pipe 115 with external coating, then upwards pulls guide arm 113, guide arm 113 drives piston 1110 upward movement, inhale coating through filler pipe 115 in the compression cylinder 111, spring 114 is compressed, under the effect of check valve 116, coating can not flow back to the filler pipe 115 in, the staff makes mounting panel 1 and wall contact again, then press one-key 3 seconds for a long time, press the enter key again, control module control solenoid valve 119 opens 20 seconds, under the effect of spring 114, piston 1110 moves downwards, piston 1110 promotes the coating in the compression cylinder 111, the coating in the compression cylinder 111 passes through drain pipe 117 blowout, spout and carry out the mark on the wall, thereby can make things convenient for the staff to install this equipment on the wall, 20 seconds later, control module control solenoid valve 119 closes.
As shown in fig. 6, the locking device 12 further includes a locking mechanism 12, the locking mechanism 12 includes an elastic hook 121 and a pull ring 123, the elastic hook 121 is connected to the right side of the rear pressing plate 103, a clamping groove 122 is formed on the right side of the front pressing plate 103, the elastic hook 121 is clamped in the clamping groove 122, and the pull ring 123 is connected to the elastic hook 121.
The elastic hook 121 can hook the front pressing plate 103 to prevent the front pressing plate 103 from loosening. When the pressing plate 103 on the front side needs to be loosened, the worker pulls the pull ring 123 rightwards, and the pull ring 123 drives the elastic hook 121 to swing rightwards, so that the elastic hook 121 is moved out of the clamping groove 122.
As shown in fig. 2, fig. 7 and fig. 8, the portable electronic device further comprises a control box 91 and a control panel 92, the right side of the fixing frame 3 is connected with the control panel 92, the control panel 92 is connected with the cross rod 62, a set key, an add key, a subtract key, a confirm key, an LCD display screen 93, a buzzer 94, a first indicator light 95 and a second indicator light 96 are both arranged on the control panel 92, the right side of the top of the fixing frame 3 is connected with the control box 91, the control module is installed in the control box 91, the control box 91 comprises a switching power supply and a power supply module, the switching power supply can supply power to the portable electronic device, the output end of the switching power supply is electrically connected with the power supply module, the control module is electrically connected with the power supply module, and the power supply module is; the control module is connected with a 24C02 circuit and a DS1302 clock circuit, the 24C02 circuit is used for storing parameters, the set parameters are stored in the 24C02 circuit, relevant parameters are called out during work, the DS1302 clock circuit provides a time reference, timing can be carried out, and the leap year compensation function is achieved; the third pressure sensor 8, the first pressure sensor 69 and the second pressure sensor 610 are all electrically connected with the control module; the electric push rod 61, the hole drilling drill 65 and the electromagnetic valve 119 are all connected with the control module through a peripheral circuit.
Although embodiments of the present invention have been shown and described, it would be appreciated by those skilled in the art that changes may be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the claims and their equivalents.

Claims (7)

1. A drilling device for building construction comprises a mounting plate (1), a sealing gasket (2), a fixing frame (3) and a handle (4), wherein the sealing gasket (2) is connected to the upper side and the lower side of the left side of the mounting plate (1), the fixing frame (3) is connected to the upper portion of the right side of the mounting plate (1), the handle (4) is connected to the top of the fixing frame (3), the novel wall drilling device is characterized by further comprising a drilling mechanism (6), a bolt (7) and a third pressure sensor (8), a through hole (5) is formed in the middle of the mounting plate (1), the drilling mechanism (6) is arranged at the bottom of the fixing frame (3), the drilling mechanism (6) is used for drilling a wall body, the third pressure sensor (8) is arranged on the upper portion of the left side of the mounting plate (1), the third pressure sensor (8) is located below the upper sealing gasket (2), and the bolt (7) is arranged on the upper portion and the lower portion of the mounting plate (1).
2. The drilling equipment for building construction as claimed in claim 1, further comprising a control module, a setting key, an adding key, a subtracting key, a confirming key, an LCD display screen (93), a buzzer (94), a first indicator light (95) and a second indicator light (96), wherein the LCD display screen (93), the buzzer (94), the first indicator light (95) and the second indicator light (96) are all electrically connected with the control module.
3. The drilling equipment for building construction according to claim 2, wherein the drilling mechanism (6) comprises an electric push rod (61), a cross rod (62), sliding blocks (64), a hole drilling drill (65), a drill bit (66), a connecting rod (67), a guide block (68), a first pressure sensor (69) and a second pressure sensor (610), the electric push rod (61) is installed at the bottom of the fixed frame (3), the cross rod (62) is connected to the bottom of the electric push rod (61), the cross rod (62) is connected with the mounting plate (1), a sliding groove (63) with a guiding function is formed at the bottom of the cross rod (62), the guide block (68) and the two sliding blocks (64) are arranged in the sliding manner in the sliding groove (63), the guide block (68) is positioned between the two sliding blocks (64), the hole drilling drill bit (65) is installed at the bottoms of the two sliding blocks (64), the drill bit (66) is arranged, the guide block (68) is connected with the electric push rod (61) through a connecting rod (67), a first pressure sensor (69) is arranged on the left side of the guide block (68), and a second pressure sensor (610) is arranged on the right side of the guide block (68).
4. The drilling equipment for building construction according to claim 3, further comprising a waste water collecting mechanism (10), wherein the waste water collecting mechanism (10) comprises a collecting pipe (101), a fixing plate (102), a pressing plate (103), a spring plate (104), a gear (105) and an anti-skid pad (106), the collecting pipe (101) and the fixing plate (102) are connected to the lower portion of the right side of the mounting plate (1), the fixing plate (102) is located below the collecting pipe (101), the two pressing plates (103) are rotatably connected to the right side of the fixing plate (102), the gear (105) is installed at the tops of the two pressing plates (103), the two gears (105) are meshed, the spring plate (104) is connected between the pressing plate (103) and the fixing plate (102) on the front side, and the anti-skid pad (106) is connected.
5. The drilling equipment for building construction according to claim 4, further comprising a marking mechanism (11), wherein the marking mechanism (11) comprises a compression cylinder (111), a guide sleeve (112), a guide rod (113), a spring (114), a liquid feeding pipe (115), a one-way valve (116), a liquid outlet pipe (117), a sealing ring (118), an electromagnetic valve (119) and a piston (1110), the compression cylinder (111) is installed at the front side of the fixing frame (3), a piston (1110) is arranged in the compression cylinder (111), the guide sleeve (112) is installed at the top of the compression cylinder (111) in an embedded manner, the guide rod (113) is arranged in the guide sleeve (112), the guide rod (113) is connected with the piston (1110), the spring (114) is wound on the guide rod (113), one end of the spring (114) is connected with the guide sleeve (112), the other end of the spring (114) is connected with the piston (1110), the liquid feeding pipe (115) for enabling the coating to flow, a one-way valve (116) for enabling the coating to flow in a one-way mode is arranged in the liquid feeding pipe (115), a liquid outlet pipe (117) for enabling the coating to flow is connected to the lower portion of the left side of the compression cylinder (111), an electromagnetic valve (119) is arranged in the liquid outlet pipe (117), and sealing rings (118) are arranged on sealing gaskets (2) on the upper side and the lower side.
6. The drilling equipment for building construction as claimed in claim 5, further comprising a locking mechanism (12), wherein the locking mechanism (12) comprises an elastic hook (121) and a pull ring (123), the right side of the pressing plate (103) at the rear side is connected with the elastic hook (121), the right side of the pressing plate (103) at the front side is provided with a clamping groove (122), the elastic hook (121) is clamped in the clamping groove (122), and the pull ring (123) is connected to the elastic hook (121).
7. The drilling equipment for building construction as claimed in claim 6, further comprising a control box (91) and a control panel (92), wherein the control panel (92) is connected to the right side of the fixing frame (3), the control panel (92) is connected with the cross bar (62), a set key, an add key, a subtract key and a confirm key are provided, the LCD display screen (93), the buzzer (94), the first indicator lamp (95) and the second indicator lamp (96) are all arranged on the control panel (92), the right side of the top of the fixing frame (3) is connected with the control box (91), the control module is installed in the control box (91), the control box (91) comprises a switching power supply and a power supply module, the switching power supply can supply power to the equipment, the output end of the switching power supply is electrically connected with the power supply module, the control module is electrically connected with the power supply module, and the power supply module is connected with a power supply main switch through a circuit; the control module is connected with a 24C02 circuit and a DS1302 clock circuit, the 24C02 circuit is used for storing parameters, the set parameters are stored in the 24C02 circuit, relevant parameters are called out during work, the DS1302 clock circuit provides a time reference, timing can be carried out, and the leap year compensation function is achieved; the third pressure sensor (8), the first pressure sensor (69) and the second pressure sensor (610) are electrically connected with the control module; the electric push rod (61), the hole drilling drill (65) and the electromagnetic valve (119) are all connected with the control module through a peripheral circuit.
CN201910971008.5A 2019-10-14 2019-10-14 Drilling equipment for construction Active CN110744100B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910971008.5A CN110744100B (en) 2019-10-14 2019-10-14 Drilling equipment for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910971008.5A CN110744100B (en) 2019-10-14 2019-10-14 Drilling equipment for construction

Publications (2)

Publication Number Publication Date
CN110744100A true CN110744100A (en) 2020-02-04
CN110744100B CN110744100B (en) 2020-10-27

Family

ID=69278176

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910971008.5A Active CN110744100B (en) 2019-10-14 2019-10-14 Drilling equipment for construction

Country Status (1)

Country Link
CN (1) CN110744100B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2083523U (en) * 1990-07-05 1991-08-28 哈尔滨澳强机电技术开发有限公司 Automatic depth fixing drill for plate work
US5170545A (en) * 1991-11-20 1992-12-15 Hubscher Darin W Screwgun saw adaptor
CN2228831Y (en) * 1995-01-26 1996-06-12 黄锦标 Wet reinforced concrete driller
US20050186041A1 (en) * 2004-02-19 2005-08-25 Hiroyuki Oda Drilling system including drilling machine and compressor
CN204414383U (en) * 2015-01-15 2015-06-24 江苏师范大学 A kind of full automatic drilling rig for metope drilling construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2083523U (en) * 1990-07-05 1991-08-28 哈尔滨澳强机电技术开发有限公司 Automatic depth fixing drill for plate work
US5170545A (en) * 1991-11-20 1992-12-15 Hubscher Darin W Screwgun saw adaptor
CN2228831Y (en) * 1995-01-26 1996-06-12 黄锦标 Wet reinforced concrete driller
US20050186041A1 (en) * 2004-02-19 2005-08-25 Hiroyuki Oda Drilling system including drilling machine and compressor
CN204414383U (en) * 2015-01-15 2015-06-24 江苏师范大学 A kind of full automatic drilling rig for metope drilling construction

Also Published As

Publication number Publication date
CN110744100B (en) 2020-10-27

Similar Documents

Publication Publication Date Title
CN112191882A (en) Drilling equipment for processing water pump body and end cover
CN110744100B (en) Drilling equipment for construction
CN108162173A (en) A kind of cement uniform mixing equipment of road and bridge
CN113109095A (en) A deep water multiple spot sampling device for sewage treatment
CN210863210U (en) Sampling device for concrete quality detection
CN211707370U (en) Screening sand device for building engineering
CN209614327U (en) A kind of door handle auxiliary positioning device for drilling
CN204808058U (en) Improvement structure of water level detector of boiler
CN108046367B (en) Energy-saving electroplating wastewater treatment device for steel plant
CN212526158U (en) Drilling equipment is used in pin production
CN108756810A (en) A kind of Pressurized petroleum wellhead driller
CN113532912A (en) Vehicle-mounted integrated platform integrating soil collection, detection, treatment and restoration
CN210231874U (en) A automatic welding system of robot for PTA technology
CN213360030U (en) Multifunctional connecting device for wellhead of oil production well
CN208234932U (en) Tuyere medium jacket of blast furnace more changing device
CN209283686U (en) A kind of automatic irrigation formula walnut planting unit
CN109296381B (en) Belt mud scraper of shield machine
CN206854690U (en) The more drill bit perforating devices of ball valve adpting flange
CN204098653U (en) A kind of inward opening window square hole gear box
CN215026590U (en) Detachable filter equipment that sewage treatment used
CN219867087U (en) Liquid level control alarm mechanism
CN214659574U (en) Hand formula is control box for windowing
CN220644162U (en) Water surface impurity cleaning mechanism
CN216170271U (en) Filter screen with multilayer filtering structure for wastewater treatment
CN209292185U (en) A kind of septic tank perforating device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200922

Address after: No. 186, Shuangdeng Avenue, Sanshui street, Jiangyan District, Taizhou City, Jiangsu Province

Applicant after: Jiangsu Jincheng Construction Co.,Ltd.

Address before: No.88, Heqing Road, economic and Technological Development Zone, Datong City, Shanxi Province

Applicant before: He Rongrong

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221125

Address after: 252000 Internal Medicine Research Building 711, High end Equipment Industrial Park, Linqing Economic Development Zone, Liaocheng, Shandong

Patentee after: Linqing Zhongke Construction Engineering Co.,Ltd.

Address before: No. 186 Shuangdeng Avenue, Sanshui street, Jiangyan District, Taizhou City, Jiangsu Province 225300

Patentee before: Jiangsu Jincheng Construction Co.,Ltd.

TR01 Transfer of patent right