CN110695911A - Mine wire point automatic installation equipment - Google Patents

Mine wire point automatic installation equipment Download PDF

Info

Publication number
CN110695911A
CN110695911A CN201911073748.3A CN201911073748A CN110695911A CN 110695911 A CN110695911 A CN 110695911A CN 201911073748 A CN201911073748 A CN 201911073748A CN 110695911 A CN110695911 A CN 110695911A
Authority
CN
China
Prior art keywords
sleeve
gear
belt pulley
mine
automatic installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201911073748.3A
Other languages
Chinese (zh)
Other versions
CN110695911B (en
Inventor
卫明
史传哲
程伯明
张见
苏广宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongling Nonferrous Metals Group Co Ltd
Original Assignee
Tongling Nonferrous Metals Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongling Nonferrous Metals Group Co Ltd filed Critical Tongling Nonferrous Metals Group Co Ltd
Priority to CN201911073748.3A priority Critical patent/CN110695911B/en
Publication of CN110695911A publication Critical patent/CN110695911A/en
Application granted granted Critical
Publication of CN110695911B publication Critical patent/CN110695911B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B27/00Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Catching Or Destruction (AREA)

Abstract

The invention belongs to the technical field of wire control point arrangement, and particularly relates to automatic installation equipment for mine wire points. The technical problem is to provide the automatic installation equipment for the mine wire points, which is convenient to install, can be used by a single person without using a ladder. The automatic installation equipment for the mine wire guide points comprises a long rod, a mechanical box, a box body, a slide rail, a slide block and the like; the long rod is provided with a mechanical box, and the top of the mechanical box is provided with a box body. The invention achieves the effects of single-person operation and convenient installation, the push rod is pushed upwards, the screw is driven by the electric drill to be installed on the top plate of the underground roadway, after the installation is finished, a worker pulls the push rod downwards, the push rod drives the fixing sleeve and the electric drill to move downwards, when the fixing sleeve is contacted with the fixing top sleeve, the clamping ball is clamped in the clamping sleeve, the mounting plate moves rightwards until a new nail sleeve is positioned above the electric drill, and the installation layout of the screw is convenient for a lead control point moving to the next position.

Description

Mine wire point automatic installation equipment
Technical Field
The invention belongs to the technical field of wire control point arrangement, and particularly relates to automatic installation equipment for mine wire points.
Background
The mine underground lead control points are arranged on the upper portion of a top plate of the roadway and are generally fixed in top plate rocks by screws. And the screw is best to have part to expose, makes things convenient for control point hanging wire to measure. Wire control point arranges in tunnel roof department, and general tunnel is than higher, installs on the roof, and mine tunnel roof is the rock, when the mounting screw, hardly installs and goes, and the staff must just can install with the help of the ladder simultaneously and go, leads to going into the well at every turn and must carry the ladder, consumes the manpower.
Therefore, the mine wire point automatic installation equipment which is not required to use a ladder, can be used by a single person and is convenient to install is designed.
Disclosure of Invention
In order to overcome when the installation screw, very difficult installation goes up, and the staff must just can install going up with the help of the ladder simultaneously, leads to going down the well at every turn and must carry the ladder, consumes the shortcoming of manpower, and the technical problem is: the automatic installation equipment for the mine wire points is convenient to install, can be used by a single person without using a ladder.
The technical scheme of the invention is as follows: an automatic installation device for mine lead points comprises a long rod, a mechanical box, a box body, a slide rail, a slide block, an installation plate and a nail sleeve, first rack, first gear, adjusting device, fixed cover, the push rod, electric drill and buffering kicking block, be provided with mechanical case on the stock, mechanical roof portion is provided with the box, the box inner wall is provided with the slide rail, the gliding type is provided with the slider on the slide rail, the gliding type is provided with the mounting panel on the slider, evenly be provided with the nail cover on the mounting panel, the mounting panel bottom is provided with first rack, be provided with first gear through the axis of rotation rotary type on the mechanical case, mechanical case lateral wall slidingtype is provided with fixed cover, the electric drill has been cup jointed on the fixed cover, fixed cover downside is provided with the push rod, fixed cover is connected with adjusting device, adjusting device is used for mounting panel lateral shifting to adjust, the bottom.
Furthermore, adjusting device is including first belt pulley, the second gear, the pawl, the second rack, the flat belt of second belt pulley, first gear front side is provided with the second belt pulley, the antetheca rotary type is provided with first belt pulley in the machinery incasement, it has the ratchet groove to open on the first belt pulley, the back wall rotary type is provided with the second gear in the machinery incasement, second gear front side is provided with the pawl, pawl and ratchet groove cooperation, be connected with the second rack on the fixed cover, the second rack meshes with the second gear, around having the flat belt between first belt pulley and the second belt pulley.
Further, still including support sleeve, sliding block and inserted bar, the stock bottom is provided with the sliding block, and the sliding block slidingtype is cup jointed at the support sleeve inboard, all opens the jack on the support sleeve and on the stock, and the jack on the support sleeve is movable to be provided with the inserted bar, inserted bar and jack cooperation.
Further, still including buffer block, elastic component and uide bushing, the box top symmetry is provided with the uide bushing, and the slidingtype is provided with the buffer block in the uide bushing, is provided with the elastic component between buffer block and the uide bushing.
Furthermore, still including fixed top cover, cutting ferrule and card ball, be provided with fixed top cover on the stock, be provided with the cutting ferrule on the fixed top cover, fixed cover downside is provided with the card ball, card ball and cutting ferrule cooperation.
The beneficial effects are that: the invention achieves the effects of single-person operation and convenient installation, and the screw is driven by the electric drill to be installed on the top plate of the underground roadway by pushing the push rod upwards, so that the installation is finished. The staff stimulates the push rod downwards, and the push rod drives fixed cover and electric drill downstream, and when fixed cover and fixed top cover contact, the card ball card is gone into in the card cover, and the mounting panel moves right and is located the electric drill top to new nail cover, is convenient for remove to the wire control point of next department and establishes the installation overall arrangement of using the screw.
Drawings
Fig. 1 is a schematic front view of the present invention.
Fig. 2 is a partial left-view structural diagram of the present invention.
Fig. 3 is a schematic front view of the adjusting device of the present invention.
Fig. 4 is an enlarged schematic view of the adjusting device of the present invention.
Part names and serial numbers in the figure: 1 stock, 2 machine cases, 3 boxes, 4 slide rails, 41 sliders, 5 mounting plates, 51 nail covers, 6 first racks, 7 first gears, 8 adjusting devices, 81 first belt pulleys, 82 ratchet grooves, 83 second gears, 84 pawls, 85 second racks, 86 second belt pulleys, 87 flat belts, 9 fixed sleeves, 91 push rods, 10 electric drills, 11 buffering ejector blocks, 12 support sleeves, 13 sliding blocks, 14 jacks, 15 inserted rods, 16 buffer blocks, 17 elastic parts, 18 guide sleeves, 19 fixed ejector sleeves, 20 cutting sleeves and 21 clamping balls.
Detailed Description
The preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.
Example 1
As shown in fig. 1-4, an automatic installation device for mine wire points comprises a long rod 1, a mechanical box 2, a box 3, a slide rail 4, a slide block 41, a mounting plate 5, a nail sleeve 51, a first rack 6, a first gear 7, an adjusting device 8, a fixing sleeve 9, a push rod 91, an electric drill 10 and a buffering top block 11, wherein the long rod 1 is provided with the mechanical box 2, the top of the mechanical box 2 is provided with the box 3, the inner wall of the box 3 is provided with the slide rail 4, the slide block 41 is slidably arranged on the slide rail 4, the rear side of the mounting plate 5 is provided with a slide groove, the mounting plate 5 is slidably mounted with the slide block 41 through the slide groove, the mounting plate 5 is uniformly provided with the nail sleeve 51, the bottom of the mounting plate 5 is provided with the first rack 6, the mechanical box 2 is provided with the first gear 7 through a rotating shaft, the fixing sleeve 9 is, fixed cover 9 is connected with adjusting device 8, and adjusting device 8 is used for the 5 lateral shifting of mounting panel to adjust, and 3 bottoms of box are provided with buffering kicking block 11, and buffering kicking block 11 is located electric drill 10 directly over.
The adjusting device 8 comprises a first belt pulley 81, a second gear 83, a pawl 84, a second rack 85, a second belt pulley 86 and a flat belt 87, the second belt pulley 86 is arranged on the front side of the first gear 7, the first belt pulley 81 is rotatably arranged on the inner front wall of the machine box 2, a ratchet groove 82 is formed in the first belt pulley 81, the second gear 83 is rotatably arranged on the inner rear wall of the machine box 2, the pawl 84 is arranged on the front side of the second gear 83, the pawl 84 is matched with the ratchet groove 82, the fixed sleeve 9 is connected with the second rack 85, the second rack 85 is meshed with the second gear 83, and the flat belt 87 is wound between the first belt pulley 81 and the second belt pulley 86.
When the installation of the wire control point is required to be carried out in the underground roadway, firstly, the screw is installed in the nail sleeve 51, then the installation plate 5 slides upwards, so that the first rack 6 is not in contact with the first gear 7, and then the installation plate 5 is pushed rightwards to the inside of the box body 3. Then the device is lifted to a position where a nail needs to be put, a worker pushes the push rod 91 upwards, the push rod 91 drives the fixing sleeve 9 to move upwards, so that the electric drill 10 drives the screw to move upwards, the second rack 85 is driven to move upwards, the second rack 85 drives the second gear 83 and the pawl 84 to rotate clockwise, the pawl 84 idles in the ratchet groove 82, when the electric drill 10 continues to move upwards, the button of the electric drill 10 is in contact with the buffering ejector block 11, the electric drill 10 works to drive the screw in the nail sleeve 51 to start rotating, the screw can be drilled into the top plate of the roadway by the upward movement, when the screw is rotated to a proper position, the push rod 91 is pulled downwards, the push rod 91 drives the fixing sleeve 9 and the electric drill 10 to move downwards, the button of the electric drill 10 is not in contact with the buffering ejector block 11, the electric drill 10 stops working, the second rack 85 is driven to move downwards, the second rack 85 drives the second gear 83 and, pawl 84 and ratchet groove 82 fit in, drive first belt pulley 81 anticlockwise rotation, then drive second belt pulley 86 anticlockwise rotation through flat belt 87, second belt pulley 86 drives first gear 7 anticlockwise rotation, first gear 7 drives first rack 6 and moves left, mounting panel 5 moves right and is located the electric drill 10 top to new nail cover 51, can remove this device to the position that needs go on the nail this moment, action before the repetition, this device simple structure, the operation of being convenient for.
Example 2
As shown in fig. 1, on the basis of embodiment 1, the portable electronic device further includes a support sleeve 12, a sliding block 13 and an insertion rod 15, the sliding block 13 is disposed at the bottom of the long rod 1, the sliding block 13 is slidably sleeved on the inner side of the support sleeve 12, insertion holes 14 are disposed on the support sleeve 12 and the long rod 1, the insertion holes 14 on the support sleeve 12 are movably disposed with the insertion rod 15, and the insertion rod 15 is matched with the insertion holes 14. Staff is through carrying out stock 1's upper and lower regulation to underworkings roof height, then through in inserted bar 15 inserts corresponding jack 14, support sleeve 12 can play the direction supporting role to stock 1, makes things convenient for the staff to establish to wire control point and carries out the overall arrangement.
The box body is characterized by further comprising a buffer block 16, an elastic piece 17 and a guide sleeve 18, the guide sleeve 18 is symmetrically arranged at the top of the box body 3, the buffer block 16 is arranged in the guide sleeve 18 in a sliding mode, and the elastic piece 17 is arranged between the buffer block 16 and the guide sleeve 18. The staff is through upwards promoting stock 1, when buffer block 16 and underworkings roof contact, fixes in inserting corresponding jack 14 through with inserted bar 15, so can make equipment support more firm, can conveniently shift over to the screw to installation operation in the tunnel roof this moment.
Still including fixed top cover 19, cutting ferrule 20 and card ball 21, be provided with fixed top cover 19 on the stock 1, be provided with cutting ferrule 20 on the fixed top cover 19, fixed cover 9 downside is provided with card ball 21, card ball 21 and the cooperation of cutting ferrule 20. The staff stimulates push rod 91 downwards, and push rod 91 drives fixed cover 9 and electric drill 10 downstream, and when fixed cover 9 contacted with fixed top cover 19, card ball 21 card was gone into cutting ferrule 20, and mounting panel 5 moves left and makes new nail cover 51 be located electric drill 10 top, is convenient for remove to the wire control point of next department and establishes the installation overall arrangement with the screw.
The present application is described in detail above, and the principles and embodiments of the present application are described herein by using specific examples, which are only used to help understand the method and the core idea of the present application; meanwhile, for a person skilled in the art, according to the idea of the present application, there may be variations in the specific embodiments and the application scope, and in summary, the content of the present specification should not be construed as a limitation to the present application.

Claims (5)

1. An automatic installation device for mine conducting wire points comprises a long rod, a mechanical box and a box body, wherein the mechanical box is arranged on the long rod, the box body is arranged at the top of the mechanical box, the automatic installation device is characterized by further comprising a slide rail, a slide block, an installation plate, a nail sleeve, a first rack, a first gear, an adjusting device, a fixing sleeve, a push rod, an electric drill and a buffering ejector block, the slide rail is arranged on the inner wall of the box body, the slide block is arranged on the slide rail in a sliding mode, the installation plate is arranged on the slide block in a sliding mode, the nail sleeve is evenly arranged on the installation plate, the first rack is arranged at the bottom of the installation plate, the first gear is arranged on the mechanical box in a rotating mode, the fixing sleeve is arranged on the side wall of the mechanical box in a sliding mode, the electric drill, the buffering top block is positioned right above the electric drill.
2. The automatic installation equipment for mine wire points according to claim 1, wherein the adjusting device comprises a first belt pulley, a second gear, a pawl, a second rack, a second belt pulley and a flat belt, the second belt pulley is arranged on the front side of the first gear, the first belt pulley is rotatably arranged on the front wall in the mechanical box, a ratchet groove is formed in the first belt pulley, the second gear is rotatably arranged on the rear wall in the mechanical box, the pawl is arranged on the front side of the second gear, the pawl is matched with the ratchet groove, the second rack is connected to the fixed sleeve and meshed with the second gear, and the flat belt is wound between the first belt pulley and the second belt pulley.
3. The automatic installation equipment for mine wire points as claimed in claim 2, further comprising a support sleeve, a sliding block and an insertion rod, wherein the sliding block is arranged at the bottom of the long rod and is slidably sleeved inside the support sleeve, insertion holes are formed in the support sleeve and the long rod, the insertion hole in the support sleeve is movably provided with the insertion rod, and the insertion rod is matched with the insertion hole.
4. The automatic installation equipment for mine conducting wire points as claimed in claim 3, further comprising a buffer block, an elastic member and a guide sleeve, wherein the guide sleeve is symmetrically arranged at the top of the box body, the buffer block is slidably arranged in the guide sleeve, and the elastic member is arranged between the buffer block and the guide sleeve.
5. The automatic installation equipment for mine conducting wire points as claimed in claim 4, further comprising a fixed top sleeve, a clamping sleeve and a clamping ball, wherein the long rod is provided with the fixed top sleeve, the clamping sleeve is arranged on the fixed top sleeve, the clamping ball is arranged on the lower side of the fixed sleeve, and the clamping ball is matched with the clamping sleeve.
CN201911073748.3A 2019-11-06 2019-11-06 Mine wire point automatic installation equipment Expired - Fee Related CN110695911B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911073748.3A CN110695911B (en) 2019-11-06 2019-11-06 Mine wire point automatic installation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911073748.3A CN110695911B (en) 2019-11-06 2019-11-06 Mine wire point automatic installation equipment

Publications (2)

Publication Number Publication Date
CN110695911A true CN110695911A (en) 2020-01-17
CN110695911B CN110695911B (en) 2020-12-29

Family

ID=69205438

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911073748.3A Expired - Fee Related CN110695911B (en) 2019-11-06 2019-11-06 Mine wire point automatic installation equipment

Country Status (1)

Country Link
CN (1) CN110695911B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2261420A (en) * 1991-10-15 1993-05-19 Muro Kk Screw holder
JPH08108376A (en) * 1994-10-06 1996-04-30 Max Co Ltd Screw supply device in screw fastener for connecting screw
US20040056065A1 (en) * 2002-09-25 2004-03-25 Wasko Erik C. Multi-track nail insertion apparatus
CN201773844U (en) * 2010-07-28 2011-03-23 张鹏 Roof mounting bracket of solar cell component
CN104227657A (en) * 2014-08-30 2014-12-24 中国长江电力股份有限公司 Special damping ring connection dismounting tool
CN105328446A (en) * 2015-12-03 2016-02-17 安徽普伦智能装备有限公司 Total tool used for massive nut and screw assembly

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2261420A (en) * 1991-10-15 1993-05-19 Muro Kk Screw holder
JPH08108376A (en) * 1994-10-06 1996-04-30 Max Co Ltd Screw supply device in screw fastener for connecting screw
US20040056065A1 (en) * 2002-09-25 2004-03-25 Wasko Erik C. Multi-track nail insertion apparatus
CN201773844U (en) * 2010-07-28 2011-03-23 张鹏 Roof mounting bracket of solar cell component
CN104227657A (en) * 2014-08-30 2014-12-24 中国长江电力股份有限公司 Special damping ring connection dismounting tool
CN105328446A (en) * 2015-12-03 2016-02-17 安徽普伦智能装备有限公司 Total tool used for massive nut and screw assembly

Also Published As

Publication number Publication date
CN110695911B (en) 2020-12-29

Similar Documents

Publication Publication Date Title
CN110695911B (en) Mine wire point automatic installation equipment
CN216240431U (en) Drilling device for geotechnical engineering construction
CN112485052B (en) Deep and shallow layer layered sampling device for prospecting engineering
CN105672913A (en) Petroleum workover pipe arranging device
CN216284374U (en) Adjustable sampler is used in hydrographic engineering geological survey
CN207643287U (en) A kind of candle block
CN217638107U (en) Automatic core sample extraction device for road coring detection
CN213674406U (en) Cutting platform for plastic packaging bag production line
CN214040726U (en) Sampling device for site investigation
CN109226480A (en) Semi-automatic bending perforating apparatus is shared in a kind of left and right
CN115592736A (en) Device for CNC (computer numerical control) machining of circuit board of numerical control drilling machine
CN107749335A (en) Bending pins equipment for plug-in type resistance
CN109490011B (en) Depth layering sampling device for prospecting engineering
CN113059208A (en) Automatic tapping device for manufacturing high-end equipment
CN213688399U (en) Power transmission and transformation engineering is with circuit conveyor of detectable cable length
CN218053005U (en) PCB drilling device
CN214867483U (en) Positioning guide device of deep hole drilling machine
CN215677665U (en) Geological survey geotome
CN213874022U (en) Micrometer is stabilized and is adjusted device well
CN214699044U (en) Unilateral guide rail of triaxial module
CN220068047U (en) PCB board convenient to location is punched
CN212526127U (en) Auto-parts perforating device
CN214959178U (en) Motor bearing positioning and mounting device
CN219455538U (en) Sampling equipment convenient to observe
CN214007073U (en) Portable guide roll angle control instrument convenient to use

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201229