CN110685284A - Foundation pit seepage-proofing structure and construction method thereof - Google Patents
Foundation pit seepage-proofing structure and construction method thereof Download PDFInfo
- Publication number
- CN110685284A CN110685284A CN201910949787.9A CN201910949787A CN110685284A CN 110685284 A CN110685284 A CN 110685284A CN 201910949787 A CN201910949787 A CN 201910949787A CN 110685284 A CN110685284 A CN 110685284A
- Authority
- CN
- China
- Prior art keywords
- supporting
- pit
- temporary
- embedded groove
- waterproof layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 10
- 239000004567 concrete Substances 0.000 claims abstract description 30
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 19
- 230000002265 prevention Effects 0.000 claims abstract description 11
- 238000009412 basement excavation Methods 0.000 claims abstract description 7
- 230000003014 reinforcing effect Effects 0.000 claims description 11
- 238000005260 corrosion Methods 0.000 claims 2
- 239000010410 layer Substances 0.000 description 67
- 238000000034 method Methods 0.000 description 5
- 102000001999 Transcription Factor Pit-1 Human genes 0.000 description 4
- 108010040742 Transcription Factor Pit-1 Proteins 0.000 description 4
- 239000002131 composite material Substances 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 239000011241 protective layer Substances 0.000 description 3
- 101150054854 POU1F1 gene Proteins 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000008014 freezing Effects 0.000 description 1
- 238000007710 freezing Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000004078 waterproofing Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/12—Restraining of underground water by damming or interrupting the passage of underground water
- E02D19/18—Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
- E02D5/182—Bulkheads or similar walls made solely of concrete in situ using formworks to separate sections
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0007—Production methods using a mold
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910949787.9A CN110685284B (en) | 2019-10-08 | 2019-10-08 | Construction method of foundation pit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910949787.9A CN110685284B (en) | 2019-10-08 | 2019-10-08 | Construction method of foundation pit |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110685284A true CN110685284A (en) | 2020-01-14 |
CN110685284B CN110685284B (en) | 2021-01-29 |
Family
ID=69111526
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910949787.9A Active CN110685284B (en) | 2019-10-08 | 2019-10-08 | Construction method of foundation pit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110685284B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114411695A (en) * | 2022-01-24 | 2022-04-29 | 梁军 | Construction method and connection structure of underground cast-in-place continuous wall |
CN114775637A (en) * | 2022-05-09 | 2022-07-22 | 北京四达基业市政建设工程有限公司 | Deep foundation pit supporting structure and supporting method |
CN115324037A (en) * | 2022-09-13 | 2022-11-11 | 六安市永固管桩建材有限公司 | High-bearing-capacity pipe pile material proportioning method and high-bearing-capacity pipe pile |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104099933A (en) * | 2014-04-01 | 2014-10-15 | 浙江省建筑设计研究院 | Supporting system reinforcement structure after foundation pit deepening |
CN105649090A (en) * | 2016-03-01 | 2016-06-08 | 江苏东合南岩土科技股份有限公司 | Construction method for support combining steel sheet piles and stirring piles |
CN105804049A (en) * | 2014-12-31 | 2016-07-27 | 云南省第三建筑工程公司 | Anti-hole-collapsing foundation reinforced structure during underground diaphragm wall construction |
CN106869110A (en) * | 2016-12-29 | 2017-06-20 | 上海市基础工程集团有限公司 | The construction method of underground continuous wall of existing underground structure |
CN208023947U (en) * | 2017-12-07 | 2018-10-30 | 中鑫建设集团有限公司 | A kind of wallboard template is connected and fixed device |
CN109056764A (en) * | 2018-09-28 | 2018-12-21 | 北京高能时代环境技术股份有限公司 | Compound impervious wall and its construction method for soft clay area landfill yard environmental protection |
CN109183809A (en) * | 2018-10-16 | 2019-01-11 | 北京建工国际投资有限责任公司 | A kind of construction method of Muddy Bottoms clay deep-foundation pit engineering composite support support replacement |
-
2019
- 2019-10-08 CN CN201910949787.9A patent/CN110685284B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104099933A (en) * | 2014-04-01 | 2014-10-15 | 浙江省建筑设计研究院 | Supporting system reinforcement structure after foundation pit deepening |
CN105804049A (en) * | 2014-12-31 | 2016-07-27 | 云南省第三建筑工程公司 | Anti-hole-collapsing foundation reinforced structure during underground diaphragm wall construction |
CN105649090A (en) * | 2016-03-01 | 2016-06-08 | 江苏东合南岩土科技股份有限公司 | Construction method for support combining steel sheet piles and stirring piles |
CN106869110A (en) * | 2016-12-29 | 2017-06-20 | 上海市基础工程集团有限公司 | The construction method of underground continuous wall of existing underground structure |
CN208023947U (en) * | 2017-12-07 | 2018-10-30 | 中鑫建设集团有限公司 | A kind of wallboard template is connected and fixed device |
CN109056764A (en) * | 2018-09-28 | 2018-12-21 | 北京高能时代环境技术股份有限公司 | Compound impervious wall and its construction method for soft clay area landfill yard environmental protection |
CN109183809A (en) * | 2018-10-16 | 2019-01-11 | 北京建工国际投资有限责任公司 | A kind of construction method of Muddy Bottoms clay deep-foundation pit engineering composite support support replacement |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114411695A (en) * | 2022-01-24 | 2022-04-29 | 梁军 | Construction method and connection structure of underground cast-in-place continuous wall |
CN114775637A (en) * | 2022-05-09 | 2022-07-22 | 北京四达基业市政建设工程有限公司 | Deep foundation pit supporting structure and supporting method |
CN115324037A (en) * | 2022-09-13 | 2022-11-11 | 六安市永固管桩建材有限公司 | High-bearing-capacity pipe pile material proportioning method and high-bearing-capacity pipe pile |
Also Published As
Publication number | Publication date |
---|---|
CN110685284B (en) | 2021-01-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110685284B (en) | Construction method of foundation pit | |
CN107083771B (en) | A kind of drilling construction method of artificial digging pile | |
CN112609703B (en) | Soil nailing wall support construction process | |
CN107938683A (en) | One kind tilts pile pit supporting construction and its construction method | |
CN107012871B (en) | A kind of suspension type goes along with sb. to guard him the deep reversed construction method for greatly enhancing foundation pit fabricated construction | |
CN105155602A (en) | Multi-support foundation strengthening comprehensive controlling method | |
CN113174988A (en) | Double-wall concrete open caisson structure and construction method | |
CN109914422A (en) | A kind of steel pipe and soil nailing combined type foundation pit supporting construction and construction method | |
CN109868826B (en) | Firm-structure foundation pit and earth excavation method thereof | |
CN210368986U (en) | Foundation pit supporting pile supporting structure | |
CN109252542B (en) | Tree root pile light retaining wall for road widening and construction method thereof | |
CN207525758U (en) | A kind of reinforced Structure About Soldier Pile | |
CN202117059U (en) | Stiffened cement soil baffle wall foundation pit space enclosing structure | |
CN109578035A (en) | Steel pipe draining lock foot stake and construction method | |
CN210658340U (en) | Prefabricated dado | |
CN102635126B (en) | Method for constructing casting well for aluminum alloy hot-rolled sheet ingots | |
CN114960715B (en) | Underground engineering surge treatment device and control method | |
CN207714336U (en) | A kind of deep basal pit closing fast rainfall guard system | |
CN110397044A (en) | The prominent foundation ditch construction method and foundation pit structure gushed of anti-artesian water | |
CN214993928U (en) | Compound supporting construction that nature was put slope and SMW worker method stake and is combined | |
CN205688448U (en) | A kind of foundation pit support device utilizing karst fragmented rock body to reinforce bearing | |
CN212001139U (en) | Deep foundation pit supporting structure capable of preventing deformation | |
JP6867664B1 (en) | Foundation structure of structure, foundation construction method, and support pipe material used for foundation | |
CN212983885U (en) | Foundation pit structure | |
CN209212270U (en) | Steel pipe draining lock foot stake |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A construction method of foundation pit Effective date of registration: 20210513 Granted publication date: 20210129 Pledgee: Yuexiu sub branch of Bank of Guangzhou Co.,Ltd. Pledgor: Guangdong QIANXING Construction Engineering Co.,Ltd. Registration number: Y2021980003612 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20220526 Granted publication date: 20210129 Pledgee: Yuexiu sub branch of Bank of Guangzhou Co.,Ltd. Pledgor: Guangdong QIANXING Construction Engineering Co.,Ltd. Registration number: Y2021980003612 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A construction method of foundation pit Effective date of registration: 20220601 Granted publication date: 20210129 Pledgee: Yuexiu sub branch of Bank of Guangzhou Co.,Ltd. Pledgor: Guangdong QIANXING Construction Engineering Co.,Ltd. Registration number: Y2022980006954 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20230612 Granted publication date: 20210129 Pledgee: Yuexiu sub branch of Bank of Guangzhou Co.,Ltd. Pledgor: Guangdong QIANXING Construction Engineering Co.,Ltd. Registration number: Y2022980006954 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A Construction Method for Foundation Pit Effective date of registration: 20230613 Granted publication date: 20210129 Pledgee: Yuexiu sub branch of Bank of Guangzhou Co.,Ltd. Pledgor: Guangdong QIANXING Construction Engineering Co.,Ltd. Registration number: Y2023980043733 |