CN110659875A - Information processing method and system - Google Patents

Information processing method and system Download PDF

Info

Publication number
CN110659875A
CN110659875A CN201910881771.9A CN201910881771A CN110659875A CN 110659875 A CN110659875 A CN 110659875A CN 201910881771 A CN201910881771 A CN 201910881771A CN 110659875 A CN110659875 A CN 110659875A
Authority
CN
China
Prior art keywords
data
audit
project
item
auditing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910881771.9A
Other languages
Chinese (zh)
Other versions
CN110659875B (en
Inventor
杨华山
何雪枫
于小建
贾子江
王勇
杨佩佩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIANBAO (HEFEI) ELECTRONIC TECHNOLOGY Co Ltd
Original Assignee
LIANBAO (HEFEI) ELECTRONIC TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIANBAO (HEFEI) ELECTRONIC TECHNOLOGY Co Ltd filed Critical LIANBAO (HEFEI) ELECTRONIC TECHNOLOGY Co Ltd
Priority to CN201910881771.9A priority Critical patent/CN110659875B/en
Publication of CN110659875A publication Critical patent/CN110659875A/en
Application granted granted Critical
Publication of CN110659875B publication Critical patent/CN110659875B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • Game Theory and Decision Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the invention provides an information processing method and system, wherein the method comprises the following steps: configuring a first task for at least one first user end related to a first examination project based on the first examination project in a first sub-scheme of the first embodiment; acquiring first data sent by a first user side based on a first task, wherein the first data comprises first audit data; when the first audit data comprises first identification information, acquiring reference data from historical data based on the first audit data, wherein the first identification information is used for identifying that the audit result of the first audit item does not accord with the preset standard; and configuring a second task for at least one second user terminal based on the first audit data, and sending reference data to the second user terminal to indicate the second user terminal to update the first data based on the reference data. The method can improve the implementation efficiency of the implementation scheme and can improve the capability of analyzing and solving problems.

Description

Information processing method and system
Technical Field
The embodiment of the invention relates to the technical field of information processing, in particular to an information processing method and an information processing system.
Background
Project quality management plans generally describe the management actions of project management organizations in assigning responsibilities, authorities, quality checks, reports, audits, and editing quality management files to implement their established quality guidelines and quality goals. Project quality management plans provide input to the project population plan and must state quality control, quality assurance, and quality improvement for the project.
In the prior art, project quality management plans are mainly based on paper or Excel, and audit projects are initiated in an email mode according to time nodes of the projects, but the management efficiency of the management mode is low, the traceability of historical data is poor, and the capability of analyzing and solving problems is poor when the audit results of the audit projects are not in accordance with the audit standards.
Disclosure of Invention
In view of the above problems in the prior art, embodiments of the present invention provide an information processing method and system, so as to solve the technical problems in the prior art that the management efficiency is low, and the capabilities of analyzing and solving the problems are poor.
In order to solve the above problems, the embodiment of the present invention provides the following technical solutions:
an information processing method, comprising:
configuring a first task for at least one first user end related to a first examination project based on the first examination project in a first sub-scheme of the first embodiment;
acquiring first data sent by the first user side based on the first task, wherein the first data comprises first audit data, and the first audit data is used for representing an audit result of auditing the first audit item;
when the first audit data comprises first identification information, acquiring reference data from historical data based on the first audit data, wherein the first identification information is used for identifying that the audit result of the first audit item does not accord with a preset standard;
and configuring a second task for at least one second user terminal based on the first audit data, and sending the reference data to the second user terminal to instruct the second user terminal to update the first data based on the reference data.
In some embodiments, the obtaining reference data in historical data based on the first audit data comprises:
detecting whether second data is included in the historical data, wherein the second data comprises second auditing data used for representing auditing results of the first auditing item of a second embodiment, and the second auditing data comprises the first identification information;
if the second data is included in the historical data, acquiring the second data; and/or
Detecting whether third data is included in the historical data, wherein the third data includes third audit data used for representing an audit result of the first audit item in a second sub-scheme of the first implementation scheme, and the third audit data includes the first identification information;
and if the third data is included in the historical data, acquiring the third data.
In some embodiments, the obtaining reference data in historical data based on the first audit data further comprises:
and if the second data and/or the third data are not detected in the historical data, sending first prompt information to at least one third user end to prompt the third user end that the auditing result of the first auditing item is not in accordance with the preset standard.
In some embodiments, the obtaining reference data in historical data based on the first audit data comprises:
acquiring second identification information used for identifying product equipment in the first audit data;
and acquiring operation and maintenance data of the product equipment from the historical data based on the second identification information.
In some embodiments, the obtaining reference data in historical data based on the first audit data comprises:
acquiring third identification information for identifying product raw materials in the first audit data;
and acquiring material information of the product raw material from the historical data based on the third identification information.
In some embodiments, the method further comprises:
obtaining the first embodiment;
configuring the first review item in the first sub-scenario and the at least one second sub-scenario of the first embodiment when the first review item belongs to a predetermined set of items.
In some embodiments, the method further comprises:
configuring the first review item in the first sub-scenario of the first embodiment when the first review item does not belong to the preset set of items.
In some embodiments, the method further comprises:
detecting whether second data exists in the historical data, wherein the second data comprises second auditing data used for representing the auditing result of the first auditing item of a second embodiment, and the second auditing data comprises the first identification information;
if so, determining that the first trial project belongs to the preset project set.
In some embodiments, the method further comprises:
detecting whether third data exists in the historical data, wherein the third data comprises third auditing data used for representing auditing results of the first auditing item of a second sub-scheme of the first implementation scheme, and the third auditing data comprises the first identification information;
if so, determining that the first trial project belongs to the preset project set.
In some embodiments, the method further comprises:
detecting whether the first audit project comprises first marking information or not, wherein the first marking information is used for marking the first audit project as a new product quality risk management and control project;
if so, determining that the first trial project belongs to the preset project set.
In some embodiments, the method further comprises:
detecting whether the first examination and verification project comprises second marking information, wherein the second marking information is used for marking the first examination and verification project as a quality copy project or a design quality control project;
if so, determining that the first examination item belongs to a preset item set.
An information processing system, comprising:
the system comprises a first configuration module, a second configuration module and a third configuration module, wherein the first configuration module is used for configuring a first task for at least one first user end related to a first examination project based on the first examination project in a first sub scheme of a first embodiment;
a first obtaining module, configured to obtain first data sent by the first user based on the first task, where the first data includes first audit data, and the first audit data is used to represent an audit result of auditing the first audit item;
the second obtaining module is used for obtaining reference data from historical data based on the first audit data when the first audit data comprises first identification information, wherein the first identification information is used for identifying that the audit result of the first audit item does not accord with a preset standard;
and the second configuration module is used for configuring a second task for at least one second user end based on the first audit data and sending the reference data to the second user end so as to instruct the second user end to update the first data based on the reference data.
In some embodiments, the system further comprises:
a third obtaining module for obtaining the first embodiment;
a third configuration module, configured to configure the first review item in the first sub-scheme and at least one second scheme in the first embodiment when the first review item belongs to the preset set of items.
Compared with the prior art, the embodiment of the invention has the beneficial effects that:
the information processing method for implementing force can automatically configure a first task for at least one related first user terminal based on a first audit project so as to instruct the related first user terminal to execute the first audit project and send first data, when the audit result of the first audit project is determined to be not in accordance with the preset standard based on the first data, obtain reference data capable of assisting in solving the problem which is not in accordance with the preset standard from historical data, configure a second task for a second user terminal, and send the reference data to the second user terminal so as to instruct the second user terminal to solve the problem which is not in accordance with the preset standard based on the reference data, and update the first data so as to improve the implementation efficiency of the implementation scheme. By referencing reference data in the historical data, the ability to analyze and resolve problems during implementation of the implementation can be improved.
Drawings
Fig. 1 is a flowchart of a first embodiment of an information processing method according to an embodiment of the present invention;
FIG. 2 is a flowchart of a first embodiment of step S300 of an information processing method according to an embodiment of the present invention;
FIG. 3 is a flowchart of a second embodiment of step S300 of an information processing method according to an embodiment of the present invention;
FIG. 4 is a flowchart of a third embodiment of step S300 of the information processing method according to the embodiment of the present invention;
FIG. 5 is a flowchart of a fourth embodiment of step S300 of the information processing method according to the embodiment of the present invention;
FIG. 6 is a flowchart of a fifth embodiment of step S300 of the information processing method according to the embodiment of the present invention;
FIG. 7 is a flowchart of a second embodiment of an information processing method according to an embodiment of the present invention;
FIG. 8 is a flowchart of one embodiment of step S600 of an information processing method of an embodiment of the present invention;
fig. 9 is a block diagram of an information processing system according to an embodiment of the present invention.
Description of reference numerals:
10-a first configuration module; 20-a first acquisition module; 30-a second acquisition module; 40-a second configuration module.
Detailed Description
In order to make the technical solutions of the embodiments of the present invention better understood, the present invention will be described in detail with reference to the accompanying drawings and the detailed description.
Fig. 1 is a flowchart of an information processing method according to an embodiment of the present invention, and referring to fig. 1, the information processing method according to the embodiment of the present invention specifically includes the following steps:
and S100, configuring a first task for at least one first user end related to a first examination project based on the first examination project in the first sub-scheme of the first embodiment.
The first embodiment may be an embodiment of a quality control plan for a product, but may also be other embodiments. The first sub-scheme may be one of the sub-schemes of the first embodiment, and the first sub-scheme may be one of the sub-schemes, for example, the product quality management plan may include sub-schemes such as product setup (MOCK UP), Functional Verification Test (FVT), System Integration Test (SIT), System Verification Test (SVT), mass production test (SOVP), and mass production test (MP). The first auditing project is one of a plurality of auditing projects in the sub-scheme, for example, the product primary setting or functional verification test sub-scheme can include auditing projects such as new product quality risk management and control (NUDD), human-machine material method auditing project (4M), Project Management (PMP), whole-person dangerous source management (THM), electromagnetic interference auditing (EMI) and the like. The first user end is a user end related to the first review project, for example, a new product quality risk management project, the first user end may be a user end of a project quality management manager, and the first user end may also be a user end of a Product Engineer (PE), a user end of an Industrial Engineer (IE), a user end of a material engineer (MQE), a user end of a research and development engineer, and the like.
After the first embodiment is obtained, a first time node closest to the current time and a first audit project in a first sub-scheme corresponding to the first time node can be determined based on the current time, then at least one first user terminal related to the first audit project is determined based on the first audit project, and then the first user terminal is matched with a first task for the related at least one first user terminal based on the audit content of the first audit project so as to instruct the first user terminal to carry out audit work of the first audit project. For example, for a new product quality risk management and control (NUDD) project in a product initialization (MOCK UP) sub-scheme, a first task may be configured for a project management manager based on the NUDD project to instruct the project management manager to complete review of the NUDD project.
And S200, acquiring first data sent by the first user side based on the first task, wherein the first data comprises first audit data, and the first audit data is used for representing an audit result of auditing a first audit item. The first data may further include implementation content for implementing the first audit item, and the first audit data may include a score of the implementation content and identification information for identifying whether an audit result of the first audit item meets a preset standard, for example, when the audit result of the first audit item does not meet the preset standard, the first audit result may be identified by the first identification information, and when the audit result of the first audit item meets the preset standard, the first audit result may be identified by another identification information. Of course, other data contents may also be included in the first data.
S300, when the first audit data comprises first identification information, acquiring reference data from historical data based on the first audit data, wherein the first identification information is used for identifying that the audit result of the first audit item does not accord with the preset standard.
When the first identification information is detected in the first audit data, it indicates that the audit result of the first audit item does not meet the preset standard, that is, the first audit item has a problem. At this point, reference data related to the issue may be looked up from the historical data based on the first audit data. The historical data may also include implementation result data of other product embodiments, implementation result data of other implemented sub-embodiments in the first embodiment, equipment information of product equipment corresponding to the first embodiment, and material information of product raw materials corresponding to the first embodiment. The reference data is related data which can assist in analyzing the reason and risk that the auditing result of the first auditing item does not meet the preset standard in the historical data.
S400, configuring a second task for at least one second user terminal based on the first audit data, and sending reference data to the second user terminal to instruct the second user terminal to update the first data based on the reference data.
When the auditing result of the first auditing item is not in accordance with the preset standard, a second task can be configured for at least one second user terminal based on the first auditing data so as to instruct the second user terminal to solve the problem that the auditing result of the first auditing item is not in accordance with the preset standard. When the second task is configured for the second user side, the reference data is also sent to the second user side, so that the second user side can analyze the reason that the auditing result of the first auditing item does not meet the preset standard based on the reference data, an improved scheme for the first auditing item and the auditing result of the improved first auditing item are provided, and then the first data is updated. For example, referring to the reason and the solution that the same kind of review items in other same kind of embodiments do not meet the preset standard, the reason that the review result of the first review item does not meet the preset standard is analyzed, and the solution is proposed.
The information processing method for implementing force can automatically configure a first task for at least one related first user terminal based on a first audit project so as to instruct the related first user terminal to execute the first audit project and send first data, when the audit result of the first audit project is determined to be not in accordance with the preset standard based on the first data, obtain reference data capable of assisting in solving the problem which is not in accordance with the preset standard from historical data, configure a second task for a second user terminal, and send the reference data to the second user terminal so as to instruct the second user terminal to solve the problem which is not in accordance with the preset standard based on the reference data, and update the first data so as to improve the implementation efficiency of the implementation scheme. By referencing reference data in the historical data, the ability to analyze and resolve problems during implementation of the implementation can be improved.
As shown in fig. 2, in some embodiments, the obtaining reference data from historical data based on the first audit data includes:
and S311, detecting whether the historical data comprises second data, wherein the second data comprises second auditing data used for representing the auditing result of the first auditing item of the second embodiment, and the second auditing data comprises first identification information.
Wherein the second embodiment is different from the first embodiment, the second embodiment can be another embodiment of the same product, or can be an embodiment of the same product, or an embodiment of other related products. The second embodiment has the same first auditing project as the first embodiment, and in the implementation process of the second embodiment, the problem that the auditing result of the first auditing project does not meet the preset standard also occurs in the auditing result of the first auditing project.
S312, if the second data is included in the historical data, the second data is obtained.
If the second data exists in the historical data, the problem that the auditing result does not accord with the preset standard also occurs in the implementation process of another implementation scheme comprising the first auditing item, the second data is obtained and is sent to the second user end as reference data, so that people, parts or units corresponding to the second user end can refer to reasons or solutions in other implementation schemes, and the analysis and processing capacity of the problem that the auditing result of the auditing item does not accord with the preset standard is improved.
As shown in fig. 3, in some embodiments, the obtaining reference data from the historical data based on the first audit data includes:
s321, detecting whether the historical data includes third data, where the third data includes third audit data used for representing an audit result of the first audit item in the second sub-scheme of the first embodiment, and the third audit data includes the first identification information.
The second sub-scheme and the first sub-scheme are the same sub-scheme in the first embodiment, the second sub-scheme also includes a first auditing item, and the first auditing item in the second sub-scheme also has a problem that the auditing result does not meet the preset auditing standard in the implementation process.
S322, if the third data is included in the historical data, the third data is obtained.
If the third data exists in the historical data, the first audit items in other sub-schemes in the first embodiment are described, and the problem that the audit result does not accord with the preset audit standard is also encountered in the implementation process, the third data is obtained and is sent to the second user end as the reference data, so that the personnel, units or departments corresponding to the second user end can use the reason and the solution of the problem that the audit result of the first audit item in other sub-schemes in the embodiment (namely the first embodiment) does not accord with the preset standard, and the analysis and processing capacity of the problem is improved.
In some embodiments, the obtaining reference data in historical data based on the first audit data further comprises:
and if the second data and/or the third data are not detected in the historical data, sending first prompt information to at least one third user end to prompt the third user end that the auditing result of the first auditing item is not in accordance with the preset standard.
If the problem that the similar audit items in other embodiments do not meet the preset standard is not detected in the historical data, and/or, the problem that the examination results of the similar examination items in the other sub-schemes in the first embodiment do not accord with the preset standard is not detected in the historical data, the problem that the review result of the first review item does not meet the preset standard is the first occurrence, and at this time, the first prompt message can be sent to at least one third user end to prompt the third user end that the auditing result of the first auditing project is not in accordance with the preset standard, so that the third user end can pay special attention when executing similar auditing projects or when preparing the implementation scheme of the similar auditing projects to avoid similar problems, or, the third user end can analyze the problem or solve the problem by using the first data as reference data when the same kind of problem is encountered.
As shown in fig. 4, in some embodiments, the obtaining reference data from the historical data based on the first audit data includes:
and S331, acquiring second identification information used for identifying the product equipment in the first audit data.
The product equipment can be research and development equipment, detection equipment or production equipment of a product, the second identification information can comprise a serial number, an equipment model, a manufacturer and the like of the product equipment, and the second identification information can uniquely identify the product equipment or can identify the product equipment.
S332, acquiring operation and maintenance data of the product equipment from the historical data based on the second identification information.
The acquired second identification information can be used for acquiring operation and maintenance data of the product equipment from historical data of an equipment management system, wherein the operation and maintenance data comprises real-time station information, rack information, maintenance records and the like of the equipment. After the operation and maintenance data of the product equipment are obtained, the operation and maintenance data can be used as reference information to be sent to the second user side, so that whether the problem that the auditing result of the first auditing item does not meet the preset standard originates from the product equipment or not can be analyzed in an auxiliary mode.
As shown in fig. 5, in some embodiments, the obtaining reference data from historical data based on the first audit data includes:
and S341, acquiring third identification information used for identifying the product raw materials in the first audit data.
This product raw materials can be the experimental materials of product, also can be the volume production raw materials of product, and this third identification information is the identification information that can this product raw materials of unique sign or can this kind of product raw materials of sign, if this third identification information can be product raw materials's serial number, product raw materials's batch number, product raw materials manufacturer, product raw materials's production line serial number etc..
And S342, acquiring material information of the product raw material from the historical data based on the third identification information.
Based on the third identification information, detection data of the product raw material at the manufacturer, performance data of the product raw material at other production lines, performance data of the same kind of products of the production line of the product raw material, operation and maintenance data of the production line of the product raw material, and the like can be obtained from a supplier system. After the material information of the product raw material is obtained, the material information can be sent to the second user end as reference data to assist the second user end in analyzing whether the problem that the auditing result of the first auditing item does not meet the preset standard originates from the product raw material or not.
In some embodiments, the reference data is not limited to one of the second data, the third data, the operation and maintenance data of the product equipment, and the material information of the product raw material, and other types of data may be acquired, or multiple types of data among the second data, the third data, the operation and maintenance data of the product equipment, and the material information of the product raw material may be acquired at the same time. As shown in fig. 6, after the first identification information is detected in the first audit data, the second data, the third data, the operation and maintenance data of the product device, and the material information of the product raw material are respectively obtained based on the first audit data, and the reference data are all sent to the second user side, so that the second user side can analyze the reason why the audit result of the first audit item does not meet the preset standard from multiple dimensions, and make the most preferable solution.
As shown in fig. 7, in some embodiments, the method further comprises:
s500, obtaining the first embodiment. The first embodiment may include a plurality of sub-schemes, such as a first sub-scheme and a second sub-scheme, and each sub-scheme may further include a plurality of review items, such as a first review item and other review items included in the first sub-scheme.
S600, when the first examination project belongs to a preset project set, configuring the first examination project in the first sub-scheme and at least one second sub-scheme in the first embodiment.
The auditing items in the preset item set are auditing items with priorities greater than a preset priority threshold, or auditing items with risk values greater than a preset risk threshold, that is, the auditing items in the preset item set can be key item sets or high-risk items. If the first audit project belongs to the preset project set, determining that the first audit project is a key project or a high-risk project, and at this time, configuring the first audit project in a first sub-scheme in the original first embodiment, and at the same time, configuring the first audit project in at least one second sub-scheme, so as to repeatedly audit the first audit project in a plurality of sub-schemes, ensure that the audit result of the first audit project meets a preset standard, and reduce the risk. For example, in the original quality management plan scheme, a Project Management (PMP) audit item is only configured in the system integration test stage, and after detecting that the PMP audit item belongs to a preset project set, it is determined that the PMP audit item is a key project or a high-risk project, and at this time, the PMP audit item can be set in multiple sub-schemes such as product initialization (MOCK UP), Functional Verification Test (FVT), System Integration Test (SIT), System Verification Test (SVT), batch production test (SOVP), and mass production test (MP), so as to repeatedly audit the PMP audit item in different stages.
In some embodiments, the method further comprises:
configuring the first review item in the first sub-scenario of the first embodiment when the first review item does not belong to the preset set of items.
If the first review item does not belong to the preset item set, it indicates that the first review item does not belong to the important item or the high-risk item, and the first review item may be configured in only the first sub-scenario according to the original first embodiment.
In a specific implementation process, the preset project set may include multiple preset audit projects as key projects or high-risk projects, and there are multiple methods for determining whether the first audit project belongs to the preset project set.
In one embodiment, the method may further comprise:
detecting whether second data exists in the historical data, wherein the second data comprises second auditing data used for representing auditing results of a first auditing item of a second embodiment, and the second auditing data comprises first identification information;
if so, determining that the first trial project belongs to the preset project set.
The second embodiment also includes a first review item, and the second data of the first review item includes the first identification information, that is, in the implementation process of the second embodiment, the review result of the first review item has a problem that the review result does not meet the preset standard.
And if the first audit item is in the implementation process of other embodiments in the historical data, the problem that the audit result does not accord with the preset standard occurs, determining that the first audit item belongs to the preset item set. That is, the preset item set includes the audit items with the audit result not meeting the preset standard in other embodiments.
In another embodiment, the method may further comprise:
detecting whether third data exists in the historical data, wherein the third data comprises third auditing data used for representing auditing results of a first auditing item of a second sub-scheme of the first embodiment, and the third auditing data comprises first identification information;
if so, determining that the first trial project belongs to the preset project set.
The second sub-scheme is a scheme different from the first sub-scheme in the first implementation, the second sub-scheme also includes the first audit item, and the third audit data used for representing the audit result of the first audit item in the second sub-scheme includes the first identification information, so that the audit result of the first audit item in the second sub-scheme does not meet the preset standard. That is, the preset project set includes the audit projects whose audit results do not meet the preset standard in other sub-schemes in the same embodiment, and if the first audit project has a problem that their audit results do not meet the preset standard in other sub-schemes in the first embodiment, it is determined that the first audit project belongs to the preset project set.
In yet another embodiment, the method further comprises:
detecting whether a first auditing project comprises first marking information, wherein the first marking information is used for marking the first auditing project as a new product quality risk management and control (NUDD) project;
if so, determining that the first trial project belongs to the preset project set.
The new product quality risk management and control (NUDD) project is used for identifying, analyzing, coping with and managing early risks of new products, products with special functions, products with high development difficulty and products with larger differences with the previous generation products, so as to reduce the quality risks of the new products. If the first audit project belongs to a new product quality risk control project in a preset project set, the first audit project is configured in a first sub-scheme in the original first implementation scheme, and meanwhile, the first audit project can be configured in at least one second sub-scheme, so that the first audit project can be repeatedly audited in a plurality of sub-schemes, the audit result of the first audit project is ensured to meet a preset standard, and the risk is reduced.
In yet another embodiment, the method further comprises:
detecting whether the first examination project comprises second marking information, wherein the second marking information is used for marking the first examination project as a quality review project (QLL) or a design quality control project (QRD);
if so, determining that the first examination item belongs to a preset item set.
The quality review project is a review of projects completed in the past, and some key events are analyzed, so that teaching and training are drawn from past experiences, and valuable references are provided for the next work. The design quality control project is an auditing project for analyzing, processing, judging, deciding and correcting the whole technical operation process of the design with the aim of ensuring that the design result meets the requirements of human society. If the first review item belongs to a quality review item or a design quality control item in a preset item set, the first review item is configured in a first sub-scheme in the original first embodiment, and meanwhile, the first review item can also be configured in at least one second sub-scheme, so that the first review item can be reviewed repeatedly in a plurality of sub-schemes, the review result of the first review item is ensured to meet a preset standard, and the risk is reduced.
In some embodiments, the preset item set may include a plurality of preset audit items, and during the detection, it is sequentially detected whether the first audit item belongs to each preset audit item. For example, as shown in fig. 8, it may be first detected whether second data exists in the historical data, where the second data includes second audit data used for characterizing the audit result of the first audit item of the second embodiment, and the second audit data includes the first identification information; if second data is detected from the historical data, determining that the first audit project belongs to a preset project set; if no second data is detected from the historical data, detecting whether third data exists in the historical data, wherein the third data comprises third auditing data used for representing auditing results of the first auditing items of a second sub-scheme of the first embodiment, and the third auditing data comprises the first identification information; determining that the first review item belongs to the preset set of items if third data is detected from the historical data; if third data are not detected from the historical data, detecting whether the first audit project comprises first marking information, wherein the first marking information is used for marking the first audit project as a new product quality risk control project; determining that a first review item belongs to the preset item set if first tag information is detected in the first review item; if first marking information is not detected in a first examination project, detecting whether the first examination project comprises second marking information, wherein the second marking information is used for marking the first examination project as a quality copy project or a design quality control project; if second mark information is detected in the first audit project, determining that the first audit project belongs to a preset project set; and finally determining that the first examination project does not belong to a preset project set if the second mark information is not detected in the first examination project. That is, it is required to sequentially detect whether the historical data includes the second data, whether the historical data includes the third data, whether the first audit item includes the first flag information, and whether the first audit item includes the second flag information, and it is determined that the first audit item belongs to the preset item set if one of the four detection items has a positive detection result, and it is determined that the first audit item does not belong to the preset item set only if all of the four detection items are negative.
Fig. 9 is a block diagram of an information processing system according to an embodiment of the present invention, and referring to fig. 9, the information processing system according to the embodiment of the present invention specifically includes:
a first configuration module 10, configured to configure a first task for at least one first user end related to a first examination project based on the first examination project in a first sub-scheme of the first embodiment;
a first obtaining module 20, configured to obtain first data sent by the first user based on the first task, where the first data includes first audit data, and the first audit data is used to represent an audit result of auditing the first audit item;
a second obtaining module 30, configured to obtain, when the first audit data includes first identification information, reference data from historical data based on the first audit data, where the first identification information is used to identify that an audit result of the first audit item does not meet a preset standard;
a second configuration module 40, configured to configure a second task for at least one second user end based on the first audit data, and send the reference data to the second user end to instruct the second user end to update the first data based on the reference data.
In some embodiments, the second obtaining module 30 includes:
a first detecting unit, configured to detect whether second data is included in the historical data, where the second data includes second audit data used to characterize an audit result of the first audit item of a second embodiment, and the second audit data includes the first identification information;
a first obtaining unit configured to obtain the second data when the history data includes the second data; and/or
A second detecting unit, configured to detect whether third data is included in the historical data, where the third data includes third audit data used to characterize an audit result of the first audit item in a second sub-scheme of the first implementation scheme, and the third audit data includes the first identification information;
a second obtaining unit configured to obtain the third data when the history data includes the third data.
In some embodiments, the second obtaining module 30 further includes:
and the sending unit is used for sending first prompt information to at least one third user end when the second data and/or the third data are not detected in the historical data so as to prompt the third user end that the auditing result of the first auditing item is not in accordance with the preset standard.
In some embodiments, the second obtaining unit includes:
a third obtaining unit, configured to obtain second identification information used for identifying product equipment in the first audit data;
and the fourth acquisition unit is used for acquiring the operation and maintenance data of the product equipment from the historical data based on the second identification information.
In some embodiments, the second obtaining unit includes:
a fifth obtaining unit, configured to obtain third identification information used for identifying a product raw material in the first audit data;
a sixth obtaining unit, configured to obtain material information of the product raw material from the historical data based on the third identification information.
In some embodiments, the system further comprises:
a third obtaining module for obtaining the first embodiment;
a third configuration module, configured to configure the first review item in the first sub-scheme and at least one second scheme in the first embodiment when the first review item belongs to the preset set of items.
In some embodiments, the third configuration module is further to:
configuring the first review item in the first sub-scheme of the first embodiment when the first review item does not belong to the preset set of items.
In some embodiments, the third configuration module is further to:
detecting whether second data exists in the historical data, wherein the second data comprises second auditing data used for representing the auditing result of the first auditing item of a second embodiment, and the second auditing data comprises the first identification information;
if so, determining that the first examination project belongs to the preset project set;
in some embodiments, the third configuration module is further to:
detecting whether third data exists in the historical data, wherein the third data comprises third auditing data used for representing auditing results of the first auditing item of a second sub-scheme of the first implementation scheme, and the third auditing data comprises the first identification information;
if so, determining that the first trial project belongs to the preset project set.
In some embodiments, the third configuration module is further to:
detecting whether the first audit project comprises first marking information or not, wherein the first marking information is used for marking the first audit project as a new product quality risk management and control project;
if so, determining that the first trial project belongs to the preset project set.
In some embodiments, the third configuration module is further to:
detecting whether the first examination and verification project comprises second marking information, wherein the second marking information is used for marking the first examination and verification project as a quality copy project or a design quality control project;
if so, determining that the first examination item belongs to a preset item set.
The above embodiments are only exemplary embodiments of the present invention, and are not intended to limit the present invention, and the scope of the present invention is defined by the claims. Various modifications and equivalents may be made by those skilled in the art within the spirit and scope of the present invention, and such modifications and equivalents should also be considered as falling within the scope of the present invention.

Claims (13)

1. An information processing method characterized by comprising:
configuring a first task for at least one first user end related to a first examination project based on the first examination project in a first sub-scheme of the first embodiment;
acquiring first data sent by the first user side based on the first task, wherein the first data comprises first audit data, and the first audit data is used for representing an audit result of auditing the first audit item;
when the first audit data comprises first identification information, acquiring reference data from historical data based on the first audit data, wherein the first identification information is used for identifying that the audit result of the first audit item does not accord with a preset standard;
and configuring a second task for at least one second user terminal based on the first audit data, and sending the reference data to the second user terminal to instruct the second user terminal to update the first data based on the reference data.
2. The information processing method according to claim 1, wherein the obtaining reference data in history data based on the first audit data includes:
detecting whether second data is included in the historical data, wherein the second data comprises second auditing data used for representing auditing results of the first auditing item of a second embodiment, and the second auditing data comprises the first identification information;
if the second data is included in the historical data, acquiring the second data; and/or
Detecting whether third data is included in the historical data, wherein the third data includes third audit data used for representing an audit result of the first audit item in a second sub-scheme of the first implementation scheme, and the third audit data includes the first identification information;
and if the third data is included in the historical data, acquiring the third data.
3. The information processing method according to claim 2, wherein the obtaining of reference data in history data based on the first audit data further comprises:
and if the second data and/or the third data are not detected in the historical data, sending first prompt information to at least one third user end to prompt the third user end that the auditing result of the first auditing item is not in accordance with the preset standard.
4. The information processing method according to claim 1, wherein the obtaining reference data in history data based on the first audit data includes:
acquiring second identification information used for identifying product equipment in the first audit data;
and acquiring operation and maintenance data of the product equipment from the historical data based on the second identification information.
5. The information processing method according to claim 1, wherein the obtaining reference data in history data based on the first audit data includes:
acquiring third identification information for identifying product raw materials in the first audit data;
and acquiring material information of the product raw material from the historical data based on the third identification information.
6. The information processing method according to claim 1, characterized by further comprising:
obtaining the first embodiment;
configuring the first review item in the first sub-scenario and the at least one second sub-scenario of the first embodiment when the first review item belongs to a predetermined set of items.
7. The information processing method according to claim 6, characterized by further comprising:
configuring the first review item in the first sub-scenario of the first embodiment when the first review item does not belong to the preset set of items.
8. The information processing method according to claim 6, characterized by further comprising:
detecting whether second data exists in the historical data, wherein the second data comprises second auditing data used for representing the auditing result of the first auditing item of a second embodiment, and the second auditing data comprises the first identification information;
if so, determining that the first trial project belongs to the preset project set.
9. The information processing method according to claim 6, characterized by further comprising:
detecting whether third data exists in the historical data, wherein the third data comprises third auditing data used for representing auditing results of the first auditing item of a second sub-scheme of the first implementation scheme, and the third auditing data comprises the first identification information;
if so, determining that the first trial project belongs to the preset project set.
10. The information processing method according to claim 6, characterized by further comprising:
detecting whether the first audit project comprises first marking information or not, wherein the first marking information is used for marking the first audit project as a new product quality risk management and control project;
if so, determining that the first trial project belongs to the preset project set.
11. The information processing method according to claim 6, characterized by further comprising:
detecting whether the first examination and verification project comprises second marking information, wherein the second marking information is used for marking the first examination and verification project as a quality copy project or a design quality control project;
if so, determining that the first examination item belongs to a preset item set.
12. An information processing system, comprising:
the system comprises a first configuration module, a second configuration module and a third configuration module, wherein the first configuration module is used for configuring a first task for at least one first user end related to a first examination project based on the first examination project in a first sub scheme of a first embodiment;
a first obtaining module, configured to obtain first data sent by the first user based on the first task, where the first data includes first audit data, and the first audit data is used to represent an audit result of auditing the first audit item;
the second obtaining module is used for obtaining reference data from historical data based on the first audit data when the first audit data comprises first identification information, wherein the first identification information is used for identifying that the audit result of the first audit item does not accord with a preset standard;
and the second configuration module is used for configuring a second task for at least one second user end based on the first audit data and sending the reference data to the second user end so as to instruct the second user end to update the first data based on the reference data.
13. The information handling system of claim 12, wherein the system further comprises:
a third obtaining module for obtaining the first embodiment;
a third configuration module, configured to configure the first review item in the first sub-scheme and at least one second scheme in the first embodiment when the first review item belongs to the preset set of items.
CN201910881771.9A 2019-09-18 2019-09-18 Information processing method and system Active CN110659875B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910881771.9A CN110659875B (en) 2019-09-18 2019-09-18 Information processing method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910881771.9A CN110659875B (en) 2019-09-18 2019-09-18 Information processing method and system

Publications (2)

Publication Number Publication Date
CN110659875A true CN110659875A (en) 2020-01-07
CN110659875B CN110659875B (en) 2022-04-12

Family

ID=69038172

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910881771.9A Active CN110659875B (en) 2019-09-18 2019-09-18 Information processing method and system

Country Status (1)

Country Link
CN (1) CN110659875B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11475493B2 (en) 2019-12-11 2022-10-18 Ul Llc Methods for dynamically assessing applicability of product regulation updates to product profiles
US12056715B2 (en) 2019-05-03 2024-08-06 Ul Llc Technologies for dynamically assessing applicability of product regulations to product protocols

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110010214A1 (en) * 2007-06-29 2011-01-13 Carruth J Scott Method and system for project management
CN106021479A (en) * 2016-05-18 2016-10-12 广东源恒软件科技有限公司 Project key index automatic association method and system
CN106327140A (en) * 2015-06-25 2017-01-11 阿里巴巴集团控股有限公司 Method and device for monitoring data modification
CN107291922A (en) * 2017-06-29 2017-10-24 深圳市佰仟金融服务有限公司 A kind of data distributing method and device
CN107368951A (en) * 2017-06-28 2017-11-21 国网江苏省电力公司检修分公司 A kind of power grid enterprises' technological transformation Overhaul Quality management and control honesty Warning System and its operation method
CN109034727A (en) * 2018-06-28 2018-12-18 上海卓繁信息技术股份有限公司 Self-service electronic government affairs processing method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110010214A1 (en) * 2007-06-29 2011-01-13 Carruth J Scott Method and system for project management
CN106327140A (en) * 2015-06-25 2017-01-11 阿里巴巴集团控股有限公司 Method and device for monitoring data modification
CN106021479A (en) * 2016-05-18 2016-10-12 广东源恒软件科技有限公司 Project key index automatic association method and system
CN107368951A (en) * 2017-06-28 2017-11-21 国网江苏省电力公司检修分公司 A kind of power grid enterprises' technological transformation Overhaul Quality management and control honesty Warning System and its operation method
CN107291922A (en) * 2017-06-29 2017-10-24 深圳市佰仟金融服务有限公司 A kind of data distributing method and device
CN109034727A (en) * 2018-06-28 2018-12-18 上海卓繁信息技术股份有限公司 Self-service electronic government affairs processing method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李静: "省级重点项目库管理系统的设计与实现", 《中国优秀博硕士学位论文全文数据库(硕士)》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US12056715B2 (en) 2019-05-03 2024-08-06 Ul Llc Technologies for dynamically assessing applicability of product regulations to product protocols
US11475493B2 (en) 2019-12-11 2022-10-18 Ul Llc Methods for dynamically assessing applicability of product regulation updates to product profiles

Also Published As

Publication number Publication date
CN110659875B (en) 2022-04-12

Similar Documents

Publication Publication Date Title
CN110659875B (en) Information processing method and system
CN109523225A (en) A kind of measure of managing contract, system and terminal device
CN110704471B (en) Material management method, material management system and electronic equipment
CN116503207B (en) Building construction safety monitoring system and method based on Internet
CN109840183B (en) Data center grading early warning method and device and storage medium
CN115309913A (en) Deep learning-based financial data risk identification method and system
CN113743892A (en) Tracking processing method and device for power grid infrastructure problem, computer equipment and medium
CN113568833A (en) Test case determination method and device, computer equipment and readable storage medium
CN113313280A (en) Cloud platform inspection method, electronic equipment and nonvolatile storage medium
CN114139626A (en) Power communication fault analysis method and device, terminal equipment and medium
CN115204614A (en) Task allocation method and device
KR20150137704A (en) Management system and method for project
CN113657788A (en) Enterprise safety production standardization intelligent supervision system and method
CN109787887A (en) Warning information management method, device, computer installation and readable storage medium storing program for executing
CN111062827B (en) Engineering supervision method based on artificial intelligence mode
CN114049095A (en) Infrastructure construction business monitoring method, device, equipment and storage medium
CN111427900B (en) Label library updating method, device, equipment and readable storage medium
CN112256594A (en) Project information processing method and device and electronic equipment
CN110275812A (en) The method and terminal device of faulted-phase judgment
Hirata Information model for quality management methods in e-learning
JP2021068010A (en) Plan generation system construction support device, and plan generation system construction support method
CN115277487B (en) Communication processing system of electronic terminal
CN117993686B (en) Logistics personnel scheduling method and system based on positioning device
CN114201145A (en) Risk demand classification detection method and system based on configurated semantic recognition
US20020120483A1 (en) Method for dynamically identifying operation entity and system thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant