CN106327140A CN201510358754.9A CN201510358754A CN106327140A CN 106327140 A CN106327140 A CN 106327140A CN 201510358754 A CN201510358754 A CN 201510358754A CN 106327140 A CN106327140 A CN 106327140A
Authority
CN
China
Prior art keywords
data block
examination
verification
flow tasks
user
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510358754.9A
Other languages
Chinese (zh)
Other versions
CN106327140B (en
Inventor
姜赟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alibaba Huabei Technology Co., Ltd
Original Assignee
Alibaba Group Holding Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alibaba Group Holding Ltd filed Critical Alibaba Group Holding Ltd
Priority to CN201510358754.9A priority Critical patent/CN106327140B/en
Publication of CN106327140A publication Critical patent/CN106327140A/en
Application granted granted Critical
Publication of CN106327140B publication Critical patent/CN106327140B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing And Monitoring For Control Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the invention discloses a method and a device for monitoring data modification. The method comprises the steps of: acquiring a flow task and a corresponding task identifier; judging whether a history audit record of the flow task is stored or not according to the task identifier; if yes, determining the flow task as a flow task which is submitted to be audited for the Nth time, acquiring data content of an audited data block, an audit result and a user identifier corresponding relationship in an auditing process of the flow task which is submitted to be audited for a (N-1)th time according to the history audit record, determining same blocks in the flow task submitted to be audited for the Nth time and the flow task submitted to be audited for the (N-1)th time, and comparing whether data content in the same data blocks is the same or not; and if yes, endowing the same data blocks with corresponding audit results in the name of corresponding user identifiers in the Nth audit of the flow task. Through the adoption of the method, when the flow task is re-submitted to be audited, a condition that an unmodified data block is sent to a user again for auditing is avoided, so that the audit efficiency of re-audit is improved.

Description

A kind of monitoring method and apparatus to data modification
Technical field
The present invention relates to data processing field, particularly relate to a kind of monitoring method to data modification and dress Put.
Background technology
In the review process to flow tasks, the data of flow tasks can be divided into one or more data Block, whether data block will be met the requirements by corresponding user examination & verification.Multiple data block is included in flow tasks In the case of, if a data block meets examination & verification requirement, then the examination & verification of this data block is passed through, but if this In business flow process, any one data block does not meets examination & verification requirement, and the most whole flow tasks will be denied, and quilt Return to the initiator of this flow tasks.The data block not meeting examination & verification requirement can be repaiied by initiator Change, and submit to amended flow tasks to re-start examination & verification.
When amended flow tasks is audited again, traditional way is each by this flow tasks Individual data block is assigned to corresponding user and is again audited, owing to generally initiator may simply repair Changed a part of data block in this flow tasks, then in review process, in this flow tasks not by The data block of amendment also needs to again be audited by user one time, thus loses time and can drag slow overall examination & verification Speed, causes the efficiency again audited low.
Summary of the invention
In order to solve above-mentioned technical problem, the invention provides a kind of monitoring method to data modification and dress Put, so that when flow tasks is audited again, data block unmodified in described flow tasks being composed Give auditing result during last examination & verification, improve the review efficiency again audited.
The embodiment of the invention discloses following technical scheme:
A kind of monitoring method to data modification, described method includes:
Obtaining flow tasks and corresponding task identification, described flow tasks includes at least one data block;
Judge whether to save the history audit logging of described flow tasks according to described task identification;
If so, determine that described flow tasks is the flow tasks that n-th submits examination & verification to, according to described history Audit logging obtains described flow tasks and submits censored data block in the review process audited at the N-1 time The corresponding relation of data content, auditing result and ID, it is right that described ID is used for identifying Described data block makes the user of described auditing result, and N is the integer more than or equal to 2;
Data block identifier according to described censored data block determines that n-th submits the flow tasks of examination & verification to Data block identical in the flow tasks of examination & verification is submitted to the N-1 time, data block identical described in comparison Data content is the most identical;
If it is identical, according to right from described history audit logging of the data block identifier of described censored data block The middle auditing result obtaining correspondence and ID should be related to, in the n-th of described flow tasks is audited, Described identical data block is given with the name of the ID of described correspondence the examination & verification knot of described correspondence Really.
Optionally, the described data block identifier according to described censored data block determines that n-th submission is examined The flow tasks of core submits data block identical in the flow tasks of examination & verification to the N-1 time, phase described in comparison With the data content of data block the most identical, also include:
If differing, according to described flow tasks being audited setting and the number of described censored data block Determine in the n-th review process of described flow tasks according to block identification, audit described identical data block Examination & verification user or examination & verification user's group;
The described identical data block of transmission is organized for auditing to described examination & verification user or examination & verification user.
Optionally, in the N-1 time review process to described flow tasks, if described flow tasks institute Including the first data block auditing result for examination & verification do not pass through, then the n-th in described flow tasks carries Handing in review process, the described data block identifier according to described censored data block determines that n-th is submitted to The flow tasks of examination & verification submits data block identical in the flow tasks of examination & verification to the N-1 time, described in comparison The data content of identical data block is the most identical, including:
If the data content of described first data block during described the N-1 time examination & verification and n-th are audited Comparison result is identical, according to the data block identifier of described censored data block from described history audit logging Corresponding relation in obtain correspondence auditing result and ID, described flow tasks n-th examine In core, give examining of described correspondence to described identical data block with the name of the ID of described correspondence Core result, including:
In the data block identifier according to described first data block corresponding relation from described history audit logging The auditing result and first obtaining described first data block of the data content of corresponding described first data block is used Family identifies;
Give, with the name that described first user identifies, the examination & verification knot that examination & verification is not passed through to described first data block Really.
Optionally, in the N-1 time review process to described flow tasks, if described flow tasks institute Including the auditing result of the second data block be that examination & verification is passed through, then the n-th in described flow tasks is submitted to In review process, the described data block identifier according to described censored data block is determined that n-th is submitted to and is examined The flow tasks of core submits data block identical in the flow tasks of examination & verification to the N-1 time, phase described in comparison With the data content of data block the most identical, including:
If the data content of described second data block during described the N-1 time examination & verification and n-th are audited Comparison result is for differing, and the examination & verification of described flow tasks is arranged and described audited number by described basis Determine in the n-th review process of described flow tasks according to the data block identifier of block, audit described identical Data block examination & verification user or examination & verification user's group, including:
Examination & verification according to described flow tasks is arranged and the data block identifier of described second data block determines careful The examination & verification user of the second data block described in core or examination & verification user's group.
Optionally, before described acquisition flow tasks and corresponding task identification, also include:
Obstructed out-of-date, by described flow tasks at described N-1 in the N-1 time examination & verification of described flow tasks The corresponding relation of the data content of censored data block, auditing result and ID in secondary review process Cover and update in described history audit logging.
Optionally, if the auditing result of the n-th examination & verification of described flow tasks is not passed through for examination & verification, also Including:
By described flow tasks in described n-th review process the data content of censored data block, examine The corresponding relation of core result and ID covers and updates in described history audit logging.
A kind of supervising device to data modification, described device includes:
First acquiring unit, for obtaining flow tasks and corresponding task identification, described flow tasks bag Include at least one data block;
Judging unit, for judging whether to save the history of described flow tasks according to described task identification Audit logging;If so, determine that described flow tasks is the flow tasks that n-th submits examination & verification to, trigger the Two acquiring units;
Described second acquisition unit, for obtaining described flow tasks the according to described history audit logging Submit the data content of censored data block in the review process of examination & verification, auditing result and user's mark for N-1 time to The corresponding relation known, described data block is made the use of described auditing result by described ID for mark Family, N is the integer more than or equal to 2;
According to the data block identifier of described censored data block, comparing unit, for determining that n-th is submitted to The flow tasks of examination & verification submits data block identical in the flow tasks of examination & verification to the N-1 time, described in comparison The data content of identical data block is the most identical;If identical, trigger examination & verification unit;
Described examination & verification unit, examines from described history for the data block identifier according to described censored data block The corresponding relation of core record obtains auditing result and the ID of correspondence, at the N of described flow tasks In secondary examination & verification, give described correspondence to described identical data block with the name of the ID of described correspondence Auditing result.
Optionally, also include:
Determine unit, if for the comparison result of described comparing unit for differing, according to described flow process The examination & verification of task is arranged and the data block identifier of described censored data block determines in described flow tasks In n-th review process, audit examination & verification user or examination & verification user's group of described identical data block;
Transmitting element, sends described identical data block use for organizing to described examination & verification user or examination & verification user In examination & verification.
Optionally, in the N-1 time review process to described flow tasks, if described flow tasks institute Including the first data block auditing result for examination & verification do not pass through, then the n-th in described flow tasks carries Hand in review process, including:
If the comparison result of described comparing unit is identical, described examination & verification unit is specifically for according to described The data block identifier of one data block corresponding relation from described history audit logging obtains corresponding described the The auditing result of described first data block of the data content of one data block and first user mark;To described The name that first data block identifies with described first user gives the auditing result that examination & verification is not passed through.
Optionally, in the N-1 time review process to described flow tasks, if described flow tasks institute Including the auditing result of the second data block be that examination & verification is passed through, then the n-th in described flow tasks is submitted to In review process, including:
If the comparison result of described comparing unit is for differing, described 3rd acquiring unit is specifically for basis The data block identifier of described second data block corresponding relation from described history audit logging obtains correspondence Second ID of the data content of described second data block;
Described transmitting element specifically for sending described according to described second ID to described second user Second data block is used for auditing.
Optionally, also include:
Updating block, for before triggering described first acquiring unit, at the N-1 of described flow tasks Secondary examination & verification is obstructed out-of-date, by described flow tasks censored data block in described the N-1 time review process Data content, auditing result and ID corresponding relation cover update to described history examination & verification note In record.
Optionally, if the auditing result of the n-th examination & verification of described flow tasks not being passed through for examination & verification, institute State updating block to be additionally operable to described flow tasks censored data block in described n-th review process The corresponding relation of data content, auditing result and ID covers and updates to described history audit logging In.
By technique scheme it can be seen that preserve flow tasks in the obstructed out-of-date history examination & verification note of examination & verification According to the task identification that the flow tasks obtained is corresponding, record, if judging that described flow tasks has history and examines Core record, it may be determined that described flow tasks is the non-flow process submitting examination & verification first to and task, according to described History audit logging obtains described flow tasks and once submits to examination & verification namely to submit examination & verification to the N-1 time upper Review process in the data content of censored data block, auditing result and the corresponding relation of ID, And according to the data block identifier of described censored data block determine n-th submit to examination & verification flow tasks and Submit data block identical in the flow tasks of examination & verification to the N-1 time, the number of data block identical described in comparison The most identical according to content, when comparison result is identical, according to the data block identifier of described censored data block Auditing result and the ID of correspondence is obtained, described from the corresponding relation of described history audit logging In the n-th examination & verification of flow tasks, to described identical data block with the name of the ID of described correspondence Justice gives the auditing result of described correspondence.Thus when flow tasks resubmits examination & verification, by than logarithm Auditing result when can be audited by directly giving the last time according to the data block not being modified of content discovery, And need not again issue user's examination & verification, save audit time, improve the review efficiency again audited.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to reality Execute the required accompanying drawing used in example or description of the prior art to be briefly described, it should be apparent that below, Accompanying drawing in description is only some embodiments of the present invention, for those of ordinary skill in the art, On the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
A kind of method flow diagram that data modification is monitored method that Fig. 1 provides for the embodiment of the present invention;
A kind of method flow diagram that data modification is monitored method that Fig. 2 provides for the embodiment of the present invention;
The structure drawing of device of a kind of supervising device to data modification that Fig. 3 provides for the embodiment of the present invention;
The structure drawing of device of a kind of supervising device to data modification that Fig. 4 provides for the embodiment of the present invention.
Detailed description of the invention
For making the purpose of the embodiment of the present invention, technical scheme and advantage clearer, below in conjunction with this Accompanying drawing in bright embodiment, is explicitly described the technical scheme in the embodiment of the present invention, it is clear that Described embodiment is a part of embodiment of the present invention rather than whole embodiments.Based on the present invention In embodiment, the institute that those of ordinary skill in the art are obtained under not making creative work premise There are other embodiments, broadly fall into the scope of protection of the invention.
When flow tasks is denied, the initiator of flow tasks can be to not meeting the data that examination & verification requires Block is modified, and submits to amended flow tasks to re-start examination & verification.Traditional examination & verification again be by Each data block of this flow tasks is assigned to corresponding user and is again audited, due to generally Initiator may simply have modified a part of data block in this flow tasks, then in review process, should The data block not being modified in flow tasks also needs to again be audited by user one time, thus loses time And slow overall examination & verification speed can be dragged, cause the efficiency again audited low.
To this end, embodiments provide a kind of monitoring method and apparatus to data modification, preserve stream Journey task is auditing obstructed out-of-date history audit logging, if according to task corresponding to flow tasks obtained Mark judges that described flow tasks has history audit logging, it may be determined that described flow tasks is non-head The secondary flow process submitting examination & verification to and task, obtain described flow tasks upper one according to described history audit logging Secondary submit to examination & verification namely the N-1 time submit to audit review process in censored data block data content, Auditing result and the corresponding relation of ID, and according to the data block identifier of described censored data block Determine that n-th submits to the flow tasks of examination & verification to submit to the N-1 time in the flow tasks of examination & verification identical Data block, the data content of data block identical described in comparison is the most identical, when comparison result is identical, Data block identifier according to described censored data block obtains from the corresponding relation of described history audit logging Corresponding auditing result and ID, in the n-th of described flow tasks is audited, to described identical Data block give the auditing result of described correspondence with the name of the ID of described correspondence.Thus work as stream When journey task resubmits examination & verification, can be by by the data block not being modified of comparison data content discovery Directly give auditing result during last time examination & verification, and need not again issue user's examination & verification, save examination & verification Time, improve the review efficiency again audited.
Embodiment one
A kind of method flow diagram that data modification is monitored method that Fig. 1 provides for the embodiment of the present invention, Described method includes:
S101: obtain flow tasks and corresponding task identification, described flow tasks includes at least one number According to block.
Illustrate, described task identification and described flow tasks one_to_one corresponding.Even if described flow tasks Certain is once audited not by being returned to the initiator of described flow tasks, and initiator revises described flow process and appoints After business to, amended described flow tasks is submitted again examination & verification, amended described flow tasks Task identification is identical with the task identification of the described flow tasks before amendment.It is to say, same flow process Task, is denied even across repeatedly returning, and when again submitting examination & verification to after amendment, does not even revise weight During new submission examination & verification, the task identification of described flow tasks will not change.
Described data block can be understood as the data acquisition system classified in advance, and different data blocks can include not Data acquisition system with type.Such as flow tasks 1 can include financial data block and law works data block, wealth Business data block can include that data acquisition system relevant to finance in flow tasks 1, law works data block can wrap Include data acquisition system relevant to law works in flow tasks 1.Data in flow tasks the most i.e. belong to In data block 1, fall within data block 2.In a different manner flow process can be appointed according to different demands Business is divided into different data blocks, and this is not limited by the present invention.Finance number can be included with flow tasks 1 As a example by block and law works data block, financial data block can be sent to financial staff's examination & verification, law works data block Can be sent to legal affairs personnel's examination & verification, the examination & verification of any one data block is not by causing whole flow process to be appointed Business is denied, and is returned the initiator of described flow tasks 1.
S102: judge whether to save the history audit logging of described flow tasks according to described task identification. If so, S103 is performed.
Illustrate, in the embodiment of the present invention, when flow tasks in a review process due to certain reason Cause the examination & verification of this flow tasks obstructed out-of-date, described flow tasks can be preserved in this review process The audit logging completed in history audit logging, which includes the relevant of the data block audited Data.
It is to say, when finding that a flow tasks has history audit logging, then this flow tasks belongs to In the non-flow tasks submitting examination & verification first to.If judging that not preserving described flow process appoints according to described task identification The history audit logging of business, then can confirm that described flow tasks is to submit the flow tasks of examination & verification first to, Can be according to the processing mode of the tradition flow tasks for submitting to first, examining according to described flow tasks Core is arranged to be sent to data block different examination & verification users and audits, and idiographic flow repeats no more here.
S103: determine that described flow tasks is the flow tasks that n-th submits examination & verification to, according to described history Audit logging obtains described flow tasks and submits censored data block in the review process audited at the N-1 time The corresponding relation of data content, auditing result and ID, it is right that described ID is used for identifying Described data block makes the user of described auditing result, and N is the integer more than or equal to 2.
Owing to described flow tasks has the history audit logging of correspondence, it may be determined that described flow tasks is non- Submit the flow tasks of examination & verification first to.For described history audit logging, optionally, perform S101 it Before, also include:
Obstructed out-of-date, by described flow tasks at described N-1 in the N-1 time examination & verification of described flow tasks The corresponding relation of the data content of censored data block, auditing result and ID in secondary review process Cover and update in described history audit logging.
It is to say, preserve in described history audit logging is last examination & verification, and obstructed in examination & verification Completed examining content before crossing.Such as flow tasks 2 includes 10 data blocks, when examination & verification for the first time, Audit wherein after 4 data block such as data blocks 1 to 4, examination & verification has occurred not when auditing data block 5 Pass through.It should be noted that when examination & verification the user not limiting examination & verification different pieces of information block is the most different, Such as that examination & verification data block 1 and 2 is user 1, and examination & verification data block 3 to 5 is user 2.Described flow process The history audit logging 2 of task 2 correspondence can include five correspondences that five censored data blocks are corresponding Relation, respectively corresponding relation 1: the data content of data block 1, auditing result are by with user's 1 ID;Corresponding relation 2: the data content of data block 2, auditing result are by the use with user 1 Family identifies;Corresponding relation 3: the data content of data block 3, auditing result are by the user with user 2 Mark;Corresponding relation 4: the data content of data block 4, auditing result are to be marked by the user with user 2 Know;Corresponding relation 5: the data content of data block 5, auditing result are not pass through and user's mark of user 2 Know.
In the n-th of described flow tasks is audited, in fact it could happen that the number that described flow tasks includes It was not reviewed in the N-1 time examination & verification of described flow tasks according to block.For this class data block, Execution can be arranged according to the examination & verification of described flow tasks in the n-th of described flow tasks is audited to examine Core, this is repeated no more by the present invention.Include saying as a example by the example of 10 data blocks by above-mentioned flow tasks 2 Bright, when for the first time examination & verification, audit wherein after 4 data block such as data blocks 1 to 4, in examination & verification Occur during data block 5 that examination & verification is not passed through.So when second time auditing flow task 2, for data block 6 To data block 10, owing to there is no record in history audit logging 2, therefore can be according to flow tasks 2 Examination & verification setting processes, and data block 6 to data block 10 is distributed to examination & verification user or the examination & verification of correspondence User's group is audited.
It is also to be noted that in embodiments of the present invention, the user that described ID is identified is permissible Examination & verification user for correspondence auditing flow task, it is also possible to the examination & verification for correspondence auditing flow task is used An examination & verification user in the group of family.Such as, data block a, data block b and the data that flow tasks 3 includes Block c, in examination & verification link, data block a and data block b by one group of user include user a, user b and User c audits.Data block c is audited by user c and user d.It is to be understood that data block a can be by In user a, user b and user c, any one the representative as this group user is audited and obtains examination & verification knot Really, if user a to data block a examination & verification pass through, then the auditing result of data block a be by and described user The user identified is user a.User c can represent user a, user b and the user of user c Data block a or data block b are audited and respectively obtain auditing result by group, and user c can also represent user c With user's group of user d data block c audited and obtain auditing result.
S104: determine that n-th submits the stream of examination & verification to according to the data block identifier of described censored data block Journey task submits data block identical in the flow tasks of examination & verification to the N-1 time, number identical described in comparison Data content according to block is the most identical.If identical, perform S105.
S105: according to the data block identifier of described censored data block from the correspondence of described history audit logging Relation obtains auditing result and the ID of correspondence, in the n-th of described flow tasks is audited, Described identical data block is given with the name of the ID of described correspondence the examination & verification knot of described correspondence Really.
Illustrate, the data block identifier of described data block and described data block one_to_one corresponding.Even if it is described Flow tasks is once audited not by being returned to the initiator of described flow tasks, and initiator revises institute After stating the data content of data block in flow tasks, amended described flow tasks is submitted to again The data block identifier phase of this data block before examination & verification, the data block identifier of this data block amended and amendment With.It is to say, the same data block in flow tasks, even if quilt during repeatedly being returned Repeatedly revise, even do not revise, when the flow tasks belonging to this data block is resubmited examination & verification, should The data block identifier of data block will not change.
Continue to illustrate as a example by the example of above-mentioned auditing flow task 2, audit described stream in second time During journey task 2, according to the data block of five censored data blocks of record in described history audit logging 2 Identify operation of comparing.It is possible that four kinds of different comparison situations, it is right to will focus in the present embodiment Two of which situation illustrates.
For the first situation, such as data block 1 and data block 1 in examination & verification for the first time in second time examination & verification Data content identical, the most do not revise, then second time examination & verification in can be directly to data block 1 The auditing result that examination & verification is passed through is given with the name of user 1.
In the first case, the last time can be allowed to audit that pass through and the most unmodified number in auditing The auditing result that examination & verification is passed through is directly obtained according to block.Without the most again auditing, save second time and examined The time of core.
For the second situation, such as data block 5 and data block 5 in examination & verification for the first time in second time examination & verification Data content identical, the most do not revise, then second time examination & verification in can be directly to data block 5 Give with the name of user 2 and audit unsanctioned auditing result.
In the second situation, can find rapidly that the sponsor of described flow tasks 2 does not has upper one The data block 5 that secondary examination & verification goes wrong carries out any adaptation, the most directly gives data block 5 and examines The auditing result that core does not passes through, eliminates process data block 5 again audited.Thus without continuation The second time of described flow tasks 2 is audited, and described flow process is appointed by the reason do not passed through with the second examination & verification The initiator of described flow tasks is returned in business 2.Improve the review efficiency of second time examination & verification.
Even if it should be noted that in the case of flow tasks only includes a data block, if to this stream The N-1 time examination & verification of journey task is not passed through, and finds that initiator is to this stream when n-th is audited by comparison When the only data block of journey task is not modified, can directly judge this flow tasks n-th Examination & verification is not passed through, and eliminates and again this only data block is dealt into the process that user audits again, Improve the review efficiency again audited.
In sum, preserve flow tasks and audit obstructed out-of-date history audit logging, if according to acquisition Task identification corresponding to flow tasks judge that described flow tasks has history audit logging, can be true Fixed described flow tasks is the non-flow process submitting examination & verification first to and task, obtains according to described history audit logging Take described flow tasks upper once submit to examination & verification namely the N-1 time submit to audit review process in The examination & verification data content of data block, auditing result and the corresponding relation of ID, and according to described The data block identifier of examination & verification data block determines that n-th is submitted the flow tasks of examination & verification to and submits to for the N-1 time Identical data block in the flow tasks of examination & verification, the data content of data block identical described in comparison whether phase With, when comparison result is identical, examine from described history according to the data block identifier of described censored data block The corresponding relation of core record obtains auditing result and the ID of correspondence, at the N of described flow tasks In secondary examination & verification, give described correspondence to described identical data block with the name of the ID of described correspondence Auditing result.Thus when flow tasks resubmits examination & verification, by comparison data content discovery not The auditing result when data block being modified can be audited by directly giving the last time, and need not again issue User audits, and has saved audit time, has improve the review efficiency again audited.
Embodiment two
In embodiment S104 corresponding to Fig. 1 in addition to being likely to occur the comparison result that comparison is identical, it is also possible to The comparison result that comparison differs occurs.
On the basis of embodiment corresponding to Fig. 1, the one that Fig. 2 provides for the embodiment of the present invention is to data The method flow diagram of the monitoring method of amendment, described method includes:
S201: obtain flow tasks and corresponding task identification, described flow tasks includes at least one number According to block.
S202: judge whether to save the history audit logging of described flow tasks according to described task identification. If so, S203 is performed.
S203: determine that described flow tasks is the flow tasks that n-th submits examination & verification to, according to described history Audit logging obtains described flow tasks and submits censored data block in the review process audited at the N-1 time The corresponding relation of data content, auditing result and ID, it is right that described ID is used for identifying Described data block makes the user of described auditing result, and N is the integer more than or equal to 2.
S204: determine that n-th submits the stream of examination & verification to according to the data block identifier of described censored data block Journey task submits data block identical in the flow tasks of examination & verification to the N-1 time, number identical described in comparison Data content according to block is the most identical.If identical, perform S205.If differing, perform S206.
S205: according to the data block identifier of described censored data block from the correspondence of described history audit logging Relation obtains auditing result and the ID of correspondence, in the n-th of described flow tasks is audited, Described identical data block is given with the name of the ID of described correspondence the examination & verification knot of described correspondence Really.
S206: according to described flow tasks being audited setting and the data block of described censored data block Mark determines in the n-th review process of described flow tasks, audits examining of described identical data block Core user or examination & verification user's group.
S207: organize the described identical data block of transmission for auditing to described examination & verification user or examination & verification user.
Illustrate as a example by continuing the example of the auditing flow task 2 in embodiment one, examine in second time Described in core during flow tasks 2, according to five censored data blocks of record in described history audit logging 2 Data block identifier compare operation.For it is possible that four kinds of different comparison situations, embodiment Have been described with two of which situation in one, the present embodiment will focus on remaining two kinds of situations are said Bright.
For the third situation, such as data block 3 and data block 3 in examination & verification for the first time in second time examination & verification Data content differ, namely occur in that amendment, then second time examination & verification in will appoint according to flow process The examination & verification of business 2 is arranged, and determines examination & verification user or examination & verification user's group of examination & verification data block 3, to determining The described examination & verification user gone out or examination & verification user organize transmission data block 3 for auditing.
In the third situation, can find rapidly that the last time is audited by the sponsor of described flow tasks 2 " additionally " amendment that the data block 3 not gone wrong is carried out.Thus avoid may be in second time examination & verification In because the appearance of accident that caused of this data block 3 being modified.It is effectively increased the peace again audited Quan Xing.
For the 4th kind of situation, such as data block 5 and data block 5 in examination & verification for the first time in second time examination & verification Data content differ, namely occur in that amendment, then second time examination & verification in will appoint according to flow process The examination & verification of business 2 is arranged, and determines examination & verification user or examination & verification user's group of examination & verification data block 5, to determining The described examination & verification user gone out or examination & verification user organize transmission data block 5 for auditing.
In the 4th kind of situation, can find rapidly that the sponsor of described flow tasks 2 is to the last time The data block 5 that examination & verification goes wrong is modified, and uses to examination & verification user or the examination & verification of corresponding data block 5 Family group sends amended data block 5, can audit whether amended data block 5 meets examination & verification requirement. Thus effectively promote the carrying out of second time examination & verification.
It should be noted that optional, if to the auditing result of the n-th examination & verification of described flow tasks being Examination & verification is not passed through, and also includes:
S208: by described flow tasks in described n-th review process in the data of censored data block The corresponding relation of appearance, auditing result and ID covers and updates in described history audit logging.
Before performing S208, preserve in described history audit logging is that described flow tasks is at N-1 The data content of censored data block, auditing result and ID in the secondary review process submitting examination & verification to Corresponding relation, performing after S208, owing to covering the action type updated, described history audit logging Middle preservation is described flow tasks number of censored data block in n-th submits the review process of examination & verification to According to content, auditing result and the corresponding relation of ID.It is to say, described history audit logging Middle preservation be a up-to-date auditing result be the examination & verification do not passed through, in examination & verification by front completed Examining content.
As can be seen from the above-described embodiment, submitted to flow tasks and the N-1 of examination & verification by comparison n-th The data content of data block identical in the secondary flow tasks submitting examination & verification to, it appeared that to by examination & verification The amendment of data block, this amendment that should not occur, thus provides again in review process in other words Safety.And when amendment not occurring by the data block of examination & verification in the N-1 time examination & verification, by these data Block is sent to user and audits, and thus effectively promotes non-the carrying out audited first.
Embodiment three
The structure drawing of device of a kind of supervising device to data modification that Fig. 3 provides for the embodiment of the present invention, Described device includes:
First acquiring unit 301, for obtaining flow tasks and corresponding task identification, described flow tasks Including at least one data block.
Illustrate, described task identification and described flow tasks one_to_one corresponding.Even if described flow tasks Certain is once audited not by being returned to the initiator of described flow tasks, and initiator revises described flow process and appoints After business to, amended described flow tasks is submitted again examination & verification, amended described flow tasks Task identification is identical with the task identification of the described flow tasks before amendment.It is to say, same flow process Task, is denied even across repeatedly returning, and when again submitting examination & verification to after amendment, does not even revise weight During new submission examination & verification, the task identification of described flow tasks will not change.
Described data block can be understood as the data acquisition system classified in advance, and different data blocks can include not Data acquisition system with type.Such as flow tasks 1 can include financial data block and law works data block, wealth Business data block can include that data acquisition system relevant to finance in flow tasks 1, law works data block can wrap Include data acquisition system relevant to law works in flow tasks 1.Data in flow tasks the most i.e. belong to In data block 1, fall within data block 2.In a different manner flow process can be appointed according to different demands Business is divided into different data blocks, and this is not limited by the present invention.Finance number can be included with flow tasks 1 As a example by block and law works data block, financial data block can be sent to financial staff's examination & verification, law works data block Can be sent to legal affairs personnel's examination & verification, the examination & verification of any one data block is not by causing whole flow process to be appointed Business is denied, and is returned the initiator of described flow tasks 1.
Judging unit 302, for judging whether to save going through of described flow tasks according to described task identification History audit logging;If so, determine that described flow tasks is the flow tasks that n-th submits examination & verification to, trigger Second acquisition unit 303.
Illustrate, in the embodiment of the present invention, when flow tasks in a review process due to certain reason Cause the examination & verification of this flow tasks obstructed out-of-date, described flow tasks can be preserved in this review process The audit logging completed in history audit logging, which includes the relevant of the data block audited Data.
It is to say, when finding that a flow tasks has history audit logging, then this flow tasks belongs to In the non-flow tasks submitting examination & verification first to.If judging that not preserving described flow process appoints according to described task identification The history audit logging of business, then can confirm that described flow tasks is to submit the flow tasks of examination & verification first to, Can be according to the processing mode of the tradition flow tasks for submitting to first, examining according to described flow tasks Core is arranged to be sent to data block different examination & verification users and audits, and idiographic flow repeats no more here.
Described second acquisition unit 303, exists for obtaining described flow tasks according to described history audit logging Submit the data content of censored data block, auditing result and use in the review process of examination & verification for N-1 time to The corresponding relation of family mark, described data block is made described auditing result for mark by described ID User, N is the integer more than or equal to 2.
Owing to described flow tasks has the history audit logging of correspondence, it may be determined that described flow tasks is non- Submit the flow tasks of examination & verification first to.For described history audit logging, optionally, corresponding to Fig. 3 On the basis of embodiment, a kind of supervising device to data modification that Fig. 4 provides for the embodiment of the present invention Structure drawing of device, including:
Updating block 401, for, before triggering described first acquiring unit 301, appointing in described flow process Business the N-1 time examination & verification obstructed out-of-date, by described flow tasks in described the N-1 time review process The corresponding relation of the examination & verification data content of data block, auditing result and ID covers and updates to described In history audit logging.
It is to say, preserve in described history audit logging is last examination & verification, and obstructed in examination & verification Completed examining content before crossing.Such as flow tasks 2 includes 10 data blocks, when examination & verification for the first time, Audit wherein after 4 data block such as data blocks 1 to 4, examination & verification has occurred not when auditing data block 5 Pass through.It should be noted that when examination & verification the user not limiting examination & verification different pieces of information block is the most different, Such as that examination & verification data block 1 and 2 is user 1, and examination & verification data block 3 to 5 is user 2.Described flow process The history audit logging 2 of task 2 correspondence can include five correspondences that five censored data blocks are corresponding Relation, respectively corresponding relation 1: the data content of data block 1, auditing result are by with user's 1 ID;Corresponding relation 2: the data content of data block 2, auditing result are by the use with user 1 Family identifies;Corresponding relation 3: the data content of data block 3, auditing result are by the user with user 2 Mark;Corresponding relation 4: the data content of data block 4, auditing result are to be marked by the user with user 2 Know;Corresponding relation 5: the data content of data block 5, auditing result are not pass through and user's mark of user 2 Know.
In the n-th of described flow tasks is audited, in fact it could happen that the number that described flow tasks includes It was not reviewed in the N-1 time examination & verification of described flow tasks according to block.For this class data block, Execution can be arranged according to the examination & verification of described flow tasks in the n-th of described flow tasks is audited to examine Core, this is repeated no more by the present invention.Include saying as a example by the example of 10 data blocks by above-mentioned flow tasks 2 Bright, when for the first time examination & verification, audit wherein after 4 data block such as data blocks 1 to 4, in examination & verification Occur during data block 5 that examination & verification is not passed through.So when second time auditing flow task 2, for data block 6 To data block 10, owing to there is no record in history audit logging 2, therefore can be according to flow tasks 2 Examination & verification setting processes, and data block 6 to data block 10 is distributed to examination & verification user or the examination & verification of correspondence User's group is audited.
It is also to be noted that in embodiments of the present invention, the user that described ID is identified is permissible Examination & verification user for correspondence auditing flow task, it is also possible to the examination & verification for correspondence auditing flow task is used An examination & verification user in the group of family.Such as, data block a, data block b and the data that flow tasks 3 includes Block c, in examination & verification link, data block a and data block b by one group of user include user a, user b and User c audits.Data block c is audited by user c and user d.It is to be understood that data block a can be by In user a, user b and user c, any one the representative as this group user is audited and obtains examination & verification knot Really, if user a to data block a examination & verification pass through, then the auditing result of data block a be by and described user The user identified is user a.User c can represent user a, user b and the user of user c Data block a or data block b are audited and respectively obtain auditing result by group, and user c can also represent user c With user's group of user d data block c audited and obtain auditing result.
Comparing unit 304, for determining n-th according to the data block identifier of described censored data block The flow tasks submitting examination & verification to submits data block identical in the flow tasks of examination & verification, comparison to the N-1 time The data content of described identical data block is the most identical;If identical, trigger examination & verification unit 305.
Described examination & verification unit 305, is used for the data block identifier according to described censored data block from described history The corresponding relation of audit logging obtains auditing result and the ID of correspondence, in described flow tasks In n-th examination & verification, described identical data block is given described with the name of the ID of described correspondence Corresponding auditing result.
Illustrate, the data block identifier of described data block and described data block one_to_one corresponding.Even if it is described Flow tasks is once audited not by being returned to the initiator of described flow tasks, and initiator revises institute After stating the data content of data block in flow tasks, amended described flow tasks is submitted to again The data block identifier phase of this data block before examination & verification, the data block identifier of this data block amended and amendment With.It is to say, the same data block in flow tasks, even if quilt during repeatedly being returned Repeatedly revise, even do not revise, when the flow tasks belonging to this data block is resubmited examination & verification, should The data block identifier of data block will not change.
Continue to illustrate as a example by the example of above-mentioned auditing flow task 2, audit described stream in second time During journey task 2, according to the data block of five censored data blocks of record in described history audit logging 2 Identify operation of comparing.It is possible that four kinds of different comparison situations, it is right to will focus in the present embodiment Two of which situation illustrates.
For the first situation, such as data block 1 and data block 1 in examination & verification for the first time in second time examination & verification Data content identical, the most do not revise, then second time examination & verification in can be directly to data block 1 The auditing result that examination & verification is passed through is given with the name of user 1.
In the first case, the last time can be allowed to audit that pass through and the most unmodified number in auditing The auditing result that examination & verification is passed through is directly obtained according to block.Without the most again auditing, save second time and examined The time of core.
For the second situation, such as data block 5 and data block 5 in examination & verification for the first time in second time examination & verification Data content identical, the most do not revise, then second time examination & verification in can be directly to data block 5 Give with the name of user 2 and audit unsanctioned auditing result.
In the second situation, can find rapidly that the sponsor of described flow tasks 2 does not has upper one The data block 5 that secondary examination & verification goes wrong carries out any adaptation, the most directly gives data block 5 and examines The auditing result that core does not passes through, eliminates process data block 5 again audited.Thus without continuation The second time of described flow tasks 2 is audited, and described flow process is appointed by the reason do not passed through with the second examination & verification The initiator of described flow tasks is returned in business 2.Improve the review efficiency of second time examination & verification.
Even if it should be noted that in the case of flow tasks only includes a data block, if to this stream The N-1 time examination & verification of journey task is not passed through, and finds that initiator is to this stream when n-th is audited by comparison When the only data block of journey task is not modified, can directly judge this flow tasks n-th Examination & verification is not passed through, and eliminates and again this only data block is dealt into the process that user audits again, Improve the review efficiency again audited.
In sum, preserve flow tasks and audit obstructed out-of-date history audit logging, if according to acquisition Task identification corresponding to flow tasks judge that described flow tasks has history audit logging, can be true Fixed described flow tasks is the non-flow process submitting examination & verification first to and task, obtains according to described history audit logging Take described flow tasks upper once submit to examination & verification namely the N-1 time submit to audit review process in The examination & verification data content of data block, auditing result and the corresponding relation of ID, and according to described The data block identifier of examination & verification data block determines that n-th is submitted the flow tasks of examination & verification to and submits to for the N-1 time Identical data block in the flow tasks of examination & verification, the data content of data block identical described in comparison whether phase With, when comparison result is identical, examine from described history according to the data block identifier of described censored data block The corresponding relation of core record obtains auditing result and the ID of correspondence, at the N of described flow tasks In secondary examination & verification, give described correspondence to described identical data block with the name of the ID of described correspondence Auditing result.Thus when flow tasks resubmits examination & verification, by comparison data content discovery not The auditing result when data block being modified can be audited by directly giving the last time, and need not again issue User audits, and has saved audit time, has improve the review efficiency again audited.
Embodiment four
Comparing unit 304 is in addition to can there is the comparison result of comparison asgard, it is also possible to occur that comparison is not Identical comparison result.
As shown in Figure 4:
Determine unit 402, if for the comparison result of described comparing unit 304 for differing, according to institute The data block identifier of the examination & verification setting and described censored data block of stating flow tasks determines in described flow process In the n-th review process of task, audit examination & verification user or examination & verification user's group of described identical data block.
Transmitting element 403, for organizing the described identical data block of transmission to described examination & verification user or examination & verification user For auditing.
Illustrate as a example by continuing the example of the auditing flow task 2 in embodiment one, examine in second time Described in core during flow tasks 2, according to five censored data blocks of record in described history audit logging 2 Data block identifier compare operation.For it is possible that four kinds of different comparison situations, embodiment Have been described with two of which situation in one, the present embodiment will focus on remaining two kinds of situations are said Bright.
For the third situation, such as data block 3 and data block 3 in examination & verification for the first time in second time examination & verification Data content differ, namely occur in that amendment, then second time examination & verification in will appoint according to flow process The examination & verification of business 2 is arranged, and determines examination & verification user or examination & verification user's group of examination & verification data block 3, to determining The described examination & verification user gone out or examination & verification user organize transmission data block 3 for auditing.
In the third situation, can find rapidly that the last time is audited by the sponsor of described flow tasks 2 " additionally " amendment that the data block 3 not gone wrong is carried out.Thus avoid may be in second time examination & verification In because the appearance of accident that caused of this data block 3 being modified.It is effectively increased the peace again audited Quan Xing.
For the 4th kind of situation, such as data block 5 and data block 5 in examination & verification for the first time in second time examination & verification Data content differ, namely occur in that amendment, then second time examination & verification in will appoint according to flow process The examination & verification of business 2 is arranged, and determines examination & verification user or examination & verification user's group of examination & verification data block 5, to determining The described examination & verification user gone out or examination & verification user organize transmission data block 5 for auditing.
In the 4th kind of situation, can find rapidly that the sponsor of described flow tasks 2 is to the last time The data block 5 that examination & verification goes wrong is modified, and uses to examination & verification user or the examination & verification of corresponding data block 5 Family group sends amended data block 5, can audit whether amended data block 5 meets examination & verification requirement. Thus effectively promote the carrying out of second time examination & verification.
It should be noted that optional, if to the auditing result of the n-th examination & verification of described flow tasks being Examination & verification is not passed through, and described updating block 401 is additionally operable to audit described flow tasks in described n-th In journey, the corresponding relation of the data content of censored data block, auditing result and ID covers and updates In described history audit logging.
The n-th review process of described flow tasks will be audited number triggering described updating block 401 Cover according to the data content of block and updated before history audit logging, described history audit logging preserves The data content of censored data block that is described flow tasks in the review process submitting examination & verification to the N-1 time, Auditing result and the corresponding relation of ID.Above-mentioned action is performed triggering described updating block 401 After, owing to covering the action type updated, preserve in described history audit logging is described flow tasks The data content of censored data block, auditing result and use in n-th submits the review process of examination & verification to The corresponding relation of family mark.It is to say, preserve in described history audit logging is up-to-date once to audit Result is the examination & verification do not passed through, in examination & verification not by front completed examining content.
As can be seen from the above-described embodiment, submitted to flow tasks and the N-1 of examination & verification by comparison n-th The data content of data block identical in the secondary flow tasks submitting examination & verification to, it appeared that to by examination & verification The amendment of data block, this amendment that should not occur, thus provides again in review process in other words Safety.And when amendment not occurring by the data block of examination & verification in the N-1 time examination & verification, by these data Block is sent to user and audits, and thus effectively promotes non-the carrying out audited first.
As seen through the above description of the embodiments, those skilled in the art is it can be understood that arrive The mode that all or part of step in above-described embodiment method can add general hardware platform by software is real Existing.Based on such understanding, prior art is contributed by technical scheme the most in other words Part can embody with the form of software product, this computer software product can be stored in storage In medium, such as ROM/RAM, magnetic disc, CD etc., including some instructions with so that a computer Equipment (can be personal computer, server, or the network communication equipment such as such as WMG) is held Each embodiment of the row present invention or the method described in some part of embodiment.
It should be noted that each embodiment in this specification all uses the mode gone forward one by one to describe, each Between embodiment, identical similar part sees mutually, and what each embodiment stressed is and it The difference of his embodiment.For equipment and system embodiment, due to its basic simlarity In embodiment of the method, so describing fairly simple, relevant part sees the part explanation of embodiment of the method ?.Equipment described above and system embodiment are only schematically, wherein as separating component The unit illustrated can be or may not be physically separate, and the parts shown as unit are permissible It is or may not be physical location, i.e. may be located at a place, or can also be distributed to multiple On NE.Some or all of module therein can be selected according to the actual needs to realize this reality Execute the purpose of example scheme.Those of ordinary skill in the art in the case of not paying creative work, To understand and to implement.
The above is only the preferred embodiment of the present invention, is not intended to limit protection scope of the present invention. It should be pointed out that, for those skilled in the art, before without departing from the principle of the invention Putting, it is also possible to make some improvements and modifications, these improvements and modifications also should be regarded as the protection of the present invention Scope.

Claims (12)

1. the monitoring method to data modification, it is characterised in that described method includes:
Obtaining flow tasks and corresponding task identification, described flow tasks includes at least one data block;
Judge whether to save the history audit logging of described flow tasks according to described task identification;
If so, determine that described flow tasks is the flow tasks that n-th submits examination & verification to, according to described history Audit logging obtains described flow tasks and submits censored data block in the review process audited at the N-1 time The corresponding relation of data content, auditing result and ID, it is right that described ID is used for identifying Described data block makes the user of described auditing result, and N is the integer more than or equal to 2;
Data block identifier according to described censored data block determines that n-th submits the flow tasks of examination & verification to Data block identical in the flow tasks of examination & verification is submitted to the N-1 time, data block identical described in comparison Data content is the most identical;
If it is identical, according to right from described history audit logging of the data block identifier of described censored data block The middle auditing result obtaining correspondence and ID should be related to, in the n-th of described flow tasks is audited, Described identical data block is given with the name of the ID of described correspondence the examination & verification knot of described correspondence Really.
Method the most according to claim 1, it is characterised in that described according to described censored data The data block identifier of block determines that n-th is submitted the flow tasks of examination & verification to and submits the stream of examination & verification for the N-1 time to Data block identical in journey task, the data content of data block identical described in comparison is the most identical, also wraps Include:
If differing, according to described flow tasks being audited setting and the number of described censored data block Determine in the n-th review process of described flow tasks according to block identification, audit described identical data block Examination & verification user or examination & verification user's group;
The described identical data block of transmission is organized for auditing to described examination & verification user or examination & verification user.
Method the most according to claim 1, it is characterised in that to described flow tasks In N-1 review process, if the auditing result of the first data block included by described flow tasks is for examination & verification not Pass through, then the n-th in described flow tasks is submitted in review process, has audited number described in described basis Determine that n-th is submitted the flow tasks of examination & verification to and submits examination & verification to the N-1 time according to the data block identifier of block Data block identical in flow tasks, the data content of data block identical described in comparison is the most identical, bag Include:
If the data content of described first data block during described the N-1 time examination & verification and n-th are audited Comparison result is identical, according to the data block identifier of described censored data block from described history audit logging Corresponding relation in obtain correspondence auditing result and ID, described flow tasks n-th examine In core, give examining of described correspondence to described identical data block with the name of the ID of described correspondence Core result, including:
In the data block identifier according to described first data block corresponding relation from described history audit logging The auditing result and first obtaining described first data block of the data content of corresponding described first data block is used Family identifies;
Give, with the name that described first user identifies, the examination & verification knot that examination & verification is not passed through to described first data block Really.
Method the most according to claim 2, it is characterised in that to described flow tasks In N-1 review process, if the auditing result of the second data block included by described flow tasks is logical for examination & verification Cross, then the n-th in described flow tasks is submitted in review process, described according to described censored data The data block identifier of block determines that n-th is submitted the flow tasks of examination & verification to and submits the stream of examination & verification for the N-1 time to Data block identical in journey task, the data content of data block identical described in comparison is the most identical, including:
If the data content of described second data block during described the N-1 time examination & verification and n-th are audited Comparison result is for differing, and the examination & verification of described flow tasks is arranged and described audited number by described basis Determine in the n-th review process of described flow tasks according to the data block identifier of block, audit described identical Data block examination & verification user or examination & verification user's group, including:
Examination & verification according to described flow tasks is arranged and the data block identifier of described second data block determines careful The examination & verification user of the second data block described in core or examination & verification user's group.
Method the most according to claim 1, it is characterised in that in described acquisition flow tasks and right Before the task identification answered, also include:
Obstructed out-of-date, by described flow tasks at described N-1 in the N-1 time examination & verification of described flow tasks The corresponding relation of the data content of censored data block, auditing result and ID in secondary review process Cover and update in described history audit logging.
6. according to the method described in any one of claim 1 to 5, it is characterised in that if to described flow process The auditing result of the n-th examination & verification of task is not passed through for examination & verification, also includes:
By described flow tasks in described n-th review process the data content of censored data block, examine The corresponding relation of core result and ID covers and updates in described history audit logging.
7. the supervising device to data modification, it is characterised in that described device includes:
First acquiring unit, for obtaining flow tasks and corresponding task identification, described flow tasks bag Include at least one data block;
Judging unit, for judging whether to save the history of described flow tasks according to described task identification Audit logging;If so, determine that described flow tasks is the flow tasks that n-th submits examination & verification to, trigger the Two acquiring units;
Described second acquisition unit, for obtaining described flow tasks the according to described history audit logging Submit the data content of censored data block in the review process of examination & verification, auditing result and user's mark for N-1 time to The corresponding relation known, described data block is made the use of described auditing result by described ID for mark Family, N is the integer more than or equal to 2;
According to the data block identifier of described censored data block, comparing unit, for determining that n-th is submitted to The flow tasks of examination & verification submits data block identical in the flow tasks of examination & verification to the N-1 time, described in comparison The data content of identical data block is the most identical;If identical, trigger examination & verification unit;
Described examination & verification unit, examines from described history for the data block identifier according to described censored data block The corresponding relation of core record obtains auditing result and the ID of correspondence, at the N of described flow tasks In secondary examination & verification, give described correspondence to described identical data block with the name of the ID of described correspondence Auditing result.
Device the most according to claim 7, it is characterised in that also include:
Determine unit, if for the comparison result of described comparing unit for differing, according to described flow process The examination & verification of task is arranged and the data block identifier of described censored data block determines in described flow tasks In n-th review process, audit examination & verification user or examination & verification user's group of described identical data block;
Transmitting element, sends described identical data block use for organizing to described examination & verification user or examination & verification user In examination & verification.
Device the most according to claim 7, it is characterised in that to described flow tasks In N-1 review process, if the auditing result of the first data block included by described flow tasks is for examination & verification not Pass through, then the n-th in described flow tasks is submitted in review process, including:
If the comparison result of described comparing unit is identical, described examination & verification unit is specifically for according to described The data block identifier of one data block corresponding relation from described history audit logging obtains corresponding described the The auditing result of described first data block of the data content of one data block and first user mark;To described The name that first data block identifies with described first user gives the auditing result that examination & verification is not passed through.
Device the most according to claim 8, it is characterised in that to described flow tasks In N-1 review process, if the auditing result of the second data block included by described flow tasks is logical for examination & verification Cross, then the n-th in described flow tasks is submitted in review process, including:
If the comparison result of described comparing unit is for differing, described 3rd acquiring unit is specifically for basis The data block identifier of described second data block corresponding relation from described history audit logging obtains correspondence Second ID of the data content of described second data block;
Described transmitting element specifically for sending described according to described second ID to described second user Second data block is used for auditing.
11. devices according to claim 7, it is characterised in that also include:
Updating block, for before triggering described first acquiring unit, at the N-1 of described flow tasks Secondary examination & verification is obstructed out-of-date, by described flow tasks censored data block in described the N-1 time review process Data content, auditing result and ID corresponding relation cover update to described history examination & verification note In record.
12. according to the device described in any one of claim 7 to 11, it is characterised in that if to described stream The auditing result of the n-th examination & verification of journey task is not passed through for examination & verification, and described updating block is additionally operable to described Flow tasks in described n-th review process the data content of censored data block, auditing result and The corresponding relation of ID covers and updates in described history audit logging.
CN201510358754.9A 2015-06-25 2015-06-25 Method and device for monitoring data modification Active CN106327140B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510358754.9A CN106327140B (en) 2015-06-25 2015-06-25 Method and device for monitoring data modification

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510358754.9A CN106327140B (en) 2015-06-25 2015-06-25 Method and device for monitoring data modification

Publications (2)

Publication Number Publication Date
CN106327140A true CN106327140A (en) 2017-01-11
CN106327140B CN106327140B (en) 2019-12-06

Family

ID=57729124

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510358754.9A Active CN106327140B (en) 2015-06-25 2015-06-25 Method and device for monitoring data modification

Country Status (1)

Country Link
CN (1) CN106327140B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110659875A (en) * 2019-09-18 2020-01-07 联宝(合肥)电子科技有限公司 Information processing method and system
CN110895745A (en) * 2019-12-02 2020-03-20 深圳前海环融联易信息科技服务有限公司 Method and device for polling and getting task, computer equipment and storage medium
CN111538748A (en) * 2020-04-30 2020-08-14 中国银行股份有限公司 Service page modification method and device
CN111598540A (en) * 2020-05-14 2020-08-28 云账户技术(天津)有限公司 Method and device for auditing items and computer-readable storage medium
CN112001691A (en) * 2020-07-01 2020-11-27 北京车行一六八信息技术有限公司 Page auditing method and device, computer equipment and storage medium
CN114638207A (en) * 2022-03-22 2022-06-17 深圳创维-Rgb电子有限公司 Method, device, equipment and storage medium for automatically configuring and submitting machine function items
CN114640606A (en) * 2020-12-01 2022-06-17 中移物联网有限公司 Abnormity processing method and controller for Internet of things card terminal

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101000667A (en) * 2006-01-12 2007-07-18 鸿富锦精密工业(深圳)有限公司 System and method of dynamic examining procedure
CN103677813A (en) * 2013-11-29 2014-03-26 广州视源电子科技股份有限公司 Automatic auditing configuration method and automatic auditing system
CN103885964A (en) * 2012-12-20 2014-06-25 北京新媒传信科技有限公司 Content checking method and system
CN104133910A (en) * 2014-08-08 2014-11-05 平安养老保险股份有限公司 System and method for outputting medical insurance reimbursement document audit result

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101000667A (en) * 2006-01-12 2007-07-18 鸿富锦精密工业(深圳)有限公司 System and method of dynamic examining procedure
CN103885964A (en) * 2012-12-20 2014-06-25 北京新媒传信科技有限公司 Content checking method and system
CN103677813A (en) * 2013-11-29 2014-03-26 广州视源电子科技股份有限公司 Automatic auditing configuration method and automatic auditing system
CN104133910A (en) * 2014-08-08 2014-11-05 平安养老保险股份有限公司 System and method for outputting medical insurance reimbursement document audit result

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110659875A (en) * 2019-09-18 2020-01-07 联宝(合肥)电子科技有限公司 Information processing method and system
CN110659875B (en) * 2019-09-18 2022-04-12 联宝(合肥)电子科技有限公司 Information processing method and system
CN110895745A (en) * 2019-12-02 2020-03-20 深圳前海环融联易信息科技服务有限公司 Method and device for polling and getting task, computer equipment and storage medium
CN110895745B (en) * 2019-12-02 2023-04-18 深圳前海环融联易信息科技服务有限公司 Method and device for polling to obtain task, computer equipment and storage medium
CN111538748A (en) * 2020-04-30 2020-08-14 中国银行股份有限公司 Service page modification method and device
CN111598540A (en) * 2020-05-14 2020-08-28 云账户技术(天津)有限公司 Method and device for auditing items and computer-readable storage medium
CN112001691A (en) * 2020-07-01 2020-11-27 北京车行一六八信息技术有限公司 Page auditing method and device, computer equipment and storage medium
CN114640606A (en) * 2020-12-01 2022-06-17 中移物联网有限公司 Abnormity processing method and controller for Internet of things card terminal
CN114638207A (en) * 2022-03-22 2022-06-17 深圳创维-Rgb电子有限公司 Method, device, equipment and storage medium for automatically configuring and submitting machine function items

Also Published As

Publication number Publication date
CN106327140B (en) 2019-12-06

Similar Documents

Publication Publication Date Title
CN106327140A (en) Method and device for monitoring data modification
CN105610654B (en) Server, and method and system for policy online testing
US20160337217A1 (en) Social graph data analytics
CN111859400A (en) Risk assessment method, apparatus, computer system, and medium
CN105550225B (en) Index structuring method, querying method and device
JP4711343B2 (en) Method and system for protecting personal information
CA2930623A1 (en) Method and system for aggregating and ranking of security event-based data
CN109118353A (en) The data processing method and device of air control model
CN110070445A (en) A kind of transaction processing method and device based on block catenary system
CN109345200A (en) Automatic auditing method and device, computer readable storage medium based on high-volume report
WO2006095506B1 (en) Information system management device
CN105719045A (en) Retention risk determiner
CN111835790B (en) Risk identification method, device and system
CN106873957A (en) The processing method and equipment of a kind of operation flow
CN108733644A (en) A kind of text emotion analysis method, computer readable storage medium and terminal device
KR102036707B1 (en) Method for analyzing mission impact factor based on dependency of assets to tasks
CN113791837B (en) Page processing method, device, equipment and storage medium
US20120191930A1 (en) Data integrity protection in storage volumes
CN110321144A (en) Recognition methods, device, equipment and the storage medium of offline source code
CN110489992A (en) Desensitization method and system based on big data platform
CN109120706A (en) Business scheduling method and system
CN106569734B (en) The restorative procedure and device that memory overflows when data are shuffled
CN110009473B (en) Data processing method, device, equipment and storage medium
CN108259441A (en) It is a kind of to prevent URL from accessing the method and device to detour
CN110516258A (en) Data verification method and device, storage medium, electronic device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211110

Address after: Room 101, warehouse 1, No. 88, Jingbin Avenue, Jingbin Industrial Park, Wuqing District, Tianjin

Patentee after: Alibaba Huabei Technology Co., Ltd

Address before: P.O. Box 847, 4th floor, capital building, Grand Cayman, British Cayman Islands

Patentee before: Alibaba Group Holdings Limited