CN110658544B - 基于核电厂进出监测系统的设备人员状态监控与预测方法 - Google Patents
基于核电厂进出监测系统的设备人员状态监控与预测方法 Download PDFInfo
- Publication number
- CN110658544B CN110658544B CN201910863657.3A CN201910863657A CN110658544B CN 110658544 B CN110658544 B CN 110658544B CN 201910863657 A CN201910863657 A CN 201910863657A CN 110658544 B CN110658544 B CN 110658544B
- Authority
- CN
- China
- Prior art keywords
- information
- monitoring
- equipment
- personal
- central control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01T—MEASUREMENT OF NUCLEAR OR X-RADIATION
- G01T1/00—Measuring X-radiation, gamma radiation, corpuscular radiation, or cosmic radiation
- G01T1/16—Measuring radiation intensity
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910863657.3A CN110658544B (zh) | 2019-09-12 | 2019-09-12 | 基于核电厂进出监测系统的设备人员状态监控与预测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910863657.3A CN110658544B (zh) | 2019-09-12 | 2019-09-12 | 基于核电厂进出监测系统的设备人员状态监控与预测方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110658544A CN110658544A (zh) | 2020-01-07 |
CN110658544B true CN110658544B (zh) | 2021-11-26 |
Family
ID=69037353
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910863657.3A Active CN110658544B (zh) | 2019-09-12 | 2019-09-12 | 基于核电厂进出监测系统的设备人员状态监控与预测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110658544B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111175800A (zh) * | 2020-01-10 | 2020-05-19 | 中广核工程有限公司 | 核电厂辐射剂量分布的测量方法和测量系统 |
CN113138405A (zh) * | 2021-04-02 | 2021-07-20 | 中国舰船研究设计中心 | 一种船用个人剂量监测管理系统与方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108535759B (zh) * | 2018-03-16 | 2020-07-24 | 广东核电合营有限公司 | 百万千瓦级核电站的远程辐射防护监控方法、装置及系统 |
CN109523041A (zh) * | 2018-12-03 | 2019-03-26 | 岭澳核电有限公司 | 核电站管理系统 |
-
2019
- 2019-09-12 CN CN201910863657.3A patent/CN110658544B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN110658544A (zh) | 2020-01-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110086649A (zh) | 异常流量的检测方法、装置、计算机设备及存储介质 | |
CN110658544B (zh) | 基于核电厂进出监测系统的设备人员状态监控与预测方法 | |
Bisset et al. | Monitoring and auditing of impacts | |
US20050086529A1 (en) | Detection of misuse or abuse of data by authorized access to database | |
CN104572391A (zh) | 监控告警策略配置方法及装置、监控告警方法及装置 | |
CN111738549A (zh) | 食品安全风险评估方法、装置、设备及存储介质 | |
CN107276046B (zh) | 智能电网实现继电保护异常智能识别与预警的系统及方法 | |
CN111008193B (zh) | 一种数据清洗与质量评价方法及系统 | |
CN113036913B (zh) | 一种综合能源设备状态监测方法及装置 | |
CN105809266A (zh) | 一种地震伤亡人数初步评估预测方法 | |
CN113610381B (zh) | 一种基于5g网络的水质远程实时监测系统 | |
CN105515820A (zh) | 一种用于运维管理的健康分析方法 | |
CN104425046A (zh) | 核电站运行安全指数量化方法和系统 | |
Tang et al. | Enhancement of distribution load modeling using statistical hybrid regression | |
CN111929496A (zh) | 办公建筑独立房间能耗采集、监测、分析及报警系统 | |
CN116596306A (zh) | 基于风险分级的食品安全监督抽查方法及系统 | |
CN115049410A (zh) | 窃电行为识别方法、装置、电子设备及计算机可读存储介质 | |
CN111310803A (zh) | 环境数据处理方法和装置 | |
CN110182871A (zh) | 一种基于全自动加药系统的水处理方法及终端 | |
CN105938573A (zh) | 医疗保险基金精算预警系统及方法 | |
Gutman et al. | The application of the fuzzy set theory to counting a regional innovative development indicators: The case of the Yamal region of the Russian Federation | |
CN105158610A (zh) | 一种变压器状态预警数据可疑值的筛查处理方法 | |
Hager | Sound exposure profiling: a noise monitoring alternative | |
CN112101596A (zh) | 设备运维方法、装置、电子设备和计算机可读存储介质 | |
CN107220784A (zh) | 一种基于微信的工程施工安全管理系统及方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 518000 Guangdong city of Shenzhen province Futian District Lotus Street No. 2002 Shennan Avenue South 14 CGN building room 1401 Applicant after: CGN (Shenzhen) operation technology and radiation monitoring Co., Ltd Applicant after: SUZHOU NUCLEAR POWER Research Institute Applicant after: CHINA GENERAL NUCLEAR POWER Corp. Applicant after: CGN POWER Co.,Ltd. Address before: 518000 Guangdong city of Shenzhen province Futian District Lotus Street No. 2002 Shennan Avenue South 14 CGN building room 1401 Applicant before: CGN (SHENZHEN) RADIATION MONITORING TECHNOLOGY Co.,Ltd. Applicant before: SUZHOU NUCLEAR POWER Research Institute Applicant before: CHINA GENERAL NUCLEAR POWER Corp. Applicant before: CGN POWER Co.,Ltd. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |