CN110616842B - Construction method of purline assembly in steel structure coal shed - Google Patents
Construction method of purline assembly in steel structure coal shed Download PDFInfo
- Publication number
- CN110616842B CN110616842B CN201910768428.3A CN201910768428A CN110616842B CN 110616842 B CN110616842 B CN 110616842B CN 201910768428 A CN201910768428 A CN 201910768428A CN 110616842 B CN110616842 B CN 110616842B
- Authority
- CN
- China
- Prior art keywords
- purline
- longitudinal
- hoisting device
- assembly
- hoisting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention provides a construction method of a purline assembly in a steel structure coal shed, which comprises the following steps: providing a hoisting device; installing longitudinal purlines on adjacent longitudinal beams; mounting and fixing the hoisting device on the longitudinal purline; hoisting and mounting the next section of longitudinal purline by using a hoisting device; removing the fixed connection relation of the hoisting device, and moving the hoisting device to the next section of longitudinal purline and fixing; hoisting and mounting a horizontal purline and a shearing fork purline corresponding to the upper section of the longitudinal purline by using a hoisting device; repeating the steps until all the longitudinal purlines are installed; dismantling the hoisting device; and installing a transverse purline and a shearing fork purline corresponding to the longitudinal purline at the tail end. According to the construction method of the purline assembly in the steel structure coal shed, provided by the invention, the hoisting device is not interfered by the ground environment when in work, and the purline assembly is gradually installed and gradually moved along the installed longitudinal purline moving position by the hoisting device. Potential safety hazards are reduced, and efficiency is improved.
Description
Technical Field
The invention relates to the technical field of cranes, in particular to a construction method of a purline assembly in a steel structure coal shed.
Background
A steel-structure coal shed, as shown in fig. 2, comprising: the roof assembly comprises a main body frame and a purline assembly which is arranged above the main body frame and is used for mounting a roof assembly; the main body frame includes: the roof comprises longitudinal beams 10, cross beams 11 and upright columns 9, wherein the longitudinal beams 10 and the cross beams 11 are connected to form a roof frame, and the upright columns 9 are supported between the roof frame and the ground; the purlin assembly includes: the longitudinal purlins 6, the transverse purlins 7 and the shearing fork purlins 8 are sequentially connected end to end and fixed above the longitudinal beam 10, and the transverse purlins 7 and the shearing fork purlins 8 are fixedly connected between every two adjacent longitudinal purlins 6 in the transverse direction.
In some cases, steel structural coal sheds are built directly above the coal pile, which limits the location of the crane. The number of the longitudinal purlins 6, the number of the transverse purlins 7 and the number of the shearing fork purlins 8 are large, the installation span is large, the longitudinal purlins, the transverse purlins and the shearing fork purlins are usually intensively hoisted to a roof frame through a crane during hoisting, and then the longitudinal purlins, the transverse purlins and the shearing fork purlins are manually transported to the. The hoisting mode has higher potential safety hazard and low operation efficiency.
Disclosure of Invention
The invention aims to solve the technical problem of providing a construction method of a purline assembly in a steel structure coal shed, which is free from the influence of coal piles when parts in the purline assembly are hoisted, so that the purline assembly does not need to be manually transported again at high altitude, the potential safety hazard is reduced, and the operation efficiency is improved.
A construction method of a purline assembly in a steel structure coal shed comprises the following steps: the roof assembly comprises a main body frame and a purline assembly which is arranged above the main body frame and is used for mounting a roof assembly;
the main body frame includes: the roof comprises longitudinal beams, cross beams and upright columns, wherein the longitudinal beams and the cross beams are connected to form a roof framework, and the upright columns are supported between the roof framework and the ground;
the purlin assembly includes: the longitudinal purlins, the transverse purlins and the shear fork purlins are sequentially connected end to end in the longitudinal direction and are fixed above the longitudinal beam, and the transverse purlins and the shear fork purlins are fixedly connected between every two adjacent longitudinal purlins in the transverse direction;
the construction method of the purline assembly comprises the following steps:
a: providing a hoisting device, wherein the hoisting device is used for hoisting the longitudinal purline, the transverse purline and the shearing fork purline, and the hoisting device comprises: the movable unit is used for being clamped on two transversely adjacent longitudinal purlines and can reciprocate along the longitudinal purlines, and the fixed unit is detachably connected with the longitudinal purlines;
b: after the main body frame is installed, the longitudinal purlines are installed on the adjacent longitudinal beams;
c: installing the hoisting device on the longitudinal purline and fixing the hoisting device;
d: hoisting a next section of longitudinal purline by using the hoisting device and installing the next section of longitudinal purline;
e: releasing the fixed connection relation of the hoisting device, moving the hoisting device to the next section of longitudinal purline and fixing the hoisting device;
f: hoisting a section of transverse purline and a section of shear fork purline corresponding to the longitudinal purline by using the hoisting device, and installing the transverse purline and the shear fork purline;
g: repeating the steps D-F until all the longitudinal purlines are installed;
h: dismantling the hoisting device;
i: and installing a transverse purline and a shearing fork purline corresponding to the longitudinal purline at the tail end.
Further, the step F further includes: and hoisting the longitudinal purlines, the transverse purlines and the shearing fork purlines positioned on the outer sides of the adjacent longitudinal beams by using the hoisting device and installing the longitudinal purlines, the transverse purlines and the shearing fork purlines.
Further, in the step D, the next section of longitudinal purlin is installed in a lifted state; and in the step F, the transverse purlines and the shearing fork purlines are installed in a hoisting state.
Further, the mobile unit includes: and each roller assembly is fixed below the working platform and clamped on the longitudinal purline.
Furthermore, each roller assembly comprises a roller, the periphery of the roller is provided with a groove formed in an annular mode, and the roller is clamped on the longitudinal purline through the groove.
Further, the connection unit includes: and one end of each connecting plate is hinged to the working platform, and the other end of each connecting plate is detachably connected with the longitudinal purline through a bolt.
Furthermore, a waist-shaped hole is formed in the connecting plate and used for penetrating the bolt.
Furthermore, the hoisting device further comprises guardrails which are arranged around the working platform.
Further, the crane includes: the base is fixed on the working platform, the suspension arm is installed on the base, the base is rotatable, and the suspension arm is telescopic.
According to the construction method of the purline assembly in the steel structure coal shed, provided by the invention, the hoisting device is not interfered by the ground environment when in work, and the purline assembly is gradually installed and gradually moved along the installed longitudinal purline moving position by the hoisting device. Potential safety hazards are reduced, and efficiency is improved.
Drawings
FIG. 1 is a flow chart of a method of constructing a purlin assembly in a steel structural coal shed in accordance with the present invention;
FIG. 2 is a schematic three-dimensional structure of a steel-structured coal shed;
FIG. 3 is a schematic structural view of the construction state of the hoisting device in the invention;
figure 4 is a three-dimensional view of the lifting device of the present invention from one of its perspectives;
figure 5 is a schematic three-dimensional structure of another view of the lifting device of the present invention;
figure 6 is a front view of the lifting device of the present invention;
FIG. 7 is a sectional view A-A of FIG. 6;
fig. 8 is an enlarged view of a partial view B in fig. 7.
In the figure, 1, a working platform, 2, a guardrail, 3, a crane, 4, a connecting plate, 5, a roller assembly, 6, a longitudinal purline, 7, a transverse purline, 8, a shearing fork purline, 9, a stand column, 10, a longitudinal beam and 11, a cross beam.
Detailed Description
The present invention is further described below in conjunction with the following figures and specific examples so that those skilled in the art may better understand the present invention and practice it, but the examples are not intended to limit the present invention.
A construction method of a purline assembly in a steel structure coal shed comprises the following steps: the roof assembly comprises a main body frame and a purline assembly which is arranged above the main body frame and is used for mounting a roof assembly;
as shown in fig. 2 and 3, the main body frame includes: the roof structure comprises longitudinal beams 10, cross beams 11 and upright posts 9, wherein the longitudinal beams 10 and the cross beams 11 are connected to form a roof framework, the longitudinal beams 10 are placed along the longitudinal direction, the cross beams 11 are placed along the transverse direction, and the upright posts 9 are supported between the roof framework and the ground;
the purlin assembly includes: the longitudinal purlins 6, the transverse purlins 7 and the shear fork purlins 8 are sequentially connected end to end in the longitudinal direction and are fixed above the longitudinal beam 10, and a plurality of the transverse purlins 7 and the shear fork purlins 8 are fixedly connected between every two adjacent longitudinal purlins 6 in the transverse direction;
as shown in fig. 1, the construction method of the purlin assembly comprises the following steps:
a: providing a hoisting device, wherein the hoisting device is used for hoisting the longitudinal purlines 6, the transverse purlines 7 and the shearing fork purlines 8, and as shown in figures 4-8, the hoisting device comprises: the device comprises a working platform 1, a crane 3 arranged above the working platform 1, a moving unit and a connecting unit, wherein the moving unit and the connecting unit are arranged on the working platform 1, the moving unit is used for being clamped on two transversely adjacent longitudinal purlins 6 and can reciprocate along the longitudinal purlins 6, and the fixing unit is used for being detachably connected with the longitudinal purlins 6;
b: after the main body frame is installed, the longitudinal purlines 6 are installed on the adjacent longitudinal beams 10;
c: mounting the hoisting device to the longitudinal purline 6 and fixing the hoisting device;
d: hoisting a next section of longitudinal purline 6 by using the hoisting device and installing the next section of longitudinal purline 6;
e: releasing the fixed connection relation of the hoisting device, moving the hoisting device to the next section of longitudinal purline 6 and fixing the hoisting device;
f: hoisting a horizontal purline 7 and a shearing fork purline 8 corresponding to the upper section of the longitudinal purline 6 by using the hoisting device, and installing the horizontal purline 7 and the shearing fork purline 8;
g: d, repeating the steps D to F until all the longitudinal purlines 6 are installed;
h: dismantling the hoisting device;
i: and installing a transverse purlin 7 and a shearing fork purlin 8 corresponding to the longitudinal purlin 6 at the tail end.
In an optional implementation manner of this embodiment, the step F further includes: and hoisting and mounting the longitudinal purlins 6, the transverse purlins 7 and the shearing fork purlins 8 positioned on the outer sides of the adjacent longitudinal beams 10 by using the hoisting device. The installation range is enlarged, and the efficiency is improved.
In an optional implementation manner of this embodiment, in step D, the next longitudinal purlin 6 is installed in a lifted state; and in the step F, the transverse purlines 7 and the shearing fork purlines 8 are installed in a hoisting state. And after the installation is finished, the hook is unhooked, so that the risk can be reduced.
In an optional implementation manner of this embodiment, as shown in fig. 3 to 8, the moving unit includes: and each roller assembly 5 is fixed below the working platform 1 and clamped on the longitudinal purline 6.
In an optional implementation manner of this embodiment, as shown in fig. 3 to 8, each of the roller assemblies 5 includes a roller, a groove formed annularly is formed on an outer periphery of the roller, and the roller is clamped on the longitudinal purline 6 through the groove.
In an optional implementation manner of this embodiment, as shown in fig. 3 to 8, the connection unit includes: and one end of each connecting plate 4 is hinged to the working platform 1, and the other end of each connecting plate 4 is detachably connected with the longitudinal purline 6 through bolts.
In an optional implementation manner of this embodiment, as shown in fig. 3 to 8, a waist-shaped hole is formed on the connecting plate 4 for penetrating the bolt.
In an optional implementation manner of this embodiment, as shown in fig. 3 to 8, the hoisting device further includes a guardrail 2 installed around the working platform 1.
In an alternative embodiment of this embodiment, as shown in fig. 3 to 8, the crane 3 includes: the base is fixed on the working platform 1, the suspension arm is installed on the base, the base is rotatable, and the suspension arm is telescopic.
The scope of the invention is not limited thereto. The equivalent substitution or change made by the technical personnel in the technical field on the basis of the invention is all within the protection scope of the invention. The protection scope of the invention is subject to the claims.
Claims (7)
1. A construction method of a purline assembly in a steel structure coal shed is characterized in that,
the steel construction coal canopy includes: the roof assembly comprises a main body frame and a purline assembly which is arranged above the main body frame and is used for mounting a roof assembly;
the main body frame includes: the roof comprises longitudinal beams, cross beams and upright columns, wherein the longitudinal beams and the cross beams are connected to form a roof framework, and the upright columns are supported between the roof framework and the ground;
the purlin assembly includes: the longitudinal purlins, the transverse purlins and the shear fork purlins are sequentially connected end to end in the longitudinal direction and are fixed above the longitudinal beam, and the transverse purlins and the shear fork purlins are fixedly connected between every two adjacent longitudinal purlins in the transverse direction;
the construction method of the purline assembly comprises the following steps:
a: providing a hoisting device, wherein the hoisting device is used for hoisting the longitudinal purline, the transverse purline and the shearing fork purline, and the hoisting device comprises: work platform, install in loop wheel machine above the work platform, install in last moving unit and the coupling unit of work platform, the moving unit is used for the card to locate at horizontal adjacent two on the vertical purlin and can along vertical purlin reciprocating motion, fixed unit be used for with vertical purlin can dismantle the connection, the moving unit includes: each roller assembly is fixed below the working platform and clamped on the longitudinal purline, each roller assembly comprises a roller, the periphery of the roller is provided with a groove in an annular mode, and the roller is clamped on the longitudinal purline through the groove;
b: after the main body frame is installed, the longitudinal purlines are installed on the adjacent longitudinal beams;
c: installing the hoisting device on the longitudinal purline and fixing the hoisting device;
d: hoisting a next section of longitudinal purline by using the hoisting device and installing the next section of longitudinal purline;
e: releasing the fixed connection relation of the hoisting device, moving the hoisting device to the next section of longitudinal purline and fixing the hoisting device;
f: hoisting a section of transverse purline and a section of shear fork purline corresponding to the longitudinal purline by using the hoisting device, and installing the transverse purline and the shear fork purline;
g: repeating the steps D-F until all the longitudinal purlines are installed;
h: dismantling the hoisting device;
i: and installing a transverse purline and a shearing fork purline corresponding to the longitudinal purline at the tail end.
2. The method for constructing a purlin assembly in a steel-structured coal shed as claimed in claim 1, wherein the step F further comprises: and hoisting the longitudinal purlines, the transverse purlines and the shearing fork purlines positioned on the outer sides of the adjacent longitudinal beams by using the hoisting device and installing the longitudinal purlines, the transverse purlines and the shearing fork purlines.
3. The method for constructing a purlin assembly in a steel structure coal shed as in claim 1, wherein in the step D, the next section of longitudinal purlin is installed in a hoisting state; and in the step F, the transverse purlines and the shearing fork purlines are installed in a hoisting state.
4. The method of constructing a purlin assembly in a steel-structured coal shed as claimed in claim 1, wherein the connecting unit includes: and one end of each connecting plate is hinged to the working platform, and the other end of each connecting plate is detachably connected with the longitudinal purline through a bolt.
5. The construction method for the purline assembly in the steel structure coal shed as claimed in claim 4, wherein the connecting plate is provided with a kidney-shaped hole for penetrating the bolt.
6. The method of constructing a purlin assembly in a steel structural coal shed as in claim 1, wherein the lifting device further comprises guard rails installed around the work platform.
7. The method of constructing a purlin assembly in a steel structural coal shed as in claim 1, wherein the crane includes: the base is fixed on the working platform, the suspension arm is installed on the base, the base is rotatable, and the suspension arm is telescopic.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910768428.3A CN110616842B (en) | 2019-08-20 | 2019-08-20 | Construction method of purline assembly in steel structure coal shed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910768428.3A CN110616842B (en) | 2019-08-20 | 2019-08-20 | Construction method of purline assembly in steel structure coal shed |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110616842A CN110616842A (en) | 2019-12-27 |
CN110616842B true CN110616842B (en) | 2021-05-14 |
Family
ID=68922299
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910768428.3A Active CN110616842B (en) | 2019-08-20 | 2019-08-20 | Construction method of purline assembly in steel structure coal shed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110616842B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07300959A (en) * | 1994-05-06 | 1995-11-14 | Takenaka Komuten Co Ltd | Lifting equipment for curved roof |
NL1013226C2 (en) * | 1999-10-06 | 2001-04-10 | Joost Van Der Waay | Device for replacement of glass panes in roof of greenhouse comprises frame with devices for displaceable support on greenhouse construction and provided with components for storage of several stacked panes in flat position |
CN104612448A (en) * | 2015-02-07 | 2015-05-13 | 辽宁福瑞达建筑科技有限公司 | Steel structure grain bin and mounting method thereof |
CN206940275U (en) * | 2017-05-22 | 2018-01-30 | 四川华神钢构有限责任公司 | A kind of steel-structure factory building steel frame roof boarding handling apparatus |
CN207144332U (en) * | 2017-08-02 | 2018-03-27 | 中国建筑第八工程局有限公司 | Railcar for the installation of large-scale steel structure roofing |
CN207944556U (en) * | 2017-10-24 | 2018-10-09 | 上海欧本钢结构有限公司 | A kind of truss and shaped steel combination building system |
-
2019
- 2019-08-20 CN CN201910768428.3A patent/CN110616842B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07300959A (en) * | 1994-05-06 | 1995-11-14 | Takenaka Komuten Co Ltd | Lifting equipment for curved roof |
NL1013226C2 (en) * | 1999-10-06 | 2001-04-10 | Joost Van Der Waay | Device for replacement of glass panes in roof of greenhouse comprises frame with devices for displaceable support on greenhouse construction and provided with components for storage of several stacked panes in flat position |
CN104612448A (en) * | 2015-02-07 | 2015-05-13 | 辽宁福瑞达建筑科技有限公司 | Steel structure grain bin and mounting method thereof |
CN206940275U (en) * | 2017-05-22 | 2018-01-30 | 四川华神钢构有限责任公司 | A kind of steel-structure factory building steel frame roof boarding handling apparatus |
CN207144332U (en) * | 2017-08-02 | 2018-03-27 | 中国建筑第八工程局有限公司 | Railcar for the installation of large-scale steel structure roofing |
CN207944556U (en) * | 2017-10-24 | 2018-10-09 | 上海欧本钢结构有限公司 | A kind of truss and shaped steel combination building system |
Also Published As
Publication number | Publication date |
---|---|
CN110616842A (en) | 2019-12-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202706503U (en) | Electric lifting discharging platform for main building construction | |
CN105888357B (en) | A kind of liftable steel construction radar tower using bottom jacking type | |
CN109081247A (en) | A kind of hanging method of vestibule large-span steel girder | |
CN109879179B (en) | Assembled steel construction tower crane platform | |
CN216587766U (en) | Hoisting facility and hoisting structure of large-span overhanging steel structural member | |
CN105672665A (en) | Installation method for large-span double-layer cylindrical surface net shell | |
CN202785351U (en) | Tower cranes attached operating platform | |
CN110616842B (en) | Construction method of purline assembly in steel structure coal shed | |
CN104828708B (en) | High-power transformer bell jar indoor vertical lifting device on the spot | |
CN110644666A (en) | Hoisting device applied to steel structure coal shed | |
CN205294694U (en) | Movable independent derrick mast hoist device | |
CN112502475B (en) | Supporting bearing capacity conversion device and using method thereof | |
CN104314354A (en) | High-voltage electric tower base | |
CN105417422B (en) | Movable independent derrick mast hoisting device and hoisting method thereof | |
CN204402001U (en) | For the mobile operating platform system that structure for steel structure roof inner slab is installed | |
CN202023149U (en) | Hanging basket used in construction | |
CN211421883U (en) | Prestressed tensioning jack lifting device | |
JP2006077456A (en) | Construction method of towered building and construction device | |
JP3811846B2 (en) | Steel tower dismantling method and apparatus | |
AU2009238217A1 (en) | Climbing mast assembly | |
CN112392245A (en) | Assembly type cantilever I-shaped steel beam operation device capable of being turned over without wall penetration and operation method thereof | |
CN112502473A (en) | Support bearing capacity conversion device and method for dismantling large steel framework by using same | |
CN211733632U (en) | Hoisting equipment | |
CN105544955A (en) | Elevator shaft tool type operation steel platform and manufacturing method thereof | |
CN220060111U (en) | Bottom flange type vertical hydraulic cylinder with top overhaul platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |