CN110616744A - Method for installing well cover of roadway - Google Patents

Method for installing well cover of roadway Download PDF

Info

Publication number
CN110616744A
CN110616744A CN201910862679.8A CN201910862679A CN110616744A CN 110616744 A CN110616744 A CN 110616744A CN 201910862679 A CN201910862679 A CN 201910862679A CN 110616744 A CN110616744 A CN 110616744A
Authority
CN
China
Prior art keywords
well
well cover
installing
asphalt
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910862679.8A
Other languages
Chinese (zh)
Inventor
曹聪
薛凯
毛林飞
顾嘉宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yonglian Jingzhu Construction Group Co Ltd
Original Assignee
Jiangsu Yonglian Jingzhu Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yonglian Jingzhu Construction Group Co Ltd filed Critical Jiangsu Yonglian Jingzhu Construction Group Co Ltd
Priority to CN201910862679.8A priority Critical patent/CN110616744A/en
Publication of CN110616744A publication Critical patent/CN110616744A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00Special pavings; Pavings for special parts of roads or airfields
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/14Covers for manholes or the like; Frames for covers

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Road Paving Structures (AREA)

Abstract

According to the method for installing the well cover of the roadway, after the implementation of the road base layer is finished, the unloading plate is excavated and poured reversely, the flange plate is embedded at the same time, the well head is provided with the transition well cover before the construction of the lower asphalt layer, the elevation of the transition well cover is flush with the lower asphalt layer, and then the lower asphalt layer is paved; and after paving the lower surface layer of the asphalt, removing the transitional well cover, then installing the well base and the well cover, and paving the upper surface layer of the asphalt. Simple structure is practical, and the installation is firm, because the effect of off-load board, can effectively resist the sinking that self inhomogeneous settlement and external load produced down, improves the structural strength and the stability of inspection shaft, reduces the rate of reprocessing, saves the expense of reprocessing, reduces the later maintenance cost.

Description

Method for installing well cover of roadway
Technical Field
The invention belongs to the technical field of road construction, and particularly relates to a method for installing a well cover of a roadway.
Background
Urban road surface is distributing a large amount of inspection shafts, and traditional well lid installation mainly fixes the well lid with mortar or fine aggregate concrete, produces the level of well lid and vertical direction's displacement easily in the use, and the later stage easily produces inhomogeneous sinking, brings the potential safety hazard for normal road traffic, causes destruction for the facility below the well lid, can cause the traffic accident, threatens people's security of lives and property.
Disclosure of Invention
In order to solve the problems, the invention discloses a method for installing a well cover of a roadway, which is simple and practical in structure, firm in installation and free of settlement.
In order to achieve the purpose, the technical scheme of the invention is as follows:
a method for installing a well lid of a roadway comprises the following steps:
the first step is as follows: after the implementation of the road base layer is finished, reversely excavating and pouring the unloading plate, and simultaneously embedding a flange plate above the junction of the unloading plate and the base layer;
the second step is that: installing a transition well cover on a well head before constructing the lower asphalt surface layer, leveling the elevation of the transition well cover with the lower asphalt surface layer, and then paving the lower asphalt surface layer;
the third step: and after paving the lower surface layer of the asphalt, removing the transitional well cover, then installing the well base and the well cover, and paving the upper surface layer of the asphalt.
As an improvement of the invention, step (1) arranges a geogrid with the width of 1 m between the unloading plate and the surface layer.
As an improvement of the invention, in the step (2), a transition well cover is installed at the well mouth during the construction of the lower asphalt layer, and the elevation of the transition well cover is flush with the upper asphalt layer.
As an improvement of the invention, in the step (3), the reserved bolt holes of the flange plate need to be protected before the well base is installed.
The invention has the beneficial effects that:
according to the method for installing the well lid of the roadway, the unloading plate is poured in a reverse excavation mode after the implementation of the road base layer is finished, the flange plate is embedded in advance, the structure is simple and practical, the installation is firm, the uneven settlement of the unloading plate and the settlement generated under the external load can be effectively resisted under the action of the unloading plate, the structural strength and the stability of the inspection well are improved, the repair rate is reduced, the repair cost is saved, and the later maintenance cost is reduced.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
List of reference numerals:
1. road base, 2, unloading board, 3, flange plate, 4, geogrid.
Detailed Description
The present invention will be further illustrated with reference to the accompanying drawings and specific embodiments, which are to be understood as merely illustrative of the invention and not as limiting the scope of the invention. It should be noted that the terms "front," "back," "left," "right," "upper" and "lower" used in the following description refer to directions in the drawings, and the terms "inner" and "outer" refer to directions toward and away from, respectively, the geometric center of a particular component.
As shown in the figure, the method for installing the well lid of the roadway comprises the following steps of:
1. the thickness H of the unloading plate is the same as that of the upper base layer, reverse excavation construction is carried out, and the base layer of the plate bottom is smooth and compact;
2. reversely excavating a base layer for construction by the unloading plate, and arranging a geogrid with the width of 1 m between the unloading plate and the surface layer;
3. pre-burying a flange plate during casting of the unloading plate;
4. the shaft is built to the bottom of the pavement structure layer, and is covered by the steel plate with the same caliber, and then the base course is paved, so that the base course is conveniently rolled and the road building material is prevented from falling into the well. After the construction of the current base course, heightening the well body, constructing the upper base course after the steel plate is covered, and the like. Installing a transition well cover at a well mouth during construction of the lower asphalt layer, wherein the elevation of the transition well cover is flush with that of the upper asphalt layer, removing the transition well cover after paving, then installing a well base well cover, and paving an upper asphalt layer;
5. the flange plate is pre-embedded during casting of the unloading plate, and the flange plate is tightly connected with concrete in the pre-embedding process, so that the concrete is vibrated tightly;
6. the reserved bolt holes of the flange plate need to be protected before the well base is installed, so that sundries are prevented from entering;
7. well head installation transition well lid when the lower surface course of pitch is under construction, transition well lid elevation flushes with pitch upper surface course, removes transition well lid after having paved, then installation well seat well lid, pave the surface course under the pitch.
After the traditional slurry well lid is installed, settlement can be easily generated after long time use, and after the process disclosed by the invention is adopted, the condition that settlement is not generated and displacement is not easy to generate can be ensured for a long time due to the action of the unloading plate, so that the well lid is firmer than the well lid installed by the traditional construction process.
The technical means disclosed in the invention scheme are not limited to the technical means disclosed in the above embodiments, but also include the technical scheme formed by any combination of the above technical features.

Claims (4)

1. A method for installing a well cover of a roadway is characterized by comprising the following steps: the method comprises the following steps:
the first step is as follows: after the implementation of the road base layer is finished, reversely excavating and pouring the unloading plate, and simultaneously embedding a flange plate above the junction of the unloading plate and the base layer;
the second step is that: installing a transition well cover on a well head before constructing the lower asphalt surface layer, leveling the elevation of the transition well cover with the lower asphalt surface layer, and then paving the lower asphalt surface layer;
the third step: and after paving the lower surface layer of the asphalt, removing the transitional well cover, then installing the well base and the well cover, and paving the upper surface layer of the asphalt.
2. The method for installing the manhole cover of the roadway according to claim 1, wherein: in the first step, a geogrid with the width of 1 m is arranged between the unloading plate and the surface layer.
3. The method for installing the manhole cover of the roadway according to claim 1, wherein: and (4) installing a transition well cover at the well mouth during the construction of the lower asphalt layer of the second step, wherein the elevation of the transition well cover is flush with the upper asphalt layer.
4. The method for installing the manhole cover of the roadway according to claim 1, wherein: and thirdly, protecting the reserved bolt holes of the flange plate before the well seat is installed.
CN201910862679.8A 2019-09-12 2019-09-12 Method for installing well cover of roadway Pending CN110616744A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910862679.8A CN110616744A (en) 2019-09-12 2019-09-12 Method for installing well cover of roadway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910862679.8A CN110616744A (en) 2019-09-12 2019-09-12 Method for installing well cover of roadway

Publications (1)

Publication Number Publication Date
CN110616744A true CN110616744A (en) 2019-12-27

Family

ID=68923305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910862679.8A Pending CN110616744A (en) 2019-09-12 2019-09-12 Method for installing well cover of roadway

Country Status (1)

Country Link
CN (1) CN110616744A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000065159A1 (en) * 1999-04-23 2000-11-02 Egon Haar Device for compensating relative vertical displacements between ground surfaces and sealing mechanisms with a frame, for built-in structures, and auxiliary device for the same
GB2411409A (en) * 2004-02-24 2005-08-31 Quintin Anthony Murfin Modular inspection chamber
CN104499504A (en) * 2014-11-25 2015-04-08 中铁四局集团第三建设有限公司 Road inspection well and construction method thereof
KR101650349B1 (en) * 2015-04-13 2016-08-23 삼영기술주식회사 Manhole frame height and inclination control valve room
CN107313456A (en) * 2017-06-26 2017-11-03 中国建筑局(集团)有限公司 A kind of municipal inspection shaft and its anti-excavation construction method
CN107882070A (en) * 2017-11-21 2018-04-06 上海市机械施工集团有限公司 A kind of well week reinforcement means

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000065159A1 (en) * 1999-04-23 2000-11-02 Egon Haar Device for compensating relative vertical displacements between ground surfaces and sealing mechanisms with a frame, for built-in structures, and auxiliary device for the same
GB2411409A (en) * 2004-02-24 2005-08-31 Quintin Anthony Murfin Modular inspection chamber
CN104499504A (en) * 2014-11-25 2015-04-08 中铁四局集团第三建设有限公司 Road inspection well and construction method thereof
KR101650349B1 (en) * 2015-04-13 2016-08-23 삼영기술주식회사 Manhole frame height and inclination control valve room
CN107313456A (en) * 2017-06-26 2017-11-03 中国建筑局(集团)有限公司 A kind of municipal inspection shaft and its anti-excavation construction method
CN107882070A (en) * 2017-11-21 2018-04-06 上海市机械施工集团有限公司 A kind of well week reinforcement means

Similar Documents

Publication Publication Date Title
CN204401447U (en) A kind of structure preventing bumping at bridge-head
CN107059667B (en) Door shape assembled armored concrete box culvert and its construction method
CN106759496B (en) Anti-settling inspection shaft changes the outfit technique
CN109610263B (en) Construction method of assembled construction access road
CN105421571A (en) Sewer well and rainwater well construction process
CN110820471A (en) Crossing plate, level crossing structure and laying method
CN201411713Y (en) Manhole of various kinds of pipe networks for urban roads having hole mouth reinforcing mechanism
CN102493288A (en) Prefabricated L-shaped retaining structure
JP6340044B2 (en) Overhang trail construction body and construction method of overhang trail using these
CN107059531A (en) A kind of anti-settling pervious surface and its laying method
CN209039963U (en) A kind of platform back preventing car jump between high road bed and bridge
CN110616744A (en) Method for installing well cover of roadway
CN110792010A (en) Roadbed reinforcing structure for preventing vehicle bump at bridge head and construction method thereof
CN206512546U (en) A kind of anti-settling pervious surface
CN216615676U (en) Bottom sealing structure suitable for soft plastic silt riverbed
CN211713557U (en) Reinforced concrete crossing plate and level crossing structure
CN111926649A (en) Reinforced integrally-built crossing plate for railway special line and line rail fixing device
CN103952950B (en) A kind of flush type track of demountable structure
CN207419538U (en) A kind of height-adjustable inspection shaft covering system
CN213837861U (en) Lower foundation pit packway structure
CN104947565A (en) Construction technology for forming railway crossing by pouring of concrete
CN212505689U (en) Reinforced integrally-built crossing plate for railway special line and line rail fixing device
CN220079583U (en) Contact net pillar protective structure
CN110144784A (en) The town road and its construction method constructed based on prestressed concrete plate stake
KR101756965B1 (en) Height adjusting type maintanable rail track construction method and maintanance method using the same

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191227

RJ01 Rejection of invention patent application after publication