CN110616744A - Method for installing well cover of roadway - Google Patents
Method for installing well cover of roadway Download PDFInfo
- Publication number
- CN110616744A CN110616744A CN201910862679.8A CN201910862679A CN110616744A CN 110616744 A CN110616744 A CN 110616744A CN 201910862679 A CN201910862679 A CN 201910862679A CN 110616744 A CN110616744 A CN 110616744A
- Authority
- CN
- China
- Prior art keywords
- well
- well cover
- installing
- asphalt
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C9/00—Special pavings; Pavings for special parts of roads or airfields
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/12—Manhole shafts; Other inspection or access chambers; Accessories therefor
- E02D29/14—Covers for manholes or the like; Frames for covers
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Road Paving Structures (AREA)
Abstract
According to the method for installing the well cover of the roadway, after the implementation of the road base layer is finished, the unloading plate is excavated and poured reversely, the flange plate is embedded at the same time, the well head is provided with the transition well cover before the construction of the lower asphalt layer, the elevation of the transition well cover is flush with the lower asphalt layer, and then the lower asphalt layer is paved; and after paving the lower surface layer of the asphalt, removing the transitional well cover, then installing the well base and the well cover, and paving the upper surface layer of the asphalt. Simple structure is practical, and the installation is firm, because the effect of off-load board, can effectively resist the sinking that self inhomogeneous settlement and external load produced down, improves the structural strength and the stability of inspection shaft, reduces the rate of reprocessing, saves the expense of reprocessing, reduces the later maintenance cost.
Description
Technical Field
The invention belongs to the technical field of road construction, and particularly relates to a method for installing a well cover of a roadway.
Background
Urban road surface is distributing a large amount of inspection shafts, and traditional well lid installation mainly fixes the well lid with mortar or fine aggregate concrete, produces the level of well lid and vertical direction's displacement easily in the use, and the later stage easily produces inhomogeneous sinking, brings the potential safety hazard for normal road traffic, causes destruction for the facility below the well lid, can cause the traffic accident, threatens people's security of lives and property.
Disclosure of Invention
In order to solve the problems, the invention discloses a method for installing a well cover of a roadway, which is simple and practical in structure, firm in installation and free of settlement.
In order to achieve the purpose, the technical scheme of the invention is as follows:
a method for installing a well lid of a roadway comprises the following steps:
the first step is as follows: after the implementation of the road base layer is finished, reversely excavating and pouring the unloading plate, and simultaneously embedding a flange plate above the junction of the unloading plate and the base layer;
the second step is that: installing a transition well cover on a well head before constructing the lower asphalt surface layer, leveling the elevation of the transition well cover with the lower asphalt surface layer, and then paving the lower asphalt surface layer;
the third step: and after paving the lower surface layer of the asphalt, removing the transitional well cover, then installing the well base and the well cover, and paving the upper surface layer of the asphalt.
As an improvement of the invention, step (1) arranges a geogrid with the width of 1 m between the unloading plate and the surface layer.
As an improvement of the invention, in the step (2), a transition well cover is installed at the well mouth during the construction of the lower asphalt layer, and the elevation of the transition well cover is flush with the upper asphalt layer.
As an improvement of the invention, in the step (3), the reserved bolt holes of the flange plate need to be protected before the well base is installed.
The invention has the beneficial effects that:
according to the method for installing the well lid of the roadway, the unloading plate is poured in a reverse excavation mode after the implementation of the road base layer is finished, the flange plate is embedded in advance, the structure is simple and practical, the installation is firm, the uneven settlement of the unloading plate and the settlement generated under the external load can be effectively resisted under the action of the unloading plate, the structural strength and the stability of the inspection well are improved, the repair rate is reduced, the repair cost is saved, and the later maintenance cost is reduced.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
List of reference numerals:
1. road base, 2, unloading board, 3, flange plate, 4, geogrid.
Detailed Description
The present invention will be further illustrated with reference to the accompanying drawings and specific embodiments, which are to be understood as merely illustrative of the invention and not as limiting the scope of the invention. It should be noted that the terms "front," "back," "left," "right," "upper" and "lower" used in the following description refer to directions in the drawings, and the terms "inner" and "outer" refer to directions toward and away from, respectively, the geometric center of a particular component.
As shown in the figure, the method for installing the well lid of the roadway comprises the following steps of:
1. the thickness H of the unloading plate is the same as that of the upper base layer, reverse excavation construction is carried out, and the base layer of the plate bottom is smooth and compact;
2. reversely excavating a base layer for construction by the unloading plate, and arranging a geogrid with the width of 1 m between the unloading plate and the surface layer;
3. pre-burying a flange plate during casting of the unloading plate;
4. the shaft is built to the bottom of the pavement structure layer, and is covered by the steel plate with the same caliber, and then the base course is paved, so that the base course is conveniently rolled and the road building material is prevented from falling into the well. After the construction of the current base course, heightening the well body, constructing the upper base course after the steel plate is covered, and the like. Installing a transition well cover at a well mouth during construction of the lower asphalt layer, wherein the elevation of the transition well cover is flush with that of the upper asphalt layer, removing the transition well cover after paving, then installing a well base well cover, and paving an upper asphalt layer;
5. the flange plate is pre-embedded during casting of the unloading plate, and the flange plate is tightly connected with concrete in the pre-embedding process, so that the concrete is vibrated tightly;
6. the reserved bolt holes of the flange plate need to be protected before the well base is installed, so that sundries are prevented from entering;
7. well head installation transition well lid when the lower surface course of pitch is under construction, transition well lid elevation flushes with pitch upper surface course, removes transition well lid after having paved, then installation well seat well lid, pave the surface course under the pitch.
After the traditional slurry well lid is installed, settlement can be easily generated after long time use, and after the process disclosed by the invention is adopted, the condition that settlement is not generated and displacement is not easy to generate can be ensured for a long time due to the action of the unloading plate, so that the well lid is firmer than the well lid installed by the traditional construction process.
The technical means disclosed in the invention scheme are not limited to the technical means disclosed in the above embodiments, but also include the technical scheme formed by any combination of the above technical features.
Claims (4)
1. A method for installing a well cover of a roadway is characterized by comprising the following steps: the method comprises the following steps:
the first step is as follows: after the implementation of the road base layer is finished, reversely excavating and pouring the unloading plate, and simultaneously embedding a flange plate above the junction of the unloading plate and the base layer;
the second step is that: installing a transition well cover on a well head before constructing the lower asphalt surface layer, leveling the elevation of the transition well cover with the lower asphalt surface layer, and then paving the lower asphalt surface layer;
the third step: and after paving the lower surface layer of the asphalt, removing the transitional well cover, then installing the well base and the well cover, and paving the upper surface layer of the asphalt.
2. The method for installing the manhole cover of the roadway according to claim 1, wherein: in the first step, a geogrid with the width of 1 m is arranged between the unloading plate and the surface layer.
3. The method for installing the manhole cover of the roadway according to claim 1, wherein: and (4) installing a transition well cover at the well mouth during the construction of the lower asphalt layer of the second step, wherein the elevation of the transition well cover is flush with the upper asphalt layer.
4. The method for installing the manhole cover of the roadway according to claim 1, wherein: and thirdly, protecting the reserved bolt holes of the flange plate before the well seat is installed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910862679.8A CN110616744A (en) | 2019-09-12 | 2019-09-12 | Method for installing well cover of roadway |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910862679.8A CN110616744A (en) | 2019-09-12 | 2019-09-12 | Method for installing well cover of roadway |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110616744A true CN110616744A (en) | 2019-12-27 |
Family
ID=68923305
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910862679.8A Pending CN110616744A (en) | 2019-09-12 | 2019-09-12 | Method for installing well cover of roadway |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110616744A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2000065159A1 (en) * | 1999-04-23 | 2000-11-02 | Egon Haar | Device for compensating relative vertical displacements between ground surfaces and sealing mechanisms with a frame, for built-in structures, and auxiliary device for the same |
GB2411409A (en) * | 2004-02-24 | 2005-08-31 | Quintin Anthony Murfin | Modular inspection chamber |
CN104499504A (en) * | 2014-11-25 | 2015-04-08 | 中铁四局集团第三建设有限公司 | Road inspection well and construction method thereof |
KR101650349B1 (en) * | 2015-04-13 | 2016-08-23 | 삼영기술주식회사 | Manhole frame height and inclination control valve room |
CN107313456A (en) * | 2017-06-26 | 2017-11-03 | 中国建筑局(集团)有限公司 | A kind of municipal inspection shaft and its anti-excavation construction method |
CN107882070A (en) * | 2017-11-21 | 2018-04-06 | 上海市机械施工集团有限公司 | A kind of well week reinforcement means |
-
2019
- 2019-09-12 CN CN201910862679.8A patent/CN110616744A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2000065159A1 (en) * | 1999-04-23 | 2000-11-02 | Egon Haar | Device for compensating relative vertical displacements between ground surfaces and sealing mechanisms with a frame, for built-in structures, and auxiliary device for the same |
GB2411409A (en) * | 2004-02-24 | 2005-08-31 | Quintin Anthony Murfin | Modular inspection chamber |
CN104499504A (en) * | 2014-11-25 | 2015-04-08 | 中铁四局集团第三建设有限公司 | Road inspection well and construction method thereof |
KR101650349B1 (en) * | 2015-04-13 | 2016-08-23 | 삼영기술주식회사 | Manhole frame height and inclination control valve room |
CN107313456A (en) * | 2017-06-26 | 2017-11-03 | 中国建筑局(集团)有限公司 | A kind of municipal inspection shaft and its anti-excavation construction method |
CN107882070A (en) * | 2017-11-21 | 2018-04-06 | 上海市机械施工集团有限公司 | A kind of well week reinforcement means |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204401447U (en) | A kind of structure preventing bumping at bridge-head | |
CN107059667B (en) | Door shape assembled armored concrete box culvert and its construction method | |
CN106759496B (en) | Anti-settling inspection shaft changes the outfit technique | |
CN109610263B (en) | Construction method of assembled construction access road | |
CN105421571A (en) | Sewer well and rainwater well construction process | |
CN110820471A (en) | Crossing plate, level crossing structure and laying method | |
CN201411713Y (en) | Manhole of various kinds of pipe networks for urban roads having hole mouth reinforcing mechanism | |
CN102493288A (en) | Prefabricated L-shaped retaining structure | |
JP6340044B2 (en) | Overhang trail construction body and construction method of overhang trail using these | |
CN107059531A (en) | A kind of anti-settling pervious surface and its laying method | |
CN209039963U (en) | A kind of platform back preventing car jump between high road bed and bridge | |
CN110616744A (en) | Method for installing well cover of roadway | |
CN110792010A (en) | Roadbed reinforcing structure for preventing vehicle bump at bridge head and construction method thereof | |
CN206512546U (en) | A kind of anti-settling pervious surface | |
CN216615676U (en) | Bottom sealing structure suitable for soft plastic silt riverbed | |
CN211713557U (en) | Reinforced concrete crossing plate and level crossing structure | |
CN111926649A (en) | Reinforced integrally-built crossing plate for railway special line and line rail fixing device | |
CN103952950B (en) | A kind of flush type track of demountable structure | |
CN207419538U (en) | A kind of height-adjustable inspection shaft covering system | |
CN213837861U (en) | Lower foundation pit packway structure | |
CN104947565A (en) | Construction technology for forming railway crossing by pouring of concrete | |
CN212505689U (en) | Reinforced integrally-built crossing plate for railway special line and line rail fixing device | |
CN220079583U (en) | Contact net pillar protective structure | |
CN110144784A (en) | The town road and its construction method constructed based on prestressed concrete plate stake | |
KR101756965B1 (en) | Height adjusting type maintanable rail track construction method and maintanance method using the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191227 |
|