CN110611304A - An online early warning method and system for low voltage risk in distribution network - Google Patents

An online early warning method and system for low voltage risk in distribution network Download PDF

Info

Publication number
CN110611304A
CN110611304A CN201810613713.3A CN201810613713A CN110611304A CN 110611304 A CN110611304 A CN 110611304A CN 201810613713 A CN201810613713 A CN 201810613713A CN 110611304 A CN110611304 A CN 110611304A
Authority
CN
China
Prior art keywords
load
preset
voltage
warning
limit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810613713.3A
Other languages
Chinese (zh)
Other versions
CN110611304B (en
Inventor
张瑜
宋晓辉
盛万兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201810613713.3A priority Critical patent/CN110611304B/en
Publication of CN110611304A publication Critical patent/CN110611304A/en
Application granted granted Critical
Publication of CN110611304B publication Critical patent/CN110611304B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/26Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
    • H02H7/261Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured involving signal transmission between at least two stations
    • H02H7/263Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured involving signal transmission between at least two stations involving transmissions of measured values
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/04Circuit arrangements for AC mains or AC distribution networks for connecting networks of the same frequency but supplied from different sources
    • H02J3/06Controlling transfer of power between connected networks; Controlling sharing of load between connected networks
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

本发明提供了一种配电网低电压风险在线预警方法和系统,包括:根据配电网实时监测数据和负荷预测数据,计算配电网中预设的线路的负荷矩;根据负荷矩计算结果,对预设的线路上的预设的负荷点的电压进行计算,并根据预设的低电压越限预警判断规则判断在预设的未来时间段内,配电网是否存在低电压越限风险。该方法和系统为合理改善配电网供电质量提供决策依据,可准确预警配电网低电压风险,具有实用性好、计算简单和易操作的优点。

The invention provides an on-line early warning method and system for low-voltage risk of a distribution network, including: calculating the load moment of a preset line in the distribution network according to the real-time monitoring data and load prediction data of the distribution network; , calculate the voltage of the preset load point on the preset line, and judge whether there is a risk of low voltage overrun in the distribution network in the preset future time period according to the preset low voltage overrun warning judgment rule . The method and system provide a decision basis for rationally improving the power supply quality of the distribution network, can accurately warn the low-voltage risk of the distribution network, and have the advantages of good practicability, simple calculation and easy operation.

Description

一种配电网低电压风险在线预警方法和系统An online early warning method and system for low voltage risk in distribution network

技术领域technical field

本发明属于配电网风险分析与控制技术领域,具体讲涉及一种配电网低电压风险在线预警方法和系统。The invention belongs to the technical field of distribution network risk analysis and control, and in particular relates to an on-line early warning method and system for distribution network low voltage risk.

背景技术Background technique

在配电网中,线路过长、负荷较重、无功补偿不足、负荷分配不合理、配变三相不平衡、导线截面偏小、配变严重偏离负荷中心、配变供电半径过大等都会使电压偏低,电流增大,有可能发生线路过载。In the distribution network, the line is too long, the load is heavy, the reactive power compensation is insufficient, the load distribution is unreasonable, the three-phase distribution transformer is unbalanced, the conductor cross section is too small, the distribution transformer is seriously deviated from the load center, and the power supply radius of the distribution transformer is too large, etc. It will cause the voltage to be low, the current to increase, and the line may be overloaded.

在配电网实际运行中,当配电线路负荷增加或超负荷运行时,线路电压降逐渐增大,超出正常允许范围,若线路无功补偿不足,线路负荷持续增加,导致电压降长时间持续增大,则会导致线路末端发生低电压风险。配电网出现低电压,将极大影响日常生产和生活,线路低电压的发生将导致以下后果:(1)增加线路损耗,降低效率;(2)电动类电器启动困难,温升过高;(3)降低白炽灯亮度,导致荧光灯无法启动;(4)影响荧屏电器的图像质量;(5)影响电热类电器的正常发热。In the actual operation of the distribution network, when the distribution line load increases or is overloaded, the line voltage drop gradually increases, which exceeds the normal allowable range. If the line reactive power compensation is insufficient, the line load continues to increase, causing the voltage drop to continue for a long time. increase, there is a risk of low voltage at the end of the line. The occurrence of low voltage in the distribution network will greatly affect daily production and life. The occurrence of low line voltage will lead to the following consequences: (1) increase line loss and reduce efficiency; (2) electric appliances are difficult to start, and the temperature rise is too high; (3) Reduce the brightness of the incandescent lamp, so that the fluorescent lamp cannot be started; (4) It affects the image quality of the screen electrical appliances; (5) It affects the normal heating of the electric heating appliances.

目前,配电网低电压现象的治理,通常采用配变增容、无功补偿、重负荷线路分流等措施,但这些措施具有一定的滞后性,即往往出现了低电压现象才去进行处理。At present, measures such as distribution transformer capacity increase, reactive power compensation, and heavy-load line shunt are usually adopted to control the low-voltage phenomenon of the distribution network.

发明内容SUMMARY OF THE INVENTION

为克服上述现有技术的不足,本发明提出一种配电网低电压风险在线预警方法和系统,对配电网低电压下降幅值进行预警。In order to overcome the above-mentioned deficiencies of the prior art, the present invention proposes an online pre-warning method and system for low-voltage risk of a distribution network, which can pre-warn the amplitude of low-voltage drop in the distribution network.

实现上述目的所采用的解决方案为:The solutions used to achieve the above goals are:

一种配电网低电压风险在线预警方法,其改进之处在于,An online early warning method for low voltage risk of distribution network, the improvement lies in:

根据配电网实时监测数据和负荷预测数据,计算所述配电网中预设的线路的负荷矩;According to the real-time monitoring data and load prediction data of the distribution network, the load moment of the preset line in the distribution network is calculated;

根据负荷矩计算结果,对预设的所述线路上的预设的负荷点的电压进行计算,并根据预设的低电压越限预警判断规则判断在预设的未来时间段内,所述配电网是否存在低电压越限风险。According to the load moment calculation result, the preset voltage of the preset load point on the line is calculated, and it is determined according to the preset low voltage over-limit early warning judgment rule that within a preset future time period, the distribution Whether there is a risk of low voltage exceeding the limit in the power grid.

本发明提供的第一优选技术方案,其改进之处在于,所述根据配电网实时监测数据和负荷预测数据,计算所述配电网中预设的线路的负荷矩如下式:The first preferred technical solution provided by the present invention is improved in that, according to the real-time monitoring data and load prediction data of the distribution network, the load moment of the preset line in the distribution network is calculated as follows:

M=∑P×L (1)M=∑P×L (1)

其中M为一个时间节点上一条线路的负荷矩,P表示获取的所述线路上所述时间节点的预设的负荷点的负荷预测数据,L表示从配电网实时监测数据中获取的所述线路上负荷点到电源的电气距离,∑表示对所述线路上所述时间节点的预设的负荷点进行求和。where M is the load moment of a line on a time node, P represents the obtained load prediction data of the preset load point at the time node on the line, and L represents the data obtained from the real-time monitoring data of the distribution network. The electrical distance from the load point on the line to the power supply, Σ represents the summation of the preset load points at the time node on the line.

本发明提供的第二优选技术方案,其改进之处在于,所述根据负荷矩计算结果,对预设的所述线路上的预设的负荷点的电压进行计算,并根据预设的低电压越限预警判断规则判断在预设的未来时间段内,所述配电网是否存在低电压越限风险,包括:The second preferred technical solution provided by the present invention is improved in that, according to the calculation result of the load moment, the preset voltage of the load point on the line is calculated, and the preset low voltage is calculated according to the preset low voltage. The over-limit warning judgment rule determines whether there is a low-voltage over-limit risk in the distribution network within a preset future time period, including:

按照负荷矩从大到小的顺序,依次计算预设的所述线路在预设的未来时间段内的时间节点上预设负荷点的电压值,当有负荷点电压低于预设的电压下限值,判断所述线路在所述负荷矩对应的时间节点存在预测低电压越限,直到负荷矩对应的时间节点不存在预测低电压越限;According to the order of load torque from large to small, the preset voltage value of the line at the preset load point at the time node in the preset future time period is calculated in turn. When the voltage of the load point is lower than the preset voltage The limit value is determined, and it is judged that the line has a predicted low voltage exceeding the limit at the time node corresponding to the load moment, until the time node corresponding to the load moment does not have a predicted low voltage exceeding the limit;

根据所述配电网的预设的负荷点在预设的未来时间段内各时间节点对应时刻的历史电压数据,判断预设的负荷点在预设的未来时间段内各时间节点对应时刻是否存在历史低电压越限;According to the historical voltage data of the preset load point of the distribution network at the corresponding time of each time node in the preset future time period, it is determined whether the preset load point corresponds to the time point of each time node in the preset future time period. There is a historical low voltage limit;

当所述时间节点不存在预测低电压越限和历史低电压越限时,给出预警结果为正常;否则给出预警结果为存在低电压越限风险。When there is no predicted low voltage out-of-limit and historical low-voltage out-of-limit at the time node, the warning result is given as normal; otherwise, the warning result is given as a risk of low-voltage out-of-limit risk.

本发明提供的第三优选技术方案,其改进之处在于,所述按照负荷矩从大到小的顺序,依次计算预设的所述线路在预设的未来时间段内的时间节点上预设负荷点的电压值,当有负荷点电压低于预设的电压下限值,判断所述线路在所述负荷矩对应的时间节点存在预测低电压越限,直到负荷矩不存在预设低电压越限,包括:The third preferred technical solution provided by the present invention is improved in that the preset lines are sequentially calculated according to the load moment in descending order and are preset on time nodes within a preset future time period. The voltage value of the load point, when the voltage of a load point is lower than the preset lower voltage limit, it is determined that the line has a predicted low voltage exceeding the limit at the time node corresponding to the load torque, until the preset low voltage does not exist in the load torque Exceeding limits, including:

按照负荷矩从大到小的顺序依次选择预设的所述线路在预设的未来时间段内各时间节点,进行潮流计算,得到预设的负荷点的电压值,并进行如下判断:Select each time node of the preset line in the preset future time period in order according to the load moment from large to small, perform power flow calculation, obtain the voltage value of the preset load point, and make the following judgments:

若有负荷点电压值低于预设的电压下限值,则判断所述线路在所述负荷矩对应的时间节点存在预测低电压越限;If the voltage value of any load point is lower than the preset voltage lower limit value, it is determined that the line has a predicted low voltage exceeding the limit at the time node corresponding to the load moment;

否则,设置所述负荷矩作为所述线路的标准负荷矩,判断所述线路负荷矩小于所述标准负荷矩的时间节点不存在低电压越限并停止潮流计算。Otherwise, the load moment is set as the standard load moment of the line, it is judged that there is no low voltage over-limit at the time node when the line load moment is less than the standard load moment, and the power flow calculation is stopped.

本发明提供的第四优选技术方案,其改进之处在于,结合所述配电网的预设的负荷点在预设的未来时间段内各时间节点对应时刻的历史电压数据,判断预设的负荷点在预设的未来时间段内各时间节点对应时刻是否存在历史低电压越限,包括:The fourth preferred technical solution provided by the present invention is improved in that the preset load point of the power distribution network is combined with the historical voltage data corresponding to each time node in the preset future time period to determine the preset load point. Whether there is a historical low voltage violation at each time node corresponding to the load point in the preset future time period, including:

获取预设时间段内各时间节点对应的一天内同一时刻的各负荷点的历史电压数据,判断所述历史电压数据是否低于电压下限值:若是,判断所述时间节点存在历史低电压越限,否则所述时间节点不存在历史低电压越限。Obtain the historical voltage data of each load point at the same moment of the day corresponding to each time node within the preset time period, and determine whether the historical voltage data is lower than the lower voltage limit value: if so, determine that the time node has historical low voltage higher Otherwise, there is no historical low voltage violation limit at the time node.

本发明提供的第五优选技术方案,其改进之处在于,所述给出预警结果之后,还包括:The fifth preferred technical solution provided by the present invention is improved in that, after the warning result is given, it also includes:

若预警结果为正常,则预警流程结束,等待下一次预警启动;If the warning result is normal, the warning process ends, waiting for the next warning to start;

否则发布预警信息并追踪预警结果;Otherwise, the warning information will be issued and the warning results will be tracked;

所述预警信息包括预测存在低电压越限的时间节点、线路、负荷节点和电压幅值。The early warning information includes time nodes, lines, load nodes and voltage amplitudes at which it is predicted that the low voltage exceeds the limit.

本发明提供的第六优选技术方案,其改进之处在于,所述追踪预警结果包括:The sixth preferred technical solution provided by the present invention is improved in that the tracking and early warning results include:

当所述配电网的拓扑发生变化时,根据最新负荷预测数据重新进行低电压风险预警,如果预警结果为正常,则取消预警信息,结束预警流程,等待下次预警启动;否则,则发布预警信息,并追踪预警结果;When the topology of the distribution network changes, the low-voltage risk warning is re-executed according to the latest load forecast data. If the warning result is normal, the warning information is canceled, the warning process ends, and the next warning is activated; otherwise, a warning is issued. information, and track the warning results;

当所述配电网的拓扑不发生变化时,负荷如果发生变化,则根据最新的负荷预测启动预警流程,如果预警结果为正常,则取消预警信息,结束预警流程,等待下次启动;否则,则发布预警信息,并追踪预警结果;When the topology of the distribution network does not change, if the load changes, start the pre-warning process according to the latest load forecast, if the pre-warning result is normal, cancel the pre-warning information, end the pre-warning process, and wait for the next start; otherwise, The warning information is issued and the warning results are tracked;

当所述配电网的拓扑和负荷均未发生变化时,则等待,直到运行到预警存在低电压越限的时刻,如果未发生低电压越限,则取消预警信息;否则得到发生低电压越限的时刻和电压幅值,取消预警信息。When the topology and load of the distribution network have not changed, wait until the time when the low voltage exceeds the limit in the early warning. If the low voltage exceeds the limit, the warning information is canceled; otherwise, the low voltage exceeds the limit. Limit time and voltage amplitude, cancel the warning information.

一种配电网低电压风险在线预警系统,其改进之处在于,包括:负荷矩计算模块和风险预测模块;An on-line early warning system for low voltage risk of a distribution network, which is improved in that it includes: a load moment calculation module and a risk prediction module;

所述负荷矩计算模块用于根据配电网实时监测数据和负荷预测数据,计算所述配电网中预设的线路的负荷矩;The load torque calculation module is used to calculate the load torque of the preset line in the distribution network according to the real-time monitoring data and load prediction data of the distribution network;

所述风险预测模块用于根据负荷矩计算结果,对预设的所述线路上的预设的负荷点的电压进行计算,并根据预设的低电压越限预警判断规则判断在未来时间段内,所述配电网是否存在低电压越限风险。The risk prediction module is used to calculate the voltage of the preset load point on the line according to the calculation result of the load moment, and to judge in the future time period according to the preset low voltage over-limit warning judgment rule. , whether there is a risk of low voltage over-limiting in the distribution network.

本发明提供的第七优选技术方案,其改进之处在于,所述负荷矩计算模块包括:数据获取子单元和负荷矩计算子单元;The seventh preferred technical solution provided by the present invention is improved in that the load moment calculation module includes: a data acquisition subunit and a load moment calculation subunit;

所述数据获取子单元用于获取预设时间段内各时间节点的负荷预测数据,从配电网实时监测数据中获取配电网中预设的负荷点到电源的电气距离;The data acquisition sub-unit is used to acquire the load prediction data of each time node in a preset time period, and acquire the electrical distance from the preset load point in the distribution network to the power supply from the real-time monitoring data of the distribution network;

所述负荷矩计算子单元用于如下式计算所述配电网中各时间节点上预设的线路的负荷矩:The load moment calculation subunit is used to calculate the load moment of the preset lines on each time node in the distribution network as follows:

M=∑P×L (1)M=∑P×L (1)

其中M为一个时间节点上一条线路的负荷矩,P表示所述线路上所述时间节点的预设的负荷点的负荷预测数据,L表示从配电网实时监测数据中获取的所述线路上负荷点到电源的电气距离,∑表示对所述线路上所述时间节点的预设的负荷点进行求和。where M is the load moment of a line on a time node, P represents the load prediction data of the preset load point at the time node on the line, and L represents the load moment on the line obtained from the real-time monitoring data of the distribution network. The electrical distance from the load point to the power source, Σ represents the summation of the preset load points at the time node on the line.

本发明提供的第八优选技术方案,其改进之处在于,所述风险预测模块包括:未来判断子单元、历史判断子单元和预警子单元;The eighth preferred technical solution provided by the present invention is improved in that the risk prediction module includes: a future judgment subunit, a historical judgment subunit and an early warning subunit;

所述未来判断子单元用于按照负荷矩从大到小的顺序,依次计算预设的所述线路在预设的未来时间段内的时间节点上预设负荷点的电压值,当有负荷点电压低于预设的电压下限值,判断所述线路在所述负荷矩对应的时间节点存在预测低电压越限,直到负荷矩对应的时间节点不存在预测低电压越限;The future judging subunit is used to sequentially calculate the voltage value of the preset load point at the time node of the line in the preset future time period according to the load moment in descending order, when there is a load point. When the voltage is lower than the preset voltage lower limit value, it is determined that the line has a predicted low voltage exceeding the limit at the time node corresponding to the load moment, until the time node corresponding to the load moment does not have a predicted low voltage exceeding the limit;

所述历史判断子单元用于根据所述配电网的预设的负荷点在预设的未来时间段内各时间节点对应时刻的历史电压数据,判断预设的负荷点在预设的未来时间段内各时间节点对应时刻是否存在历史低电压越限;The historical judging subunit is used for judging that the preset load point is in the preset future time according to the historical voltage data corresponding to each time node in the preset future time period of the preset load point of the power distribution network Whether there is a historical low voltage violation at the corresponding time of each time node in the segment;

所述预警子单元用于当所述时间节点不存在预测低电压越限和历史低电压越限时,给出预警结果为正常;否则给出预警结果为存在低电压越限风险。The pre-warning subunit is configured to give a warning result as normal when there is no predicted low-voltage out-of-limit and historical low-voltage out-of-limit at the time node; otherwise, the pre-warning result is given as a risk of low-voltage out-of-limit risk.

本发明提供的第九优选技术方案,其改进之处在于,还包括追踪模块;The ninth preferred technical solution provided by the present invention is improved in that it also includes a tracking module;

所述追踪模块用于若预警结果为正常,则预警流程结束,等待下一次预警启动;The tracking module is used to end the early warning process if the warning result is normal, and wait for the next warning to start;

否则发布预警信息并追踪预警结果;Otherwise, the warning information will be issued and the warning results will be tracked;

所述预警信息包括预测存在低电压越限的时间节点、线路、负荷节点和电压幅值。The early warning information includes time nodes, lines, load nodes and voltage amplitudes at which it is predicted that the low voltage exceeds the limit.

本发明提供的第十优选技术方案,其改进之处在于,所述追踪模块包括:拓扑变化子单元、负荷变化子单元和不变子单元;The tenth preferred technical solution provided by the present invention is improved in that the tracking module includes: a topology change subunit, a load change subunit, and an invariant subunit;

所述拓扑变化子单元用于当所述配电网的拓扑发生变化时,根据最新负荷预测数据重新进行低电压风险预警,如果预警结果为正常,则取消预警信息,等待下次预警启动;否则,则发布预警信息,并追踪预警结果;The topology change subunit is used to re-run low-voltage risk warning according to the latest load forecast data when the topology of the distribution network changes, if the warning result is normal, cancel the warning information and wait for the next warning to start; otherwise , the warning information is issued and the warning results are tracked;

所述负荷变化子单元用于当所述配电网的拓扑不发生变化时,负荷如果发生变化,则根据最新的负荷预测启动预警流程,如果预警结果为正常,则取消预警信息,结束预警流程,等待下次启动;否则,则发布预警信息,并追踪预警结果;The load change sub-unit is used to start an early warning process according to the latest load forecast if the load changes when the topology of the distribution network does not change, and if the early warning result is normal, cancel the early warning information and end the early warning process , wait for the next startup; otherwise, issue warning information and track the warning results;

所述不变子单元用于当所述配电网的拓扑和负荷均未发生变化时,则等待,直到运行到预警存在低电压越限的时刻,如果未发生低电压越限,则取消预警信息;否则得到发生低电压越限的时刻和电压幅值,取消预警信息。The invariant sub-unit is used to wait until the time when there is a low-voltage over-limit in the operation when the topology and load of the distribution network have not changed, and cancel the pre-warning if no low-voltage over-limit occurs. information; otherwise, the time and voltage amplitude when the low voltage exceeds the limit is obtained, and the warning information is cancelled.

与最接近的现有技术相比,本发明具有的有益效果如下:Compared with the closest prior art, the present invention has the following beneficial effects:

本发明提出一种配电网低电压风险在线预警方法和系统,旨在根据电网实时监测数据和负荷预测数据,计算负荷矩,并根据负荷矩的计算结果对预设线路上的预设节点电压指标进行计算和评估,并根据预设的低电压越限预警判断规则判断在预设的未来时间段内,配电网是否存在电压越限风险,为合理改善配电网供电质量提供决策依据,可准确预警配电网低电压风险,具有实用性好、计算简单和易操作的优点。The present invention proposes an on-line early warning method and system for low-voltage risk of distribution network, which aims to calculate the load moment according to the real-time monitoring data and load prediction data of the power grid, and calculate the preset node voltage on the preset line according to the calculation result of the load torque. The indicators are calculated and evaluated, and according to the preset low-voltage over-limit early warning judgment rules, it is judged whether there is a risk of over-voltage in the distribution network in the preset future time period, so as to provide a decision basis for reasonably improving the power supply quality of the distribution network. It can accurately warn the low voltage risk of distribution network, and has the advantages of good practicability, simple calculation and easy operation.

附图说明Description of drawings

图1为本发明提供的一种配电网低电压风险在线预警方法流程示意图。FIG. 1 is a schematic flowchart of an online early warning method for low voltage risk of a distribution network provided by the present invention.

具体实施方式Detailed ways

下面结合附图对本发明的具体实施方式做进一步的详细说明。The specific embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.

本发明提供的一种配电网低电压风险监测及预警方法的流程示意图如图1所示,包括:A schematic flowchart of a low-voltage risk monitoring and early-warning method for a distribution network provided by the present invention is shown in FIG. 1 , including:

根据配电网实时监测数据和负荷预测数据,计算配电网中预设的线路的负荷矩;According to the real-time monitoring data and load forecast data of the distribution network, the load moment of the preset lines in the distribution network is calculated;

根据负荷矩计算结果,对预设的线路上的预设的负荷点的电压进行计算,并根据预设的低电压越限预警判断规则判断在预设的未来时间段内,配电网是否存在低电压越限风险。According to the load moment calculation result, the voltage of the preset load point on the preset line is calculated, and according to the preset low voltage over-limit early warning judgment rule, it is judged whether the distribution network exists in the preset future time period. Risk of low voltage overrun.

具体的,配电网低电压风险在线预警方法具体步骤如下:Specifically, the specific steps of the online early warning method for low voltage risk of distribution network are as follows:

步骤1:获取未来预设时间段内各时间节点的负荷预测数据,如下式计算预设线路在时间节点的负荷矩M:Step 1: Obtain the load prediction data of each time node in the future preset time period, and calculate the load moment M of the preset line at the time node as follows:

M=∑P×L (1)M=∑P×L (1)

其中,负荷点功率为P,负荷点到电源点的电气距离为L,∑表示对同一线路上相同时间节点的预设负荷点进行求和。Among them, the power of the load point is P, the electrical distance from the load point to the power point is L, and ∑ represents the summation of the preset load points at the same time node on the same line.

步骤2:将该线路预测时间段内的负荷矩从大到小进行排序。Step 2: Sort the load moments in the predicted time period of the line from large to small.

步骤3:选取最大负荷矩对应的时间节点,进行潮流计算,保存各负荷点的电压值。Step 3: Select the time node corresponding to the maximum load moment, perform power flow calculation, and save the voltage value of each load point.

步骤4:判断最大负荷矩对应的时间节点下,各负荷点电压是否低于预设的电压下限值。Step 4: Judging whether the voltage of each load point is lower than the preset lower voltage limit at the time node corresponding to the maximum load moment.

步骤5:若有负荷点的电压低于电压下限值,则认为该线路线在最大负荷矩对应的时间节点t’时刻存在预测低电压越限,记录该时刻相应的负荷矩及电压越限的时间节点、电压幅值和负荷节点,转入步骤6;Step 5: If the voltage of any load point is lower than the lower voltage limit, it is considered that the line has a predicted low voltage over-limit at the time node t' corresponding to the maximum load moment, and the corresponding load moment and voltage over-limit at this moment are recorded. time node, voltage amplitude and load node, go to step 6;

若电压在正常范围,记录相应负荷矩,将该时刻的负荷矩作为该条线路的标准负荷矩,判断该线路负荷矩小于标准负荷矩的时间节点不存在预测低电压越限,执行步骤8。If the voltage is in the normal range, record the corresponding load moment, and use the load moment at this moment as the standard load moment of the line. It is judged that the time node when the line load moment is less than the standard load moment does not have a predicted low voltage exceeding the limit, and go to step 8.

步骤6:选择下一个最大负荷矩对应时间节点,进行潮流计算。Step 6: Select the time node corresponding to the next maximum load moment for power flow calculation.

步骤7:若有负荷点电压低于电压下限值,则认为线路在该负荷矩对应的时间节点t”时刻存在预测低电压越限,记录该时刻相应的负荷矩及电压越限时间节点、电压幅值和负荷节点,返回步骤6。Step 7: If there is a load point voltage lower than the lower voltage limit, it is considered that the line has a predicted low voltage over-limit at the time node t” corresponding to the load moment, and the corresponding load moment and voltage over-limit time node at this moment are recorded. Voltage amplitude and load node, return to step 6.

若电压在正常范围,记录负荷矩,将该时刻的负荷矩作为该线路的标准负荷矩,并执行步骤8。If the voltage is in the normal range, record the load moment, take the load moment at this moment as the standard load moment of the line, and go to step 8.

步骤8:结合历史统计的预测时间段内各时间节点的各负荷点的电压情况,根据低电压越限预警判断规则,判断电网是否存在电压越限风险,给出预警结果。其中,历史统计中的历史电压数据为各时间节点各负荷点对应的一天内同一时刻的电压数据。Step 8: According to the voltage situation of each load point at each time node in the predicted time period based on historical statistics, according to the low-voltage out-of-limit early warning judgment rule, determine whether the power grid has a voltage out-of-limit risk, and give an early warning result. Among them, the historical voltage data in the historical statistics is the voltage data at the same time in a day corresponding to each load point at each time node.

判断历史电压数据是否低于电压下限值:若是,判断对应时间节点存在历史低电压越限,否则对应时间节点不存在历史低电压越限;Determine whether the historical voltage data is lower than the lower voltage limit: if so, determine that the corresponding time node has a historical low voltage over-limit, otherwise there is no historical low-voltage over-limit at the corresponding time node;

当该时间节点不存在预测低电压越限和历史低电压越限时,预警结果为正常;When there is no predicted low voltage over-limit and historical under-voltage over-limit at this time node, the warning result is normal;

当该时间节点存在预测低电压越限和历史低电压越限中任一项时,预警结果为存在低电压越限风险。When there is any one of the predicted low voltage out-of-limit and the historical low-voltage out-of-limit at the time node, the warning result is that there is a low-voltage out-of-limit risk.

低电压越限预警判断规则总结如下表1。The low-voltage out-of-limit warning judgment rules are summarized in Table 1 below.

表1低电压越限预警判断规则Table 1 Low-voltage out-of-limit warning judgment rules

步骤9:一条线路计算结束。Step 9: One line calculation ends.

步骤10:对预设线路重复上述步骤1~步骤9,待计算完毕后,对计算结果进行保存和统计分析。所有线路计算完成后同一发布预警信息。Step 10: Repeat the above steps 1 to 9 for the preset line, and after the calculation is completed, save and statistically analyze the calculation result. After the calculation of all lines is completed, the same warning information is issued.

步骤11:如果没有预警,则预警流程结束,等待下一次预警启动。Step 11: If there is no warning, the warning process ends, waiting for the next warning to start.

步骤12:如果有预警,则追踪预警结果。Step 12: If there is an alert, track the alert result.

配电网低电压风险预警结果追踪,需针对网络拓扑变化情况进行追踪,具体内容包括:The tracking of low-voltage risk early warning results in distribution network needs to be tracked based on changes in network topology. The specific contents include:

拓扑发生变化,负荷矩也相应发生变化,下面分两种情况进行判断:When the topology changes, the load moment also changes accordingly. The judgment is divided into two situations as follows:

(1)当拓扑发生变化时,根据最新负荷预测结果重新进行低电压风险预警步骤,如果结果是没有低电压,则取消预警信息,并记录当前正常运行的电压幅值,结束预警流程,等待下次启动;如果仍有低电压,则仍发布预警信息,并进行低电压风险追踪。(1) When the topology changes, perform the low-voltage risk warning step again according to the latest load prediction result. If the result is that there is no low voltage, cancel the warning information, record the voltage amplitude of the current normal operation, end the warning process, and wait for the next If there is still low voltage, the warning information will still be issued, and the risk of low voltage will be tracked.

(2)当拓扑不发生变化时,负荷如果发生变化,则根据最新的负荷预测启动预警流程,如果结果是没有低电压,则取消预警信息,并记录当前正常运行的电压幅值,结束预警流程,等待下次启动。如果仍有低电压,则进行低电压风险追踪。如果负荷未发生变化,则等待,直到运行到预警发生低电压的时刻,如果未发生低电压,则记录当前正常运行的电压幅值,取消预警信息;如果发生低电压,记录该时刻发生低电压越限,并记录电压幅值,取消预警信息。(2) When the topology does not change, if the load changes, start the early warning process according to the latest load forecast. If the result is that there is no low voltage, cancel the early warning information, and record the voltage amplitude of the current normal operation, and end the early warning process , wait for the next startup. If there is still a low voltage, a low voltage risk trace is performed. If the load does not change, wait until the time when the low voltage warning occurs. If the low voltage does not occur, record the voltage amplitude of the current normal operation and cancel the warning information; if the low voltage occurs, record the low voltage at this moment. Over the limit, and record the voltage amplitude, cancel the warning information.

基于同一发明构思,本发明还提供了一种配电网低电压风险在线预警系统,由于这些设备解决技术问题的原理与配电网低电压风险在线预警方法相似,重复之处不再赘述。Based on the same inventive concept, the present invention also provides an on-line early warning system for low-voltage risk of distribution network. Since the principle of these devices for solving technical problems is similar to the method of on-line early-warning of low-voltage risk of electrical distribution network, the repetition will not be repeated.

该系统包括负荷矩计算模块和风险预测模块;The system includes a load moment calculation module and a risk prediction module;

其中,负荷矩计算模块用于根据配电网实时监测数据和负荷预测数据,计算配电网中预设的线路的负荷矩;Wherein, the load torque calculation module is used to calculate the load torque of the preset lines in the distribution network according to the real-time monitoring data and load prediction data of the distribution network;

风险预测模块用于根据负荷矩计算结果,对预设的线路上的预设的负荷点的电压进行计算,并根据预设的低电压越限预警判断规则判断在未来时间段内,配电网是否存在低电压越限风险。The risk prediction module is used to calculate the voltage of the preset load point on the preset line according to the calculation result of the load moment, and judge the power distribution network in the future time period according to the preset low-voltage over-limit early warning judgment rule. Whether there is a risk of low voltage overrun.

其中,负荷矩计算模块包括:数据获取子单元和负荷矩计算子单元;Wherein, the load moment calculation module includes: a data acquisition subunit and a load moment calculation subunit;

数据获取子单元用于获取预设时间段内各时间节点的负荷预测数据,从配电网实时监测数据中获取配电网中预设的负荷点到电源的电气距离;The data acquisition sub-unit is used to acquire the load prediction data of each time node in the preset time period, and obtain the electrical distance from the preset load point in the distribution network to the power source from the real-time monitoring data of the distribution network;

负荷矩计算子单元用于如下式计算配电网中各时间节点上预设的线路的负荷矩:The load moment calculation subunit is used to calculate the load moment of the preset lines on each time node in the distribution network as follows:

M=∑P×L (1)M=∑P×L (1)

其中M为一个时间节点上一条线路的负荷矩,P表示该线路上该时间节点的预设的负荷点的负荷预测数据,L表示线路上负荷点到电源的电气距离,∑表示对同一线路上时间节点的预设负荷点进行求和。Among them, M is the load moment of a line on a time node, P represents the load prediction data of the preset load point on the line at this time node, L represents the electrical distance from the load point on the line to the power supply, and ∑ represents the load on the same line. The preset load points of the time nodes are summed.

其中,风险预测模块包括:未来判断子单元、历史判断子单元和预警子单元;The risk prediction module includes: a future judgment subunit, a historical judgment subunit, and an early warning subunit;

未来判断子单元用于按照负荷矩从大到小的顺序,依次计算预设的线路在预设的未来时间段内的时间节点上预设负荷点的电压值,当有负荷点电压低于预设的电压下限值,判断线路在负荷矩对应的时间节点存在预测低电压越限,直到负荷矩对应的时间节点不存在预测低电压越限;The future judgment subunit is used to calculate the voltage value of the preset load point on the preset line at the time node in the preset future time period in order according to the load moment from large to small, when the voltage of the load point is lower than the preset value. Set the lower limit of the voltage, and judge that the line has a predicted low voltage over-limit at the time node corresponding to the load moment, until the time node corresponding to the load moment does not have a predicted low voltage over-limit;

历史判断子单元用于根据配电网的预设的负荷点在预设的未来时间段内各时间节点对应时刻的历史电压数据,判断预设的负荷点在预设的未来时间段内各时间节点对应时刻是否存在历史低电压越限;The historical judgment sub-unit is used for judging the preset load point at each time in the preset future time period according to the historical voltage data corresponding to each time node in the preset future time period of the preset load point of the distribution network Whether there is a historical low voltage violation at the time corresponding to the node;

预警子单元用于当时间节点不存在预测低电压越限和历史低电压越限时,给出预警结果为正常;否则给出预警结果为存在低电压越限风险。The early warning subunit is used to give an early warning result when there is no predicted low voltage out-of-limit and historical low-voltage out-of-limit at the time node;

该系统还包括追踪模块;The system also includes a tracking module;

追踪模块用于若预警结果为正常,则预警流程结束,等待下一次预警启动;The tracking module is used to end the warning process if the warning result is normal, and wait for the next warning to start;

否则发布预警信息并追踪预警结果;Otherwise, the warning information will be issued and the warning results will be tracked;

预警信息包括预测存在低电压越限的时间节点、线路、负荷节点和电压幅值。The early warning information includes time nodes, lines, load nodes and voltage amplitudes that are predicted to have low voltage violations.

其中,追踪模块包括:拓扑变化子单元、负荷变化子单元和不变子单元;Wherein, the tracking module includes: a topology change subunit, a load change subunit and an invariant subunit;

拓扑变化子单元用于当配电网的拓扑发生变化时,根据最新负荷预测数据重新进行低电压风险预警,如果预警结果为正常,则取消预警信息,结束预警流程,等待下次预警启动;否则,则发布预警信息,并追踪预警结果;The topology change sub-unit is used to re-run low-voltage risk warning according to the latest load forecast data when the topology of the distribution network changes. If the warning result is normal, cancel the warning information, end the warning process, and wait for the next warning to start; otherwise , the warning information is issued and the warning results are tracked;

负荷变化子单元用于当配电网的拓扑不发生变化时,负荷如果发生变化,则根据最新的负荷预测启动预警流程,如果预警结果为正常,则取消预警信息,结束预警流程,等待下次启动;否则,则发布预警信息,并追踪预警结果;The load change sub-unit is used to start the early warning process according to the latest load forecast if the load changes when the topology of the distribution network does not change. If the early warning result is normal, cancel the early warning information, end the early warning process, and wait for the next time. Start; otherwise, the warning information will be issued and the warning results will be tracked;

不变子单元用于当配电网的拓扑和负荷均未发生变化时,则等待,直到运行到预警存在低电压越限的时刻,如果未发生低电压越限,则取消预警信息;否则得到发生低电压越限的时刻和电压幅值,取消预警信息。The invariant sub-unit is used to wait when the topology and load of the distribution network have not changed, until the operation reaches the time when the low voltage exceeds the limit. If no low voltage exceeds the limit, the warning information is canceled; otherwise, the The time and voltage amplitude when the low voltage exceeds the limit will cancel the warning message.

最后应当说明的是:以上实施例仅用于说明本申请的技术方案而非对其保护范围的限制,尽管参照上述实施例对本申请进行了详细的说明,所属领域的普通技术人员应当理解:本领域技术人员阅读本申请后依然可对申请的具体实施方式进行种种变更、修改或者等同替换,但这些变更、修改或者等同替换,均在申请待批的权利要求保护范围之内。Finally, it should be noted that: the above embodiments are only used to illustrate the technical solutions of the present application rather than limitations of its protection scope, although the present application has been described in detail with reference to the above embodiments, those of ordinary skill in the art should understand: After reading this application, those skilled in the art can still make various changes, modifications or equivalent replacements to the specific embodiments of the application, but these changes, modifications or equivalent replacements are all within the protection scope of the pending claims.

Claims (12)

1.一种配电网低电压风险在线预警方法,其特征在于:1. an on-line early warning method for low voltage risk of distribution network, is characterized in that: 根据配电网实时监测数据和负荷预测数据,计算所述配电网中预设的线路的负荷矩;According to the real-time monitoring data and load prediction data of the distribution network, the load moment of the preset line in the distribution network is calculated; 根据负荷矩计算结果,对预设的所述线路上的预设的负荷点的电压进行计算,并根据预设的低电压越限预警判断规则判断在预设的未来时间段内,所述配电网是否存在低电压越限风险。According to the load moment calculation result, the preset voltage of the preset load point on the line is calculated, and it is determined according to the preset low voltage over-limit early warning judgment rule that within a preset future time period, the distribution Whether there is a risk of low voltage exceeding the limit in the power grid. 2.如权利要求1所述的方法,其特征在于,所述根据配电网实时监测数据和负荷预测数据,计算所述配电网中预设的线路的负荷矩如下式:2. The method according to claim 1, wherein, according to the real-time monitoring data of the distribution network and the load prediction data, the load moment of the preset line in the distribution network is calculated as follows: M=∑P×L (1)M=∑P×L (1) 其中M为一个时间节点上一条线路的负荷矩,P表示获取的所述线路上所述时间节点的预设的负荷点的负荷预测数据,L表示从配电网实时监测数据中获取的所述线路上负荷点到电源的电气距离,∑表示对所述线路上所述时间节点的预设的负荷点进行求和。where M is the load moment of a line on a time node, P represents the obtained load prediction data of the preset load point at the time node on the line, and L represents the data obtained from the real-time monitoring data of the distribution network. The electrical distance from the load point on the line to the power supply, Σ represents the summation of the preset load points at the time node on the line. 3.如权利要求1所述的方法,其特征在于,所述根据负荷矩计算结果,对预设的所述线路上的预设的负荷点的电压进行计算,并根据预设的低电压越限预警判断规则判断在预设的未来时间段内,所述配电网是否存在低电压越限风险,包括:3 . The method according to claim 1 , wherein, according to the calculation result of the load moment, the preset voltage of the load point on the line is calculated, and the voltage of the preset low voltage is calculated according to the preset low voltage. 4 . The limit warning judgment rule judges whether there is a low voltage over-limit risk in the distribution network within a preset future time period, including: 按照负荷矩从大到小的顺序,依次计算预设的所述线路在预设的未来时间段内的时间节点上预设负荷点的电压值,当有负荷点电压低于预设的电压下限值,判断所述线路在所述负荷矩对应的时间节点存在预测低电压越限,直到负荷矩对应的时间节点不存在预测低电压越限;According to the order of load torque from large to small, the preset voltage value of the line at the preset load point at the time node in the preset future time period is calculated in turn. When the voltage of the load point is lower than the preset voltage The limit value is determined, and it is judged that the line has a predicted low voltage exceeding the limit at the time node corresponding to the load moment, until the time node corresponding to the load moment does not have a predicted low voltage exceeding the limit; 根据所述配电网的预设的负荷点在预设的未来时间段内各时间节点对应时刻的历史电压数据,判断预设的负荷点在预设的未来时间段内各时间节点对应时刻是否存在历史低电压越限;According to the historical voltage data of the preset load point of the distribution network at the corresponding time of each time node in the preset future time period, it is determined whether the preset load point corresponds to the time point of each time node in the preset future time period. There is a historical low voltage limit; 当所述时间节点不存在预测低电压越限和历史低电压越限时,给出预警结果为正常;否则给出预警结果为存在低电压越限风险。When there is no predicted low voltage out-of-limit and historical low-voltage out-of-limit at the time node, the warning result is given as normal; otherwise, the warning result is given as a risk of low-voltage out-of-limit risk. 4.如权利要求3所述的方法,其特征在于,所述按照负荷矩从大到小的顺序,依次计算预设的所述线路在预设的未来时间段内的时间节点上预设负荷点的电压值,当有负荷点电压低于预设的电压下限值,判断所述线路在所述负荷矩对应的时间节点存在预测低电压越限,直到负荷矩不存在预设低电压越限,包括:4 . The method according to claim 3 , wherein, according to the load moment in descending order, the preset load of the line at the time node in the preset future time period is calculated sequentially. 4 . When the voltage at the load point is lower than the preset voltage lower limit value, it is determined that the line has a predicted low voltage exceeding the limit at the time node corresponding to the load torque, until the preset low voltage exceeds the limit when the load torque does not exist. limits, including: 按照负荷矩从大到小的顺序依次选择预设的所述线路在预设的未来时间段内各时间节点,进行潮流计算,得到预设的负荷点的电压值,并进行如下判断:Select each time node of the preset line in the preset future time period in order according to the load moment from large to small, perform power flow calculation, obtain the voltage value of the preset load point, and make the following judgments: 若有负荷点电压值低于预设的电压下限值,则判断所述线路在所述负荷矩对应的时间节点存在预测低电压越限;If the voltage value of any load point is lower than the preset voltage lower limit value, it is determined that the line has a predicted low voltage exceeding the limit at the time node corresponding to the load moment; 否则,设置所述负荷矩作为所述线路的标准负荷矩,判断所述线路负荷矩小于所述标准负荷矩的时间节点不存在低电压越限并停止潮流计算。Otherwise, the load moment is set as the standard load moment of the line, it is judged that there is no low voltage over-limit at the time node when the line load moment is less than the standard load moment, and the power flow calculation is stopped. 5.如权利要求3所述的方法,其特征在于,所述结合所述配电网的预设的负荷点在预设的未来时间段内各时间节点对应时刻的历史电压数据,判断预设的负荷点在预设的未来时间段内各时间节点对应时刻是否存在历史低电压越限,包括:5 . The method according to claim 3 , wherein the predetermined load point of the power distribution network is combined with historical voltage data corresponding to each time node in a preset future time period to determine the preset value. 6 . Whether there is a historical low voltage violation at the corresponding time point of each time node in the preset future time period, including: 获取预设时间段内各时间节点对应的一天内同一时刻的各负荷点的历史电压数据,判断所述历史电压数据是否低于电压下限值:若是,判断所述时间节点存在历史低电压越限,否则所述时间节点不存在历史低电压越限。Obtain the historical voltage data of each load point at the same moment of the day corresponding to each time node within the preset time period, and determine whether the historical voltage data is lower than the lower voltage limit value: if so, determine that the time node has historical low voltage higher Otherwise, there is no historical low voltage violation limit at the time node. 6.如权利要求3所述的方法,其特征在于,所述给出预警结果之后,还包括:6. The method according to claim 3, characterized in that, after the warning result is given, further comprising: 若预警结果为正常,则预警流程结束,等待下一次预警启动;If the warning result is normal, the warning process ends, waiting for the next warning to start; 否则发布预警信息并追踪预警结果;Otherwise, the warning information will be issued and the warning results will be tracked; 所述预警信息包括预测存在低电压越限的时间节点、线路、负荷节点和电压幅值。The early warning information includes time nodes, lines, load nodes and voltage amplitudes at which it is predicted that the low voltage exceeds the limit. 7.如权利要求6所述的方法,其特征在于,所述追踪预警结果包括:7. The method of claim 6, wherein the tracking and warning results comprise: 当所述配电网的拓扑发生变化时,根据最新负荷预测数据重新进行低电压风险预警,如果预警结果为正常,则取消预警信息,结束预警流程,等待下次预警启动;否则,则发布预警信息,并追踪预警结果;When the topology of the distribution network changes, the low-voltage risk warning is re-executed according to the latest load forecast data. If the warning result is normal, the warning information is canceled, the warning process ends, and the next warning is activated; otherwise, a warning is issued. information, and track the warning results; 当所述配电网的拓扑不发生变化时,负荷如果发生变化,则根据最新的负荷预测启动预警流程,如果预警结果为正常,则取消预警信息,结束预警流程,等待下次启动;否则,则发布预警信息,并追踪预警结果;When the topology of the distribution network does not change, if the load changes, start the pre-warning process according to the latest load forecast, if the pre-warning result is normal, cancel the pre-warning information, end the pre-warning process, and wait for the next start; otherwise, The warning information is issued and the warning results are tracked; 当所述配电网的拓扑和负荷均未发生变化时,则等待,直到运行到预警存在低电压越限的时刻,如果未发生低电压越限,则取消预警信息;否则得到发生低电压越限的时刻和电压幅值,取消预警信息。When the topology and load of the distribution network have not changed, wait until the time when the low voltage exceeds the limit in the early warning. If the low voltage exceeds the limit, the warning information is canceled; otherwise, the low voltage exceeds the limit. Limit time and voltage amplitude, cancel the warning information. 8.一种配电网低电压风险在线预警系统,其特征在于,包括:负荷矩计算模块和风险预测模块;8. An on-line early warning system for low voltage risk in a distribution network, characterized in that it comprises: a load moment calculation module and a risk prediction module; 所述负荷矩计算模块用于根据配电网实时监测数据和负荷预测数据,计算所述配电网中预设的线路的负荷矩;The load torque calculation module is used to calculate the load torque of the preset line in the distribution network according to the real-time monitoring data and load prediction data of the distribution network; 所述风险预测模块用于根据负荷矩计算结果,对预设的所述线路上的预设的负荷点的电压进行计算,并根据预设的低电压越限预警判断规则判断在未来时间段内,所述配电网是否存在低电压越限风险。The risk prediction module is used to calculate the voltage of the preset load point on the line according to the calculation result of the load moment, and to judge in the future time period according to the preset low voltage over-limit warning judgment rule. , whether there is a risk of low voltage over-limiting in the distribution network. 9.如权利要求8所述的系统,其特征在于,所述负荷矩计算模块包括:数据获取子单元和负荷矩计算子单元;9. The system of claim 8, wherein the load moment calculation module comprises: a data acquisition subunit and a load moment calculation subunit; 所述数据获取子单元用于获取预设时间段内各时间节点的负荷预测数据,从配电网实时监测数据中获取配电网中预设的负荷点到电源的电气距离;The data acquisition sub-unit is used to acquire the load prediction data of each time node in a preset time period, and acquire the electrical distance from the preset load point in the distribution network to the power supply from the real-time monitoring data of the distribution network; 所述负荷矩计算子单元用于如下式计算所述配电网中各时间节点上预设的线路的负荷矩:The load moment calculation subunit is used to calculate the load moment of the preset lines on each time node in the distribution network as follows: M=∑P×L (1)M=∑P×L (1) 其中M为一个时间节点上一条线路的负荷矩,P表示所述线路上所述时间节点的预设的负荷点的负荷预测数据,L表示从配电网实时监测数据中获取的所述线路上负荷点到电源的电气距离,∑表示对所述线路上所述时间节点的预设的负荷点进行求和。where M is the load moment of a line on a time node, P represents the load prediction data of the preset load point at the time node on the line, and L represents the load moment on the line obtained from the real-time monitoring data of the distribution network. The electrical distance from the load point to the power source, Σ represents the summation of the preset load points at the time node on the line. 10.如权利要求8所述的系统,其特征在于,所述风险预测模块包括:未来判断子单元、历史判断子单元和预警子单元;10. The system of claim 8, wherein the risk prediction module comprises: a future judgment subunit, a historical judgment subunit, and an early warning subunit; 所述未来判断子单元用于按照负荷矩从大到小的顺序,依次计算预设的所述线路在预设的未来时间段内的时间节点上预设负荷点的电压值,当有负荷点电压低于预设的电压下限值,判断所述线路在所述负荷矩对应的时间节点存在预测低电压越限,直到负荷矩对应的时间节点不存在预测低电压越限;The future judging subunit is used to sequentially calculate the voltage value of the preset load point at the time node of the line in the preset future time period according to the load moment in descending order, when there is a load point. When the voltage is lower than the preset voltage lower limit value, it is determined that the line has a predicted low voltage exceeding the limit at the time node corresponding to the load moment, until the time node corresponding to the load moment does not have a predicted low voltage exceeding the limit; 所述历史判断子单元用于根据所述配电网的预设的负荷点在预设的未来时间段内各时间节点对应时刻的历史电压数据,判断预设的负荷点在预设的未来时间段内各时间节点对应时刻是否存在历史低电压越限;The historical judging subunit is used for judging that the preset load point is in the preset future time according to the historical voltage data corresponding to each time node in the preset future time period of the preset load point of the power distribution network Whether there is a historical low voltage violation at the corresponding time of each time node in the segment; 所述预警子单元用于当所述时间节点不存在预测低电压越限和历史低电压越限时,给出预警结果为正常;否则给出预警结果为存在低电压越限风险。The pre-warning subunit is configured to give a warning result as normal when there is no predicted low-voltage out-of-limit and historical low-voltage out-of-limit at the time node; otherwise, the pre-warning result is given as a risk of low-voltage out-of-limit risk. 11.如权利要求10所述的系统,其特征在于,还包括追踪模块;11. The system of claim 10, further comprising a tracking module; 所述追踪模块用于若预警结果为正常,则预警流程结束,等待下一次预警启动;The tracking module is used to end the early warning process if the warning result is normal, and wait for the next warning to start; 否则发布预警信息并追踪预警结果;Otherwise, the warning information will be issued and the warning results will be tracked; 所述预警信息包括预测存在低电压越限的时间节点、线路、负荷节点和电压幅值。The early warning information includes time nodes, lines, load nodes and voltage amplitudes at which it is predicted that the low voltage exceeds the limit. 12.如权利要求11所述的系统,其特征在于,所述追踪模块包括:拓扑变化子单元、负荷变化子单元和不变子单元;12. The system of claim 11, wherein the tracking module comprises: a topology change subunit, a load change subunit, and an invariant subunit; 所述拓扑变化子单元用于当所述配电网的拓扑发生变化时,根据最新负荷预测数据重新进行低电压风险预警,如果预警结果为正常,则取消预警信息,等待下次预警启动;否则,则发布预警信息,并追踪预警结果;The topology change subunit is used to re-run low-voltage risk warning according to the latest load forecast data when the topology of the distribution network changes, if the warning result is normal, cancel the warning information and wait for the next warning to start; otherwise , the warning information is issued and the warning results are tracked; 所述负荷变化子单元用于当所述配电网的拓扑不发生变化时,负荷如果发生变化,则根据最新的负荷预测启动预警流程,如果预警结果为正常,则取消预警信息,结束预警流程,等待下次启动;否则,则发布预警信息,并追踪预警结果;The load change sub-unit is used to start an early warning process according to the latest load forecast if the load changes when the topology of the distribution network does not change, and if the early warning result is normal, cancel the early warning information and end the early warning process , wait for the next startup; otherwise, issue warning information and track the warning results; 所述不变子单元用于当所述配电网的拓扑和负荷均未发生变化时,则等待,直到运行到预警存在低电压越限的时刻,如果未发生低电压越限,则取消预警信息;否则得到发生低电压越限的时刻和电压幅值,取消预警信息。The invariant sub-unit is used to wait until the time when there is a low-voltage over-limit in the operation when the topology and load of the distribution network have not changed, and cancel the pre-warning if no low-voltage over-limit occurs. information; otherwise, the time and voltage amplitude when the low voltage exceeds the limit is obtained, and the warning information is cancelled.
CN201810613713.3A 2018-06-14 2018-06-14 Power distribution network low-voltage risk online early warning method and system Active CN110611304B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810613713.3A CN110611304B (en) 2018-06-14 2018-06-14 Power distribution network low-voltage risk online early warning method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810613713.3A CN110611304B (en) 2018-06-14 2018-06-14 Power distribution network low-voltage risk online early warning method and system

Publications (2)

Publication Number Publication Date
CN110611304A true CN110611304A (en) 2019-12-24
CN110611304B CN110611304B (en) 2022-09-02

Family

ID=68887568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810613713.3A Active CN110611304B (en) 2018-06-14 2018-06-14 Power distribution network low-voltage risk online early warning method and system

Country Status (1)

Country Link
CN (1) CN110611304B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117614132A (en) * 2023-11-27 2024-02-27 广州航海学院 Distribution transformer voltage limit imaging method and device for distribution network

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102063651A (en) * 2010-11-10 2011-05-18 中国电力科学研究院 Urban power grid risk evaluation system based on on-line data acquisition
CN103326354A (en) * 2013-05-23 2013-09-25 国家电网公司 Closed loop power distribution network tide estimation method based on load moment
CN103400047A (en) * 2013-08-21 2013-11-20 国家电网公司 Method for processing bus voltage overrun risk information of power transmission system
CN104330669A (en) * 2014-11-03 2015-02-04 国家电网公司 Load moment based low-voltage early-warning method for rural distribution network
CN106571629A (en) * 2016-11-16 2017-04-19 合肥普望电子有限责任公司 Power distribution network low-voltage early warning method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102063651A (en) * 2010-11-10 2011-05-18 中国电力科学研究院 Urban power grid risk evaluation system based on on-line data acquisition
CN103326354A (en) * 2013-05-23 2013-09-25 国家电网公司 Closed loop power distribution network tide estimation method based on load moment
CN103400047A (en) * 2013-08-21 2013-11-20 国家电网公司 Method for processing bus voltage overrun risk information of power transmission system
CN104330669A (en) * 2014-11-03 2015-02-04 国家电网公司 Load moment based low-voltage early-warning method for rural distribution network
CN106571629A (en) * 2016-11-16 2017-04-19 合肥普望电子有限责任公司 Power distribution network low-voltage early warning method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117614132A (en) * 2023-11-27 2024-02-27 广州航海学院 Distribution transformer voltage limit imaging method and device for distribution network
CN117614132B (en) * 2023-11-27 2024-06-11 广州航海学院 Distribution transformer voltage over-limit image method and device for distribution network

Also Published As

Publication number Publication date
CN110611304B (en) 2022-09-02

Similar Documents

Publication Publication Date Title
CN108037780B (en) Oil-immersed transformer cooling control method based on temperature rise and load rate
CN101425686B (en) An Adaptive Screening Method for Predicted Fault Sets in On-line Security and Stability Assessment of Power Systems
CN104252686B (en) A kind of power grid security overall target determines method
CN103941079B (en) Power distribution network PT on-line monitoring and fault diagnosis system
CN103985068A (en) Online risk evaluation method for power distribution network
CN104166940B (en) Power distribution network operation risk assessment method and assessment system
CN109450089B (en) Transformer area low voltage identification method and device and terminal equipment
CN109993665B (en) Online safety and stability assessment method, device and system for power system
CN110750760B (en) Anomaly Theoretical Line Loss Detection Method Based on Situation Awareness and Control Chart
CN107171316B (en) An energy-feedback voltage sag characteristic sensitive load simulation method
CN103632311A (en) Fault examining system and method for power grid operation
CN108287294A (en) Distribution network failure region Fast Identification Method based on power failure distribution transforming and topological analysis
CN107181253A (en) A kind of Electric power network planning method based on power network dynamic reliability probability level
CN211121641U (en) High voltage passive wireless temperature online monitoring system
CN107730076A (en) A kind of regional distribution network equipment complex utilization ratio analysis method
CN107516903B (en) A Precise Load Control Method Considering Economy and Multi-time Scale Safety and Stability
CN107067126B (en) Thermal stability key power transmission channel identification method based on power flow transfer ratio
CN104408539B (en) A kind of comprehensive evaluation of power distribution network optimization allocation method and system
CN116050667B (en) Distributed photovoltaic-oriented smart grid load forecasting management system and management method
CN110611304B (en) Power distribution network low-voltage risk online early warning method and system
CN103326352B (en) A kind of power distribution network cable line local overheating Risk Identification
CN102789603A (en) Provincial dispatch active regulation method for considering load switch-off model
CN106295176B (en) A method of assessment transformer short-circuit and damage risk
CN109217320A (en) A kind of electric power system control management method
CN106253355B (en) Parallel operation system power supply module number fuzzy control method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant