CN110588892A - 一种简易fsru靠泊及天然气外输装置 - Google Patents
一种简易fsru靠泊及天然气外输装置 Download PDFInfo
- Publication number
- CN110588892A CN110588892A CN201910835999.4A CN201910835999A CN110588892A CN 110588892 A CN110588892 A CN 110588892A CN 201910835999 A CN201910835999 A CN 201910835999A CN 110588892 A CN110588892 A CN 110588892A
- Authority
- CN
- China
- Prior art keywords
- mooring
- fsru
- barge
- natural gas
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 title claims abstract description 26
- 239000003345 natural gas Substances 0.000 title claims abstract description 13
- 239000003949 liquefied natural gas Substances 0.000 claims abstract description 6
- 230000000694 effects Effects 0.000 claims description 2
- 239000007789 gas Substances 0.000 claims 3
- 238000009434 installation Methods 0.000 claims 3
- 238000000034 method Methods 0.000 description 3
- 230000033001 locomotion Effects 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 238000002309 gasification Methods 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 230000008016 vaporization Effects 0.000 description 1
- 238000009834 vaporization Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/50—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/50—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
- B63B21/507—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers with mooring turrets
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/24—Arrangement of ship-based loading or unloading equipment for cargo or passengers of pipe-lines
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Loading And Unloading Of Fuel Tanks Or Ships (AREA)
Abstract
本发明公开了一种简易FSRU靠泊及天然气外输装置,包括FSRU(1)、单点系泊装置(3)和系泊驳船(2),FSRU(1)上的液化天然气,增压并气化后,通过跨接管(4)连接到单点系泊装置(3)上,经单点系泊装置(3)上的旋转接头(6)接入立管(9),最后采用经海底管道终端(11)与立管(9)连通的海底管道(10)输送至陆地或海上用户;单点系泊装置(3)转动设在系泊驳船(2)上。本发明费用至少降低50%~70%,并降低事故风险。
Description
技术领域
本发明涉及一种海洋工程及能源领域的FSRU系泊及外输装置,具体为一种简易FSRU靠泊及天然气外输装置。
背景技术
LNG作为低碳清洁能源越来越受到国际关注与重视,很多国家都将LNG列为首选燃料。
FSRU是天然气运输和输送过程最重要的储存、增压和气化装备。一般采用靠泊在码头的方式,将所储存的LNG增压并气化后外输。这种方式造成码头岸线长期被占用,也会占用航道,且存在与其他船只碰撞的风险。若单独为FSRU建造码头,则投资非常大,经济性差,且周期长。如果置于码头之外,FSRU的作业受到风浪条件的限制,其外输对浮体的系泊和运动又有较高的要求,长时间置于码头会增加FSRU作业风险。
发明内容
为了解决以上技术问题,本发明提供一种简易FSRU靠泊及天然气外输装置,包括FSRU、单点系泊装置和系泊驳船。FSRU 是浮式存储及汽化装置,为现有技术。FSRU 通过系泊缆与和系泊驳船连接;系泊驳船上设单点系泊装置,单点系泊装置的转柱通过系泊链固定在海床上。FSRU上的液化天然气,增压并气化后,通过跨接管线连接到单点系泊装置上,通过单点系泊装置上的旋转接头接入立管,并通过海底管道输送至陆地或海上用户。单点系泊装置的立管一端通过海底管道终端与海底管道连接,立管另一端通过旋转接头与连接管连接;连接管固定在系泊驳船上,并通过跨接管与FSRU 上的天然气输送管道连通。
进一步的,单点系泊装置包括立管,转柱,旋转接头,轴承;转柱通过轴承与系泊驳船连接,转柱上设立管,立管一端设有旋转接头。
进一步的,跨接管为软管。
在作业过程中,FSRU通过系泊驳船连接于单点系泊装置上,利用单点系泊的风向标作用,使得FSRU和系泊驳船可以自由围绕单点系泊装置旋转随单点系泊同步运动,可有效的降低在天然气外输过程中FSRU的外部载荷,显著提升抗恶劣风浪的能力。
本发明相对于现有技术具备以下优点:1.可实现FSRU安全的离岸卸载,不占港口面积。2. 利用管道旋转接头替代传统的滑环,费用至少降低50%~70%。3.避免FSRU在卸载过程中与其他船只碰撞,从而降低发生事故风险。4.满足各种规格的FSRU的作业要求。5.FSRU卸载时,与系泊驳船同步绕单点运动,抵抗恶劣风浪条件能力增强。6.从原理上改变传统FSRU的系泊及作业方式,但基本不改变原有FSRU的结构,能够与传统FSRU兼容,通用性强。
附图说明
图1为本发明侧视图。
图2为本发明俯视图。
图中,1. FSRU 、2.系泊驳船、3.单点系泊装置、4.跨接管、5.连接管、6.旋转接头、7.轴承、8.系泊链、9.立管,10.海底管道,11.海底管道终端,12. 海床,13.转柱,14.系泊缆。
具体实施方式
如图1和2所示,一种简易FSRU靠泊及天然气外输装置,包括FSRU 1,FSRU 1通过系泊缆14与和系泊驳船2连接。系泊驳船2上设单点系泊装置3,单点系泊装置3包括立管9,转柱13,旋转接头6,轴承7。转柱13通过轴承7与系泊驳船2连接。单点系泊装置3中的转柱13通过系泊链8固定在海床12上,立管9与转柱13固定连接,立管9通过海底管道终端11实现与海底管道10的连接,海底管道10直接通往陆地终端或海上用户。立管9上部连接旋转接头6,旋转接头6的与连接管5连接,连接管5固定于系泊驳船2上。立管9为一条,采用旋转接头6替代传统的堆栈式滑环,显著的降低成本。系泊驳船2通过轴承7与转柱13连接,并可与转柱13相对转动。当系泊驳船2 与转柱13发生相对转动时,固定于系泊驳船2上的设施都会转动,连接管5通过旋转接头6与立管9发生相对转动而不发生失效。当FSRU 1进行作业时,通过系泊缆14与系泊驳船相固定,利用FSRU 1的风向标作用绕转柱13运动。天然气输送管道通过跨接管4与连接管5相连通,实现FSRU 1上的天然气依次通过跨接管4、旋转接头6、立管9、海底管道终端11、海底管道10输送至陆地终端或海上用户。跨接管4为软管,补偿FSRU运动对管线形成的载荷。旋转接头6与立管9和FSRU1天然气输送管道的接口均为活连接,可以更换。
本发明采用简易单点系泊装置结合系泊驳船来系泊FSRU,相比于传统的FSRU系泊方式,不占码头,不占航道,降低其他船舶相撞的风险,并且具有投资低、建造周期快,遇不可抗力,如战争、政变、灾难等可迅速解脱的优点。
Claims (4)
1.一种简易FSRU靠泊及天然气外输装置,包括单点系泊装置(3)和系泊驳船(2),其特征在于:FSRU (1)上的液化天然气,增压并气化后,通过跨接管(4)连接到单点系泊装置(3)上,经单点系泊装置(3)上的旋转接头(6)接入立管(9),通过经海底管道终端(11)与立管(9)连通的海底管道(10)输送至陆地或海上用户;单点系泊装置(3)通过系泊链(8)固定在海床(12)上。
2.按照权利要求1所述的一种简易FSRU靠泊及天然气外输装置,其特征在于:所述FSRU(1)通过系泊驳船(2)连接于单点系泊装置(3)上,利用单点系泊的风向标作用,使得FSRU(1)和系泊驳船(2)自由围绕单点系泊装置(3)旋转。
3.按照权利要求1所述的一种简易FSRU靠泊及天然气外输装置,其特征在于:所述单点系泊装置(3)包括包括转柱(13),转柱(13)通过轴承(7)与系泊驳船(2)连接,利用FSRU(1)的风向标作用绕转柱(13)运动;转柱(13)上设立管(9);立管(9)顶端通过旋转接头(6)与连接管(5)连接,立管(9)底端通过海底管道终端(11)与海底管道(10)连接;连接管(5)固定在系泊驳船(2)上。
4.按照权利要求1所述的一种简易FSRU靠泊及天然气外输装置,其特征在于:所述跨接管(4)为软管。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910835999.4A CN110588892A (zh) | 2019-09-05 | 2019-09-05 | 一种简易fsru靠泊及天然气外输装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910835999.4A CN110588892A (zh) | 2019-09-05 | 2019-09-05 | 一种简易fsru靠泊及天然气外输装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110588892A true CN110588892A (zh) | 2019-12-20 |
Family
ID=68857704
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910835999.4A Withdrawn CN110588892A (zh) | 2019-09-05 | 2019-09-05 | 一种简易fsru靠泊及天然气外输装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110588892A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112078758A (zh) * | 2020-08-03 | 2020-12-15 | 沪东中华造船(集团)有限公司 | 一种用于lng船改装为fsru的方法 |
CN113460269A (zh) * | 2021-06-25 | 2021-10-01 | 沪东中华造船(集团)有限公司 | 一种将lng旧船改装成lng-fsru船的电站模块结构及方法 |
CN114212197A (zh) * | 2022-01-05 | 2022-03-22 | 中海石油气电集团有限责任公司 | 一种lng低温浮式输送系统及方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR790001902B1 (ko) * | 1974-01-01 | 1979-12-27 | 미쯔비시 쥬고교 가부시기가이샤 | 부양성 저유 구조물의 계류장치 |
US5288253A (en) * | 1992-08-07 | 1994-02-22 | Nortrans Shipping And Trading Far East Pte Ltd. | Single point mooring system employing a submerged buoy and a vessel mounted fluid swivel |
US20060080973A1 (en) * | 2004-04-30 | 2006-04-20 | Jack Pollack | Quick LNG offloading |
CN101646597A (zh) * | 2007-03-29 | 2010-02-10 | 雪佛龙美国公司 | 利用柔性导管和可释放的系泊系统在浮动式船舶之间输送流体的系统 |
KR20150001236A (ko) * | 2013-06-27 | 2015-01-06 | 대우조선해양 주식회사 | 선박의 연안 액화공정 시험 방법 |
US20150307161A1 (en) * | 2012-11-07 | 2015-10-29 | Sevan Marine Asa | Device and method for interconnecting a tanker and a floating terminal |
CN107152007A (zh) * | 2017-05-19 | 2017-09-12 | 大连理工大学 | 双向停靠泊式液化天然气码头 |
CN211139574U (zh) * | 2019-09-05 | 2020-07-31 | 招商局海洋装备研究院有限公司 | 一种简易fsru靠泊及天然气外输装置 |
-
2019
- 2019-09-05 CN CN201910835999.4A patent/CN110588892A/zh not_active Withdrawn
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR790001902B1 (ko) * | 1974-01-01 | 1979-12-27 | 미쯔비시 쥬고교 가부시기가이샤 | 부양성 저유 구조물의 계류장치 |
US5288253A (en) * | 1992-08-07 | 1994-02-22 | Nortrans Shipping And Trading Far East Pte Ltd. | Single point mooring system employing a submerged buoy and a vessel mounted fluid swivel |
US20060080973A1 (en) * | 2004-04-30 | 2006-04-20 | Jack Pollack | Quick LNG offloading |
CN101646597A (zh) * | 2007-03-29 | 2010-02-10 | 雪佛龙美国公司 | 利用柔性导管和可释放的系泊系统在浮动式船舶之间输送流体的系统 |
US20150307161A1 (en) * | 2012-11-07 | 2015-10-29 | Sevan Marine Asa | Device and method for interconnecting a tanker and a floating terminal |
KR20150001236A (ko) * | 2013-06-27 | 2015-01-06 | 대우조선해양 주식회사 | 선박의 연안 액화공정 시험 방법 |
CN107152007A (zh) * | 2017-05-19 | 2017-09-12 | 大连理工大学 | 双向停靠泊式液化天然气码头 |
CN211139574U (zh) * | 2019-09-05 | 2020-07-31 | 招商局海洋装备研究院有限公司 | 一种简易fsru靠泊及天然气外输装置 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112078758A (zh) * | 2020-08-03 | 2020-12-15 | 沪东中华造船(集团)有限公司 | 一种用于lng船改装为fsru的方法 |
CN113460269A (zh) * | 2021-06-25 | 2021-10-01 | 沪东中华造船(集团)有限公司 | 一种将lng旧船改装成lng-fsru船的电站模块结构及方法 |
CN114212197A (zh) * | 2022-01-05 | 2022-03-22 | 中海石油气电集团有限责任公司 | 一种lng低温浮式输送系统及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20210245845A1 (en) | Jetty-Less Offshore Terminal Configurations | |
US7299760B2 (en) | Floating LNG import terminal and method for docking | |
US8286678B2 (en) | Process, apparatus and vessel for transferring fluids between two structures | |
US3590407A (en) | Swivel tanker floating storage system | |
CN110588892A (zh) | 一种简易fsru靠泊及天然气外输装置 | |
US6829901B2 (en) | Single point mooring regasification tower | |
CN103328878B (zh) | 用于海上液化天然气浮式储存的具有自升式平台再气化单元的设备 | |
AU2008101305A4 (en) | Process, vessel and system for transferring fluids between floating vessels using flexible conduit and releasable mooring system | |
CN101438009A (zh) | 浅水中的lng油船卸载 | |
CN102050208B (zh) | 一种液化天然气储运系统及其浮式接收平台 | |
CN108860481B (zh) | 一种全方位浮式燃油补给系统及其作业方法 | |
CN211139574U (zh) | 一种简易fsru靠泊及天然气外输装置 | |
WO2006088371A1 (en) | System and method for offshore offloading and regasification of LNG | |
WO1993024732A1 (en) | A system for use in offshore petroleum production | |
CN103328879B (zh) | 用于海上液化天然气浮式储存的具有码头再气化单元的设备 | |
GB2399320A (en) | Semi-submersible jetty for transferring LNG from a production vessel to a transport vessel | |
CN211146078U (zh) | 一种近海液化天然气卸载装置 | |
GB2267687A (en) | Mooring system for oceangoing vessels | |
CN210734441U (zh) | 用于传输流体或电力的浮式的传输结构和传输系统 | |
EP1169216A1 (en) | Anchoring system | |
CN110617399A (zh) | 一种近海液化天然气卸载装置 | |
Newport | A Historical Review of Disconnectable Moorings for Ship Shaped Floating Production Units | |
CN219584405U (zh) | 一种单点系泊输油装置 | |
CN217422917U (zh) | 一种浮式近岸或离岸co2液化存储转运系统 | |
CN216969918U (zh) | 一种用于二氧化碳海上过驳的软刚臂装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20191220 |
|
WW01 | Invention patent application withdrawn after publication |