CN110524143A - The device and method of weld porosity defect in a kind of elimination aluminum alloy piping welding - Google Patents

The device and method of weld porosity defect in a kind of elimination aluminum alloy piping welding Download PDF

Info

Publication number
CN110524143A
CN110524143A CN201910711157.8A CN201910711157A CN110524143A CN 110524143 A CN110524143 A CN 110524143A CN 201910711157 A CN201910711157 A CN 201910711157A CN 110524143 A CN110524143 A CN 110524143A
Authority
CN
China
Prior art keywords
aluminum alloy
welding
cartridge heater
alloy piping
weld
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910711157.8A
Other languages
Chinese (zh)
Inventor
张颖云
李明祥
王浩军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Aircraft Industry Group Co Ltd
Original Assignee
Xian Aircraft Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Aircraft Industry Group Co Ltd filed Critical Xian Aircraft Industry Group Co Ltd
Priority to CN201910711157.8A priority Critical patent/CN110524143A/en
Publication of CN110524143A publication Critical patent/CN110524143A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/0426Fixtures for other work

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Arc Welding In General (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The present invention provides a kind of device and method of weld porosity defect in elimination aluminum alloy piping welding, using the protection air-flow overflowed in inductive heating weldment reverse side fixture, the protective gas of room temperature is heated to the boiling point that temperature is more than water, and guarantee before starting welding, weldment to-be-welded region is removed by high temperature gas flow, the moisture of the adsorptions such as shield jig, ensure that to-be-welded region leaves no residue moisture, guarantee there is no moisture retention in molten bath in subsequent welding process, near Seam and heat effected zone, to eliminate the gas hole defect generated in aluminum alloy piping welding by moisture.It solves the problems, such as to generate gas hole defect in aluminum alloy piping welding, simplifies the method for preventing weld blowhole defect from generating, improve the quality of welding point.

Description

The device and method of weld porosity defect in a kind of elimination aluminum alloy piping welding
Technical field
Present patent application is related to weldment technical field, weld porosity defect in especially a kind of elimination aluminum alloy piping welding Device and method.
Background technique
In aircraft manufacturing field, in order to achieve the purpose that aircraft loss of weight, the aluminum alloy materials for largely having used density extremely low, Achieve the purpose that material loss of weight.In order to further reach structural weight reduction and improve the requirement of production efficiency, abandoned as far as possible in engineering The method of mechanical connection, using more efficient fusion welding technology.However, due to aluminium alloy itself, aluminium alloy Fusion welding have the shortcomings that one it is fatal, be very easy to when fusion welding generate gas hole defect.Gas pore in weld metal defect is not The intensity that weld seam can only be reduced, more important is the fatigue lives that will be greatly reduced structural member, therefore each standard is right The quantity, size and location of gas hole defect work it out detailed regulation in welded seam of aluminium alloy.Such as the navigation mark HB/Z120 in China Regulation in " aluminium and aluminium alloy welding process and quality control standards (QCS) ", " first-order weld does not allow that there are any surface pores;It is internal The diameter of stomata be not greater than 0.5 times after thickness, quantity must not exceed 3, the gross area must not exceed 15mm2", and require three Person meets simultaneously.Regulation in the standard ZPS10320-000000 " melting welding acceptance criteria " of civil aircraft ARJ, " welds A grades Seam, the single diameter maximum value of surface pores are no more than 0.25T or 0.75mm, take smaller value (T is plate thickness);And two stomatas Spacing be not less than 5mm;5 stomatas are up in every 50mm fusion length ", it also requires while meeting.It can be seen that each boat Empty manufacturing company and country propose high control requirement to the gas hole defect in aluminum alloy melting weldering, it is desirable that in welding point Strongly avoid the occurrence of gas hole defect.
The main reason for gas hole defect is produced in weld seam is to be adsorbed on the moisture of near zone to be welded before welding, weldering Entering in molten pool metal in termination process, under the arcing of superhigh temperature, moisture is decomposed into hydrogen atom and oxygen atom in weld seam molten bath, And then it forms stomata and remains in weld metal.Since welding procedure is the physical and chemical process of a flash melt and solidification, The hydrogen atom and oxygen atom of formation can not all quickly be precipitated from molten bath, and aggregation forms hydrogen and oxygen rapidly under high temperature, It is closed in the weld metal solidified, forms discrete or chain gas hole defect immediately, when under X-ray detection, It appears in egative film.Therefore, the moisture being adsorbed on weldment and welding fixture before welding is thoroughly removed, is to eliminate welded seam of aluminium alloy The principal element of middle gas hole defect.In order to eliminate the moisture of absorption, common process has following four, pickling weldering before 1. welding Part, and control the time interval being cleaned between welding;2. in the drying in oven weldment more than 130 DEG C, and reducing to the greatest extent and turning Shift time;3. wiping to-be-welded region again using acetone or alcohol before closing on welding, residual moisture is removed;4. being operated in weldment Interior installation air-conditioning and dehumidifier reduce the moisture content etc. under welding region environment.It is for eliminating weldment surface residual Moisture, but have little effect.
Summary of the invention
To solve the above-mentioned problems, the invention proposes it is a kind of elimination aluminum alloy piping welding in weld porosity defect device and Method dries welding region using high temperature gas flow, removes the moisture of to-be-welded region absorption.Stomata is reduced to the maximum extent to lack The source of production is fallen into, while weld root being protected not aoxidized.
The device of weld porosity defect in a kind of elimination aluminum alloy piping welding, including cartridge heater, screen drum, coil, inductive heating Device, coil are wrapped on cartridge heater, and are placed in screen drum together with cartridge heater, and coil is connect with inductive heater, screen drum and Air hole is provided on the tube wall of cartridge heater, entire protective device is placed on back of weld.High temperature resistant can be selected not in the material of screen drum Conductive material, the present invention in Ceramics.High temperature alloy can be selected in the material of cartridge heater, and heating cylinder material is in the present invention GH4169。
The method of weld porosity defect, includes the following steps: in a kind of elimination aluminum alloy piping welding
1 is powered coil, generates induced current heating coil and cartridge heater;
2 by room temperature protection gas be passed through in cartridge heater, by cartridge heater will protect temperature degree be heated to 150 DEG C~190 DEG C it Between;
3 high temperature protection air-flows are flowed out by the venthole on cartridge heater, and flow through screen drum;
4 final high temperature protection air-flows reach back of weld from air-flow metal lens spilling.
Start induction coil before welding and heats gas in socket and cylinder, preparatory duration of ventilation 10s~20s, protection air-flow amount It is maintained between 5~7L/min.In welding process, protection air-flow amount is maintained between 2~4L/min.
The beneficial effects of the present application are as follows: 1) at the weldment back side shield jig be installed, and be connected with argon gas (Ar) as protection Gas, using the method heated protective gas of inductive heating to 150 DEG C~190 DEG C, protection air-flow flows through weld seam and near zone, Remove the moisture on surface;2) it is connected with protective gas in welding process whole process, since protection air-flow temperature is higher, can achieve preheating The effect of the gentle cold welding seam of weldment, more conducively exclusion Residual Pores defect, improve weldquality.
Attached drawing with reference to embodiments is described in further detail the application:
Detailed description of the invention
Fig. 1 welds back side device and weldment overall structure diagram.
Fig. 2 device unit block diagram.
Fig. 3 protection air-flow drying position to be welded flows longitudinally through figure.
Fig. 4 protection air-flow drying position to be welded flows transversely across figure.
Explanation: 1- airflow inlet tube is numbered in figure;2- welding fixture;3- coil;4- screen drum;5- air-flow metal is saturating Mirror;The first weldment of 6-;The second weldment of 7-;8- cartridge heater;9- overflows tracheae mouth;10- protection air-flow.
Specific embodiment
Referring to attached drawing 1, change the method that traditional aluminum alloy piping welding does not use back side fixture, by 6 He of the first weldment of aluminium alloy Second weldment 7 is placed on weldment fixture 2, and guarantees that weld groove is in the central location of air-flow metal lens 5.
As depicted in figs. 1 and 2.Device includes cartridge heater 8, screen drum 4, coil 3, inductive heater, and coil 3 is wrapped in heating It on cylinder 8, and is placed in screen drum 4 together with cartridge heater 8, coil 3 is connect with inductive heater, the tube wall of screen drum 4 and cartridge heater 8 On be provided with air hole, entire protective device is placed on back of weld.High temperature resistant electrically non-conductive material can be selected in the material of screen drum 4, this Ceramics in invention.High temperature alloy can be selected in the material of cartridge heater 8, and heating cylinder material is GH4169 in the present invention.
Start to weld preceding 10s~20s, inductive heater is passed through high-frequency alternating current to coil 3, voltage: 200V~250V, frequency Rate: 10KHz, electric current: 10A, coil 3 generates thermal energy, by kelvin effect in the 8 surface heat production of high temperature alloy cartridge heater.Meanwhile it is logical It crosses airflow inlet tube 1 and inputs inertia protection gas, flow is maintained between 5~7L/min, and protection air-flow 10 is heated in high temperature alloy 150 DEG C~190 DEG C are heated in cylinder 8, the venthole on 8 tube wall of cartridge heater, 10 flowing through coil 3 of protection air-flow and screen drum 4。
The air-flow being heated continues up the air-flow metal lens 5 for flowing through and making using red copper T1, as shown in figure 3, finally The back side and the weld groove for reaching weldment, remove the moisture for being adsorbed on weldment to-be-welded region surface.Air-flow metal lens 5 uses Thermal conductivity it is fabulous red copper T1 material production, the heat of dispersed-heated air-flow can be continued, as shown in figure 4, expand butt-welding fitting and The heated perimeter of welding fixture 2 removes the moisture being adsorbed on welding fixture 2 and weldment.
In the 10s~20s to ventilate in advance, high temperature protection air-flow 10 by the moisture of fully erased weldment adsorption, it After start to weld.In welding process, the high temperature gas flow of 2~4L/min is still supplied, guarantees that unwelded region is in High Temperature Gas In the cleaning of stream, prevent the moisture in surrounding air from penetrating into welding region.Extra protective gas is overflowed from excessive tracheae mouth 9, Guarantee that the air-flow of weld root is appropriate, flow speed stability.
The present invention increases inductive heating facility and protective gas channel in welding fixture.It is dried in real time using high temperature gas flow Dry weld seam near zone moisture, cleaning are adsorbed on the residual moisture of the device surfaces such as weldment, fixture, it is ensured that exist without residual moisture Near weld seam, prevent the gas hole defect generated by moisture.

Claims (7)

1. it is a kind of eliminate aluminum alloy piping welding in weld porosity defect device, it is characterised in that including cartridge heater, screen drum, coil, Inductive heater, coil are wrapped on cartridge heater, and are placed in screen drum together with cartridge heater, and coil and inductive heater connect It connects, air hole is provided on the tube wall of screen drum and cartridge heater, entire protective device is placed on back of weld.
2. a kind of device for eliminating weld porosity defect in aluminum alloy piping welding according to claim 1, it is characterised in that institute The material for stating screen drum is high temperature resistant electrically non-conductive material.
3. a kind of device for eliminating weld porosity defect in aluminum alloy piping welding according to claim 2, it is characterised in that institute The material of screen drum is stated as ceramics.
4. a kind of device for eliminating weld porosity defect in aluminum alloy piping welding according to claim 1, it is characterised in that institute The material for stating cartridge heater is high temperature alloy.
5. a kind of device for eliminating weld porosity defect in aluminum alloy piping welding according to claim 4, it is characterised in that institute State the material heating cylinder material GH4169 of cartridge heater.
6. a kind of method for eliminating weld porosity defect in aluminum alloy piping welding, it is characterised in that include the following steps:
Coil is powered by 6-1, generates induced current heating coil and cartridge heater;
Room temperature protection gas is passed through in cartridge heater by 6-2, temperature degree will be protected to be heated between 150 DEG C~190 DEG C by cartridge heater;
6-3 high temperature protection air-flow is flowed out by the venthole on cartridge heater, and flows through screen drum;
The final high temperature protection air-flow of 6-4 reaches back of weld from air-flow metal lens spilling.
7. a kind of method for eliminating weld porosity defect in aluminum alloy piping welding according to claim 6, it is characterised in that open Begin before welding gas in induction coil heating socket and cylinder, preparatory duration of ventilation 10s~20s, and protection air-flow amount is maintained at 5~ Between 7L/min.In welding process, protection air-flow amount is maintained between 2~4L/min.
CN201910711157.8A 2019-08-02 2019-08-02 The device and method of weld porosity defect in a kind of elimination aluminum alloy piping welding Pending CN110524143A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910711157.8A CN110524143A (en) 2019-08-02 2019-08-02 The device and method of weld porosity defect in a kind of elimination aluminum alloy piping welding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910711157.8A CN110524143A (en) 2019-08-02 2019-08-02 The device and method of weld porosity defect in a kind of elimination aluminum alloy piping welding

Publications (1)

Publication Number Publication Date
CN110524143A true CN110524143A (en) 2019-12-03

Family

ID=68661228

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910711157.8A Pending CN110524143A (en) 2019-08-02 2019-08-02 The device and method of weld porosity defect in a kind of elimination aluminum alloy piping welding

Country Status (1)

Country Link
CN (1) CN110524143A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112372192A (en) * 2021-01-18 2021-02-19 泛海海工(山东)智能装备有限公司 Welding set based on thing networking platform boats and ships assemblage grillage structure
CN112475643A (en) * 2020-11-24 2021-03-12 中国船舶科学研究中心 Welding device and welding process for reducing porosity in laser welding joint

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102528242A (en) * 2010-12-17 2012-07-04 上海航天设备制造总厂 Aluminum alloy tube broaching welding method
JP5326344B2 (en) * 2007-04-27 2013-10-30 新日鐵住金株式会社 Heat-resistant structure with excellent creep characteristics in heat-affected zone
CN205768066U (en) * 2016-05-31 2016-12-07 上海典码电子科技有限公司 A kind of streamline code spraying machine shower nozzle and ink jet numbering machine
CN106583889A (en) * 2016-12-07 2017-04-26 淮海工学院 Automated aluminum alloy plate welding device with acetone washing unit
CN207476895U (en) * 2017-08-08 2018-06-12 南京老山药业股份有限公司 A kind of honey processing concentration cooling integrated device
CN208781819U (en) * 2018-09-21 2019-04-23 德淮半导体有限公司 Nozzle component and semiconductor processing equipment for semiconductor processing equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5326344B2 (en) * 2007-04-27 2013-10-30 新日鐵住金株式会社 Heat-resistant structure with excellent creep characteristics in heat-affected zone
CN102528242A (en) * 2010-12-17 2012-07-04 上海航天设备制造总厂 Aluminum alloy tube broaching welding method
CN205768066U (en) * 2016-05-31 2016-12-07 上海典码电子科技有限公司 A kind of streamline code spraying machine shower nozzle and ink jet numbering machine
CN106583889A (en) * 2016-12-07 2017-04-26 淮海工学院 Automated aluminum alloy plate welding device with acetone washing unit
CN207476895U (en) * 2017-08-08 2018-06-12 南京老山药业股份有限公司 A kind of honey processing concentration cooling integrated device
CN208781819U (en) * 2018-09-21 2019-04-23 德淮半导体有限公司 Nozzle component and semiconductor processing equipment for semiconductor processing equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112475643A (en) * 2020-11-24 2021-03-12 中国船舶科学研究中心 Welding device and welding process for reducing porosity in laser welding joint
CN112372192A (en) * 2021-01-18 2021-02-19 泛海海工(山东)智能装备有限公司 Welding set based on thing networking platform boats and ships assemblage grillage structure

Similar Documents

Publication Publication Date Title
CN110524143A (en) The device and method of weld porosity defect in a kind of elimination aluminum alloy piping welding
Qin et al. Numerical simulation on MIG arc brazing-fusion welding of aluminum alloy to galvanized steel plate
CN102211235B (en) Soldering method of heterogeneous stainless steel oil injection nozzle nut of engine
RU2138652C1 (en) Filtering plug for separation of combustible substances from exhaust gases and regeneration
CN103692060B (en) A kind of �� 1.6 solid wire CO2The welding process of shielded welding
CN104289805B (en) A kind of welding method of pyrite liquid-dividing head assembly
CN103978063B (en) Dissimilar metal tubing and its preparation method and application
CN203992765U (en) Novel tank welding protection device
CN106583889B (en) Carry the aluminium alloy plate welding equipment of the automation of acetone cleaning device
CN105195875A (en) Welding gun of lockhole effect TIG deep penetration welding
CN103464873A (en) Electric-arc welding process for Ti alloy and nickel-base high-temperature alloy
CN205571712U (en) Laser welding gas protective device
CN103586560A (en) Method for repairing cracks in installing support of combustion box
CN106111989B (en) A kind of protective gas pre-heating mean and device for 3D printing
CN1891390A (en) Induction heating brazing method for in-situ connecting carbon steel gas pipeline or stainless steel water supply pipeline and its special apparatus
CN109926699A (en) A kind of tungsten electrode replaces robot TIG welding gun automatically
CN112222619A (en) Low-frequency low-power laser welding method for oxygen-free copper
CN213163590U (en) Cooling water control device for resistance welding spot welding gun
CN104625349A (en) Aluminum alloy thin water channel cover plate and thick vacuum cavity water channel welding technology
CN108480812A (en) A kind of pipeline induction brazing device and welding procedure
CN204526156U (en) Open heat blower and plastic welding equipment
CN203900716U (en) Lock hole effect TIG deep penetration welding gun
CN104858517A (en) Repairing method of palladium alloy tube assembly for hydrogen purification device
Demianová et al. Brazing of aluminum tubes using induction heating
CN114871538B (en) Method for welding magnesium ammonia heat pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20191203

WD01 Invention patent application deemed withdrawn after publication