CN110521438A - Strengthen the assembled rainwater flower bed being detained - Google Patents

Strengthen the assembled rainwater flower bed being detained Download PDF

Info

Publication number
CN110521438A
CN110521438A CN201910784151.3A CN201910784151A CN110521438A CN 110521438 A CN110521438 A CN 110521438A CN 201910784151 A CN201910784151 A CN 201910784151A CN 110521438 A CN110521438 A CN 110521438A
Authority
CN
China
Prior art keywords
flower bed
assembled
rainwater
plate
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910784151.3A
Other languages
Chinese (zh)
Inventor
贺卫宁
陆先镭
黄国辉
陈世洋
韩磊
吴彦
陈慧
张李佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Machinery International Engineering Design and Research Institute Co Ltd
Original Assignee
China Machinery International Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Machinery International Engineering Design and Research Institute Co Ltd filed Critical China Machinery International Engineering Design and Research Institute Co Ltd
Priority to CN201910784151.3A priority Critical patent/CN110521438A/en
Publication of CN110521438A publication Critical patent/CN110521438A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/10Growth substrates; Culture media; Apparatus or methods therefor based on or containing inorganic material
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/20Growth substrates; Culture media; Apparatus or methods therefor based on or containing natural organic material
    • A01G24/22Growth substrates; Culture media; Apparatus or methods therefor based on or containing natural organic material containing plant material
    • A01G24/25Dry fruit hulls or husks, e.g. chaff or coir
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D36/00Filter circuits or combinations of filters with other separating devices
    • B01D36/02Combinations of filters of different kinds
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/24Structural elements or technologies for improving thermal insulation
    • Y02A30/254Roof garden systems; Roof coverings with high solar reflectance
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B80/00Architectural or constructional elements improving the thermal performance of buildings
    • Y02B80/32Roof garden systems

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Inorganic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The invention discloses a kind of assembled rainwater flower beds strengthened and be detained, include: flower bed altar body, be filled in flower bed altar body for carrying out the stagnant stagnant storage purification body for storing purification to rainwater, being set in flower bed altar body for by purified rainwater catchment and the drainage pipeline networks that is discharged in vitro to flower bed altar, stagnant storages purification body to include gravel layer, reinforcing retention layer and multiple stagnant storage purifying boxs.Each stagnant purifying box that stores includes accommodating cabinet, the biology delay dielectric layer being layed in accommodating box baseplate, the metalling being layed on biology delay dielectric layer and plants the plant in metalling.Gravel layer is layed on the bottom plate of flower bed altar body, strengthen retention layer to be layed on gravel layer, stagnant storage purifying box, which is supported on, to be strengthened on retention layer and is connected to retention layer is strengthened, and is strengthened retention layer and is used to carry out strong stagnant storage and purification to the rainwater by stagnant storage purifying box discharge to reduce Biomedia soil layer required thickness in stagnant storage purifying box.

Description

Strengthen the assembled rainwater flower bed being detained
Technical field
The present invention relates to rainwater to be detained purification facility field, particularly, is related to a kind of assembled rainwater flower strengthened and be detained Altar.
Background technique
Rainwater flower bed is a kind of rainwater delay purification facility, by plant, soil and the stagnant storage of microflora, is percolated, net Change rainfall runoff, delay and reduces peak value run-off, cut down runoff pollution, to prevent region waterlogging, and reduction is to being discharged into water The pollution of body.It is typically provided layer of plants, metalling, biology inside existing rainwater flower bed and is detained dielectric layer and gravel layer, biology is stagnant Staying dielectric layer is the key function layer of rainwater flower bed, has biggish permeability, porosity and adsorption function, is risen to rainfall runoff Stagnant storage and catharsis, but have water conservation and fertilizer conservation performance, ensure upper plant normal growth, thickness by medium hole Rate, the amount of rainfall of required stagnant storage are determining, and in the case where the amount of rainfall of stagnant storage is certain, medium porosity is smaller, required biology It is thicker to be detained dielectric layer.
In terms of internal structure: the Biomedia layer porosity inside existing rainwater flower bed is lower, to meet stagnant storage amount of rainfall Requirement, it is required biology be detained thickness of dielectric layers it is higher, it is also higher in turn result in rainwater flower bed;Meanwhile when rainwater flower bed facility Lower infiltration ability be not able to satisfy the stagnant storage of rainwater when requiring, dielectric layer need to be detained to biology and safeguarded, in existing rainwater flower bed Portion's filler is by the way of layering filling, and filler will cause each layer filler doping mixing and influence operational effect when safeguarding, simultaneously Existing rainwater flower bed maintenance can only use digging mode, and time-consuming, is affected to periphery.
In terms of external structure: when existing flower bed constructs, generally building molding or live wiretie using building block scene, take It models plate and is formed using concreting.This situ wet operation building mode not only influences greatly surrounding enviroment, and process Many and diverse, long construction period, cost is high, serious waste of resources, and landscape effect is poor, and is limited by building periphery place, difficult With widespread adoption.
Summary of the invention
The present invention provides it is a kind of strengthen be detained assembled rainwater flower bed, with solve existing rainwater flower bed height compared with High, attended operation inconvenience technical problem.
The technical solution adopted by the invention is as follows:
It is a kind of strengthen be detained assembled rainwater flower bed, for be laid in ground, partially be laid in subsurface or completely It is laid in below ground, to carry out delay purification to building roof or town road rainwater, assembled rainwater flower bed includes: flower bed Altar body is filled in flower bed altar body and is used for for carrying out the stagnant stagnant storage purification body for storing purification to rainwater, being set in flower bed altar body By purified rainwater catchment and the drainage pipeline networks that is discharged in vitro to flower bed altar, stagnant storage purification body includes gravel layer, strengthens and be detained Layer and multiple stagnant storage purifying boxs;Each stagnant storage purifying box includes biology delay Jie for accommodating cabinet, being layed in accommodating box baseplate Matter layer is layed in metalling and plant the plant in metalling that biology is detained on dielectric layer;Gravel layer is layed in flower bed altar On the bottom plate of body, strengthen retention layer and be layed on gravel layer, stagnant storage purifying box, which is supported on, strengthens on retention layer and be detained with strengthening Layer connection strengthens retention layer and is used to carry out strong stagnant storage and purification to the rainwater by stagnant storage purifying box discharge to reduce stagnant storage purifying box Middle Biomedia soil layer required thickness.
Further, strengthening retention layer includes the aperture filter plate being supported on gravel layer, the pottery being layed on aperture filter plate Granulosa offers the aperture of multiple perforations on aperture filter plate;Strengthen retention layer with a thickness of 160mm~200mm;Strengthen retention layer Porosity be 0.5~0.6.
Further, accommodating cabinet is the box-like structure of top end opening, by the detachable assembled shape of muti-piece side plate and bottom plate At being respectively equipped with the drainage hole of multiple perforations on each side plate and bottom plate.
Further, the intracorporal plant of each storage box is the native plants of the resistance to water logging in short-term of drought resisting;Each storage box is intracorporal Metalling with a thickness of 50mm~100mm, and the partial size of metalling medium stone is 10mm~30mm;Each intracorporal biology of storage box Be detained dielectric layer with a thickness of 200mm~400mm, it includes planting soil, fine sand and coco bran that biology, which is detained dielectric layer,;The thickness of gravel layer Degree is 300mm~400mm, and the partial size of gravel layer cobble-stone is 30mm~50mm, and the porosity of gravel layer is 0.25~0.3.
Further, stagnant storage purification body further includes being layed on gravel layer and being located at gravel layer and strengthen between retention layer First permeable geotextiles and/or stagnant storage purification body further include the second permeable geotextiles being coated on outside gravel layer;Assembled rainwater Flower bed further include for prevent flower bed altar body leak waterproof layer, waterproof layer be layed on the inner wall of flower bed altar body and with flower bed altar Body detachable connection.
Further, the side wall of flower bed altar body is equipped with the overflow port and effluent pipe mouth for extending vertically through flower bed altar body sidewall, Aquitard is formed between overflow port and the stagnant metalling for storing purifying box, effluent pipe mouth corresponds to gravel layer setting;Drainage pipeline networks includes The overflow pipe being inserted in overflow port, and the punched collection pipe being inserted in effluent pipe mouth;The water outlet of overflow pipe extends to flower Altar altar with rainwater utilization facility or city planting ductwork in vitro to be connected to;The water inlet end of punched collection pipe extends to the middle part of gravel layer, The water outlet of punched collection pipe extends to flower bed altar in vitro to be connected to rainwater utilization facility or city planting ductwork.
Further, the side wall of flower bed altar body is equipped with the effluent pipe mouth for extending vertically through flower bed altar body sidewall, effluent pipe mouth Corresponding gravel layer setting;Drainage pipeline networks includes the punched collection pipe being inserted in effluent pipe mouth, and is laid in stagnant storage purification vertically Overflow well in body;Aquitard is formed between the overflow port of overflow well and the stagnant metalling for storing purifying box, overflow well goes out stream end It is connected to punched collection pipe;The water inlet end of punched collection pipe extends to the middle part of gravel layer, and the water outlet of punched collection pipe extends To flower bed altar in vitro to be connected to rainwater utilization facility or city planting ductwork.
Further, assembled rainwater flower bed further includes the L-shaped flow-stopping plate in section;Assembled rainwater flower bed for pair Building roof rainwater carries out delay purification, and flower bed altar body is in rectangle, and the lateral wall of flower bed altar body is close to external wall, flow-stopping plate edge The length direction of flower bed altar body is laid in metalling, and the inner sidewall of the free end contact flower bed altar body of flow-stopping plate level board with Baffle slot is formed with the inner sidewall of flower bed altar body, external wall is externally provided with the rainwater down pipe for building roof rainwater diversion, and rain is fallen The outlet pipe of pipe stretches in baffle slot;Or assembled rainwater flower bed is spent for carrying out delay purification to town road rainwater Altar altar body is in rectangle, and the length direction along road is laid, and the quantity of flow-stopping plate is two pieces, and two pieces of flow-stopping plates are symmetrically laid in rubble In layer, and the inner sidewall of the flower bed altar body of the free end contact respective side of each flow-stopping plate level board is with the inner sidewall with flower bed altar body Form baffle slot.
Further, flower bed altar body includes the outer ring wall in polygonal ring shape, and outer ring wall includes being used to form outer ring wall side First assembly board group of wall and the first connecting elements for playing connection, fixed function;It is in plate that first assembly board group, which includes two pieces, The assembled side plate of the first of shape, the first assembled side plate include for abutting with the adjacent first assembled side plate in same first assembly board group Interior splicing seamed edge, and the outer splicing seamed edge for being abutted with the first assembled side plate of adjacent first assembly board group;First is assembled The length direction being respectively equipped at interior splicing seamed edge on the inner plate surface and outer plate surface of side plate along interior splicing seamed edge is successively spaced The first of two the first installation grooves being correspondingly arranged in multiple first installation grooves being arranged, and connection inner plate surface and outer plate surface Intercommunicating pore, each first installation groove are connected to interior splicing seamed edge;First connecting elements includes for being installed in connected two piece first Two the first installation grooves of connection are corresponded on assembled side plate inner plate surface, for being installed in connected two piece first assembled side plate outside plate The second connecting plate on face in two the first installation grooves of corresponding connection is set in the first intercommunicating pore and both ends are respectively with first Connecting plate and the second connecting plate are connected so that by the first connecting plate and opposite the first connector tensed of the second connecting plate, first is assembled The assembled side plate of two piece first of board group passes through the detachable splicing of the first connecting elements of multiple groups.
Further, flower bed altar body further includes being connected to the bottom end of outer ring wall for sealing the bottom of outer ring wall bottom end opening Envelope, underseal include being used to form the second assembly board group at flower bed altar bottom and the second connection structure for playing connection and fixed function Part;Second assembly board group includes two pieces of plate-like first assembled bottom plates, and the first assembled bottom plate includes for spelling in group first It fills the interior abutting seamed edge that bottom plate abuts, and outer is supported for what is abutted with the first assembled side plate being correspondingly arranged or the second assembled side plate Connect seamed edge;Second connecting elements include it is pre- be embedded in the first assembled bottom plate and locking end by the first assembled bottom plate outer abutting seamed edge The second pre embedded bolt, the 4th connecting plate in the second installation groove for being installed in the first assembled side plate, spiral shell extended perpendicularly out Line is connected to the second locking nut in the second pre embedded bolt locking end outer circle, and the second pre embedded bolt is assembled with to be connect first The second intercommunicating pore on side plate is correspondingly arranged;First assembled bottom plate passes through the second connecting elements of multiple groups and the first spelling being correspondingly arranged Fill the detachable splicing of side plate.
The invention has the following advantages:
The assembled rainwater flower bed structure that reinforcing of the invention is detained is simple, various shapes, globality are strong, building when cost It is cheap and safe and efficient;The reinforcing retention layer that can carry out strong stagnant storage and purification to rainwater by adding, enhances the stagnant storage capacity of rainwater, And under the stagnant storage capacity of same rainwater, the thickness that biology is detained dielectric layer can be greatly reduced, and then reduce rainwater flower bed Highly, it while improving overall beautiful and reducing construction investment;Plant, the metalling on top and biology are detained the filler dress of dielectric layer Enter to accommodate in cabinet, facilitate biology to be detained the maintenance and replacement of dielectric layer, and then greatly shorten the construction time, reduces to peripheral ring The influence in border.
Other than objects, features and advantages described above, there are also other objects, features and advantages by the present invention. Below with reference to accompanying drawings, the present invention is described in further detail.
Detailed description of the invention
The attached drawing constituted part of this application is used to provide further understanding of the present invention, schematic reality of the invention It applies example and its explanation is used to explain the present invention, do not constitute improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is that the assembled rainwater flower bed that the reinforcing of the preferred embodiment of the present invention is detained is detained applied to building roof rainwater Purify schematic diagram;
Fig. 2 is that the assembled rainwater flower bed that the reinforcing of the preferred embodiment of the present invention is detained is applied to road or pavement is flat The schematic diagram when tooth of road;
Fig. 3 is that the assembled rainwater flower bed that the reinforcing of the preferred embodiment of the present invention is detained is applied to road or pavement is to open Schematic diagram when mouth road tooth;
Fig. 4 is that the assembled rainwater flower bed that the reinforcing of the preferred embodiment of the present invention is detained is applied to road or pavement Wu Lu Third schematic diagram when tooth;
Fig. 5 is the space structure schematic diagram of the assembled flower bed altar body first embodiment of the preferred embodiment of the present invention;
Fig. 6 is the space structure schematic diagram of the assembled flower bed altar body second embodiment of the preferred embodiment of the present invention
Fig. 7 is the space structure schematic diagram of the assembled flower bed altar body 3rd embodiment of the preferred embodiment of the present invention;
Fig. 8 is the schematic view of the front view of the first assembled side plate in Figures 5 and 6;
Fig. 9 is the schematic view of the front view of the one of first assembled side plate in Fig. 7;
Figure 10 is the schematic view of the front view of another piece first assembled side plate in Fig. 7;
Figure 11 is the schematic view of the front view of the first form of the second assembled side plate in Fig. 5-7;
Figure 12 is the schematic view of the front view of second of form of the second assembled side plate in Fig. 5-7;
Figure 13 is the overlooking structure diagram of the first assembled bottom plate in Fig. 5-7;
Figure 14 is the overlooking structure diagram of the second assembled bottom plate in Fig. 5-7;
Figure 15 is the space concrete structure schematic diagram of assembled flower bed altar body 3rd embodiment in Fig. 7;
Figure 16 is the partial enlargement structural representation in Figure 15 at C;
Figure 17 is the partial enlargement structural representation in Figure 15 at D;
Figure 18 is the broken section structural schematic diagram of assembled flower bed altar body 3rd embodiment in Fig. 7;
Figure 19 is the space structure schematic diagram that cabinet is accommodated in Fig. 1-4.
Marginal data
10, outer ring wall;103, overflow port;104, effluent pipe mouth;11, the first assembly board group;111, the first assembled side plate; 1111, the first installation groove;1112, the first intercommunicating pore;1113, interior splicing seamed edge;1114, outer splicing seamed edge;1115, the second peace Fill groove;1116, the second intercommunicating pore;112, the second assembled side plate;1121, third installation groove;1122, third connecting hole;12, First connecting elements;121, the first connecting plate;122, the second connecting plate;123, the first connector;124, the first pre embedded bolt; 125, third connecting plate;126, the first locking nut;20, underseal;21, the second assembly board group;211, the first assembled bottom plate; 2111, interior abutting seamed edge;2112, outer abutting seamed edge;212, the second assembled bottom plate;22, the second connecting elements;221, second is pre-buried Screw rod;222, the 4th connecting plate;223, the second locking nut;30, waterproof layer;40, stagnant storage purification body;41, gravel layer;42, strong Change retention layer;43, stagnant storage purifying box;431, cabinet is accommodated;4310, drainage hole;432, biology is detained dielectric layer;433, rubble Layer;434, plant;44, the first permeable geotextiles;45, the second permeable geotextiles;50, drainage pipeline networks;51, overflow pipe;52, it perforates Collecting pipe;53, overflow well;60, flow-stopping plate;601, baffle slot;70, external wall;80, rainwater down pipe;90, road tooth;110, road.
Specific embodiment
The embodiment of the present invention is described in detail below in conjunction with attached drawing, but the present invention can be limited by following and The multitude of different ways of covering is implemented.
- Fig. 4 referring to Fig.1, the preferred embodiment of the present invention provide a kind of assembled rainwater flower bed strengthened and be detained, are used for It is laid on ground, is partially laid in subsurface or is laid in completely below ground, to building roof or town road rainwater Delay purification is carried out, assembled rainwater flower bed includes: flower bed altar body, is filled in flower bed altar body for carrying out stagnant store only to rainwater The stagnant storage purification body 40 changed is set in flower bed altar body for by purified rainwater catchment and the row that is discharged in vitro to flower bed altar Pipe network 50, stagnant storage purification body 40 include gravel layer 41, strengthen retention layer 42 and multiple stagnant storage purifying boxs 43.Each stagnant storage purifying box 43 include accommodating cabinet 431, being layed in the biology delay dielectric layer 432 accommodated on 431 bottom plate of cabinet, be layed in biology delay Jie The plant 434 of metalling 433 and plantation in metalling 433 on matter layer 432.Gravel layer 41 is layed in the bottom plate of flower bed altar body On, strengthen retention layer 42 and be layed on gravel layer 41, stagnant storage purifying box 43, which is supported on, strengthens on retention layer 42 and be detained with strengthening Layer 42 is connected to, and is strengthened retention layer 42 and is used to carry out strong stagnant storage and purification to the rainwater being discharged by stagnant storage purifying box 43 to reduce stagnant storage Biomedia soil layer required thickness in purifying box 43.
It is from top to bottom respectively layer of plants, metalling 433, life inside the assembled rainwater flower bed that reinforcing of the invention is detained Object is detained dielectric layer 432, strengthens retention layer 42 and gravel layer 41, and rainfall runoff passes sequentially through rubble after entering rainwater flower bed After layer 433, biology are detained dielectric layer 432, strengthen retention layer 42 and the stagnant storage filtration treatment of gravel layer 41, collected by drainage pipeline networks 50 It is discharged into rainwater utilization facility or municipal rain pipe.Plant, the metalling 433 on top and biology are detained the filler dress of dielectric layer 432 Enter to accommodate in the assembled rainwater flower bed for being reloaded into cabinet 431 and strengthening and being detained, and stagnant storage purifying box 43 and reinforcing retention layer 42 Connection is entered back by the stagnant filtered rainwater of storage of stagnant storage purifying box 43 and is strengthened in retention layer 42.Make when biology delay medium reaches When being needed replacing with the time limit, the stagnant storage purifying box 43 of built-in filler can be prepared in advance, stagnant storage purifying box 43 is directly replaced i.e. in scene It can.
The assembled rainwater flower bed structure that reinforcing of the invention is detained is simple, various shapes, globality are strong, building when cost It is cheap and safe and efficient;The reinforcing retention layer 42 that can carry out strong stagnant storage and purification to rainwater by adding, enhances the stagnant storage of rainwater Amount, and under the stagnant storage capacity of same rainwater, the thickness that biology is detained dielectric layer 432 can be greatly reduced, and then reduce rainwater The height of flower bed, while improving overall beautiful and reducing construction investment;Plant 434, the metalling 433 on top and biology, which are detained, to be situated between The filler of matter layer 432 is fitted into accommodating cabinet 431, facilitates biology to be detained the maintenance and replacement of dielectric layer 432, and then greatly shorten Construction time reduces the influence to surrounding enviroment.
Optionally, as Figure 1-Figure 4, strengthen retention layer 42 to include the aperture filter plate being supported on gravel layer 41, be laid with In the aperture for offering multiple perforations on the haydite layer on aperture filter plate, aperture filter plate.Strengthen retention layer 42 with a thickness of 160mm ~200mm.The porosity for strengthening retention layer 42 is 0.5~0.6.Specifically, haydite layer is made of macropore haydite, the thickness of haydite layer Degree is 120mm~140mm;Aperture filter plate with a thickness of 40mm~60mm.For relatively common rainwater flower bed, in same rainwater Under stagnant storage capacity, the assembled rainwater flower bed for strengthening delay can reduce flower bed height 200mm~450mm.Meanwhile strengthening retention layer 42 It is formed by stacking by top macropore haydite+lower part aperture filter plate, it is dirty that rainwater first passes through big porous porcelain granule filter material retention big particle partial size Object is contaminated, bulky grain pollutant is avoided to block filter plate, aperture filter plate continues to intercept the dirt for the smaller particle that filtering upper layer is not intercepted Object is contaminated, macropore haydite+aperture filter plate conjunctive use improves retaining power to the maximum extent, ensures that biology is detained dielectric layer 432 thickness do not change rainwater flower bed to the clean-up effect of rainwater after reducing.
Optionally, as shown in figure 19, accommodating cabinet 431 is the box-like structure of top end opening, can by muti-piece side plate and bottom plate Detachable assembly is formed, and the drainage hole 4310 of multiple perforations is respectively equipped on each side plate and bottom plate.It accommodates and is opened at the top of cabinet 431 It opens, and the water hole 4310 that begins to rehearse on the bottom plate and side plate of accommodating cabinet 431, rainwater, which may pass through, to be seeped under drainage hole 4310 and realize side Flow exchange, it is each accommodate 431 side plate of cabinet can mutual assembling combination, flexibly accommodate cabinet by rainwater flower bed size and shape 431 setting size and shape.
Optionally, as Figure 1-Figure 4, the plant 434 respectively in accommodating cabinet 431 is that the native country of the resistance to water logging in short-term of drought resisting is planted Object.Metalling 433 in each accommodating cabinet 431 with a thickness of 50mm~100mm, and the partial size of 433 medium stone of metalling is 10mm~30mm.Biology in each accommodating cabinet 431 be detained dielectric layer 432 with a thickness of 200mm~400mm, biology, which is detained, to be situated between Matter layer 432 includes planting soil, fine sand and coco bran.Gravel layer 41 with a thickness of 300mm~400mm, and 41 cobble-stone of gravel layer Partial size is 30mm~50mm, and the porosity of gravel layer 41 is 0.25~0.3.
Preferably, as Figure 1-Figure 4, stagnant storage purification body 40 further includes being layed on gravel layer 41 and being located at gravel layer 41 The first permeable geotextiles 44 and/or stagnant storage purification body 40 between reinforcing retention layer 42 further include being coated on outside gravel layer 41 The second permeable geotextiles 45.Assembled rainwater flower bed further includes the waterproof layer 30 for preventing flower bed altar body from leaking, waterproof layer 30 be layed on the inner wall of flower bed altar body and with flower bed altar body detachable connection.Specifically, as Figure 1-Figure 4, waterproof layer 30 include two layers of geotextiles being stacked up and down and the geomembrane being set between two layers of geotextiles.Waterproof layer 30 passes through connection and flower The inner wall detachable connection of altar altar body.Preferably, as shown in figure 18, the edge of two layers of geotextiles sews up, and sew up width etc. In or greater than 100mm.Geomembrane is formed using welding manner, and gluing can be used in sectional repair, and lap width is no less than 100mm。
Optionally, as Figure 1-Figure 4, the side wall of flower bed altar body is equipped with the overflow port for extending vertically through flower bed altar body sidewall 103 and effluent pipe mouth 104, aquitard, effluent pipe mouth 104 are formed between overflow port 103 and the stagnant metalling 433 for storing purifying box 43 Corresponding gravel layer 41 is arranged.Drainage pipeline networks 50 includes the overflow pipe 51 being inserted in overflow port 103, and is inserted in effluent pipe mouth Punched collection pipe 52 in 104.The water outlet of overflow pipe 51 extends to flower bed altar in vitro to manage with rainwater utilization facility or municipal administration Net connection.The water inlet end of punched collection pipe 52 extends to the middle part of gravel layer 41, and the water outlet of punched collection pipe 52 extends to flower Altar altar with rainwater utilization facility or city planting ductwork in vitro to be connected to.Specifically, the height of aquitard is 100mm~150mm.It is preferred that Ground, the permeable geotextiles of 52 outsourcing of punched collection pipe are right while entering punched collection pipe 52 for the rainwater in stagnant storage purification body 40 The rainwater of entrance is filtered purification.
Optionally, as Figure 1-Figure 4, the side wall of flower bed altar body is equipped with the outlet pipe for extending vertically through flower bed altar body sidewall Mouth 104, the corresponding gravel layer 41 of effluent pipe mouth 104 are arranged.Drainage pipeline networks 50 includes the punched collection being inserted in effluent pipe mouth 104 Pipe 52, and the overflow well 53 being laid in stagnant storage purification body 40 vertically.The overflow port 103 of overflow well 53 and stagnant storage purifying box 43 Aquitard is formed between metalling 433, the stream end that goes out of overflow well 53 is connected to punched collection pipe 52.The water inlet of punched collection pipe 52 End extends to the middle part of gravel layer 41, the water outlet of punched collection pipe 52 extend to flower bed altar in vitro with rainwater utilization facility or City planting ductwork connection.Specifically, the height of aquitard is 100mm~150mm.Preferably, the permeable soil of 52 outsourcing of punched collection pipe Work cloth is filtered purification to the rainwater of entrance while entering punched collection pipe 52 for the rainwater in stagnant storage purification body 40.
Preferably, assembled rainwater flower bed further includes the L-shaped flow-stopping plate 60 in section.Assembled rainwater flower bed for pair Building roof rainwater carries out delay purification, as shown in Figure 1, flower bed altar body is in rectangle, it is outer that the lateral wall of flower bed altar body is close to building Wall 70, flow-stopping plate 60 are laid in metalling 433 along the length direction of flower bed altar body, and the free end top of 60 level board of flow-stopping plate To form baffle slot 601 with the inner sidewall of flower bed altar body, external wall 70 is externally provided with for building inner sidewall to flower bed altar body The rainwater down pipe 80 of rain water on roof water conservancy diversion, the outlet pipe of rainwater down pipe 80 stretch in baffle slot 601.Or assembled rainwater flower bed is used In carrying out delay purification to town road rainwater, as shown in Fig. 2, road/pavement of Accumulated Rainwater is level road tooth, rainfall runoff Rainwater flower bed is flowed into from the top of level road tooth, or as shown in figure 3, road/pavement of Accumulated Rainwater is opening road tooth, road tooth 90 It is arranged every a distance and is open, rainfall runoff flows into rainwater flower bed, or as shown in figure 4, Accumulated Rainwater from 90 opening of road tooth Road/pavement appeared on the stage 150mm~200mm using rainwater flower bed wall, be arranged on rainwater flower bed wall every a distance and be open, Rainfall runoff flows into rainwater flower bed from rainwater flower bed wall opening, and flower bed altar body is in rectangle, along the length direction cloth of road 110 If the quantity of flow-stopping plate 60 is two pieces, two pieces of flow-stopping plates 60 are symmetrically laid in metalling 433, and 60 level board of each flow-stopping plate Free end contact respective side flower bed altar body inner sidewall with the inner sidewall of flower bed altar body formed baffle slot 601.The present invention In, flow-stopping plate 60 is set in rainwater flower bed to form baffle slot 601 with rainwater flower bed inner wall, and then prevent rainfall runoff from entering When plant and metalling are washed away, ensure that the growth of plant is stablized and to the clean-up effect of rainwater.
Optionally, such as Fig. 5, Fig. 6, Fig. 7 and Figure 18, flower bed altar body includes the outer ring wall 10 in polygonal ring shape, outer ring wall 10 include the first assembly board group 11 for being used to form 10 side wall of outer ring wall and the first connecting elements for playing connection, fixed function 12.First assembly board group 11 includes two blocks of plate-like first assembled side plates 111, and the first assembled side plate 111 is plate-like, including with In the interior splicing seamed edge 1113 abutted with adjacent first assembled side plate 111 in same first assembly board group 11, and be used for it is adjacent The outer splicing seamed edge 1114 that first assembled side plate 111 of group the first assembly board group 11 abuts.The inner plate surface of first assembled side plate 111 Setting is successively spaced along the interior length direction for splicing seamed edge 1113 with being respectively equipped at interior splicing seamed edge 1113 in outer plate surface Multiple first installation grooves 1111, and two the first installation grooves 1111 being correspondingly arranged in connection inner plate surface and outer plate surface First intercommunicating pore 1112, each first installation groove 1111 are connected to interior splicing seamed edge 1113.First connecting elements 12 includes being used for It is installed in two the first installation grooves 1111 of corresponding connection on connected two piece first 111 inner plate surface of assembled side plate, for installing In the second connecting plate in two piece of first 111 outer plate surface of assembled side plate that be connected in two the first installation grooves 1111 of corresponding connection 122, it is set in the first intercommunicating pore 1112 and both ends is connected respectively with the first connecting plate and the second connecting plate 122 to connect first Plate 121 and opposite the first connector 123 tensed of the second connecting plate 122, two piece of first assembled side plate of the first assembly board group 11 111 pass through the detachable splicing of the first connecting elements of multiple groups 12.Specifically, the first connector 123 is connection bolt or connection spiral shell Nail.
In assembled flower bed altar body of the invention, outer ring wall 10 assembles board group 11 by multiple groups first and is connected by multiple groups first Component 12 it is detachable it is assembled formed, to make that assembled flower bed altar body structure of the invention is simple, globality is strong, at low cost It is honest and clean;Outer ring wall 10 uses modular construction again, realizes the component standardization of fabricated construction, template number needed for reducing construction on site Amount, while economy is improved, and all components can be produced in batches in component factory, labour is saved, while improving total quality; Component can be assembled into more sizes, the structure type of Multiple Shape, short construction period, flexibility at the construction field (site) according to the actual situation It is high, adaptable to ambient enviroment;Connection between component uses 12 detachable connection method of the first connecting elements, belongs to dry type Connection reduces working procedure, and accelerates speed of application;The component standardization of this kind of fabricated construction, in combination with scene landscape and Application site selects the multiple structural forms such as a high position, semi-underground type, fully buried, is not limited by place, wide adaptability.
Specifically, as shown in Fig. 5, Fig. 6 and Fig. 8, by the first assembly board group 11 in first embodiment and second embodiment When two piece of first assembled 111 assembly of side plate, or as shown in Figure 15, Figure 16, Fig. 9 and Figure 10, by the first assembly in 3rd embodiment When the assembled side plate 111 of two piece first of board group 11 is assembled, first support the interior splicing seamed edge 1113 of two piece of first assembled side plate 111 It connects, the first connecting plate of one group of first connecting elements 12 and the second connecting plate 122 is then sub-packed in two piece of first assembled side plate Two first installations of corresponding connection are recessed in two the first installation grooves 1111 of corresponding connection and in outer plate surface on 111 inner plate surfaces In slot 1111, two group of first connector 123 of first connecting elements of group 12 is then sub-packed in corresponding two first connections In hole 1112, two group of first connector 123 is finally tightened by the first connecting plate and the opposite tension of the second connecting plate 122, is completed Two piece of first detachable splicing of assembled side plate 111 in board group 11 is assembled by first, finally repeats above-mentioned steps until using The first connecting elements of multiple groups 12 connects two piece of first assembled side plate 111 simultaneously.
Optionally, as shown in Fig. 5, Fig. 6 and Fig. 8, in the first and second embodiments of assembled flower bed altar body, two adjacent groups Angle between first assembly board group 11 is not equal to 90 °.Close to outer splicing on the inner plate surface and outer plate surface of first assembled side plate 111 Length direction successively spaced multiple second installation grooves along outer splicing seamed edge 1114 are correspondingly provided at seamed edge 1114 Multiple second intercommunicating pores for two the second installation grooves 1115 being correspondingly arranged on 1115, and connection inner plate surface and outer plate surface 1116, each second installation groove 1115 is connected to outer splicing seamed edge 1114.Two adjacent groups first assemble board group 11 and pass through while wearing Cross the detachable splicing of the first connecting elements of multiple groups 12 of the second intercommunicating pore 1116 of the two piece of first assembled side plate 111 that be connected.
Specifically, as shown in Fig. 5, Fig. 6 and Fig. 8, by the first assembly board group adjacent in first embodiment and second embodiment When the two piece of first assembly side plate 111 that be connected in 11 is assembled, first support the outer splicing seamed edge 1114 of two piece of first assembled side plate 111 It connects, the first connecting plate of one group of first connecting elements 12 and the second connecting plate 122 is then sub-packed in two piece of first assembled side plate Two second installations of corresponding connection are recessed in two the second installation grooves 1115 of corresponding connection and in outer plate surface on 111 inner plate surfaces In slot 1115, two group of first connector 123 of first connecting elements of group 12 is then sub-packed in corresponding two second connections In hole 1116, two group of first connector 123 is finally tightened by the first connecting plate and the opposite tension of the second connecting plate 122, is completed Two piece of first detachable splicing of assembled side plate 111 in board group 11 is assembled by first, finally repeats above-mentioned steps until using The first connecting elements of multiple groups 12 connects the two piece of first assembled side plate 111 that be connected simultaneously.
Optionally, adjacent in the 3rd embodiment of assembled flower bed altar body as shown in Fig. 7, Fig. 9, Figure 10, Figure 15-Figure 17 Angle between two group of first assembly board group 11 is equal to 90 °.Close to outer splicing seamed edge in the outer plate surface of first assembled side plate 111 Length direction successively spaced multiple second installation grooves 1115, and setting along outer splicing seamed edge 1114 are equipped at 1114 In in the second installation groove 1115 and vertically through the second intercommunicating pore 1116 of the first assembled side plate 111.First connecting elements 12 Further include it is pre- be embedded in the one of first assembled side plate 111 and locking end by the first assembled side plate 111 outer splicing seamed edge 1114 the first pre embedded bolt 124, for being installed in not set first pre embedded bolt 124 the first assembled side plates extended perpendicularly out Third connecting plate 125 in 111 the second intercommunicating pore 1116 is threadedly connected in 124 locking end outer circle of the first pre embedded bolt First locking nut 126, and the first pre embedded bolt 124 and the second intercommunicating pore 1116 on the to be connect first assembled side plate 111 It is correspondingly arranged.
Specifically, as shown in Fig. 7, Fig. 9, Figure 10, Figure 15-Figure 17, by the first assembly board group 11 adjacent in 3rd embodiment In be connected two piece of first assembled side plate 111 it is assembled when, make first piece first equipped with the first pre embedded bolt 124 assembled side plate first 111 outer splicing seamed edge 1114 abuts the inner plate surface of second piece of first assembled side plate 111 of not set first pre embedded bolt 124, Meanwhile first pre embedded bolt 124 be arranged in the second intercommunicating pore 1116, then the third of first connecting elements of group 12 is connected again Fishplate bar 125 is installed on second piece of first assembled side plate 111 in corresponding second installation groove 1115, finally tightens threaded connection The first locking nut 126 in 124 locking end outer circle of the first pre embedded bolt will be connected two pieces in adjacent first assembly board group 11 First assembled side plate 111 tenses, and completes the two piece of first assembled side plate 111 that be connected in adjacent first assembly board group 11 is detachable Splicing finally repeats above-mentioned steps until using connected two piece first assembled side plate of the first connecting elements of multiple groups 12 while connection 111。
Optionally, as shown in figure 12, the first assembly board group 11 further includes being connected between two piece of first assembled side plate 111 Second assembled side plate 112, the second assembled side plate 112 are plate-like.Close to its two splicings on the inner plate surface of second assembled side plate 112 Length direction successively spaced multiple third installation grooves 1121 along splicing seamed edge are correspondingly provided at seamed edge, second is assembled The outer plate surface of side plate 112 is equipped with third installation groove 1121 corresponding with the third installation groove 1121 on its inner plate surface, and Each third installation groove 1121 is connected to the splicing seamed edge being correspondingly arranged.It is additionally provided on second assembled side plate 112 and is connected to its inner panel The third connecting hole 1122 for two third installation grooves 1121 being correspondingly arranged on face and outer plate surface.Second assembled side plate 112 it Between or the second assembled side plate 112 and the first assembled side plate 111 between pass through the detachable splicing of the first connecting elements of multiple groups 12.
Specifically, as shown in figure 12, the second assembled side plate 112 and the first adjacent assembly into 3rd embodiment by first When side plate 111 is assembled, make the splicing seamed edge of the first assembled side plate 111 and the interior splicing seamed edge of the first assembled side plate 111 first 1113 abut, and the first connecting plate of one group of first connecting elements 12 and the second connecting plate 122 are then sub-packed in the second assembled side It is corresponded in the third installation groove 1121 and the first installation groove 1111 being connected on plate 112 and the first 111 inner plate surface of assembled side plate, And the group first is then connected into structure in the third installation groove 1121 and the first installation groove 1111 of corresponding connection in outer plate surface Two group of first connector 123 of part 12 is sub-packed in corresponding third connecting hole 1122 and the first intercommunicating pore 1112, is finally tightened Two group of first connector 123 completes the first connecting plate and the opposite tension of the second connecting plate 122 by the second assembled side plate 112 With the first detachable splicing of assembled side plate 111, above-mentioned steps are finally repeated until same using the first connecting elements of multiple groups 12 When the assembled side plate 112 of connection second and the first assembled side plate 111.
Optionally, as shown in figure 13, flower bed altar body further includes being connected to the bottom end of outer ring wall 10 for sealing outer ring wall 10 The underseal 20 of bottom end opening, underseal 20 include being used to form the second assembly board group 21 at flower bed altar bottom and being used to connect, is fixed Second connecting elements of effect.Optionally, when flower bed altar body does not include underseal 20, the stagnant gravel layer 41 for storing purification body 40 is directly propped up It holds on the foundation pit bottom of compacting, as Figure 1-Figure 4.Second assembly board group 21 includes two pieces of plate-like first assembled bottom plates 211, the first assembled bottom plate 211 is plate-like, including the interior abutting seamed edge 2111 for being abutted with the in group first assembled bottom plate 211, And the outer abutting seamed edge 2112 for being abutted with the first assembled side plate 111 being correspondingly arranged or the second assembled side plate 112.Second connects Connection member 22 include be embedded in the first assembled bottom plate 211 in advance and locking end by the first assembled bottom plate 211 outer abutting seamed edge 2112 The second pre embedded bolt 221 for extending perpendicularly out is spelled for being installed in the second installation groove 1115 or second of the first assembled side plate 111 It fills the 4th connecting plate 222 in the third installation groove 1121 of side plate 112, be threadedly connected to 221 locking end of the second pre embedded bolt The second locking nut 223 in outer circle, the second pre embedded bolt 221 are connected to second on the to be connect first assembled side plate 111 Third connecting hole 1122 on hole 1116 or the second assembled side plate 112 is correspondingly arranged.First assembled bottom plate 211 passes through multiple groups second Connecting elements 22 and the first assembled side plate 111 being correspondingly arranged or the second detachable splicing of assembled side plate 112.
Specifically, as shown in figure 13, by the first assembled bottom plate 211 and the first assembled side plate 111 or the second assembled side plate 112 When assembled, the outer abutting seamed edge 2112 of the first assembled bottom plate 211 is made to abut the first assembled side plate 111 or the second assembled side plate first 112 inner plate surface, at this point, the first intercommunicating pore 1112 or second that the second pre embedded bolt 221 is arranged in the first assembled side plate 111 connects In through-hole 1116 or in the third connecting hole 1122 of the second assembled side plate 112, then again by the of second connecting elements of group 22 Four connecting plates 222 are installed in the first installation groove 1111 or the second installation groove 1115 of the corresponding first assembled side plate 111, Or it in the third installation groove 1121 of corresponding second assembly side plate 112, finally tightens and is threadedly connected to the second pre embedded bolt 221 The second locking nut 223 in locking end outer circle, by the first assembled bottom plate 211 and the first assembly side plate 111 or the second for being connected Assembled side plate 112 tenses, and completes the first assembled bottom plate 211 and the first assembled side plate 111 or the second assembled side plate 112 is detachable Formula splicing finally repeats above-mentioned steps until using the second connecting elements of multiple groups 22 while the assembled bottom plate of connection connected first 211 and first assembled side plate 111 or the second assembled side plate 112.
Preferably, as shown in figure 14, the second assembly board group 21 further includes being connected between two piece of first assembled bottom plate 211 Second assembled bottom plate 212, the second assembled bottom plate 212 are plate-like.The both ends of second assembled bottom plate 212 connect structure by multiple groups second Part 22 and the first assembled side plate 111 being correspondingly arranged or the second detachable splicing of assembled side plate 112.Second assembled bottom plate 212 The connection type being connected by the second connecting elements 22 with the first assembled side plate 111 or the second assembled side plate 112, with the first assembly Bottom plate 211 is identical as the connected connection type of the first assembled side plate 111 or the second assembled side plate 112, is not repeated herein.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of strengthen the assembled rainwater flower bed being detained, for being laid in ground, being partially laid in subsurface or complete cloth Set below ground, to carry out delay purification to building roof or town road rainwater, which is characterized in that assembled rainwater flower bed Include:
Flower bed altar body is filled in the flower bed altar body for carrying out the stagnant stagnant storage purification body (40) for storing purification, setting to rainwater In in the flower bed altar body for by purified rainwater catchment and the drainage pipeline networks (50) that is discharged in vitro to the flower bed altar, institute Stagnant storage purification body (40) is stated to include gravel layer (41), strengthen retention layer (42) and multiple stagnant storage purifying boxs (43);
Each stagnant biology for storing purifying box (43) and including accommodating cabinet (431), being layed on described accommodating cabinet (431) bottom plate It is detained dielectric layer (432), is layed in metalling (433) and plant in the rubble that the biology is detained on dielectric layer (432) Plant (434) in layer (433);
The gravel layer (41) is layed on the bottom plate of the flower bed altar body, and the reinforcing retention layer (42) is layed in the gravel On layer (41), the stagnant storage purifying box (43) is supported on the reinforcing retention layer (42) and connects with the reinforcing retention layer (42) Logical, described strengthen retention layer (42) are used to carry out strong stagnant storage and purification to by the stagnant rainwater for storing purifying box (43) discharge to drop Biomedia soil layer required thickness described in the low stagnant storage purifying box (43).
2. according to claim 1 strengthen the assembled rainwater flower bed being detained, which is characterized in that
Described strengthen retention layer (42) include the aperture filter plate being supported on the gravel layer (41), are layed in the aperture filter plate On haydite layer, the aperture of multiple perforations is offered on the aperture filter plate;
It is described strengthen retention layer (42) with a thickness of 160mm~200mm;
The porosity for strengthening retention layer (42) is 0.5~0.6.
3. according to claim 1 strengthen the assembled rainwater flower bed being detained, which is characterized in that
Accommodating cabinet (431) is the box-like structure of top end opening, is formed by the detachable assembly of muti-piece side plate and bottom plate, respectively The drainage hole (4310) of multiple perforations is respectively equipped on the side plate and the bottom plate.
4. according to claim 1 strengthen the assembled rainwater flower bed being detained, which is characterized in that
The plant (434) in each accommodating cabinet (431) is the native plants of the resistance to water logging in short-term of drought resisting;
The metalling (433) in each accommodating cabinet (431) with a thickness of 50mm~100mm, and the metalling (433) partial size of medium stone is 10mm~30mm;
It is each it is described accommodating cabinet (431) in it is described biology be detained dielectric layer (432) with a thickness of 200mm~400mm, the life It includes planting soil, fine sand and coco bran that object, which is detained dielectric layer (432),;
The gravel layer (41) with a thickness of 300mm~400mm, and the partial size of the gravel layer (41) cobble-stone be 30mm~ 50mm, the porosity of the gravel layer (41) are 0.25~0.3.
5. according to claim 1 strengthen the assembled rainwater flower bed being detained, which is characterized in that
The stagnant storage purification body (40) further include be layed on the gravel layer (41) and be located at the gravel layer (41) with it is described The first permeable geotextiles (44) and/or the stagnant storage purification body (40) between reinforcing retention layer (42) further include being coated on institute State the second permeable geotextiles (45) of gravel layer (41) outside;
The assembled rainwater flower bed further includes the waterproof layer (30) for preventing the flower bed altar body leakage, the waterproof layer (30) be layed on the inner wall of the flower bed altar body and with the flower bed altar body detachable connection.
6. according to claim 1 strengthen the assembled rainwater flower bed being detained, which is characterized in that
The side wall of the flower bed altar body is equipped with the overflow port (103) and effluent pipe mouth for extending vertically through the flower bed altar body sidewall (104), aquitard is formed between the overflow port (103) and the stagnant metalling (433) for storing purifying box (43), it is described Corresponding gravel layer (41) setting of effluent pipe mouth (104);
The drainage pipeline networks (50) includes the overflow pipe (51) being inserted in the overflow port (103), and is inserted in the water outlet Punched collection pipe (52) in nozzle (104);
The water outlet of the overflow pipe (51) extends to the flower bed altar in vitro to be connected to rainwater utilization facility or city planting ductwork;
The water inlet end of the punched collection pipe (52) extends to the middle part of the gravel layer (41), the punched collection pipe (52) Water outlet extends to the flower bed altar in vitro to be connected to the rainwater utilization facility or the city planting ductwork.
7. according to claim 1 strengthen the assembled rainwater flower bed being detained, which is characterized in that
The side wall of the flower bed altar body is equipped with the effluent pipe mouth (104) for extending vertically through the flower bed altar body sidewall, the water outlet Corresponding gravel layer (41) setting of nozzle (104);
The drainage pipeline networks (50) includes the punched collection pipe (52) being inserted in the effluent pipe mouth (104), and vertical laying In the stagnant overflow well (53) stored in purification body (40);
It is formed between the overflow port (103) of the overflow well (53) and the stagnant metalling (433) for storing purifying box (43) The stream end that goes out of aquitard, the overflow well (53) is connected to the punched collection pipe (52);
The water inlet end of the punched collection pipe (52) extends to the middle part of the gravel layer (41), the punched collection pipe (52) Water outlet extends to the flower bed altar in vitro to be connected to rainwater utilization facility or city planting ductwork.
8. according to claim 1 strengthen the assembled rainwater flower bed being detained, which is characterized in that
The assembled rainwater flower bed further includes the L-shaped flow-stopping plate in section (60);
The assembled rainwater flower bed is used to carry out building roof rainwater delay purification, and the flower bed altar body is in rectangle, described The lateral wall of flower bed altar body is close to external wall (70), and the flow-stopping plate (60) is laid in along the length direction of the flower bed altar body In the metalling (433), and the inner sidewall of flower bed altar body described in the free end contact of the flow-stopping plate (60) level board with The inner sidewall of the flower bed altar body forms baffle slot (601), and the external wall (70) is externally provided with leads for building roof rainwater The rainwater down pipe (80) of stream, the outlet pipe of the rainwater down pipe (80) stretch in the baffle slot (601);Or
The assembled rainwater flower bed is used to carry out town road rainwater delay purification, and the flower bed altar body is in rectangle, along road The length direction on road (110) is laid, and the quantity of the flow-stopping plate (60) is two pieces, and two pieces of flow-stopping plates (60) are symmetrically laid in In the metalling (433), and the flower bed altar body of the free end contact respective side of each flow-stopping plate (60) level board Inner sidewall is to form baffle slot (601) with the inner sidewall of the flower bed altar body.
9. according to claim 1 strengthen the assembled rainwater flower bed being detained, which is characterized in that
The flower bed altar body includes the outer ring wall (10) in polygonal ring shape, and the outer ring wall (10) includes being used to form outside described First assembly board group (11) of ringwall (10) side wall and the first connecting elements (12) for playing connection, fixed function;
First assembly board group (11) includes two pieces of plate-like first assembled side plates (111), the described first assembled side plate It (111) include for assembling the interior spelling that adjacent described first assembled side plate (111) abuts in board group (11) with same described first It connects seamed edge (1113), and outer for being abutted with the described first assembled side plate (111) of adjacent first assembly board group (11) Splice seamed edge (1114);
It is respectively equipped at the interior splicing seamed edge (1113) on the inner plate surface and outer plate surface of described first assembled side plate (111) Along the interior length direction for splicing seamed edge (1113) successively spaced multiple first installation grooves (1111), and connection The first intercommunicating pore (1112) for two the first installation grooves (1111) being correspondingly arranged in plate face and outer plate surface, each first peace Dress groove (1111) is connected to the interior splicing seamed edge (1113);
First connecting elements (12) includes right on connected two pieces described first assembled side plate (111) inner plate surfaces for being installed in Two for should being connected to, first installation groove (1111), for being installed in the connected two pieces first assembled side plates (111) outside The second connecting plate (122) in two the first installation grooves (1111) of connection is corresponded in plate face, is set to first intercommunicating pore (1112) in and both ends are connected respectively with by first connecting plate with first connecting plate and second connecting plate (122) (121) and second connecting plate (122) is with respect to the first connector (123) of tension, and described first assembles the two of board group (11) First assembled side plate (111) described in block passes through the first connecting elements (12) detachable splicing described in multiple groups.
10. according to claim 9 strengthen the assembled rainwater flower bed being detained, which is characterized in that
The flower bed altar body further includes being connected to the bottom end of the outer ring wall (10) to open for sealing the outer ring wall (10) bottom end Mouthful underseal (20), the underseal (20) include be used to form flower bed altar bottom second assembly board group (21) and be used for connection with The second connecting elements (22) of fixed function;
Second assembly board group (21) includes two pieces of plate-like first assembled bottom plates (211), the described first assembled bottom plate (211) include interior abutting seamed edge (2111) for abutting with the first assembled bottom plate (211) described in group, and for setting with corresponding The outer abutting seamed edge (2112) that the assembled side plate (111) of described first set or the second assembled side plate (112) abut;
The described first assembled bottom plate (211) is interior and locking end is spelled by described first including being embedded in advance for second connecting elements (22) Dress bottom plate (211) outer abutting seamed edge (2112) extend perpendicularly out the second pre embedded bolt (221), for be installed in it is described first spell Fill that the 4th connecting plate (222) in second installation groove (1115) of side plate (111), to be threadedly connected to described second pre-buried The second locking nut (223) in screw rod (221) locking end outer circle, second pre embedded bolt (221) with it is to be connect described in Second intercommunicating pore (1116) on first assembled side plate (111) is correspondingly arranged;
Described first assembled bottom plate (211) passes through the second connecting elements (22) described in multiple groups and first assembly being correspondingly arranged Side plate (111) detachable splicing.
CN201910784151.3A 2019-08-23 2019-08-23 Strengthen the assembled rainwater flower bed being detained Pending CN110521438A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910784151.3A CN110521438A (en) 2019-08-23 2019-08-23 Strengthen the assembled rainwater flower bed being detained

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910784151.3A CN110521438A (en) 2019-08-23 2019-08-23 Strengthen the assembled rainwater flower bed being detained

Publications (1)

Publication Number Publication Date
CN110521438A true CN110521438A (en) 2019-12-03

Family

ID=68664084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910784151.3A Pending CN110521438A (en) 2019-08-23 2019-08-23 Strengthen the assembled rainwater flower bed being detained

Country Status (1)

Country Link
CN (1) CN110521438A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113582441A (en) * 2021-07-22 2021-11-02 长沙理工大学 Collecting, purifying and recycling system for pollution runoff of dry bulk cargo wharf

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130048884A (en) * 2011-11-03 2013-05-13 (주)고려환경 Natural circulation tree filter box system
CN206302813U (en) * 2016-12-02 2017-07-07 成都建工工业化建筑有限公司 Assembled combined flower pond
KR20170084428A (en) * 2016-01-12 2017-07-20 (주) 보원건설산업 A flowerport, and apparatus for treating rainwater comprising the flowerport
CN208518041U (en) * 2018-06-29 2019-02-19 广东诚实建设工程设计有限公司 It is a kind of to have both the drainage arrangement regulated and stored with filtration, purification function
KR20190032784A (en) * 2017-09-20 2019-03-28 이명권 Eco-friendly vegetation drainage device
CN109775925A (en) * 2019-01-29 2019-05-21 苏州同科环境市政服务有限公司 A kind of assembled biology arresting device
CN211353216U (en) * 2019-08-23 2020-08-28 中机国际工程设计研究院有限责任公司 Assembly type rainwater flower bed capable of reinforcing detention

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130048884A (en) * 2011-11-03 2013-05-13 (주)고려환경 Natural circulation tree filter box system
KR20170084428A (en) * 2016-01-12 2017-07-20 (주) 보원건설산업 A flowerport, and apparatus for treating rainwater comprising the flowerport
CN206302813U (en) * 2016-12-02 2017-07-07 成都建工工业化建筑有限公司 Assembled combined flower pond
KR20190032784A (en) * 2017-09-20 2019-03-28 이명권 Eco-friendly vegetation drainage device
CN208518041U (en) * 2018-06-29 2019-02-19 广东诚实建设工程设计有限公司 It is a kind of to have both the drainage arrangement regulated and stored with filtration, purification function
CN109775925A (en) * 2019-01-29 2019-05-21 苏州同科环境市政服务有限公司 A kind of assembled biology arresting device
CN211353216U (en) * 2019-08-23 2020-08-28 中机国际工程设计研究院有限责任公司 Assembly type rainwater flower bed capable of reinforcing detention

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113582441A (en) * 2021-07-22 2021-11-02 长沙理工大学 Collecting, purifying and recycling system for pollution runoff of dry bulk cargo wharf
CN113582441B (en) * 2021-07-22 2023-04-18 长沙理工大学 Collecting, purifying and recycling system for pollution runoff of dry bulk cargo wharf

Similar Documents

Publication Publication Date Title
CA2976915C (en) Integrated tree root and storm water system
CN106088289A (en) A kind of water storage system for sponge Front river course road and construction method
CN204919757U (en) Rainwater normal position purifies repair system
CN206571217U (en) Outdoor Parking position system based on sponge the idea of the city
CN110016886B (en) Riverway near natural ecological embankment
CN209011269U (en) Inlet for stom water
CN205205999U (en) Regulation and clean system of rainwater
CN105926709B (en) It is multi-functional to store row's Rain Garden system
CN110042724A (en) Collapsible Loess District road sponge facility rainwater catchment system and exhaust system
CN207597185U (en) Multi-functional ink storage draining and the urban ecology road surface for conserving lawn
CN207727376U (en) A kind of urban road of multimode rainwater-collecting purification and self-restraint greenbelt
CN210216634U (en) Urban rainwater and sewage diversion system
CN204898828U (en) Rainwater conserves - restores integrative device
CN112854405B (en) Multifunctional biological detention pond and construction method thereof
CN106088684A (en) The sunk type square of a kind of rainwater-collecting recycling and construction method thereof
CN110521438A (en) Strengthen the assembled rainwater flower bed being detained
CN207958057U (en) Rain processing system
CN211353216U (en) Assembly type rainwater flower bed capable of reinforcing detention
CN110521439A (en) Assembled rainwater flower bed
CN211353215U (en) Assembled rainwater flower bed
KR101268665B1 (en) Filtering devices having concatenated things with filter layer
CN112830581B (en) Seepage well type biological retention pond and construction method thereof
CN107864781A (en) The cultivation matrix structure and method of construction in roof rain water garden
CN109250859A (en) A kind of resident living area initial rainwater runoff intercepts, purification equipment
CN207392364U (en) Resident living area infiltration type intercepting pollution for rainwater governing system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination