CN110515812A - Dummy emulation system construction method based on Unity+3D technology - Google Patents
Dummy emulation system construction method based on Unity+3D technology Download PDFInfo
- Publication number
- CN110515812A CN110515812A CN201910744332.3A CN201910744332A CN110515812A CN 110515812 A CN110515812 A CN 110515812A CN 201910744332 A CN201910744332 A CN 201910744332A CN 110515812 A CN110515812 A CN 110515812A
- Authority
- CN
- China
- Prior art keywords
- module
- output end
- processing unit
- emulation
- database
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/3003—Monitoring arrangements specially adapted to the computing system or computing system component being monitored
- G06F11/301—Monitoring arrangements specially adapted to the computing system or computing system component being monitored where the computing system is a virtual computing platform, e.g. logically partitioned systems
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/34—Recording or statistical evaluation of computer activity, e.g. of down time, of input/output operation ; Recording or statistical evaluation of user activity, e.g. usability assessment
- G06F11/3457—Performance evaluation by simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/54—Interprogram communication
- G06F9/546—Message passing systems or structures, e.g. queues
Abstract
The invention discloses the dummy emulation system construction methods based on Unity+3D technology, including simulation model system module and database module, the output end of the simulation model system module is signal transmitting module, the simulation model system module input is database module, the simulation model system module and database module transmitting terminal each other, by being provided with emulation processing unit module in the input terminal of first processing units module and the second processing unit module in the present invention, it can make to carry out by emulation processing unit module in this way to treat the information to be modeled and be sieved and conveyed, the phenomenon that can causing confusion in this way to avoid the information of modeling, pass through the output end that first processing units module is modeling information to be analyzed in the present invention, the second processing unit module is the output end of the modeling information generated, in this way By the path of different output, so that the information of modeling can analyze the enhanced convenience with transmission.
Description
Technical field
The invention belongs to virtual emulation correlative technology fields, and in particular to the dummy emulation system based on Unity+3D technology
Construction method.
Background technique
System emulation is exactly the purpose according to network analysis, on the basis of each element property of analysis system and its correlation
On, system structure or simulation model action process and with certain logical relation or quantitative relation can be described by establishing, accordingly
Test or quantitative analysis are carried out, to obtain various information needed for correct decisions, emulation can be than more accurately describing system
Operation, develop and its development process, the process of emulation be also experiment process, but also be systematically collect and accumulating information
Process.
Existing dummy emulation system technology has the following problems: existing dummy emulation system carry out using when
It would generally carry out model to be generated by an analogue system to be modeled, the information of the model after modeling will do it biography
It is defeated with send, but since data are more, in this way when carrying out the transmission of data it is possible that the phenomenon that deviation, in this way
Meeting is so that the problem of data after the information and transmission that modeling needs cause confusion.
Summary of the invention
It is above-mentioned to solve the purpose of the present invention is to provide the dummy emulation system construction method based on Unity+3D technology
The existing dummy emulation system proposed in background technique is during carrying out the transmission and transmission of data it is possible that mixed
Random problem.
To achieve the above object, the invention provides the following technical scheme: the dummy emulation system based on Unity+3D technology
Construction method, including simulation model system module and database module, the output end of the simulation model system module are signal
Sending module, the simulation model system module input are database module, the simulation model system module and database
Transmitting terminal, the simulation model system module and signal transmitting module are electrically connected module each other, the signal transmitting module
Output end is signal processing module, and the output end of the signal processing module is database module, and the database module is set altogether
It sets there are two output end, one of output end of the database module is first processing units module, the database mould
Another output end of block is simulation model system module, another input terminal of the database module is second processing
Unit module, the output end of the first processing units module are emulation processing unit module, the second processing unit module
Input terminal be emulation processing unit module, the output end of the emulation processing unit module is Simulation Application scene module, institute
The input terminal for stating Simulation Application scene module is emulation processing unit module, the Simulation Application scene module and simulation process list
Element module output end and input terminal each other.
Preferably, the composition of the simulation model system module includes to establish structural model, carry out DATA REASONING, ODS
Module generates analysis report and model analysis module, and the output end for establishing structural model is to carry out DATA REASONING, it is described into
Row DATA REASONING is arranged altogether there are two output end, and the one of output end for carrying out DATA REASONING is ODS module, described
Another output end for carrying out DATA REASONING is model analysis module, the model analysis module and ODS module it is common
Output end makes a living into analysis report, and the simulation model system module and power switch are electrically connected.
Preferably, the composition of the emulation processing unit module includes virtual machine module, application program module, operation system
System module, virtual hardware abstraction layer module, virtualization layer VMM module and hardware processing module, the emulation processing unit module
Setting is virtual machine module, the emulation there are six output end, one of output end of the emulation processing unit module altogether
One of output end of processing unit module is application program module, one of output of the emulation processing unit module
End is operating system module, and one of output end of the emulation processing unit module is virtual hardware abstraction layer module, institute
State emulation processing unit module one of output end be virtualization layer VMM module, the emulation processing unit module its
In output end be hardware processing module, the emulation processing unit module and power switch are electrically connected.
Preferably, the ODS module is an optional part in operation data storage in data warehouse architecture, institute
It states ODS module and has the Partial Feature of data warehouse and the Partial Feature of OLTP system, the ODS module and power switch are electrical
Connection.
Preferably, the signal processing module is received from the information with signal transmitting module, the signal processing module
Send the information after reception to the inside of database module, the signal transmitting module and database module information each other
Receiving end and transmitting terminal.
Preferably, the first processing units module and the second processing unit module are parallel-connection structure, first processing
Unit module receives the information that database module is sent, and the information received is sent data by the second processing unit module
The inside of library module, the first processing units module and the second processing unit module and power switch are electrically connected.
Preferably, the progress DATA REASONING is arranged altogether there are two output end, described to carry out therein the one of DATA REASONING
A output end is ODS module, and described another output end for carrying out DATA REASONING is model analysis module, the ODS module
It is parallel-connection structure with model analysis module.
Preferably, the database module is to come the warehouse of tissue, storage and management data according to data structure, the number
No longer it is only storage and management data according to library module data management and is transformed into the sides of various data managements required for user
Formula, the database module are the core of the various informations system such as management information system, the office automation system, DSS
Center portion point, the database module are to carry out the important technical of scientific research and decision-making management.
Compared with prior art, the present invention provides the dummy emulation system construction method based on Unity+3D technology, tools
It is standby following the utility model has the advantages that
(1), by being provided at emulation in the input terminal of first processing units module and the second processing unit module in the present invention
Manage unit module, can make to carry out treating by emulation processing unit module in this way the information to be modeled carry out screening with it is defeated
The phenomenon that sending, can causing confusion in this way to avoid the information of modeling;
It (2), is the output end of modeling information to be analyzed, the second processing unit by first processing units module in the present invention
Module is the output end of the modeling information generated, in this way by the path of different output, so that the information of modeling can analyze
With the enhanced convenience of transmission, thus solve existing dummy emulation system carry out data transmission and transmission during
It is possible that chaotic problem.
Detailed description of the invention
Fig. 1 is dummy emulation system construction method structural schematic diagram of the invention;
Fig. 2 is simulation model system modular structure schematic diagram of the invention;
Fig. 3 is emulation processing unit modular structure schematic diagram of the invention;
In figure: 1, simulation model system module;11, structural model is established;12, DATA REASONING is carried out;13, ODS module;14, raw
At analysis report;15, model analysis module;2, signal transmitting module;3, signal processing module;4, database module;5, first
Processing unit module;6, emulation processing unit module;61, virtual machine module;62, application program module;63, operating system mould
Block;64, virtual hardware abstraction layer module;65, virtualization layer VMM module;66, hardware processing module;7, Simulation Application scene mould
Block;8, the second processing unit module.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Fig. 1-3 is please referred to, the present invention, which provides, is based on technical solution: the dummy emulation system building based on Unity+3D technology
Method, including simulation model system module 1 and database module 4, the output end of simulation model system module 1 are that signal sends mould
Block 2,1 input terminal of simulation model system module are database module 4, and simulation model system module 1 is sent out each other with database module 4
Sending end, simulation model system module 1 and signal transmitting module 2 are electrically connected, and the output end of signal transmitting module 2 is signal processing
Module 3, signal processing module 3 are received from the information with signal transmitting module 2, and signal processing module 3 is by the letter after reception
Breath is sent to the inside of database module 4 so that the reception of information and transmission can preferably carry out it is orderly into
Row, the receiving end of information and transmitting terminal, the output end of signal processing module 3 are signal transmitting module 2 each other with database module 4
Database module 4, database module 4 are arranged altogether there are two output end, and one of output end of database module 4 is at first
Unit module 5 is managed, another output end of database module 4 is simulation model system module 1, simulation model system module 1
Composition include to establish structural model 11, carry out DATA REASONING 12, ODS module 13, generate analysis report 14 and model analysis
Module 15 establishes the output end of structural model 11 to carry out DATA REASONING 12, and carrying out DATA REASONING 12, there are two outputs for setting altogether
End, the one of output end for carrying out DATA REASONING 12 is ODS module 13, so that preferably work, into
Another output end of row DATA REASONING 12 is model analysis module 15, and ODS module 13 is in parallel with model analysis module 15
Structure, carrying out DATA REASONING 12, there are two output ends for setting altogether, and the one of output end for carrying out DATA REASONING 12 is ODS mould
Block 13, ODS module 13 are an optional part in operation data storage in data warehouse architecture, and ODS module 13 has
The Partial Feature of data warehouse and the Partial Feature of OLTP system so that by ODS doorframe 13 can preferably into
The preservation of style of writing part, ODS module 13 and power switch are electrically connected, another output end for carrying out DATA REASONING 12 is mode
The common output end of analysis module 15, model analysis module 15 and ODS module 13 makes a living into analysis report 14,
Dummy emulation system construction method based on Unity+3D technology, including simulation model system module 1 and power switch electricity
Property connection, another input terminal of database module 4 is the second processing unit module 8, the output of first processing units module 5
End is emulation processing unit module 6, and first processing units module 5 and the second processing unit module 8 are parallel-connection structure, so as to
So that preferably carrying out the work of the transmission of respective information, first processing units module 5 receives the letter that database module 4 is sent
Breath, database module 4 is to come the warehouse of tissue, storage and management data according to data structure, and 4 data management of database module is not
It is only storage and management data again and is transformed into the modes of various data managements required for user, database module 4 is pipe
The core of the various informations systems such as information system, the office automation system, DSS is managed, database module 4 is
The important technical of scientific research and decision-making management is carried out, the information received is sent number by the second processing unit module 8
According to the inside of library module 4, first processing units module 5 and the second processing unit module 8 and power switch are electrically connected, at second
The input terminal for managing unit module 8 is emulation processing unit module 6, and the output end of emulation processing unit module 6 is Simulation Application field
Scape module 7, the input terminal of Simulation Application scene module 7 are emulation processing unit module 6, the composition of emulation processing unit module 6
It include virtual machine module 61, application program module 62, operating system module 63, virtual hardware abstraction layer module 64, virtualization
Layer VMM module 65 and hardware processing module 66, there are six output end, emulation processing units for setting altogether for emulation processing unit module 6
One of output end of module 6 is virtual machine module 61, and one of output end of emulation processing unit module 6 is using journey
Sequence module 62, one of output end of emulation processing unit module 6 are operating system module 63, emulation processing unit module 6
One of output end be virtual hardware abstraction layer module 64 so that preferably carry out abstract modeling, emulate
One of output end of processing unit module 6 be virtualization layer VMM module 65, emulation processing unit module 6 one of them
Output end is hardware processing module 66, and emulation processing unit module 6 and power switch are electrically connected, Simulation Application scene module 7
With emulation processing unit module 6 output end and input terminal each other.
The working principle of the invention and process for using: after the present invention installs, when making for dummy emulation system to be carried out
With when, be at this moment first turned on power switch, so that obtaining the offer of power, carried out later by operator by the system
The structural model 11 of establishing of model is analyzed, then carry out DATA REASONING 12, allow measurement after data more
It is accurate, the data after measurement are transmitted later, the generation of model analysis module 15 is carried out, and passes through at the same time
It then will generate analysis report 14 so that generating analysis report 14 with the cooperation of ODS module 13 and carry out being transferred to signal transmission mould
Then the inside of block 2 is output to the inside of signal processing module 3 with signal transmitting module 2, then defeated by signal processing module 3
The inside of database module 4 is arrived out, can carry out analysis and processing to information under the action of database module 4 in this way, so
It afterwards sends the information after analysis to the inside of first processing units module 5, is then sent to by first processing units module 5
The inside of emulation processing unit module 6, by that can carry out different operations under the action of emulation processing unit module 6 and divide
Analysis, is then output to the inside of Simulation Application scene module 7, if in Simulation Application scene mould by emulation processing unit module 6
There is discordant place in block 7, at this moment transmits data to emulation processing unit module 6 by Simulation Application scene module 7
Inside, the inside that then will send information to the second processing unit module 8 are analyzed and are sent, and database mould is finally sent to
The inside of block 4 carries out the comparison of different data, finally sends the data after comparison in simulation model system module 1
Portion is further modeled, and this completes using for the equipment.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (8)
1. the dummy emulation system construction method based on Unity+3D technology, including simulation model system module (1) and database
Module (4), it is characterised in that: the output end of the simulation model system module (1) is signal transmitting module (2), the emulation
Model system module (1) input terminal is database module (4), and the simulation model system module (1) and database module (4) are mutual
For transmitting terminal, the simulation model system module (1) and signal transmitting module (2) are electrically connected, the signal transmitting module (2)
Output end be signal processing module (3), the output end of the signal processing module (3) is database module (4), the data
Library module (4) is arranged altogether there are two output end, and one of output end of the database module (4) is first processing units mould
Block (5), another output end of the database module (4) are simulation model system module (1), the database module
(4) another input terminal is the second processing unit module (8), and the output end of the first processing units module (5) is imitative
True processing unit module (6), the input terminal of the second processing unit module (8) are emulation processing unit module (6), described imitative
The output end of true processing unit module (6) is Simulation Application scene module (7), the input of the Simulation Application scene module (7)
End is emulation processing unit module (6), and the Simulation Application scene module (7) exports each other with emulation processing unit module (6)
End and input terminal.
2. the dummy emulation system construction method according to claim 1 based on Unity+3D technology, it is characterised in that: institute
The composition for stating simulation model system module (1) includes to establish structural model (11), carry out DATA REASONING (12), ODS module
(13), analysis report (14) and model analysis module (15) are generated, the output end for establishing structural model (11) is to be counted
According to measurement (12), there are two output ends for setting altogether for the progress DATA REASONING (12), and the progress DATA REASONING (12) is wherein
An output end be ODS module (13), it is described carry out DATA REASONING (12) another output end be model analysis module
(15), the common output end of the model analysis module (15) and ODS module (13) is made a living into analysis report (14), described imitative
True mode system module (1) and power switch are electrically connected.
3. the dummy emulation system construction method according to claim 1 based on Unity+3D technology, it is characterised in that: institute
The composition for stating emulation processing unit module (6) includes virtual machine module (61), application program module (62), operating system module
(63), virtual hardware abstraction layer module (64), virtualization layer VMM module (65) and hardware processing module (66), at the emulation
Managing unit module (6), there are six output ends for setting altogether, and one of output end of the emulation processing unit module (6) is virtual
Machine module (61), one of output end of the emulation processing unit module (6) are application program module (62), the emulation
One of output end of processing unit module (6) be operating system module (63), the emulation processing unit module (6) its
In output end be virtual hardware abstraction layer module (64), one of output end of the emulation processing unit module (6)
For virtualization layer VMM module (65), one of output end of the emulation processing unit module (6) is hardware processing module
(66), the emulation processing unit module (6) and power switch are electrically connected.
4. the dummy emulation system construction method according to claim 2 based on Unity+3D technology, it is characterised in that: institute
Stating ODS module (13) is an optional part in operation data storage in data warehouse architecture, the ODS module (13)
Have the Partial Feature of data warehouse and the Partial Feature of OLTP system, the ODS module (13) and power switch are electrically connected.
5. the dummy emulation system construction method according to claim 1 based on Unity+3D technology, it is characterised in that: institute
It states signal processing module (3) to receive from the information with signal transmitting module (2), the signal processing module (3) will receive it
Information afterwards is sent to the inside of database module (4), the signal transmitting module (2) and database module (4) information each other
Receiving end and transmitting terminal.
6. the dummy emulation system construction method according to claim 1 based on Unity+3D technology, it is characterised in that: institute
Stating first processing units module (5) and the second processing unit module (8) is parallel-connection structure, the first processing units module (5)
The information that database module (4) are sent is received, the information received is sent database by the second processing unit module (8)
The inside of module (4), the first processing units module (5) and the second processing unit module (8) and power switch are electrically connected.
7. the dummy emulation system construction method according to claim 2 based on Unity+3D technology, it is characterised in that: institute
It states and carries out DATA REASONING (12) total setting there are two output end, the one of output end for carrying out DATA REASONING (12) is
ODS module (13), described another output end for carrying out DATA REASONING (12) are model analysis module (15), the ODS mould
Block (13) and model analysis module (15) are parallel-connection structure.
8. the dummy emulation system construction method according to claim 1 based on Unity+3D technology, it is characterised in that: institute
Stating database module (4) is the warehouse for coming tissue, storage and management data according to data structure, database module (4) number
No longer it is only storage and management data according to management and is transformed into the modes of various data managements required for user, the data
Library module (4) is the core of the various informations system such as management information system, the office automation system, DSS,
The database module (4) is the important technical for carrying out scientific research and decision-making management.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910744332.3A CN110515812A (en) | 2019-08-13 | 2019-08-13 | Dummy emulation system construction method based on Unity+3D technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910744332.3A CN110515812A (en) | 2019-08-13 | 2019-08-13 | Dummy emulation system construction method based on Unity+3D technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110515812A true CN110515812A (en) | 2019-11-29 |
Family
ID=68624838
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910744332.3A Pending CN110515812A (en) | 2019-08-13 | 2019-08-13 | Dummy emulation system construction method based on Unity+3D technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110515812A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101841839A (en) * | 2010-01-22 | 2010-09-22 | 华中科技大学 | Wireless sensor network (WSN) emulation system |
CN101908232A (en) * | 2010-07-30 | 2010-12-08 | 重庆埃默科技有限责任公司 | Interactive scene simulation system and scene virtual simulation method |
CN102955882A (en) * | 2012-11-08 | 2013-03-06 | 江苏省电力公司电力科学研究院 | Automatic detection simulation analog system of ultra-large intelligent electric energy meter |
CN105006017A (en) * | 2015-07-01 | 2015-10-28 | 国家电网公司 | Simulation method for generating three-dimensional scene based on Unity dynamic technology |
CN105045970A (en) * | 2015-07-01 | 2015-11-11 | 国家电网公司 | Simulation system for dynamically generating three-dimensional scene on the basis of Unity, and implementation method thereof |
CN105093959A (en) * | 2014-05-15 | 2015-11-25 | 南京药育智能科技有限公司 | Medicine production process three-dimensional simulation apparatus and simulation method |
CN107679281A (en) * | 2017-09-05 | 2018-02-09 | 国家电网公司 | Intelligent station three-dimensional scenic analogue system and implementation method based on Unity dynamic generations |
CN109446553A (en) * | 2018-09-14 | 2019-03-08 | 清华大学 | A kind of aerial Dynamic IR Scene analogue system based on Unity3D |
-
2019
- 2019-08-13 CN CN201910744332.3A patent/CN110515812A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101841839A (en) * | 2010-01-22 | 2010-09-22 | 华中科技大学 | Wireless sensor network (WSN) emulation system |
CN101908232A (en) * | 2010-07-30 | 2010-12-08 | 重庆埃默科技有限责任公司 | Interactive scene simulation system and scene virtual simulation method |
CN102955882A (en) * | 2012-11-08 | 2013-03-06 | 江苏省电力公司电力科学研究院 | Automatic detection simulation analog system of ultra-large intelligent electric energy meter |
CN105093959A (en) * | 2014-05-15 | 2015-11-25 | 南京药育智能科技有限公司 | Medicine production process three-dimensional simulation apparatus and simulation method |
CN105006017A (en) * | 2015-07-01 | 2015-10-28 | 国家电网公司 | Simulation method for generating three-dimensional scene based on Unity dynamic technology |
CN105045970A (en) * | 2015-07-01 | 2015-11-11 | 国家电网公司 | Simulation system for dynamically generating three-dimensional scene on the basis of Unity, and implementation method thereof |
CN107679281A (en) * | 2017-09-05 | 2018-02-09 | 国家电网公司 | Intelligent station three-dimensional scenic analogue system and implementation method based on Unity dynamic generations |
CN109446553A (en) * | 2018-09-14 | 2019-03-08 | 清华大学 | A kind of aerial Dynamic IR Scene analogue system based on Unity3D |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106301911B (en) | The centralized simulation platform in kind of Information Network based on SDN half and its implementation | |
CN111798068A (en) | Digital twinning system based on block chain bottom layer | |
CN108876286A (en) | A kind of distributed real time processing system towards flight path processing and emi analysis | |
CN111722043B (en) | Power equipment fault detection method, device and system | |
CN105207366B (en) | Distribution terminal plug and play model configuration tool and its implementation based on IEC61850 | |
CN114338418B (en) | Virtual-real combined information network verification platform | |
CN113312177A (en) | Wireless edge computing system and optimization method based on federal learning | |
CN208608998U (en) | A kind of equipment test verifying system based on FC network | |
CN106933712A (en) | Networking remote test system and method based on B/S frameworks | |
CN103676669A (en) | Method and system for checking motion information | |
CN110515812A (en) | Dummy emulation system construction method based on Unity+3D technology | |
CN110137945B (en) | Simulation test method and system for mass measurement data | |
CN102130799B (en) | System and method for testing network services | |
CN110569615A (en) | multi-source heterogeneous embedded software collaborative simulation test method | |
CN108880948A (en) | A kind of equipment test verifying system and method based on FC network | |
CN106934554A (en) | The implementation method and device of mirror-image system in a kind of intelligent scheduling automated system | |
CN107395405A (en) | Test environment analogy method and device based on spatial network topology | |
CN106773790A (en) | Based on the synchronous many iteration electric power of clobal axle and communication joint simulation method | |
CN105139114A (en) | Automatic compiling method for annual operation mode of power grid in district or county | |
CN112818545B (en) | Power information physical joint simulation system based on OPC | |
CN109639319A (en) | A kind of multi-source end noise modeling method under the line topological environmental based on Complex Power | |
CN106339803B (en) | A kind of power distribution network methods of risk assessment considering communication failure | |
CN114185280B (en) | Energy storage power station semi-physical real-time simulation architecture construction method based on embedded system | |
Lutze et al. | A modular framework for evaluating smart grid communication protocols over mobile networks | |
CN110363494A (en) | A kind of area code system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20191129 |
|
WD01 | Invention patent application deemed withdrawn after publication |