CN110512921A CN201910863649.9A CN201910863649A CN110512921A CN 110512921 A CN110512921 A CN 110512921A CN 201910863649 A CN201910863649 A CN 201910863649A CN 110512921 A CN110512921 A CN 110512921A
Authority
CN
China
Prior art keywords
bolster stake
column
mounting groove
basal layer
maintenance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910863649.9A
Other languages
Chinese (zh)
Inventor
江胜学
罗会平
陈龙超
周华海
杜欣
吴业飞
曹化锦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201910863649.9A priority Critical patent/CN110512921A/en
Publication of CN110512921A publication Critical patent/CN110512921A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • E04C5/163Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
    • E04C5/165Coaxial connection by means of sleeves
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H6/00Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
    • E04H6/08Garages for many vehicles

Abstract

The present invention relates to a kind of assembling structure for overhauling column, including basis and prefabricated bolster stake, on the basis of offer rim of a cup formula mounting groove, bolster stake is inserted in mounting groove and by cast-in-place concrete consolidation.Additionally relate to a kind of train overhaul platform and its construction method, the platform includes basal layer and maintenance track, basal layer is equipped with multiple rim of a cup formula mounting grooves, it is plugged in each mounting groove and is consolidated with a bolster stake, each bolster stake is prefabricated component and top is concordant, overhauls track installation in two carrying colonnade.By the way of in the rim of a cup formula mounting groove that the present invention opens up on the basis of complete prefabricated bolster stake is inserted into, constructs more convenient, can shorten the construction period significantly, save engineering cost;It is prefabricated under bolster stake line, it can guarantee quality, be convenient for standardized production;Scene only needs to guarantee the quality of the casting concrete into mounting groove, and it is not tacit can thoroughly to solve the problems, such as that track construction unit cooperates with civil construction unit for easily operated control.

Description

Overhaul assembling structure, train overhaul platform and its construction method of column
Technical field
The present invention relates to a kind of assembling structure, train overhaul platform and its construction methods for overhauling column, can be applied to rail Road traffic engineering field is particularly suitable for being related to the engineering of train overhaul.
Background technique
Currently, urban rail transit construction high speed development, rolling stock section relevant to rail traffic Maintenance Bases are also in high volume being built If in, according to using function difference to be broadly divided into two class of rolling stock section and parking lot, (generic name is fortune to vehicle comprehensive repair depot With library and maintenance library), for car inspection and repair and park.There is pillar inspection pit in library, each column inspection pit contains a large amount of short columns With supporting track and train load;According to track installation needs, short column 400 × 400mm of sectional dimension, about 1 meter of height.
According to current construction technology, it is all made of molded-in-place cast-in-place concrete short column at this stage, the construction period is longer, existing Field casting concrete quality is difficult to ensure that waste of material is larger;And concrete column has been constructed completion before being laid with track, by Exist in column plane and vertical positioning compared with multiple error, rail installation accuracy is caused to be difficult to ensure, it is vertical need to repair or remove part Column, workload are huge.
Summary of the invention
The present embodiments relate to a kind of assembling structure, train overhaul platform and its construction methods for overhauling column, at least It can solve the segmental defect of the prior art.
The present embodiments relate to a kind of assembling structures for overhauling column, including basis, further include bolster stake, the carrying Column is prefabricated component;It is embedded with the connecting elements for connecting with maintenance track at the top of the bolster stake, is opened on the basis of Yu Suoshu Equipped with rim of a cup formula mounting groove, the bolster stake is inserted in the mounting groove and is fixedly arranged at the installation by cast-in-place concrete In slot.
As one of embodiment, the bolster stake is precast concrete column.
As one of embodiment, the bolster stake include top solid-section and below the solid-section have it is hollow The hollow section of chamber.
As one of embodiment, the bolster stake is square column and its each equal inverted arc angle of incline.
The embodiment of the present invention further relates to a kind of train overhaul platform, including basal layer and maintenance track, Yu Suoshu basal layer On set that there are two rims of a cup to arrange, each rim of a cup column include the multiple rim of a cup formula mounting grooves being longitudinally arranged successively along maintenance track, It is plugged in each mounting groove and is consolidated with a bolster stake, each bolster stake is prefabricated component and top is concordant, the inspection Track installation is repaired in two carrying colonnade.
As one of embodiment, each bolster stake is precast concrete column.
As one of embodiment, in each carrying colonnade, retaining wall is equipped between adjacent two bolster stake.
As one of embodiment, the retaining wall be reinforced concrete structure and at least partly horizontal steel bar with it is adjacent Bolster stake consolidation.
The embodiment of the present invention further relates to the construction method of train overhaul platform as described above, comprising:
Carry out the prefabricated of each bolster stake;
Cast in situs basal layer when basal layer pours, completes the reserved molding of each mounting groove;
Each bolster stake is lifted respectively to corresponding mounting groove;
It installs track installation steel moulding bed and is laid with maintenance track, by the maintenance orbit adjusting to design lines position;
Each bolster stake and the maintenance track are assembled together;
The casting concrete in each mounting groove is fixedly arranged at each bolster stake on basal layer;
Remove track installation steel moulding bed.
As one of embodiment, the construction method further include:
When bolster stake is prefabricated, the embedded bar connector sleeve in its edge;
When basal layer pours, the vertical reinforcement of retaining wall is reserved;
After each bolster stake is fixedly arranged on basal layer, the horizontal steel bar of retaining wall, part of horizontal steel bar are bound With adjacent reinforcing bar connector sleeve connection, subsequent casting concrete is to form retaining wall between every adjacent two bolster stake.
The embodiment of the present invention at least has the following beneficial effects:
In the present invention, in the rim of a cup formula mounting groove that is opened up on the basis of complete prefabricated bolster stake is inserted by the way of, construction It is more convenient, it can shorten the construction period significantly, template uses less or can not have to template substantially, saves engineering cost;Carrying It is prefabricated under column line, it can guarantee quality, be convenient for standardized production;Scene only needs to guarantee the quality of the casting concrete into mounting groove , easily operated control, can thoroughly solve the problems, such as track construction unit and civil construction unit cooperation it is not tacit.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the structural schematic diagram of bolster stake provided in an embodiment of the present invention;
Fig. 2 be Fig. 1 along the sectional view of A-A;
Fig. 3 is the planar structure schematic diagram of train overhaul platform provided in an embodiment of the present invention;
Fig. 4 is cross-sectional view of the Fig. 3 along B-B;
Fig. 5 is cross-sectional view of the Fig. 3 along C-C;
Fig. 6 is cross-sectional view of the Fig. 3 along D-D.
Specific embodiment
The following is a clear and complete description of the technical scheme in the embodiments of the invention, it is clear that described embodiment Only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, the common skill in this field Art personnel all other embodiment obtained without making creative work belongs to the model that the present invention protects It encloses.
Embodiment one
Such as Fig. 4 and Fig. 5, the embodiment of the present invention provides a kind of assembling structure for overhauling column, including basis 2 and bolster stake 1, The bolster stake 1 is prefabricated component;Rim of a cup formula mounting groove 21 is offered on described basic 2, the bolster stake 1 is inserted in the peace It is fixedly arranged in the mounting groove 21 in tankage 21 and by cast-in-place concrete 5.
Above-mentioned basic 2 be preferably concrete foundation 2, is further preferably reinforced concrete foundation 2.
Above-mentioned bolster stake 1 is preferably concrete column 1, further preferably reinforced column 1, guarantees structural strength.
The assembling structure is mainly used in the vehicle comprehensive repair depot in 3 traffic engineering of track, to support maintenance rail Road 3 and train load.Such as Fig. 1, connecting elements 11 is set generally at the top of the bolster stake 1, it, should for being connect with maintenance track 3 Connecting elements 11 can be the plastic sleeve 11 being embedded in bolster stake 1, depending on the specific structure of track 3.
It is further preferred that bolster stake 1 provided in this embodiment can be hollow structure such as Fig. 1 and Fig. 2, can guarantee Mitigate the self weight of bolster stake 1 in the case where structural strength significantly, is readily transported installation and pipeline is walked.In optional embodiment In, such as Fig. 1 and Fig. 2, the bolster stake 1 includes top solid-section and the sky with hollow cavity 14 below the solid-section Heart section, above-mentioned connecting elements 11 are set in the solid-section, and the hollow cavity 14 of the hollow section for example can be perforation to bolster stake 1 Bottom end, in the casting concrete into mounting groove 21, part concrete can be entered in the hollow cavity 14 of bolster stake 1, to mention Consolidation structure stability and reliability between high-mechanic column 1 and basis 2;Alternatively, can correspondingly be set in the slot bottom of mounting groove 21 Guide pile is set, by hollow cavity 14 and the mutual intercalation of guide pile, facilitates positioning bolster stake 1, guarantees the precision of assembling structure, simultaneously The consolidation structure stability and reliability between bolster stake 1 and basis 2 can be improved.Correspondingly, can on bolster stake 1 it is pre-buried walk Spool 12, this is walked spool 12 and is connected to above-mentioned hollow cavity 14.
Above-mentioned bolster stake 1 can be the shapes such as square column, cylinder;The bolster stake 1 is square column in one of the embodiments, And its each equal inverted arc angle of incline, pole section are smaller and beautiful.
Above-mentioned mounting groove 21 be in rim of a cup shape, such as its cell wall can be with vertically it is parallel, be also possible to incline from top to bottom Tiltedly setting.Its groove bottom size/area is greater than 1 bed-plate dimension of bolster stake/area, is easily carried column 1 and stands on slot bottom;In bolster stake After 1 connect with maintenance track 3, into mounting groove 21 when casting concrete, concrete can at least surround 1 surrounding of bolster stake, In the case where bolster stake 1 is separated with slot bottom, cast-in-place concrete 5 can also surround 1 bottom end of bolster stake.It is cast-in-place in mounting groove 21 to mix Solidifying soil is preferably fine sand concrete, and consolidation effect is preferable.
The assembling structure of maintenance column provided in this embodiment is inserted into using complete prefabricated bolster stake 1 and is opened up on basis 2 Mode in rim of a cup formula mounting groove 21 is constructed more convenient, can be shortened the construction period significantly, and template uses less or substantially can be with Without template, engineering cost is saved;It is prefabricated under 1 line of bolster stake, it can guarantee quality, be convenient for standardized production;Scene only needs to protect The quality of the casting concrete into mounting groove 21 is demonstrate,proved, easily operated control can thoroughly solve track construction unit and soil It builds unit in charge of construction and cooperates not tacit problem.
Embodiment two
Such as Fig. 3-Fig. 5, the embodiment of the present invention provides a kind of train overhaul platform, including basal layer 2 and maintenance track 3, in It is set on the basal layer 2 there are two rim of a cup column, each rim of a cup column include multiple cups that edge maintenance track 3 is longitudinally arranged successively Mouthful formula mounting groove 21 plugs in each mounting groove 21 and is consolidated with a bolster stake 1, each bolster stake 1 be prefabricated component simultaneously And top is concordant, the maintenance track 3 is installed in two carrying colonnade.
Wherein, bolster stake 1 can be used described in above-described embodiment one and bolster stake 1, specific structure do not go to live in the household of one's in-laws on getting married herein It states.
Above-mentioned basal layer 2 is preferably still concrete foundation layer 2, is further preferably reinforced concrete foundation layer 2.Respectively The structure of rim of a cup formula mounting groove 21 is also described in above-described embodiment one, is not repeated herein.
Train overhaul platform provided in this embodiment is inserted into the rim of a cup opened up on basal layer 2 using complete prefabricated bolster stake 1 Mode in formula mounting groove 21 is constructed more convenient, can be shortened the construction period significantly, and template uses less or substantially can not have to Template saves engineering cost;It is prefabricated under 1 line of bolster stake, it can guarantee quality, be convenient for standardized production;Scene only need guarantee to The quality of casting concrete in mounting groove 21, easily operated control can thoroughly solve track construction unit and apply with civil engineering Work order position cooperates not tacit problem.
Further, such as Fig. 5 and Fig. 6, in each carrying colonnade, retaining wall 2 is equipped between adjacent two bolster stake 1. The retaining wall 2 is preferably concrete walls, is further preferably reinforced concrete structure;2 both ends of retaining wall are preferably divided It is not abutted with adjacent two bolster stake 1, make bolster stake 1 stands that structure is more stable, and the bearing load of bolster stake 1 can be improved Ability.
Above-mentioned retaining wall 2 is preferably cast in situs, when pouring basal layer 2, can reserve 2 vertical reinforcement 222 of retaining wall, When binding 2 horizontal steel bar 221 of retaining wall, it is preferably such that at least partly horizontal steel bar 221 and adjacent bolster stake 1 are solid Knot.It, can be when bolster stake 1 be prefabricated in one of the embodiments, on the basis 2 that above-mentioned bolster stake 1 is precast concrete Embedded bar connector sleeve 13, realization are reliably connected with 2 horizontal steel bar 221 of retaining wall, make each bolster stake 1 and each earth-retaining Wall 2 and basal layer 2 are linked together, and cooperative bearing, functional reliability significantly improves.
Embodiment three
The embodiment of the present invention provides the construction method of above-mentioned train overhaul platform, comprising:
(1) the prefabricated of each bolster stake 1 is carried out;
(2) cast in situs basal layer 2 when basal layer 2 pours, completes the reserved molding of each mounting groove 21;
(3) each bolster stake 1 is lifted respectively to corresponding mounting groove 21;
(4) attachment rail installs steel moulding bed 4 and is laid with maintenance track 3, and the maintenance track 3 is adjusted to design lines position;
(5) each bolster stake 1 and the maintenance track 3 are assembled together;
(6) casting concrete in each mounting groove 21, is fixedly arranged at each bolster stake 1 on basal layer 2;
(7) track installation steel moulding bed 4 is removed.
Wherein, pouring for the prefabricated and basal layer 2 of bolster stake 1 can carry out simultaneously.In above-mentioned (4) part steps In, it is laid with after maintenance track 3, by adjusting 3 plane positioning of track and absolute altitude equidimension precision, track 3 will be overhauled to reach It adjusts to the purpose of design lines position;Location and installation is carried out by 4 pairs of maintenance tracks 3 of track installation steel moulding bed, can reach higher Installation accuracy avoids carrying out re-adjustments positioning to each bolster stake 1.
It is further preferred that for above-mentioned the case where being additionally provided with retaining wall 2, the construction method further include:
When bolster stake 1 is prefabricated, the embedded bar connector sleeve 13 in its edge;
When basal layer 2 pours, the vertical reinforcement 222 of retaining wall 2 is reserved;
After each bolster stake 1 is fixedly arranged on basal layer 2, the horizontal steel bar 221 of retaining wall 2 is bound, it is part of horizontal Connect to reinforcing bar 221 with adjacent reinforcing bar connector sleeve 13, subsequent casting concrete between every adjacent two bolster stake 1 at Type retaining wall 2.
In addition, the method for prefabricating of above-mentioned bolster stake 1 may include following steps:
1. binding reinforcing bar in column (vertical muscle and stirrup);
2. by reinforcing bar binding and fixing in the pre-buried pvc pipe 12 of the pre-buried plastic sleeve 11 in column top and middle part and column;
3. the steel reinforcement cage that binding is completed is put into prefabricated molds board slot;
4. pouring high-grade concrete in template slot;
5. doing hollowcore precast concrete column by high-speed centrifugation technology;
6. quickly forming precast concrete column finished product by steam press maintenance.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of assembling structure for overhauling column, including basis, it is characterised in that: further include bolster stake, the bolster stake is pre- Product;It is embedded with the connecting elements for connecting with maintenance track at the top of the bolster stake, offers cup on the basis of Yu Suoshu Mouth formula mounting groove, the bolster stake are inserted in the mounting groove and are fixedly arranged in the mounting groove by cast-in-place concrete.
2. the assembling structure of maintenance column as described in claim 1, it is characterised in that: the bolster stake is precast concrete Column.
3. the assembling structure of maintenance column as described in claim 1, it is characterised in that: the bolster stake includes top solid-section With the hollow section with hollow cavity being located at below the solid-section.
4. the assembling structure of maintenance column as described in claim 1, it is characterised in that: the bolster stake is square column and it is each The equal inverted arc angle of incline.
5. a kind of train overhaul platform, including basal layer and maintenance track, it is characterised in that: there are two being set on Yu Suoshu basal layer Rim of a cup column, each rim of a cup column include the multiple rim of a cup formula mounting grooves being longitudinally arranged successively along maintenance track, each peace It is plugged in tankage and is consolidated with a bolster stake, each bolster stake is prefabricated component and top is concordant, the maintenance track installation In in two carrying colonnade.
6. train overhaul platform as claimed in claim 5, it is characterised in that: each bolster stake is precast concrete column.
7. train overhaul platform as claimed in claim 5, it is characterised in that: in each carrying colonnade, adjacent two carrying Retaining wall is equipped between column.
8. train overhaul platform as claimed in claim 7, it is characterised in that: the retaining wall be reinforced concrete structure and At least partly horizontal steel bar and adjacent bolster stake consolidates.
9. the construction method of train overhaul platform as claimed in claim 5 characterized by comprising
Carry out the prefabricated of each bolster stake;
Cast in situs basal layer when basal layer pours, completes the reserved molding of each mounting groove;
Each bolster stake is lifted respectively to corresponding mounting groove;
It installs track installation steel moulding bed and is laid with maintenance track, by the maintenance orbit adjusting to design lines position;
Each bolster stake and the maintenance track are assembled together;
The casting concrete in each mounting groove is fixedly arranged at each bolster stake on basal layer;
Remove track installation steel moulding bed.
10. construction method as claimed in claim 9, which is characterized in that further include:
When bolster stake is prefabricated, the embedded bar connector sleeve in its edge;
When basal layer pours, the vertical reinforcement of retaining wall is reserved;
After each bolster stake is fixedly arranged on basal layer, the horizontal steel bar of retaining wall, part of horizontal steel bar and phase are bound Adjacent reinforcing bar connector sleeve connection, subsequent casting concrete is to form retaining wall between every adjacent two bolster stake.
CN201910863649.9A 2019-09-12 2019-09-12 Overhaul assembling structure, train overhaul platform and its construction method of column Pending CN110512921A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910863649.9A CN110512921A (en) 2019-09-12 2019-09-12 Overhaul assembling structure, train overhaul platform and its construction method of column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910863649.9A CN110512921A (en) 2019-09-12 2019-09-12 Overhaul assembling structure, train overhaul platform and its construction method of column

Publications (1)

Publication Number Publication Date
CN110512921A true CN110512921A (en) 2019-11-29

Family

ID=68632172

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910863649.9A Pending CN110512921A (en) 2019-09-12 2019-09-12 Overhaul assembling structure, train overhaul platform and its construction method of column

Country Status (1)

Country Link
CN (1) CN110512921A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111497003A (en) * 2020-04-20 2020-08-07 建华建材交通科技(湖北)有限公司 Production process of prefabricated overhaul small stand column
CN113914682A (en) * 2021-09-26 2022-01-11 广州地铁设计研究院股份有限公司 Prefabricated cavity column assembly type column type maintenance pit and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938644A (en) * 2014-03-14 2014-07-23 中国水电顾问集团西北勘测设计研究院有限公司 Prefabricated concrete bearing platform with reserved pile nest holes and fabricated multi-pile foundation installation method based on prefabricated concrete bearing platform with reserved pile nest holes
CN205444475U (en) * 2016-03-11 2016-08-10 中民筑友有限公司 Prefab and basic connected node
CN207419509U (en) * 2017-08-07 2018-05-29 江西省路桥工程集团有限公司 Prestressing force assembled Complex retaining wall structure
CN108335853A (en) * 2018-03-21 2018-07-27 广东电网有限责任公司东莞供电局 A kind of precast splice type box type transformer basis
CN211229702U (en) * 2019-09-12 2020-08-11 中铁第四勘察设计院集团有限公司 Assembly structure for overhauling stand column and train overhauling platform

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938644A (en) * 2014-03-14 2014-07-23 中国水电顾问集团西北勘测设计研究院有限公司 Prefabricated concrete bearing platform with reserved pile nest holes and fabricated multi-pile foundation installation method based on prefabricated concrete bearing platform with reserved pile nest holes
CN205444475U (en) * 2016-03-11 2016-08-10 中民筑友有限公司 Prefab and basic connected node
CN207419509U (en) * 2017-08-07 2018-05-29 江西省路桥工程集团有限公司 Prestressing force assembled Complex retaining wall structure
CN108335853A (en) * 2018-03-21 2018-07-27 广东电网有限责任公司东莞供电局 A kind of precast splice type box type transformer basis
CN211229702U (en) * 2019-09-12 2020-08-11 中铁第四勘察设计院集团有限公司 Assembly structure for overhauling stand column and train overhauling platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111497003A (en) * 2020-04-20 2020-08-07 建华建材交通科技(湖北)有限公司 Production process of prefabricated overhaul small stand column
CN113914682A (en) * 2021-09-26 2022-01-11 广州地铁设计研究院股份有限公司 Prefabricated cavity column assembly type column type maintenance pit and construction method thereof

Similar Documents

Publication Publication Date Title
CN101302739B (en) Prestress concrete box girder hydraulic internal mold vehicle as well as hydraulic internal mold system
CN109487814A (en) Cast-in-place piping lane integrated moveable formwork jumbo construction method
CN103924525B (en) Urban interchange industrialization short-term precast assembly construction method
CN109808054A (en) A kind of straight line PC track girder precast construction method
CN109853381B (en) Transitional structure for preventing bridge head from jumping and construction method thereof
CN101793006A (en) Construction method for rapid construction of support cast-in-situ continuous beam
CN110512921A (en) Overhaul assembling structure, train overhaul platform and its construction method of column
CN106863555A (en) And of Varying Depth PC track girder adjustable forms
CN217104732U (en) Sectional type crossbeam construction structures of strideing across existing railway line gate-type pier
CN113279324A (en) Semi-prefabricated UHPC-NC combined cover beam connecting structure and assembling method
CN102587282B (en) Large-section simply-supported box girder precasting and assembly process under conditions of strong wind and high altitude
CN102660925B (en) Moveable formwork for variable-width curved bridge
CN102720137B (en) Prefabrication construction method for trough girder sections of track traffic high-level bridge
CN106049201A (en) Medium and low speed maglev traffic engineering low line solid bearing-trail beam structure and construction method thereof
CN101885206B (en) Hydraulic internal mold truss type walking track system of high speed railway prefabricating box girder
CN204982681U (en) Steel bow member integral translation device
CN201244857Y (en) Prestress concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system
CN110106788B (en) Post-cast section construction method for butt joint of track beams
CN107575023A (en) A kind of sliding formwork component and apply its caisson cutting edge layer slding form operation method
CN108978699B (en) Land integral prefabricated bearing platform and production and installation method thereof
CN110173134A (en) Wide-flat beam formula assembled railroad platform concrete awning
CN211229702U (en) Assembly structure for overhauling stand column and train overhauling platform
CN110512922A (en) Assembled overhauls column, train overhaul platform and its construction method
CN110093948A (en) Variable cross-section Pipe rack and its construction method suitable for rapid construction
KR20020035038A (en) mould form apparatus for box girder of ILM and method of construction for box-girder

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination