CN110512788A - A kind of clean operating room assembled electrolysis steel plate linked system and its construction method - Google Patents

A kind of clean operating room assembled electrolysis steel plate linked system and its construction method Download PDF

Info

Publication number
CN110512788A
CN110512788A CN201910837062.0A CN201910837062A CN110512788A CN 110512788 A CN110512788 A CN 110512788A CN 201910837062 A CN201910837062 A CN 201910837062A CN 110512788 A CN110512788 A CN 110512788A
Authority
CN
China
Prior art keywords
keel
wall
steel plate
assembled
top plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910837062.0A
Other languages
Chinese (zh)
Inventor
王俊杰
付宝强
张兰芳
刘志国
羊志成
高文光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Sixth Group Co Ltd
Original Assignee
Beijing Urban Construction Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Sixth Group Co Ltd filed Critical Beijing Urban Construction Sixth Group Co Ltd
Priority to CN201910837062.0A priority Critical patent/CN110512788A/en
Publication of CN110512788A publication Critical patent/CN110512788A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/001Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by provisions for heat or sound insulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/006Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation with means for hanging lighting fixtures or other appliances to the framework of the ceiling
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/04Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/04Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
    • E04B9/045Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like being laminated
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0875Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements having a basic insulating layer and at least one covering layer
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0889Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements characterised by the joints between neighbouring elements, e.g. with joint fillings or with tongue and groove connections
    • E04F13/0891Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements characterised by the joints between neighbouring elements, e.g. with joint fillings or with tongue and groove connections with joint fillings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Electrolytic Production Of Non-Metals, Compounds, Apparatuses Therefor (AREA)

Abstract

The invention discloses a kind of clean operating room assembled electrolysis steel plate linked system and its construction method, linked system includes that the top plate keel being connected under top plate, the wall body keel being connected on the inside of wall, the diagonal brace being connected between wall and wall body keel and the assembled being connected on top plate keel and wall body keel are electrolysed steel plate;Assembled electrolysis steel plate piecemeal is assembled, and assembled is electrolysed steel plate and connects respectively with top plate keel and wall body keel mounting;The end of adjacent assembled electrolysis steel plate is provided with flange, and flange is connected with corresponding top plate keel or wall body keel.When construction, on the other hand assembled electrolysis steel plate of the present invention can guarantee the installation tightness of electrolysis steel plate by hanging and welding dual connection type, on the one hand convenient construction;By the setting of top plate keel and wall body keel, wall body keel is connect with top plate and bottom plate by corner fittings respectively, and diagonal brace is provided between wall body keel and wall, further enhances the stable connection of wall body keel.

Description

A kind of clean operating room assembled electrolysis steel plate linked system and its construction method
Technical field
The present invention relates to operation room wallboard construction technology, in particular to a kind of clean operating room assembled electrolysis steel plate connection System and its construction method.
Background technique
Operating room is that the important place of operation and rescue is provided for patient.The form of operating room is also from distributed hand before Art room sum aggregate intermediate surgeries room develops clean operating room till now.For clean operating room, the construction one of metope and top plate As constructed by whole welding type, but when whole welding type operating room is constructed, electrolysis steel plate used in metope and top plate needs Welded by on-site consolidation, electric welding field and spraying operation amount are larger, more demanding to construction personnel's handicraft, and construction period compared with It is long, it is time-consuming;In addition, piece weld be easy to cause paint topcoat because expanding with heat and contract with cold in the integrally welding of electrolysis steel plate Cracking, poly-putty base, which is dealt with improperly, is easy to cause antibiotic paint to chemically react with metal, floating trace occurs.In addition, In In integral solder construction, it is unfavorable for door-window opening for change design and construction;And assembly construction method, have and meets batch The characteristics of construction and saving working hour.Therefore, in conjunction with fabricated construction, clean operating room functional requirement, again can be met by providing one kind It can convenient construction usage and the firm clean operating room electrolysis steel plate linked system of installation quality and its construction method.
Summary of the invention
The present invention provides a kind of clean operating room assembled electrolysis steel plate linked system and its construction methods, to solve Assembled electrolysis steel plate assembly mounting, top plate and wall body keel are reinforced and the technologies such as assembled electrolysis steel plate design installation are asked Topic.
To achieve the above object, the present invention adopts the following technical scheme:
A kind of clean operating room assembled is electrolysed steel plate linked system, comprising be connected under top plate top plate keel, be connected to wall It the wall body keel of internal side, the diagonal brace being connected between wall and wall body keel and is connected on top plate keel and wall body keel Assembled is electrolysed steel plate;Assembled electrolysis steel plate piecemeal is assembled, assembled be electrolysed steel plate respectively with top plate keel and Wall body keel mounting connection, wherein connected between assembled electrolysis steel plate and wall body keel by wall pendant, assembled is electrolysed steel plate It is connect between top plate keel by connector;
Adjacent assembled electrolysis steel plate connecting sewing is arranged at top plate keel or wall body keel, adjacent assembled electrolysis steel plate connection It is filled with sealant at seam, the end of adjacent assembled electrolysis steel plate is provided with flange, flange and corresponding top plate keel or wall Keel connection.
Further, the assembled electrolysis steel plate includes the plasterboard that electrolysis steel plate is connected with the back side, is connected on plasterboard It is stupefied to be connected to steel back;The electrolysis steel plate surface layer is high-pressure electrostatic anti-bacterial powder baking vanish.
Further, the wall body keel includes wall centre keel and the wall transom being vertically connected on wall centre keel Keel are mounted with wall;The top of the wall centre keel is connect by corner fittings with top plate, and bottom end is connected in wall transom.
Further, wall mounting keel correspond to assembled electrolysis steel plate and wall hole setting, wall mount keel and Wall pendant is connected between assembled electrolysis steel plate;The wall mounting keel are angle-shaped piece, and angle-shaped piece inner corner trim is towards wall, angle-shaped piece One side is flushed with wall centre keel, another side vertical wall centre keel.
Further, the wall pendant includes upper L shape part and the lower L shape part being connected to below L shape part;Wherein, upper L shape Part is right angle, and the corresponding formula electrolysis steel plate that is linked and packed in the long side face of upper L shape part, the short side end of upper L shape part connects lower L shape part Long side top;Lower L shape part inner corner trim is obtuse angle, and lower L shape part external corner and upper L shape part long side extended line horizontal distance adapt to wall mounting dragon Bone side thickness.
Further, be connected with wall between the wall pendant and assembled electrolysis steel plate and connect part, the wall connect part by U-shaped part and Alternately connection is combined into inverted U-shaped part;The sealing side of U-shaped part and inverted U-shaped part alternative one is connected on assembled electrolysis steel plate, separately One sealing side is connect with the upper L shape part long side of wall pendant;The thickness that wall connects part adapts to assembled electrolysis steel plate and wall mounts keel Between horizontal width.
Further, the connector includes the adapter of the connecting rod connecting with top plate and connection boom end connection;Institute It states adapter to connect with top plate keel upper side, adapter is that L hooks part, angle-shaped piece or connecting plate.
Further, the flange downside that the assembled electrolysis steel plate is connect with top plate keel is connected with top even part, top Even anchoring piece is connected between part and adapter;Even part is angle-shaped piece or connecting plate on the top, and anchoring piece is bolt or pin rod.
Further, the top plate keel in the top plate surrounding and corner are connected with diagonal brace, diagonal brace and wall between wall respectively Body is connected by corner fittings;Top plate keel are connect at inner corner trim with wall body keel is connected with corner fittings.
Further, the construction method of a kind of clean operating room assembled electrolysis steel plate linked system, specific steps It is as follows:
Step 1: checking clean operating room region spatial position and size according to clean operating room architectural drawing, scene is drawn Measurement figure;By in-site measurement figure, the Deepen Design of clean operating room is carried out;When clean operating room design in-depth, carry out top plate The design of keel and wall body keel, and according to wall and the demands such as mounting of roof plate equipment or ventilation setting wall hole and top plate hole Mouth and the electrolysis steel plate typesetting of corresponding progress assembled and lattice portal design;
Step 2: production assembled is electrolysed steel plate, the electrolysis steel plate back side is connected into plasterboard, connects steel back in gypsum back It is stupefied, and high-pressure electrostatic anti-bacterial powder baking vanish is made in electrolysis steel plate surface layer;By the assembled to complete electrolysis steel plate according to row Version carries out various sizes of division production, and the assembled of each plate is electrolysed plating numerals;
Step 3: making according to Deepen Design drawing and installing wall body keel;Line core is controlled to wall body keel on clean operating room After examination is received, the wall transom of wall body keel bottom end is fixed on bottom plate, after verification wall transom position is errorless, by the perpendicular dragon of wall Bone top is fixed on top plate using corner fittings, and bottom end is fixed in wall transom;Using wall corner as wall body keel starting point, It is sequentially arranged wall centre keel, wall transom and wall mounting keel, wherein wall mounts spine arrangement spacing and assembled is electrolysed steel plate Sub-cell width is consistent, highly selected according to actual needs;
Step 4: making according to Deepen Design drawing and installing top plate keel;After top plate keel control line verifies examination, according to The layout drawing of top plate keel pops up top plate Keel Line on bottom plate, is projected with laser by by bottom plate upper plate keel control line On top board surface, along top plate keel control line installation connecting element;Top plate keel and root are well placed by bottom plate unwrapping wire position is corresponding According to design drawing assembly, after the completion of assembled, top plate keel is lifted by crane by two chain blocks, are lifted at connector, school After core meets error requirements, top plate keel and wall are connected with diagonal brace;Wherein, there is flat top imperial design on top plate keel Bone, arc top plate keel or air-blow ceiling hole keel, carry out the handover transition and hanging of variant top plate keel junction Point Encryption Design;Junction is installed for top plate keel and wall body keel, corner fittings is installed at inner corner trim below the junction;
Step 5: the assembled on installation wall body keel is electrolysed steel plate, connection wall pendant in advance is first electrolysed on steel plate in assembled Connect part with wall, is placed in the corresponding assembled electrolysis steel plate of each wall of clean operating room accordingly according still further to Deepen Design drawing Position;First from door opening place side according to clockwise successively perimeter mounted formula electrolysis steel plate and wall body keel mount, Then it smooths, be straightened, then the flange of assembled electrolysis steel plate is connect with wall body keel;Finally, wall and bottom plate corner Assembled electrolysis steel plate is installed on corner, and corresponding installation waterproof layer;
Step 6: the assembled on installation top plate keel is electrolysed steel plate, even part is pushed up in installation on assembled electrolysis steel plate in advance, then Assembled electrolysis steel plate is sequenced according to Deepen Design drawing, first carries out the assembled electrolysis hoisting steel plate of plane at no hole, The assembled electrolysis steel plate being equipped at top plate hole again;Top even part is connect with connector by anchoring piece after lifting up, The flange of assembled electrolysis steel plate is connect with wall body keel again;Finally by the top plate keel on periphery assembled electrolysis steel plate with The assembled electrolysis steel plate opposite joint connection installed on wall body keel, and corresponding installation insulating layer;
Step 7: the filling with sealant at each splicing seams, and the assembled electrolysis steel plate on wall body keel and top plate keel is spelled Seam carries out verification adjustment;Then, check and modify engineering defect when installing on assembled electrolysis steel plate;Further installation dress Decorations property attachment and corresponding installation door and window, lamps and lanterns and other equipment at wall hole and top plate hole, finally carry out cleaning and tidying With dyestripping gluing.
The beneficial effects of the present invention are embodied in:
1) present invention is electrolysed the setting of steel plate by assembled, and electrolysis surface of steel plate is sprayed high-pressure electrostatic anti-bacterial powder baking vanish, Cleaning in clean operation room, comfortable and environmentally friendly functionalization requirement can be met;And assembled electrolysis steel plate passes through hanging and welding Dual connection type, on the one hand avoid integral solder construct technological problems, on the other hand can guarantee convenient construction and electrolysis The installation tightness of steel plate;
2) present invention passes through the setting of top plate keel and wall body keel, and wall body keel is connected with top plate and bottom plate by corner fittings respectively It connects, diagonal brace is provided between wall body keel and wall, further enhance the stable connection of wall body keel;Top plate keel respectively with It is provided with diagonal brace between wall and top plate, and is provided with reinforcer between top plate keel and wall body keel, formula is electrolysed steel to be linked and packed Plate provides reliable support system;
3) it when the present invention passes through construction, first to the installation hole of needed equipment or structure at wall body keel and top plate keel, carries out It reserves and is designed for changing, then steel plate is electrolysed by assembled and carries out preparatory typesetting and design, so that can in formally installation Guarantee the installation quality at hole and saves the construction time;
In addition, the present invention in construction and installation, because of its functionalization demand, is provided with waterproof layer in bottom comers, in top corners It is provided with insulating layer, and is filled with sealant between adjacent electrolysis steel plate, conducive to the use of clean operating room;The present invention is using dress With formula technique, site workload is small, and construction quality is high, is conducive to mass production, reduces construction cost;Other feature of the invention It will be illustrated in the following description with advantage, and partly as will become apparent from the description, or by implementing this It invents and understands;The main object of the present invention and further advantage can be realized by scheme specifically noted in the description and It obtains.
Detailed description of the invention
Fig. 1 is clean operating room assembled electrolysis steel plate linked system vertical profile figure;
Fig. 2 is the vertical distribution schematic diagram of wall body keel;
Fig. 3 is that top plate and assembled are electrolysed steel plate connection schematic diagram;
Fig. 4 is that bottom plate and assembled are electrolysed steel plate connection schematic diagram;
Fig. 5 is that assembled electrolysis steel plate and wall mount keel connection schematic diagram.
Appended drawing reference: 1- top plate, 2- wall, 3- bottom plate, 4- top plate keel, 5- wall body keel, 51- wall centre keel, 52- wall Transom, 53- wall mounting keel, 6- diagonal brace, 7- assembled electrolysis steel plate, 71- electrolysis steel plate, 72- plasterboard, 73- sealant, 8- connector, 81- connecting rod, 82- adapter, 9- insulating layer, 10- waterproof layer, 11- wall hole, 12- corner fittings, 13- wall connect L shape part, the top 15- connect part, 16- anchoring piece under part, 14- wall pendant, the upper L shape part of 141-, 142-.
Specific embodiment
By taking certain clean operating room as an example, as shown in Figure 1, being electrolysed the company with top plate 1 and wall 2 respectively of steel plate 7 for assembled Connect sectional view.Clean operating room assembled electrolysis 7 linked system of steel plate includes the top plate keel 4 being connected under top plate 1, is connected to The wall body keel 5 of the inside of wall 2, the diagonal brace 6 being connected between wall 2 and wall body keel 5 and it is connected to top plate keel 4 and wall Assembled on keel 5 is electrolysed steel plate 7;Assembled be electrolysed 7 piecemeal of steel plate it is assembled, assembled be electrolysed steel plate 7 respectively with top Board keel 4 and the mounting connection of wall body keel 5, wherein assembled is electrolysed between steel plate 7 and wall body keel 5 and is connected by wall pendant 14, It is connected between assembled electrolysis steel plate 7 and top plate keel 4 by connector 8.
In the present embodiment, assembled is electrolysed steel plate 7 and does substrate by electrolysis steel plate 71, electrolysis 71 thickness of steel plate have 1.0mm, 1.2mm and tri- kinds of 1.5mm in 71 backing high-strength waterproof gypsum board 72 of electrolysis steel plate and reinforce C-type steel back cord, and surface layer is that high pressure is quiet Electric anti-bacterial powder baking vanish.This assembled, which is electrolysed steel plate 7, has good thermal insulation, is not likely to produce and gathers electrostatic, and surface is flat Cunning is not easy dust, is not easy adhesive dust and is easy to remove dust.
In the present embodiment, adjacent assembled electrolysis 7 connecting sewing of steel plate is arranged at top plate keel 4 or wall body keel 5, adjacent Assembled, which is electrolysed at 7 connecting sewing of steel plate, is filled with sealant 73, and the end of adjacent assembled electrolysis steel plate 7 is provided with flange, turns over Side is welded to connect with corresponding top plate keel 4 or wall body keel 5.
As shown in Fig. 2, wall body keel 5 includes wall centre keel 51 and the horizontal dragon of the wall being vertically connected on wall centre keel 51 Bone 52 and wall mount keel 53, and wherein wall centre keel 51 and wall transom 52 are made for square steel tube, and junction is using welding; The top of wall centre keel 51 is bolted by corner fittings 12 with top plate 1, and bottom end is welded or is bolted in wall transom 52.Wall Transom 52 is distributed in 51 bottom end of wall centre keel and top furred ceiling or hangs canopy position, and wall transom 52 passes through bolt or pre-buried Part is connect with bottom plate 3;Wall mounts the corresponding assembled electrolysis steel plate 7 of keel 53 and wall hole 11 is arranged, wall mount keel 53 with Wall pendant 14 is connected between assembled electrolysis steel plate 7;It is angular steel part that wall, which mounts keel 53, and angle-shaped piece inner corner trim is towards wall 2, angle Shape part one side is flushed with wall centre keel 51, another side vertical wall centre keel 51.
As shown in figure 3, connector 8 includes to connect with the bolted connecting rod 81 of top plate 1 and 81 bottom bolts of connecting rod Adapter 82;Adapter 82 is that steel L shape hooks part and welds with 4 upper side of top plate keel, in addition, adapter 82 can also be angle Shape part or connecting plate are welded or are bolted with corresponding top plate keel 4;Assembled is electrolysed what steel plate 7 was welded with top plate keel 4 Flange downside is welded with top even part 15, and even part 15 is steel angle-shaped piece or junction steel plate on top;Top, which connects, is welded with anchoring on part 15 Part 16, anchoring piece 16 are bolt or pin rod.When installation, anchoring piece 16 and adapter 82 are connected and fixed.In addition, 1 surrounding of top plate And the top plate keel 4 in corner are connected with diagonal brace 6 between wall 2 respectively, diagonal brace 6 is connect with wall 2 by corner fittings 12, and diagonal brace 6 is Rectangular steel tube production;Top plate keel 4 are connect at inner corner trim with wall body keel 5 is connected with corner fittings 12, and corner fittings 12 is square steel part.
As shown in Figure 4 and Figure 5, wall pendant 14 is steel component, and wall pendant 14 includes upper L shape part 141 and is connected to L shape The lower L shape part 142 of 141 lower section of part;Wherein, upper L shape part 141 is right angle, and the long side face of upper L shape part 141 corresponds to assemble welding Formula is electrolysed steel plate 7, and the short side end welding of upper L shape part 141 or integral production connect lower 142 long side top of L shape part;Lower L shape part 142 inner corner trims are obtuse angle, and lower 142 external corner of L shape part and upper 141 long side extended line horizontal distance of L shape part adapt to wall and mount 53 side of keel Side thickness.
In the present embodiment, it is connected with wall between wall pendant 14 and assembled electrolysis steel plate 7 and connects part 13, it is steel structure that wall, which connects part 13, Part, wall connects part 13, and by U-shaped part and inverted U-shaped part, alternately welding or integral production are formed;The envelope of U-shaped part and inverted U-shaped part alternative one Mouth side is welded on assembled electrolysis steel plate 7, and upper 141 long side of L shape part of another sealing side and wall pendant 14 is welded;Wall connects part 13 Thickness adapt to assembled electrolysis steel plate 7 and wall mounting keel 53 between horizontal width.
In conjunction with Fig. 1 to Fig. 5, a kind of construction party of clean operating room assembled electrolysis steel plate linked system is further illustrated Method, the specific steps are as follows:
Step 1: checking clean operating room region spatial position and size according to clean operating room architectural drawing, scene is drawn Measurement figure;By in-site measurement figure, the Deepen Design of clean operating room is carried out;When clean operating room design in-depth, top plate is carried out The design of keel 4 and wall body keel 5, and the demands such as equipment or ventilation are installed according to wall 2 and top plate 1,11 He of wall hole is set Top plate hole, and electrolysis 7 typesetting of steel plate of corresponding progress assembled and lattice portal design.
In reference line construction, cleaning installation setting-out place keeps bottom plate 3 smooth clean, not influence snap the line as principle.Root According to in-depth drawing, find out reference line, generally using metope where clean operating room gate as benchmark line, from doorframe draw lines, It successively finishes in a clockwise direction.Each central point, right angle and oblique angle mark are drawn, to install.Entire construction technology is carried out The installation node full-page proof of keypoint part is drawn in detailed planning, in conjunction with typesetting figure and spine arrangement figure, is drawn assembled and is electrolysed steel 7 unwrapping wire full-page proof of plate.
Step 2: production assembled is electrolysed steel plate 7, electrolysis 71 back side of steel plate is connected into plasterboard 72, is carried on the back in plasterboard 72 It is stupefied that face connects steel back, and makes high-pressure electrostatic anti-bacterial powder baking vanish in electrolysis 71 surface layer of steel plate;By the assembled to complete electricity It solves steel plate 7 and various sizes of division production is carried out according to typesetting, and the assembled of each plate electrolysis steel plate 7 is numbered.
Step 3: making according to Deepen Design drawing and installing wall body keel 5;To 5 base of wall body keel on clean operating room After quasi- control line verifies examination, the wall transom 52 of 5 bottom end of wall body keel is fixed on bottom plate 3, checks wall transom 52 Set it is errorless after, 51 top of wall centre keel is fixed on top plate 1 using corner fittings 12, bottom end is weldingly fixed in wall transom 52; Using 2 corner of wall as 5 starting point of wall body keel, it is sequentially arranged wall centre keel 51, wall transom 52 and wall mounting keel 53;Wall It mounts keel 53 and arranges that spacing is consistent with assembled electrolysis 7 sub-cell width of steel plate, it is highly selected according to actual needs.
Wherein, the control of 51 spacing of wall centre keel is highly selected according to actual needs between 600mm ~ 1200mm.Check wall After 51 position of centre keel is errorless, spacing is determined according to 51 layout drawing of clean operating room wall centre keel, 51 top of wall centre keel uses It is fixed on 1 bottom surface of top plate with the expansion bolt of M8 × 60 after the welding of 4# angle bar, lower end is welded in wall transom 52;Wall centre keel 51 Middle part interval is fixed on wall 2 using diagonal brace 6;Adjacent metope if it is be wall body keel 5 then be used in keel between weld connect, shape At stablizing truss;Every wall centre keel 51 is both needed to both direction and hangs plumb line, and error is not more than 2mm.Wall transom 52 and wall are hung 53 spacing of building sequence bone controls between 600mm ~ 1200mm;After the completion of 52 wall line of wall transom is checked and accepted, by control line expanding screw Bolt is fixed on bottom plate 3.When welding wall transom 52 at skirt, skirting keel use dedicated wall transom 52, the horizontal dragon of wall Bone 52 is welded between wall centre keel 51, and 52 center of wall transom is 85mm with a distance from wall centre keel 51.
Step 4: making according to Deepen Design drawing and installing top plate keel 4;The verification of 4 benchmark control line of top plate keel is tested After receipts, 4 line of top plate keel is popped up on bottom plate 3 according to the layout drawing of top plate keel 4, is pressed with laser by bottom plate 3 upper plate dragon 4 control line of bone projects on 1 surface of top plate, along 4 control line installation connecting element 8 of top plate keel;It is corresponding to press 3 unwrapping wire position of bottom plate It is well placed top plate keel 4 and top plate keel 4 is risen by two chain blocks after the completion of assembled according to design drawing assembly It hangs, is lifted at connector 8, after check meets error requirements, connect top plate keel 4 and wall 2 with diagonal brace 6;For top plate dragon Bone 4 and wall body keel 5 install junction, install corner fittings 12 at inner corner trim below the junction.
Wherein, top plate keel 4 include arc top plate keel, flat top keel and air-blow ceiling top plate keel;Wall 2 Top wall transom 52 joins transition with arc top plate keel, flat top keel or air-blow ceiling top plate keel respectively;In addition, Flat top keel 4 arrange the arrangement that consider the equipment such as lamps and lanterns and preprocessing air-blow ceiling on top plate 1, and to top plate keel 4 Make design in reasonable sling point position.
Air-blow ceiling is the integrated clean air conditioner air outlet of an independent design, and cavity wall is electrolysed steel plate by assembled 7 is totally-enclosed, seam gluing encapsulation process, forms clean chamber;Air-blow ceiling is hung on top plate 1, quadrangle and the top fixed The angle steel of the four corners of 4 skeleton of board keel is bolted.
Step 5: the assembled on installation wall body keel 5 is electrolysed steel plate 7, first connected in advance on assembled electrolysis steel plate 7 Wall pendant 14 and wall connect part 13, and the clean operating room corresponding assembled of each wall 2 is electrolysed steel plate 7 according still further to design in-depth drawing It is placed in corresponding position;First from door opening place side according to clockwise successively perimeter mounted formula electrolysis steel plate 7 with Wall body keel 5 mounts, and then smooths, is straightened, then the flange of assembled electrolysis steel plate 7 is connect with wall body keel 5;Finally, handle Wall 2 and 3 corner assembled of bottom plate electrolysis steel plate 7 are installed on corner, and corresponding installation waterproof layer 10, waterproof layer 10 use Water-resistant gypsum board is formed with assembled electrolysis 7 integral production of steel plate.
Wherein, it after assembled electrolysis steel plate 7 checks level, is welded and fixed with 2 bottom end wall transom 52 of wall.Wall base The assembled electrolysis steel plate 7 of seat is 5mm smaller than metope assembled electrolysis 7 thickness of steel plate, thus can be formed at metope skirt hiding Formula skirt facilitates and furls head on the PVC roll material at bottom plate 3 under waterproof layer 10;After the bottom plate 3 is using the pretreatment of 2mm Self-leveling, Paving import antistatic rubber coiled material, and it is integral using homogeneous electrode welding, and bottom plate 3 is connecting corner smearing with wall 2 Cement fillet.
The corresponding assembled electrolysis steel plate 7 of each metope of clean operating room is placed in corresponding position, from gate door opening institute Side according to clockwise successively with locking pliers periphery wallboard and wall mounting keel 53 fix.Assembled is electrolysed steel plate 7 smoothings, alignment design piece 3mm wide between holding plate and plate, then flange and wall with electric weld handle assembled electrolysis steel plate 7 Keel 5 are welded and fixed.Assembled electrolysis steel plate 7 in corner is attached on angle, and electricity consumption solid welding is set, the horizontal dragon of the wall of bottom and skirt Bone 52 and pedestal electrolysis steel plate spot welding connect, and are polished flat with grinding machine and fill antirust being welded with protrusion metope.
Step 6: the assembled on installation top plate keel 4 is electrolysed steel plate 7, top is installed on assembled electrolysis steel plate 7 in advance Assembled electrolysis steel plate 7 is sequenced according still further to Deepen Design drawing, first carries out the assembled electrolysis of plane at no hole by even part 15 Steel plate 7 lifts, then is equipped with the assembled electrolysis steel plate 7 at top plate hole;Top even part 15 is led to connector 8 after lifting up The connection of anchoring piece 16 is crossed, then the flange of assembled electrolysis steel plate 7 is connect with wall body keel 5;Finally by the top plate keel 4 on periphery Assembled electrolysis 7 opposite joint of steel plate installed on upper assembled electrolysis steel plate 7 and wall body keel 5 is connect, and corresponding installation insulating layer 9, insulating layer 9 is electrolysed 7 integral production of steel plate using self binding thermal insulation plate and assembled.
Wherein, steel plate 7 is electrolysed for flat top keel installation assembled, sequences assembled electrolysis on the ground according to drawing Steel plate 7.It is connected in order between M5 key screw assembled electrolysis steel plate 7 and between assembled electrolysis steel plate 7 and connector 8 Good, error is no more than 0.5mm between plate and plate;The smoothing of assembled electrolysis steel plate 7, alignment, guarantee piece between plate and plate 3mm wide, then with electric weld handle assembled electrolysis steel plate 7 and top plate keel 4 be welded and fixed, with grinding machine be welded with protrusion metope beat It polishes and fills antirust.
Steel plate 7 is electrolysed for arc top plate keel and air-blow ceiling top plate keel installation assembled, is first existed by drawing sequence Corresponding circular arc and air-blow ceiling top plate keel are sequenced, is first connect top plate keel 4 with top plate or wall 2 with M5 screw, then use M5 screw is connect with assembled electrolysis steel plate 7.The assembled electrolysis steel plate 7 installed need to guarantee design flatness and leakproofness, No more than 0.5mm, assembled electrolysis steel plate 7 is welded and fixed convex-concave with top plate keel 4, using guarantor's type weather proofing sealant to plate and Edge joint position between plate carries out snapping gluing.
Step 7: being filled at each splicing seams and supplementing sealant 73, and to the dress on wall body keel 5 and top plate keel 4 Verification adjustment is carried out with formula electrolysis 7 splicing seams of steel plate;Then, check and modify engineering when installing on assembled electrolysis steel plate 7 Defect;Further install ornamental accessories and at wall hole 11 and top plate hole corresponding installation door and window, lamps and lanterns and other set It is standby, finally carry out cleaning and tidying and dyestripping gluing.
In addition, being both needed at screwed joint or at welded connecting etc. fill antirust oil, guaranteeing the normal of component and making for a long time With.In the construction process, the customizable processing of a variety of materials used, finished product is neatly packed at the scene, operation process Plays Construction, thus, it can be ensured that the construction of construction site civilization highly effective and safe.
The foregoing is merely the preferable specific embodiments of the present invention, but scope of protection of the present invention is not limited thereto, The change or replacement that anyone skilled in the art is expected in the technical scope disclosed by the present invention should all be contained Lid is within protection scope of the present invention.

Claims (10)

1. a kind of clean operating room assembled is electrolysed steel plate linked system, which is characterized in that include the top being connected under top plate (1) Board keel (4), the wall body keel (5) being connected on the inside of wall (2), the diagonal brace being connected between wall (2) and wall body keel (5) (6) and be connected on top plate keel (4) and wall body keel (5) assembled electrolysis steel plate (7);The assembled is electrolysed steel plate (7) piecemeal is assembled, and assembled is electrolysed steel plate (7) and connects respectively with top plate keel (4) and wall body keel (5) mounting, wherein Assembled is electrolysed steel plate (7) and is connect between wall body keel (5) by wall pendant (14), and assembled is electrolysed steel plate (7) and top plate dragon It is connected between bone (4) by connector (8);
Adjacent assembled electrolysis steel plate (7) connecting sewing is arranged at top plate keel (4) or wall body keel (5), adjacent assembled electricity It solves and is filled with sealant (73) at steel plate (7) connecting sewing, the end of adjacent assembled electrolysis steel plate (7) is provided with flange, flange It is connected with corresponding top plate keel (4) or wall body keel (5).
2. a kind of clean operating room assembled is electrolysed steel plate linked system as described in claim 1, which is characterized in that the assembly Formula electrolysis steel plate (7) includes the plasterboard (72) that electrolysis steel plate (71) is connected with the back side, and it is stupefied to be connected with steel back on plasterboard (72); Electrolysis steel plate (71) surface layer is high-pressure electrostatic anti-bacterial powder baking vanish.
3. a kind of clean operating room assembled is electrolysed steel plate linked system as described in claim 1, which is characterized in that the wall Keel (5) include wall centre keel (51) and the wall transom (52) and wall that are vertically connected on wall centre keel (51) mounting dragon Bone (53);The top of the wall centre keel (51) is connect by corner fittings (12) with top plate (1), and bottom end is connected to wall transom (52) On.
4. a kind of clean operating room assembled is electrolysed steel plate linked system as claimed in claim 3, which is characterized in that the wall is hung Corresponding assembled electrolysis steel plate (7) of building sequence bone (53) and wall hole (11) setting, wall mounts keel (53) and assembled is electrolysed Wall pendant (14) are connected between steel plate (7);Wall mounting keel (53) is angle-shaped piece, and angle-shaped piece inner corner trim is towards wall (2), angle Shape part one side is flushed with wall centre keel (51), another side vertical wall centre keel (51).
5. a kind of clean operating room assembled is electrolysed steel plate linked system as claimed in claim 4, which is characterized in that the wall is hung Part (14) includes upper L shape part (141) and the lower L shape part (142) being connected to below L shape part (141);Wherein, upper L shape part (141) be right angle, corresponding formula electrolysis steel plate (7) that is linked and packed in the long side face of upper L shape part (141), upper L shape part (141) it is short Side end portion connects lower L shape part (142) long side top;Lower L shape part (142) inner corner trim is obtuse angle, lower L shape part (142) external corner and upper L shape Part (141) long side extended line horizontal distance adapts to wall and mounts keel (53) side thickness.
6. a kind of clean operating room assembled is electrolysed steel plate linked system as claimed in claim 5, which is characterized in that the wall is hung It is connected with wall between part (14) and assembled electrolysis steel plate (7) to connect part (13), the wall connects part (13) and handed over by U-shaped part and inverted U-shaped part It is combined into for connection;The sealing side of U-shaped part and inverted U-shaped part alternative one is connected in assembled electrolysis steel plate (7), another sealing Side is connect with upper L shape part (141) long side of wall pendant (14);Wall connect part (13) thickness adapt to assembled electrolysis steel plate (7) with Wall mounts horizontal width between keel (53).
7. a kind of clean operating room assembled is electrolysed steel plate linked system as described in claim 1, which is characterized in that the connection Part (8) includes the adapter (82) of the connecting rod (81) connecting with top plate (1) and the connection of connecting rod (81) end;The adapter (82) it is connect with top plate keel (4) upper side, adapter (82) is that L hooks part, angle-shaped piece or connecting plate.
8. a kind of clean operating room assembled is electrolysed steel plate linked system as described in claim 1 or 7, which is characterized in that described The flange downside that assembled electrolysis steel plate (7) is connect with top plate keel (4) is connected with top even part (15), and top connects part (15) and turns Anchoring piece (16) are connected between fitting (82);The top even part (15) is angle-shaped piece or connecting plate, anchoring piece (16) be bolt or Pin rod.
9. a kind of clean operating room assembled is electrolysed steel plate linked system as described in claim 1, which is characterized in that the top plate (1) the top plate keel (4) in surrounding and corner are connected with diagonal brace (6) between wall (2) respectively, and diagonal brace (6) and wall (2) pass through angle Part (12) connection;Top plate keel (4) connect at inner corner trim with wall body keel (5) and are connected with corner fittings (12).
10. a kind of construction party of clean operating room assembled electrolysis steel plate linked system as described in claim 1 to 9 any one Method, which is characterized in that specific step is as follows:
Step 1: checking clean operating room region spatial position and size according to clean operating room architectural drawing, scene is drawn Measurement figure;By in-site measurement figure, the Deepen Design of clean operating room is carried out;When clean operating room design in-depth, top plate is carried out The design of keel (4) and wall body keel (5), and wall is arranged according to wall (2) and top plate (1) the installation demands such as equipment or ventilation Hole (11) and top plate hole, and electrolysis steel plate (7) typesetting of corresponding progress assembled and lattice portal design;
Step 2: production assembled electrolysis steel plate (7), by electrolysis steel plate (71) back side connection plasterboard (72), in plasterboard (72) connection steel back in the back side is stupefied, and makes high-pressure electrostatic anti-bacterial powder baking vanish in electrolysis steel plate (71) surface layer;By what is completed Assembled is electrolysed steel plate (7) and carries out various sizes of division production according to typesetting, and the assembled of each plate is electrolysed steel plate (7) Number;
Step 3: making according to Deepen Design drawing and installing wall body keel (5);Wall body keel on clean operating room (5) are controlled After line core examination processed is received, the wall transom (52) of wall body keel (5) bottom end is fixed on bottom plate (3), wall transom is checked (52) after position is errorless, wall centre keel (51) top is fixed on top plate (1) using corner fittings (12), bottom end is fixed on the horizontal dragon of wall On bone (52);Using wall (2) corner as wall body keel (5) starting point, it is sequentially arranged wall centre keel (51), wall transom (52) Keel (53) are mounted with wall, wherein wall mounts keel (53) and arranges that spacing is consistent with assembled electrolysis steel plate (7) sub-cell width, Height is selected according to actual needs;
Step 4: making according to Deepen Design drawing and installing top plate keel (4);Top plate keel (4) control line, which is verified, to be checked and accepted Afterwards, top plate keel (4) line is popped up on bottom plate (3) according to the layout drawing of top plate keel (4), being pressed with laser will be on bottom plate (3) Top plate keel (4) control line projects on top plate (1) surface, along top plate keel (4) control line installation connecting element (8);The bottom of by Plate (3) unwrapping wire position is corresponding to be well placed top plate keel (4) and passes through two hands after the completion of assembled according to design drawing assembly It draws cucurbit that top plate keel (4) are lifted by crane, is lifted at connector (8), after check meets error requirements, connected and pushed up with diagonal brace (6) Board keel (4) and wall (2);Wherein, there are flat top keel, arc top plate keel for design on top plate keel (4) or send Wind ceiling roof keel, carry out handover transition and the sling point Encryption Design of variant top plate keel (4) junction;For top Junction is installed in board keel (4) and wall body keel (5), installs corner fittings (12) at inner corner trim below the junction;
Step 5: the assembled in installation wall body keel (5) is electrolysed steel plate (7), first connect in advance in assembled electrolysis steel plate (7) It connects wall pendant (14) and wall connects part (13), according still further to Deepen Design drawing by the corresponding assembled of each wall of clean operating room (2) Electrolysis steel plate (7) is placed in corresponding position;Elder generation is from door opening place in side according to clockwise successively perimeter mounted formula It is electrolysed steel plate (7) and wall body keel (5) to mount, then smooths, is straightened, then the flange and wall of assembled electrolysis steel plate (7) Keel (5) connection;Finally, wall (2) and bottom plate (3) corner assembled electrolysis steel plate (7) are installed on corner, and corresponding It installs waterproof layer (10);
Step 6: the assembled in installation top plate keel (4) is electrolysed steel plate (7), installed in assembled electrolysis steel plate (7) in advance Top even part (15), according still further to Deepen Design drawing sequences assembled electrolysis steel plate (7), first carries out the assembly of plane at no hole Formula is electrolysed steel plate (7) lifting, then is equipped with assembled electrolysis steel plate (7) at top plate hole;By top even part after lifting up (15) it is connect with connector (8) by anchoring piece (16), then the flange of assembled electrolysis steel plate (7) and wall body keel (5) is connected It connects;Finally the assembled installed in assembled electrolysis steel plate (7) and wall body keel (5) on the top plate keel (4) on periphery is electrolysed The connection of steel plate (7) opposite joint, and corresponding installation insulating layer (9);
Step 7: filling with sealant (73) at each splicing seams, and to the assembled on wall body keel (5) and top plate keel (4) Electrolysis steel plate (7) splicing seams carry out verification adjustment;Then, check and modify engineering when installing in assembled electrolysis steel plate (7) Defect;Further install ornamental accessories and at wall hole (11) and top plate hole corresponding installation door and window, lamps and lanterns and other Equipment finally carries out cleaning and tidying and dyestripping gluing.
CN201910837062.0A 2019-09-05 2019-09-05 A kind of clean operating room assembled electrolysis steel plate linked system and its construction method Pending CN110512788A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910837062.0A CN110512788A (en) 2019-09-05 2019-09-05 A kind of clean operating room assembled electrolysis steel plate linked system and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910837062.0A CN110512788A (en) 2019-09-05 2019-09-05 A kind of clean operating room assembled electrolysis steel plate linked system and its construction method

Publications (1)

Publication Number Publication Date
CN110512788A true CN110512788A (en) 2019-11-29

Family

ID=68629998

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910837062.0A Pending CN110512788A (en) 2019-09-05 2019-09-05 A kind of clean operating room assembled electrolysis steel plate linked system and its construction method

Country Status (1)

Country Link
CN (1) CN110512788A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2005251A1 (en) * 1988-12-13 1990-06-13 Robert Sampson Skylight construction
KR20010087827A (en) * 2001-06-26 2001-09-26 정진황 The operation method of metal lath bonding exterior insulation and finishing system
CN2721222Y (en) * 2004-08-04 2005-08-31 格满林(南京)实业有限公司 Assembled cleaning room
CN201883633U (en) * 2010-12-02 2011-06-29 苏州净化工程安装有限公司 Operating room wall surface hanging plate
CN204299218U (en) * 2014-12-17 2015-04-29 铭铉(江西)医疗净化科技有限公司 Precast combined operating room
CN105839876A (en) * 2016-05-25 2016-08-10 北京城建六建设集团有限公司 Decorative construction system of wall body and roof board for clean operating room and construction method of decorative construction system
WO2017020676A1 (en) * 2015-07-31 2017-02-09 北新集团建材股份有限公司 Modular wall and erection method thereof
CN206987268U (en) * 2017-07-14 2018-02-09 上海品宅装饰科技有限公司 A kind of assembled indoor wall finished system
CN207436346U (en) * 2017-11-06 2018-06-01 马会 A kind of clean operating room suspended ceiling mounting structure
CN108204070A (en) * 2018-02-07 2018-06-26 苏州通快净化科技有限公司 A kind of hanging top plate mounting structure
CN208725157U (en) * 2017-11-06 2019-04-12 聂莉莉 A kind of medical apparatus cabinet mounting structure applied to clean operating room
CN210798029U (en) * 2019-09-05 2020-06-19 北京城建六建设集团有限公司 Clean operating room assembled electrolysis steel sheet connected system

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2005251A1 (en) * 1988-12-13 1990-06-13 Robert Sampson Skylight construction
KR20010087827A (en) * 2001-06-26 2001-09-26 정진황 The operation method of metal lath bonding exterior insulation and finishing system
CN2721222Y (en) * 2004-08-04 2005-08-31 格满林(南京)实业有限公司 Assembled cleaning room
CN201883633U (en) * 2010-12-02 2011-06-29 苏州净化工程安装有限公司 Operating room wall surface hanging plate
CN204299218U (en) * 2014-12-17 2015-04-29 铭铉(江西)医疗净化科技有限公司 Precast combined operating room
WO2017020676A1 (en) * 2015-07-31 2017-02-09 北新集团建材股份有限公司 Modular wall and erection method thereof
CN105839876A (en) * 2016-05-25 2016-08-10 北京城建六建设集团有限公司 Decorative construction system of wall body and roof board for clean operating room and construction method of decorative construction system
CN206987268U (en) * 2017-07-14 2018-02-09 上海品宅装饰科技有限公司 A kind of assembled indoor wall finished system
CN207436346U (en) * 2017-11-06 2018-06-01 马会 A kind of clean operating room suspended ceiling mounting structure
CN208725157U (en) * 2017-11-06 2019-04-12 聂莉莉 A kind of medical apparatus cabinet mounting structure applied to clean operating room
CN108204070A (en) * 2018-02-07 2018-06-26 苏州通快净化科技有限公司 A kind of hanging top plate mounting structure
CN210798029U (en) * 2019-09-05 2020-06-19 北京城建六建设集团有限公司 Clean operating room assembled electrolysis steel sheet connected system

Similar Documents

Publication Publication Date Title
CN208792663U (en) A kind of room finishing system
CN103510631A (en) Indoor sound insulation construction structure and construction method thereof
CN103031964A (en) Modularized clean operating room and installation technology thereof
CN107447939A (en) A kind of construction method of exterior-wall heat insulation stone decoration integrated board architectural surface
CN111042392A (en) Construction method of SDHH type disassembly-free formwork foam concrete partition wall
CN101906858B (en) Seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board
CN107740553B (en) Hard plate material mounts construction method
CN110512788A (en) A kind of clean operating room assembled electrolysis steel plate linked system and its construction method
CN108915136A (en) A kind of construction method of open stone curtain wall
CN113338518A (en) Construction method of GRG material acoustic suspended ceiling in large-scale construction project
CN210798029U (en) Clean operating room assembled electrolysis steel sheet connected system
CN209568581U (en) A kind of assembly type low power consuming curtain wall system
CN102493620B (en) Through long folded fastener type wall body connecting piece of heat insulation integrated plate and mounting method thereof
CN108729580B (en) Wall manufacturing method
CN205663072U (en) Aluminium honeycomb welt stainless steel curtain
CN115653168A (en) Double-curved-surface honeycomb aluminum plate structure and mounting method thereof
CN214461491U (en) Arc light partition wall
CN204510701U (en) A kind of imitative stone material GRC integrated plate for heat insulation hanging structure
CN1314870C (en) Method of dry construction of energy saving walls with 3D adjustment
CN212866706U (en) Assembled aluminum plate dry hanging structure
CN112922257A (en) ECP wallboard mounting construction method
CN209082824U (en) A kind of light lath
CN205935805U (en) Moving as a whole formula standard curing room
CN212656450U (en) Ceiling internal corner groove assembly type closing-in system
CN221001633U (en) Telescopic partition plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination