CN205935805U - Moving as a whole formula standard curing room - Google Patents
Moving as a whole formula standard curing room Download PDFInfo
- Publication number
- CN205935805U CN205935805U CN201620906564.6U CN201620906564U CN205935805U CN 205935805 U CN205935805 U CN 205935805U CN 201620906564 U CN201620906564 U CN 201620906564U CN 205935805 U CN205935805 U CN 205935805U
- Authority
- CN
- China
- Prior art keywords
- standard curing
- movable type
- curing room
- integral movable
- type standard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Building Environments (AREA)
Abstract
The utility model discloses a moving as a whole formula standard curing room, it includes body, test piece frame, attemperator, humidification device, water circle device, atmospheric control appearance, shaking table, lifting hook and block terminal, the body includes: frame, roof, wallboard, bottom plate and partition wall, admittedly, the lifting hook is equipped with on the frame apex angle, the partition wall is vertical to be installed in the frame, separates into between standard curing the body and the operation room, humidification device is installed at wallboard top between standard curing, installs attemperator on it, installs the test piece frame on the bottom plate between standard curing, and water circle device is still installed to its bottom to be connected with humidification device, atmospheric control appearance of installing the shaking table in the operation room, being connected with water circle device and the block terminal of being connected with the atmospheric control appearance. The utility model discloses the turnover rate is high, saves construction cost, moreover waterproof, the heat insulating ability good.
Description
Technical field
The utility model is related to technical field of building construction, more particularly, to a kind of integral movable type standard curing room.
Background technology
With the continuous development of concrete technology, the use of high performance concrete and additive, people are to concrete material
The attention degree of performance steps up, and the test index of many concrete performances also steps up, the survey of many concrete performances
Examination index is also progressively well known.Concrete walls intensity is the process of a progressive development, and its development degree and speed take
Certainly in the aquation situation of cement, and temperature and humidity is the key factor of impact hydrated cementitious speed and degree.Therefore, concrete
It is necessary to keep suitable temperature and enough humidity within a certain period of time after shaping, so that the abundant aquation of cement, here it is coagulation
The maintenance of soil.Water is the necessary condition of hydrated reaction of cement, and only suitably, hydrated reaction of cement could smoothly for ambient humidity
Carry out, so that concrete strength is attained full development.
The temperature that the temperature and humidity of standard curing room is consistent with iso standard is 20 ± 2 DEG C, relative humidity more than 95%
Standard curing room.The accuracy of fog room temperature and humidity and uniformity, are that the development to cement concrete strength plays decision work
Factor.Test block, as important foundation, plays very important effect in engineering construction and quality control procedure.Test block
Whether carry out standard curing, be to ensure that construction quality, save cement, the key factor of reduces cost.
But in construction site, because condition is simple and crude, often it is extremely difficult to the curing condition similar with laboratory,
Unified ripe component scheme is there is no effectively to realize the maintenance of live test block at present.Therefore, detect in construction site
During concrete deformation performance indications, how to resolve the problem of experimental situation, the test block of field fabrication can be made to keep
In the environment of temperature relative constancy, the science for field test plays vital effect.
At present, the standard curing room of job site is built by laying bricks or stones using traditional masonry or is set up mark using color steel and supports room, mark
The site operation of foster room is built, time-consuming consumptive material, and engineering needs after terminating to remove, and leads to substantial amounts of repeat building it is impossible to effectively
Recycling, wastes valuable resource, affects project progress.Scene configures unification it cannot be guaranteed that mark supports room equipment and instrument simultaneously,
Layout is not reasonable, and maintenance water can not recycle, and heat insulation effect is poor, often can not play answering effectively of standard curing
Really.Especially in the winter time, because job site temperature is relatively low, it is very difficult that fog room will reach standard curing condition, direct shadow
Ring to concrete mark and support the maintenance of test block, construction quality is judged to cause extreme influence.
Utility model content
In order to solve above-mentioned technical problem, the utility model discloses a kind of integral movable type standard curing room, it includes
Body, test-piece stand, register, damping device, water circle device, temperature and humidity control instrument, shake table, suspension hook and distribution box, institute
State body to include:Framework, top board, wallboard, base plate and partition wall, described framework drift angle is fixed with suspension hook, described top board and base plate
It is separately mounted to frame roof and bottom, described wallboard is separately mounted to framework both ends of the surface and two sides, described partition wall is vertically pacified
It is contained in framework, body is separated between standard curing and operation room, the panel tops between described standard curing are provided with humidification
Device, is provided with register thereon, and the base plate between standard curing is provided with test-piece stand, and its bottom is also equipped with water circulation dress
Put, and be connected with damping device, be provided with described operation room the temperature and humidity control instrument that shake table is connected with water circle device with
And the distribution box being connected with temperature and humidity control instrument.
Further, described wallboard is multi-layer compound structure, is from outer to inner followed successively by dope layer, antirust coat, steel plate layer, guarantor
Warm layer, anticracking grout layer and waterproof coating layer.
Further, described top board is multi-layer compound structure, and it is disposed with dope layer, antirust coat, steel from top to bottom
Plate, heat-insulation layer and buckle layer.
Further, described base of frame is provided with horizontal shore, and described horizontal shore is provided with base plate.
Further, die frame, Hygrothermograph and scoring table are also included, described die frame, Hygrothermograph and scoring table are divided
Other device is in operation room.
Further, described base plate offers rhone, described rhone end is connected with water circle device.
Further, described water circle device includes water pump, water tank and heater, and described water tank is arranged on the bottom of base plate
Portion, described water pump one end is connected with water tank, and the other end is connected with damping device, and described heater is arranged in water tank, described
Water pump and heater are connected with temperature controller respectively.
Further, described water tank bottom offers discharge outlet and water inlet, and leads to fog room originally by pipeline respectively
In vitro.
Further, also include lighting device, described lighting device be separately mounted between standard curing and operation room in.
Further, described register is connected with temperature and humidity control instrument.
The utility model facilitates handling to install, and internal unit is complete, is not affected it is ensured that standard curing room quilt by site environment
Humidity and temperature stabilization, turnover rate is high to save construction cost and construction period problem it is not necessary to remove, and is formed effectively
Overall, increase the service life, reduce repeated construction, and waterproof, good heat preservation performance, effectively standard can be provided to support for architectural engineering
Shield room, also using water wisely, reach the purpose of energy-saving and emission-reduction, reduce repeated construction and shorten the building site standard curing room construction period,
Standard construction scene.
Brief description
Fig. 1 is the utility model planar structure schematic diagram;
Fig. 2 is the utility model facade structures schematic diagram;
Legend:1. body;11. frameworks;111. horizontal shore;12. top boards;13. wallboards;131. window;14. base plates;
141. rhone;15. dividing plates;2. test-piece stand;3. register;4. damping device;41. water pipes;42. sprinkler heads;5. water circulation
Device;51. water pumps;52. water tanks;521. discharge outlet;522. delivery port;53. heaters;6. temperature and humidity control instrument;7. vibrate
Platform;8. suspension hook;9. distribution box;10. between standard curing;20. operation rooms.
Specific embodiment
In order to further describe the utility model, a kind of integral movable type standard curing is expanded on further below in conjunction with the accompanying drawings
The specific embodiment of room, following examples are that the utility model is not limited to following enforcement to of the present utility model explanation
Example.
As shown in figure 1, a kind of the utility model integral movable type standard curing room, it includes fog room body 1, test-piece stand
2nd, register 3, damping device 4, water circle device 5, temperature and humidity control instrument 6, shake table 7, suspension hook 8, die frame, Hygrothermograph
And scoring table, described fog room body 1 is movable plank house, described fog room body
Described fog room body 1 includes framework 11, top board 12, wallboard 13, base plate 14 and partition wall 15, and described framework 11 is groove
The cuboid that steel or drum steel are welded, four drift angles of framework 11 are respectively welded suspension hook 8, support room for mobile mark
When, crane is sling marking foster room by suspension hook 8, and described top board 12 is arranged on framework 11 top, and described wallboard 13 is separately mounted to
On four sides of framework 11, described framework 11 bottom is fixed with 8-10 horizontal shore 111, and described base plate 14 is packed in water
In flat support beam 111, and offer rhone 141, described partition wall 15 is vertically packed in framework 11, and by fog room body 1
It is divided between standard curing 10 and operation room 20.
Described top board 12 is followed successively by dope layer, antirust coat, steel plate layer, heat-insulation layer and buckle layer from top to bottom, described antirust
Layer is twice rust preventive coating composition, and described heat-insulation layer is extruded polystyrene board.
Described wallboard 13 be from outer to inner disposed with dope layer, antirust coat, steel plate layer, heat-insulation layer, anticracking grout layer and
Waterproof coating layer, described dope layer is blue coating alternate in vain, and described antirust coat forms for twice rust preventive coating, described heat-insulation layer
For extruded polystyrene board, described wallboard 13 offers window 131.
Test-piece stand 2, register 3, damping device 4 and water circle device 5 are installed in 10 between described standard curing, described
Temperature and humidity control instrument 6, shake table 7, die frame 8, distribution box 9, Hygrothermograph and scoring table are installed in operation room 20;Test-piece stand
2 support test block for placing concrete mark;Damping device 4 is used for the wet curing that concrete mark supports test block;Water circle device 5 is used for will
Sewage treatment, reuses for damping device 4, reaches water-saving purpose;Register 3 is used for 10 between adjustment criteria maintenance
Interior temperature
Described test-piece stand 2 is packed between standard curing 10 base plate 14,10 between standard curing in be provided with two test-piece stands
2, test-piece stand 2 is three layers of frame structure being connected into using multiple steel pipe weldings, and concrete mark is supported the frame that test block is placed in test-piece stand 2
On body.But the structure of test-piece stand 2 and number are not limited thereto, specifically can according to construction situation depending on.
Described register 3 is wall-hanging air conditioner or electric heater, when summer, because outdoor temperature is higher, can pass through
Wall-hanging air conditioner to standard curing between 10 coolings, its indoor set is arranged on wallboard 13, and its off-premises station is arranged on fog room body 1
On exterior wall, can manually control, also can be connected with temperature and humidity control instrument 6, during winter, because outdoor temperature is relatively low, Ke Yitong
Cross electric heater to standard curing between 10 intensification, thus ensureing the temperature in 10 between standard curing.
Described damping device 4 is used for the wet curing that concrete mark supports test block, and damping device 4 includes water pipe 41 and multiple spray
Spill 42, along the body of wall surrounding setting between standard curing 10, water pipe 41 one end is connected separately described water pipe 41 with water circle device 5
One end is connected with sprinkler head 42, and described sprinkler head 41 is multiple, and it is from different directions against the solidifying soil mark being positioned on test-piece stand 2
Foster test block water spray.
Described water circle device 5 includes water pump 51, water tank 52 and heater 53, and described water tank 52 is arranged on base plate 14
Bottom, and connect with rhone 141 end, described water pump 51 one end is connected with water tank 52, and the other end is connected with damping device 4,
Described heater 53 is arranged in water tank 52, for water heating, described water pump 51 and 53 points of the heater in water tank 52
It is not connected with temperature controller 6, described water tank 53 bottom offers discharge outlet 531 and water inlet 532, and passes through pipeline respectively and lead to
To outside fog room body 1.
Operation room 20 than standard curing between 10 area little, operation room 20 includes distribution box 9, temperature and humidity control instrument 6, vibration
Platform 7 and scoring table, distribution box 9 is located at the wall edge of operation room 20, is connected with external power source, and whole standard curing room electricity consumption is whole
Laid by distribution box 9;Described temperature and humidity control instrument 6 is connected with water circle device 5, and temperature and humidity control instrument 6 includes one
Temperature Humidity Sensor, it is used for the indoor temperature and humidity of Standard of Monitoring maintenance it is ensured that controlling standard curing room to reach mark support bar
Part;Described shake table can carry out concrete mark and support the work such as making, dismounting and the mark of test block.Additionally, fog room body 1 also sets
There is illuminator, be conveniently operated.
The utility model adopts movable plank house as the basic structure of standard curing room, and it is transformed.Fog room is originally
Be configured between standard curing 10 and operation room 20 inside body 1 on request, in casing the maintenance register 3 of configuration standard, plus
Wet device 4, is only placed it in by suspension hook 16 using crane during use and transports appointed place on transport vehicle, arrive at
Afterwards, then by crane it is suitably positioned, connect water-supply source, power supply can come into operation.
The utility model energy effective and reasonable arrangement job site standard curing room, turnover rate height, it is not necessary to remove, is fully examined
Consider the relatively low factor of the temperature of winter construction, waterproof, good heat preservation performance, effectively can provide standard curing room for architectural engineering, and
And using water wisely, reach the purpose of energy-saving and emission-reduction, reduce repeated construction and shorten the building site standard curing room construction period, specification is applied
Work scene.Save construction cost and construction period problem, formed effectively overall, increase the service life, reduce and repeat to build
If.
Obviously, above-mentioned embodiment of the present utility model is only intended to clearly illustrate the utility model example,
And it is not the restriction to embodiment of the present utility model.For those of ordinary skill in the field, state upper
Can also make other changes in different forms on the basis of bright.Here all of embodiment cannot be given thoroughly
Lift.Every belong to the obvious change that the technical solution of the utility model extended out or change still in the utility model
Protection domain row.
Claims (10)
1. a kind of integral movable type standard curing room it is characterised in that:It includes body(1), test-piece stand(2), register
(3), damping device(4), water circle device(5), temperature and humidity control instrument(6), shake table(7), suspension hook(8)And distribution box(9), institute
State body(1)Including:Framework(11), top board(12), wallboard(13), base plate(14)And partition wall(15), described framework(11)Drift angle
On be fixed with suspension hook(8), described top board(12)And base plate(14)It is separately mounted to framework(11)Top and bottom, described wallboard
(13)It is separately mounted to framework(11)Both ends of the surface and two sides, described partition wall(15)It is vertically installed at framework(11)Interior, by body
(1)It is separated between standard curing(10)And operation room(20), between described standard curing(10)Wallboard(13)Top is provided with and adds
Wet device(4), register is installed thereon(3), between standard curing(10)Base plate(14)On test-piece stand is installed(2), its
Bottom is also equipped with water circle device(5), and and damping device(4)Connect, described operation room(20)Shake table is inside installed
(7), and water circle device(5)The temperature and humidity control instrument connecting(6)And and temperature and humidity control instrument(6)The distribution box connecting(9).
2. integral movable type standard curing room according to claim 1 it is characterised in that:Described wallboard(13)Multiple for multilayer
Close structure, from outer to inner set gradually dope layer, antirust coat, steel plate layer, heat-insulation layer, anticracking grout layer and waterproof coating layer.
3. integral movable type standard curing room according to claim 1 it is characterised in that:Described top board(12)Multiple for multilayer
Close structure, it is disposed with dope layer, antirust coat, steel plate, heat-insulation layer and buckle layer from top to bottom.
4. integral movable type standard curing room according to claim 1 it is characterised in that:Described framework(11)Bottom is installed
There is horizontal shore(111), described horizontal shore(111)On base plate is installed(14).
5. integral movable type standard curing room according to claim 1 it is characterised in that:Also include die frame, humiture
Meter and scoring table, described die frame, Hygrothermograph and scoring table difference device are in operation room(20)Interior.
6. integral movable type standard curing room according to claim 1 it is characterised in that:Described base plate(14)On offer
Rhone(141), described rhone(141)End and water circle device(5)Connect.
7. the integral movable type standard curing room according to claim 1 or 6 it is characterised in that:Described water circle device(5)
Including water pump(51), water tank(52)And heater(53), described water tank(52)It is arranged on base plate(14)Bottom, described water pump
(51)One end and water tank(52)Connection, the other end and damping device(4)Connect, described heater(53)Device is in water tank(52)
Interior, described water pump(51)And heater(53)Respectively with temperature controller(6)Connect.
8. integral movable type standard curing room according to claim 7 it is characterised in that:Described water tank(52)Bottom opens up
There is discharge outlet(521)And water inlet(522), and respectively fog room body is led to by pipeline(1)Outside.
9. integral movable type standard curing room according to claim 1 it is characterised in that:Also include lighting device, described
Lighting device is separately mounted between standard curing(10)And operation room(20)Interior.
10. integral movable type standard curing room according to claim 1 it is characterised in that:Described register(3)With temperature
Humidity controller(6)Connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620906564.6U CN205935805U (en) | 2016-08-19 | 2016-08-19 | Moving as a whole formula standard curing room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620906564.6U CN205935805U (en) | 2016-08-19 | 2016-08-19 | Moving as a whole formula standard curing room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205935805U true CN205935805U (en) | 2017-02-08 |
Family
ID=57946927
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620906564.6U Expired - Fee Related CN205935805U (en) | 2016-08-19 | 2016-08-19 | Moving as a whole formula standard curing room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205935805U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108687945A (en) * | 2018-06-28 | 2018-10-23 | 北京市市政四建设工程有限责任公司 | A kind of test specimen makes fog room and maintenance process |
-
2016
- 2016-08-19 CN CN201620906564.6U patent/CN205935805U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108687945A (en) * | 2018-06-28 | 2018-10-23 | 北京市市政四建设工程有限责任公司 | A kind of test specimen makes fog room and maintenance process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104947788A (en) | DGC modular fabricated building system and building method thereof | |
CN204844438U (en) | Integrated form standard curing room | |
CN106368312B (en) | Modularized house | |
CN207277674U (en) | Armored concrete and air entrained concrete composite thermo-insulating wall board | |
CN101736922A (en) | Clean operating room and construction method thereof | |
WO2013135108A1 (en) | Assembled steel structure hollow building | |
CN202899342U (en) | Ventilating and heat insulating waterproof wall | |
CN108978989A (en) | A kind of Assembled self-insulating fire-proof sound insulation wallboard | |
CN205935805U (en) | Moving as a whole formula standard curing room | |
CN207934332U (en) | Assembled architecture with steel Special-Shaped Column | |
CN204299102U (en) | A kind of wallboard quick-mount system | |
CN104005496B (en) | Can assemble environmental protection exterior wall | |
CN109267695A (en) | A kind of prefabricated wallboard of lightweight with connection structure and its installation method | |
CN201756737U (en) | Light heat-preservation load-bearing sandwiched net plate steel structural system | |
CN203867001U (en) | Assemblable and environment-friendly outer wall | |
CN116927426A (en) | Steel skeleton light roof board installation construction method | |
WO2017121103A1 (en) | Integrated housing unit | |
CN111101594A (en) | Cold-formed thin-wall light steel structure building | |
CN105908877A (en) | Self-insulation composite fireproof curtain wall board and preparation method thereof | |
CN203145232U (en) | Novel energy-saving insulation wall | |
CN115075484A (en) | Green building design construction process | |
CN211690738U (en) | Cold-formed thin-wall light steel structure building | |
CN203364357U (en) | Air conditioning plenum chamber for air supply system under seats | |
CN208604859U (en) | A kind of steel mesh mould heat-preserving decorative wall plate structure | |
WO2011134270A1 (en) | Wall-mounted panel and wall structure using the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |