CN110512613B - Red sandstone layer water-resisting shotcrete supporting method and water-resisting device thereof - Google Patents

Red sandstone layer water-resisting shotcrete supporting method and water-resisting device thereof Download PDF

Info

Publication number
CN110512613B
CN110512613B CN201910730465.5A CN201910730465A CN110512613B CN 110512613 B CN110512613 B CN 110512613B CN 201910730465 A CN201910730465 A CN 201910730465A CN 110512613 B CN110512613 B CN 110512613B
Authority
CN
China
Prior art keywords
resisting
red sandstone
water
sandstone layer
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910730465.5A
Other languages
Chinese (zh)
Other versions
CN110512613A (en
Inventor
史智伟
舒蓉
闫鹏程
雒奇奇
潘有旺
路志南
杨全兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Cib Construction Ltd
Original Assignee
Gansu Cib Construction Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Cib Construction Ltd filed Critical Gansu Cib Construction Ltd
Priority to CN201910730465.5A priority Critical patent/CN110512613B/en
Publication of CN110512613A publication Critical patent/CN110512613A/en
Application granted granted Critical
Publication of CN110512613B publication Critical patent/CN110512613B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Abstract

The invention discloses a water-proof spray anchor supporting method for a red sandstone layer, which comprises the following steps: a. carrying out vertical layering and horizontal segmented excavation on earthwork between piles; b. after vertical layering and horizontal segmentation excavation; c. b, fixedly arranging plastic cloth in the vertical pit excavated in the step b; d. c20 fine stone concrete with the thickness not less than 80mm is sprayed on the mesh fabric of the steel bars in the step C. The invention also discloses a water-resisting device of the red sandstone layer water-resisting shotcrete supporting method, which comprises plastic cloth, wherein the plastic cloth is vertically installed on the wall surface of the inter-pile rock mass of the supporting pile, a steel reinforcement framework is fixedly installed outside the plastic cloth, a grass curtain is fixedly installed outside the steel reinforcement framework, and a steel mesh is fixedly installed outside the grass curtain. The invention solves the problem that the supporting surface is difficult to support or cracks are generated on the supporting surface and even bulges fall off due to water seepage of the pebble bed at the top of the red sandstone layer after the red sandstone layer is supported due to the characteristics of the rock soil of the red sandstone layer.

Description

Red sandstone layer water-resisting shotcrete supporting method and water-resisting device thereof
Technical Field
The invention relates to the technical field of supporting methods, in particular to a red sandstone layer water-resisting spray anchor supporting method and a water-resisting device thereof.
Background
In recent years, with the development of national economy, basements in main urban areas of cities have a deeper and deeper trend, most basements of newly-built residences are designed with 2-3 floors, and foundation pit support is particularly important for ensuring the safety of surrounding buildings.
For the deep foundation pit, the supporting form is various, the economy, the safety and the applicability are considered, the deep foundation pit supporting mostly takes pile anchor supporting as a main part, the underground water level condition is combined, and the comprehensive supporting precipitation mode of 'pile anchor + pipe well + water collection and surface drainage' or 'secant pile water stop + anchor cable + pipe well precipitation' is taken as a main part
However, when the rock stratum in the foundation pit is the red sandstone, due to the characteristics of the rock stratum, after the red sandstone is supported, the supporting surface is difficult to support or cracks are generated on the supporting surface and even the bulge is fallen off due to water seepage of the pebble layer at the top of the red sandstone layer.
Disclosure of Invention
Aiming at the technical problems, the invention provides a water-proof spray anchor supporting method for a red sandstone layer, which can solve the problem that due to the characteristics of rock soil of the red sandstone layer, after the red sandstone layer is supported, the supporting surface is difficult to support or cracks are generated on the supporting surface and even bulges fall off due to water seepage of a pebble layer at the top of the red sandstone layer.
In order to achieve the above purpose, the technical scheme of the invention is as follows:
a red sandstone layer water-resisting shotcrete supporting method comprises the following steps:
a. after the foundation pit is constructed by supporting piles, carrying out vertical layering and horizontal segmented excavation on earthwork between piles;
b. after vertical layering and horizontal sectional excavation, excavating the excavation surface again along the direction vertical to the foundation pit supporting surface to expose the pile body;
c. b, fixedly arranging plastic cloth in the vertical pit excavated in the step b, fixedly installing a reinforcement cage on the plastic cloth, fixedly installing a grass curtain outside the reinforcement cage, and fixedly installing a reinforcement mesh outside the grass curtain;
d. c20 fine stone concrete with the thickness not less than 80mm is sprayed on the reinforcing mesh sheets in the step C to be combined with the pile body to form the composite reinforced waterproof concrete retaining wall.
In the step a, the excavation height of each layer is not more than 2m below the last supporting surface, and the length of the horizontal sections is determined according to the site construction speed.
And in the step b, excavating the excavation surface again along the direction vertical to the foundation pit supporting surface, and making the recess between the two piles be 250mm and 350 mm.
In the step c, the thickness of the plastic cloth is not less than 1 mm.
And c, fixing the grass curtain on the steel bar framework by using binding wires to ensure that the grass curtain tightly presses the plastic cloth to be attached to the sandstone surface layer.
In the step c, the thickness of the straw curtain is not less than 40 mm.
And c, binding the reinforcing mesh sheets on the outer sides of the reinforcing cages by using binding wires to form the composite stressed cage.
In the step c, the transverse and longitudinal spacing of the mesh of the reinforcing steel bar mesh is 200mm multiplied by 200mm, and the diameter of the reinforcing steel bar is 6 mm.
In the step c, the vertical interval of the steel bars of the steel bar framework is the pile interval minus the diameter of the pile, the steel bars are arranged in the horizontal direction according to 500mm, the steel bars are planted at the horizontal and vertical connection positions of the steel bar framework, the steel bar framework and the planted steel bars are welded and fixed with each other, and the depth of the planted steel bars is larger than 240 mm.
The water-resisting device of the red sandstone layer water-resisting shotcrete supporting method comprises plastic cloth, wherein the plastic cloth is vertically installed on an inter-pile rock wall surface of a supporting pile, a steel reinforcement framework is fixedly installed outside the plastic cloth, a grass curtain is fixedly installed outside the steel reinforcement framework, and a steel mesh is fixedly installed outside the grass curtain.
The invention has the beneficial effects that: the method comprises the steps of firstly using plastic cloth to block water, then welding a steel reinforcement framework, planting steel reinforcements on a pile body to connect the steel reinforcement framework, fixing a straw curtain on the steel reinforcement framework, binding a steel reinforcement net sheet with the size of 200 multiplied by 200mm on the outer side, spraying C20 fine-stone concrete on the outermost side, and finally repairing a catchment open drain underground water at the root of a foundation pit support. The invention can effectively support the surface layer of the foundation pit, the plastic cloth can separate the upper seepage water from the supporting surface, the newly added straw curtain increases the friction force of the side wall, provides an operation environment for spraying concrete, and the reinforcement framework and the reinforcement mesh are combined to form a reinforced structure, thereby effectively preventing collapse caused by expansion of sandstone in water and reduction of cohesive force. The invention can also ensure the strength of the foundation pit anchor-spraying surface layer, effectively control the settlement deformation of foundation pit engineering, prolong the durability of foundation pit support, and ensure the safety of a foundation pit support structure and an adjacent structure building, wherein, C20 fine stone concrete with the thickness of not less than 80mm is sprayed on the reinforcing mesh in the step C, the aim is to improve the strength of the whole support surface, in the step a, the excavation height of each layer is not more than 2m below the last support surface, the aim is to prevent the collapse or the downward movement of the upper support surface, in the step b, 250-350mm is recessed between two piles, the aim is to provide an installation space for the subsequent placement of plastic, grass curtain and a reinforcing steel bar framework between the two piles, and provide a position bar-planting position, the thickness of the plastic cloth is not less than 1mm, the aim is to prevent the plastic cloth from leaking in the construction process, the construction difficulty is increased, and the thickness of the, the aim is to prevent the concrete from being sprayed, the stones penetrate through the grass curtains to break through the plastic cloth, the transverse and longitudinal spacing of the mesh grids of the reinforcing mesh is 200mm multiplied by 200mm, the diameter of the reinforcing steel bar is 6mm, the aim is to improve the overall tensile strength, the vertical spacing of the reinforcing steel bars of the reinforcing steel bar framework is the distance between the piles minus the diameter of the piles, the reinforcing steel bars are arranged one way in the horizontal direction according to 500mm, and the planting depth is larger than 240mm, so that the reinforcing steel bar framework is used as a stress framework for spraying the concrete, the reinforcing steel.
Drawings
Fig. 1 is a schematic diagram of the present invention.
Detailed Description
Example 1
As shown in fig. 1, the water-resisting device of the red sandstone layer water-resisting shotcrete supporting method comprises plastic cloth 1, wherein the plastic cloth 1 is vertically installed on the wall surface of an inter-pile rock body of a supporting pile, a steel reinforcement framework 2 is fixedly installed outside the plastic cloth 1, a grass curtain 3 is fixedly installed outside the steel reinforcement framework 2, and a steel mesh 4 is fixedly installed outside the grass curtain 3.
A red sandstone layer water-resisting shotcrete supporting method comprises the following steps:
a. after supporting pile construction is carried out on a foundation pit, vertical layering and horizontal segmentation excavation are carried out on earthwork between piles, the excavation height of each layer is 2m below a supporting surface last time, and the length of a horizontal segmentation is determined according to the site construction speed;
b. after vertical layering and horizontal sectional excavation, excavating the excavation surface again along the direction vertical to the foundation pit supporting surface to expose the pile body, and excavating the excavation surface again along the direction vertical to the foundation pit supporting surface to enable the two piles to be recessed by 250 mm;
c. fixedly arranging a plastic cloth 1 in the vertical pit excavated in the step b, fixedly installing a steel reinforcement framework 2 on the plastic cloth 1, the grass curtain 3 is fixedly installed outside the steel reinforcement framework 2, the steel reinforcement net piece 4 is fixedly installed outside the grass curtain 3, the thickness of the plastic cloth 1 is 1mm, the grass curtain 3 is fixed on the steel reinforcement framework 2 through binding wires, the plastic cloth 1 is tightly pressed and stuck on a sandstone surface layer through the grass curtain 3, the thickness of the grass curtain 3 is 40mm, the steel reinforcement net piece 4 is bound on the outer side of the steel reinforcement framework 2 through the binding wires to form a composite stress framework, the transverse and longitudinal spacing of grids of the steel reinforcement net piece 4 is 200mm multiplied by 200mm, the diameter of the steel reinforcement is 6mm, the vertical spacing of steel reinforcements of the steel reinforcement framework 2 is the pile spacing minus the pile diameter, one pile is arranged in the horizontal direction according to 500, planting bars at the horizontal and vertical connection part of the steel bar framework 2, and welding and fixing the steel bar framework 2 and the planted bars, wherein the depth of the planted bars is 250 mm;
d. c20 fine stone concrete 5 with the thickness of 80mm is sprayed on the reinforcing mesh sheets in the step C, and the reinforcing mesh sheets are combined with the pile body to form the composite reinforced waterproof concrete retaining wall.
Example 2
As shown in fig. 1, the water-resisting device of the red sandstone layer water-resisting shotcrete supporting method comprises plastic cloth 1, wherein the plastic cloth 1 is vertically installed on the wall surface of an inter-pile rock body of a supporting pile, a steel reinforcement framework 2 is fixedly installed outside the plastic cloth 1, a grass curtain 3 is fixedly installed outside the steel reinforcement framework 2, and a steel mesh 4 is fixedly installed outside the grass curtain 3.
A red sandstone layer water-resisting shotcrete supporting method comprises the following steps:
a. after supporting pile construction is carried out on a foundation pit, vertical layering and horizontal segmentation excavation are carried out on earthwork between piles, the excavation height of each layer is 1.5m below a supporting surface last time, and the length of a horizontal segmentation is determined according to the site construction speed;
b. after vertical layering and horizontal sectional excavation, excavating the excavation surface again along the direction vertical to the foundation pit supporting surface to expose the pile body, and excavating the excavation surface again along the direction vertical to the foundation pit supporting surface to enable the two piles to be recessed by 350 mm;
c. fixedly arranging a plastic cloth 1 in the vertical pit excavated in the step b, fixedly installing a steel reinforcement framework 2 on the plastic cloth 1, the grass curtain 3 is fixedly installed outside the steel reinforcement framework 2, the steel reinforcement net piece 4 is fixedly installed outside the grass curtain 3, the thickness of the plastic cloth 1 is 1.5mm, the grass curtain 3 is fixed on the steel reinforcement framework 2 through binding wires, the plastic cloth 1 is tightly pressed and stuck on a sandstone surface layer through the grass curtain 3, the thickness of the grass curtain 3 is 45mm, the steel reinforcement net piece 4 is bound on the outer side of the steel reinforcement framework 2 through the binding wires to form a composite stress framework, the transverse and longitudinal spacing of grids of the steel reinforcement net piece 4 is 200mm multiplied by 200mm, the diameter of the steel reinforcement is 6mm, the vertical spacing of the steel reinforcement framework 2 is the pile spacing minus the pile diameter, and the vertical spacing of the steel reinforcement of the, planting bars at the horizontal and vertical connection part of the steel bar framework 2, and welding and fixing the steel bar framework 2 and the planted bars, wherein the depth of the planted bars is 260 mm;
d. c20 fine stone concrete 5 with the thickness of 85mm is sprayed on the reinforcing mesh sheets in the step C, and the reinforcing mesh sheets are combined with the pile body to form the composite reinforced waterproof concrete retaining wall.

Claims (9)

1. A water-resisting shotcrete supporting method for a red sandstone layer is characterized by comprising the following steps:
a. after the foundation pit is constructed by supporting piles, carrying out vertical layering and horizontal segmented excavation on earthwork between piles;
b. after vertical layering and horizontal sectional excavation, excavating the excavation surface again along the direction vertical to the foundation pit supporting surface to expose the pile body;
c. b, fixedly arranging plastic cloth (1) in the vertical pit excavated in the step b, fixedly installing a reinforcement cage (2) on the plastic cloth (1), connecting the reinforcement cage (2) through embedded steel bars of the pile body, fixedly installing a grass curtain (3) outside the reinforcement cage (2), and fixedly installing a reinforcement mesh (4) outside the grass curtain (3);
d. c20 fine stone concrete (5) with the thickness not less than 80mm is sprayed on the reinforcing mesh sheets in the step C, and the reinforcing mesh sheets are combined with the pile body to form the composite reinforced waterproof concrete retaining wall;
still include the water proof device, the water proof device includes plastic sheeting (1), plastic sheeting (1) outside fixed mounting steel reinforcement skeleton (2), steel reinforcement skeleton (2) outside fixed mounting grass curtain (3), grass curtain (3) outside fixed mounting reinforcing bar net piece (4).
2. The red sandstone layer water-resisting shotcrete supporting method according to claim 1, wherein the method comprises the following steps: in the step a, the excavation height of each layer is not more than 2m below the last supporting surface, and the length of the horizontal sections is determined according to the site construction speed.
3. The red sandstone layer water-resisting shotcrete supporting method according to claim 1, wherein the method comprises the following steps: and in the step b, excavating the excavation surface again along the direction vertical to the foundation pit supporting surface, and making the recess between the two piles be 250mm and 350 mm.
4. The red sandstone layer water-resisting shotcrete supporting method according to claim 1, wherein the method comprises the following steps: in the step c, the thickness of the plastic cloth (1) is not less than 1 mm.
5. The red sandstone layer water-resisting shotcrete supporting method according to claim 1, wherein the method comprises the following steps: in the step c, the grass curtain (3) is fixed on the steel bar framework (2) through binding wires, and the plastic cloth (1) is tightly pressed and attached to the sandstone surface layer through the grass curtain (3).
6. The red sandstone layer water-resisting shotcrete supporting method according to claim 1 or 5, wherein: in the step c, the thickness of the grass curtain (3) is not less than 40 mm.
7. The red sandstone layer water-resisting shotcrete supporting method according to claim 1, wherein the method comprises the following steps: and in the step c, binding the reinforcing mesh (4) by using binding wires at the outer side of the reinforcing cage (2) to form a composite stressed cage.
8. The red sandstone layer water-resisting shotcrete supporting method according to claim 1 or 7, wherein: in the step c, the transverse and longitudinal spacing of the meshes of the reinforcing steel mesh (4) is 200mm multiplied by 200mm, and the diameter of the reinforcing steel is 6 mm.
9. The red sandstone layer water-resisting shotcrete supporting method according to claim 1, wherein the method comprises the following steps: in the step c, the vertical interval of the steel bars of the steel bar framework (2) is the pile interval minus the diameter of the pile, one pile is arranged in the horizontal direction according to 500mm, steel bars are planted at the horizontal and vertical connection positions of the steel bar framework (2), the steel bar framework (2) and the planted steel bars are welded and fixed with each other, and the depth of the planted steel bars is larger than 240 mm.
CN201910730465.5A 2019-08-08 2019-08-08 Red sandstone layer water-resisting shotcrete supporting method and water-resisting device thereof Active CN110512613B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910730465.5A CN110512613B (en) 2019-08-08 2019-08-08 Red sandstone layer water-resisting shotcrete supporting method and water-resisting device thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910730465.5A CN110512613B (en) 2019-08-08 2019-08-08 Red sandstone layer water-resisting shotcrete supporting method and water-resisting device thereof

Publications (2)

Publication Number Publication Date
CN110512613A CN110512613A (en) 2019-11-29
CN110512613B true CN110512613B (en) 2021-06-11

Family

ID=68623882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910730465.5A Active CN110512613B (en) 2019-08-08 2019-08-08 Red sandstone layer water-resisting shotcrete supporting method and water-resisting device thereof

Country Status (1)

Country Link
CN (1) CN110512613B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111648373B (en) * 2020-05-15 2021-11-09 中铁六局集团有限公司 Excavation supporting construction process for water-rich deep foundation pit fender pile gap

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201762729U (en) * 2010-07-12 2011-03-16 无锡市政设计研究院有限公司 Anti-seepage structure of solid waste landfill on high-steep side slope or strongly-weathered bedrock
KR101612521B1 (en) * 2015-10-12 2016-04-14 우경기술주식회사 Method for constructing underground structures restraining transformation and using external wall
CN205617353U (en) * 2016-04-13 2016-10-05 西京学院 Miniature compound soil nail wall that intercepts water by force
CN207348070U (en) * 2017-09-07 2018-05-11 甘肃中建市政工程勘察设计研究院 Layer cake formula jetting cement surface layer foundation pit side-wall water sealing structure
CN108842784A (en) * 2018-07-04 2018-11-20 上海建工七建集团有限公司 A kind of shallow foundation hole slope protecting device and means of defence excavated for slope
CN208748663U (en) * 2018-08-15 2019-04-16 江铃汽车集团江西工程建设有限公司 A kind of environment-friendly type pattern foundation pit supporting structure construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201762729U (en) * 2010-07-12 2011-03-16 无锡市政设计研究院有限公司 Anti-seepage structure of solid waste landfill on high-steep side slope or strongly-weathered bedrock
KR101612521B1 (en) * 2015-10-12 2016-04-14 우경기술주식회사 Method for constructing underground structures restraining transformation and using external wall
CN205617353U (en) * 2016-04-13 2016-10-05 西京学院 Miniature compound soil nail wall that intercepts water by force
CN207348070U (en) * 2017-09-07 2018-05-11 甘肃中建市政工程勘察设计研究院 Layer cake formula jetting cement surface layer foundation pit side-wall water sealing structure
CN108842784A (en) * 2018-07-04 2018-11-20 上海建工七建集团有限公司 A kind of shallow foundation hole slope protecting device and means of defence excavated for slope
CN208748663U (en) * 2018-08-15 2019-04-16 江铃汽车集团江西工程建设有限公司 A kind of environment-friendly type pattern foundation pit supporting structure construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
海富大厦地下室围护桩桩壁合一结构设计特点与经济效益;应高飞等;《福建建筑》;20111001(第10期);全文 *

Also Published As

Publication number Publication date
CN110512613A (en) 2019-11-29

Similar Documents

Publication Publication Date Title
CN103321230B (en) The deep big foundation pit excavation method in place is passed through in the long distance of operation shallow embedding subway
CN110158600B (en) Construction method for synchronous excavation and asynchronous backfilling of adjacent foundation pits
CN101775807B (en) Structure for supporting deep foundation pit of soft soil foundation
CN204491626U (en) The foundation pit enclosure structure that Larsen steel sheet pile and prestressed anchor combine
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN100510281C (en) Semi-inverse construction method of super large diameter, ultra-burial depth storage pond
CN102330436B (en) Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank
CN108661088A (en) A kind of permanent drainage and step-down anti-floating construction method of basement
CN110374111B (en) Slope releasing and steel pipe pile anchor cooperative supporting system
CN110438999A (en) A kind of deep basal pit slope excavation construction method of rich groundwater
CN107700474A (en) A kind of existing construction foundation reinforcement means and campshed formula diaphram wall
CN109457709A (en) A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable
CN112211199A (en) Large deep foundation pit supporting construction structure and method thereof
CN109505298A (en) A kind of self-balancing foundation pit enclosure method
CN110512613B (en) Red sandstone layer water-resisting shotcrete supporting method and water-resisting device thereof
CN110424372A (en) Along road interval method in a row remove obstacles after construct diaphram wall construction method
CN206385548U (en) A kind of tandem anchor slab foundation pit support system with Recyclable anchor rope
CN110805049B (en) Construction method of mountain slope ultra-thickness spray anchor permanent supporting structure
CN210263073U (en) Supporting construction that adjacent foundation ditch synchronous excavation was asynchronously backfilled
CN111733894A (en) Anti-floating system of deep foundation pit underground structure and construction process
CN207419441U (en) A kind of campshed formula diaphram wall
CN210712867U (en) Water-resisting device for spray anchor support of red sandstone layer
CN201972711U (en) Device for controlling deformation of near metro tunnel caused by super-deep foundation pit evacuation in soft soil areas
CN113236309A (en) Shallow tunnel arch-up open-construction arch-down underground excavation construction method
CN112814735A (en) Waterproof and drainage construction method for suspension bridge tunnel type anchorage cavern

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant