CN110503230A - A kind of distribution network planning auxiliary system and method based on power grid gridding - Google Patents

A kind of distribution network planning auxiliary system and method based on power grid gridding Download PDF

Info

Publication number
CN110503230A
CN110503230A CN201910439947.5A CN201910439947A CN110503230A CN 110503230 A CN110503230 A CN 110503230A CN 201910439947 A CN201910439947 A CN 201910439947A CN 110503230 A CN110503230 A CN 110503230A
Authority
CN
China
Prior art keywords
grid
project
distribution network
power distribution
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910439947.5A
Other languages
Chinese (zh)
Inventor
宁柏锋
许冠中
钟宇欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Power Supply Bureau Co Ltd
Shenzhen Comtop Information Technology Co Ltd
Original Assignee
Shenzhen Power Supply Bureau Co Ltd
Shenzhen Comtop Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Power Supply Bureau Co Ltd, Shenzhen Comtop Information Technology Co Ltd filed Critical Shenzhen Power Supply Bureau Co Ltd
Priority to CN201910439947.5A priority Critical patent/CN110503230A/en
Publication of CN110503230A publication Critical patent/CN110503230A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention provides a kind of power distribution network auxiliary programming system based on power grid gridding, including mesh-managing module, grid As-Is analysis module, project planning management module, project tracking control of full process module.The present invention passes through power grid gridding, by have power distribution network grid project programme automatically in power distribution network grid there are the problem of propose can grid project programme for reference, auxiliary relevant staff plans power distribution network, improves the efficiency of distribution network planning work.

Description

A kind of distribution network planning auxiliary system and method based on power grid gridding
Technical field:
The present invention relates to power domains, it particularly relates to which a kind of distribution network planning based on power grid gridding assists system System and method.
Technical background:
Power distribution network is the important component of power grid as the most critical link for realizing electric energy supply and consumption, how complete Kind distribution rack, promotes distribution construction and efficiency of operation, on the basis of ensureing power distribution network power supply safety, stablizing, improves power supply Reliability and power supply quality become the most important thing of the following power grid construction.
Existing power distribution network auxiliary programming system, can not be to existing for power distribution network in the process planned power distribution network Problem proposes the grid project programme for being used for auxiliary reference;Digital management can not be carried out to power distribution network, way to manage is stupid My, it is extensive, inefficient;There is no a set of closing and unified and standard administrative standard and process, under managerial ability and level are relatively low.
Summary of the invention:
To solve the above problems, the present invention provide it is a kind of based on the power distribution network auxiliary programming system of power grid gridding and side Method, for improving distribution network planning management level, specific technical solution is as follows:
A kind of power distribution network auxiliary programming system based on power grid gridding, comprising:
Mesh-managing module, comprising: the full dimension of grid manages module, shows grid dividing management module based on map view The grid of division, and call the grid real-time running data of power distribution network grid database, with human-computer interaction interface to related work Personnel show, while calculating the circuit load situation in grid;Grid dividing management module, for issuing grid dividing task, Relevant staff is based on grid dividing principle and draws grid on cloud platform map, after drawing grid by staff's audit Automatically grid is numbered, power distribution network facility operation real time data establishes power distribution network grid data with mesh mapping in reading grid Library is shown with tabular form to relevant staff by human-computer interaction interface;
Grid As-Is analysis module, comprising:
Planning strategy management module manages the planning strategy of each grid with tabular form;
Power distribution network As-Is analysis module analyzes power distribution network for reading the real-time running data of power distribution network grid database Overall operation situation, power load in real-time predicted grid formulate the reference of grid project programme for staff;
Project planning management module, comprising:
Grid programme management module, for managing the account data in grid, operation data, rack data, power grid Resource data establishes power distribution network problem base, to power distribution network representation and map entries warehouse, according to existing item goal programming Account data, operation data, rack data, power network resources data in scheme and grid, the automatic grid for searching for Similar Problems Project planning scheme proposes the grid project programme of auxiliary reference with this;
Grid project programme evaluation module assesses economic benefit, technology for showing design size, project report Feasibility establishes project warehouse;
Project Whole Course Management module, comprising:
System policy management module is used for management project management system file;
Investment deposit database management module, the investment deposit for will be formed according to the project examination result in project warehouse Library classification, and shown with tabular form;
Project management indicator-specific statistics module, in statistical item warehouse by feasibility study give an written reply the number of entry and account for Than, and shown with tabular form;
Project tracking control of full process module for project is associated with grid coding and power distribution network representation, and updates Project process and variation are shown with card form list.
According in a kind of power distribution network auxiliary programming method based on power grid gridding provided by the invention, including following step It is rapid:
Mesh-managing step, for being numbered to grid and calling power distribution network facility according to grid dividing principle grid division Operation data real time monitoring grid in power distribution network situation;
Grid As-Is analysis step, for reading the operation data of the distribution network device in grid, analysis power distribution network exists The problem of, distribution network construction is formulated for relevant staff and transformation project provides data and supports;
Project planning management process, for Distribution Network Equipment operation data in statistical correlation grid, according to data reflection Problem establishes power distribution network issue database, contacts, issue database and project warehouse is mapped, automatically to the foundation of related grid It is proposed project planning scheme for reference, after assessment, stored items programme is into project warehouse;
Project Whole Course Management step, planned project for being established according to project planning management module to project investment, Feasibility study, construction progress are tracked, and relevant staff is according to the manual renewal item progress of development of projects.
In the above-mentioned power distribution network auxiliary programming method of the present invention, the mesh-managing the following steps are included:
The full dimension of grid manages step, for showing the grid of grid dividing management module division based on map view, and The grid real-time running data of power distribution network grid database is called, is shown with human-computer interaction interface to relevant staff, simultaneously Calculate the circuit load situation in grid;
Grid dividing management process, for issuing grid dividing task, relevant staff is based on grid dividing principle and exists Grid is drawn on cloud platform map, draws after grid is audited by staff and grid is numbered automatically, read distribution in grid Net facility operation real time data establishes power distribution network grid database, by human-computer interaction interface with tabular form with mesh mapping It is shown to relevant staff.
In the above-mentioned power distribution network auxiliary programming method of the present invention, the grid As-Is analysis the following steps are included:
Planning strategy management process, for managing the planning strategy of each grid;
Power distribution network As-Is analysis step analyzes power distribution network for reading the real-time running data of power distribution network grid database Overall operation situation, power load in real-time predicted grid.
In the above-mentioned power distribution network auxiliary programming method of the present invention, the project planning management the following steps are included:
Grid programme management process, for managing the account data in grid, operation data, rack data, power grid Resource data establishes power distribution network problem base, to power distribution network representation and map entries warehouse, according to existing item goal programming Account data, operation data, rack data, power network resources data in scheme and grid, the automatic grid for searching for Similar Problems Project planning scheme proposes the grid project programme of auxiliary reference with this;
Grid project programme appraisal procedure assesses economic benefit, technology for showing design size, project report Feasibility establishes project warehouse.
In the above-mentioned power distribution network auxiliary programming method of the present invention, the project Whole Course Management the following steps are included:
System tactical management step, the project management system formulated for managing each subordinate unit;
Warehouse management process is invested, according to the approval results of project in project warehouse, investment warehouse is formed, with people Machine interactive interface is shown to relevant staff;Project management indicator-specific statistics module, according to the feasibility study of project in project warehouse Situation is given an written reply, and is shown with human-computer interaction interface to relevant staff;
Project tracking control of full process step, by grid coding, problem base coding is matched with the project in project warehouse, is updated And show the construction progress of project.
System and method of the invention are beneficial in that, by facilitating relevant staff to distribution net gridding Power distribution network in grid is analyzed, find power distribution network in there are the problem of;System can be built according to the power distribution network of Similar Problems If transformation project, proposes the grid project programme of auxiliary reference and assessed, relevant staff is facilitated to make rationally Project planning scheme.Distribution network construction transformation project whole process is tracked, ensure that construction retrofit project can be on schedule It completes.
Detailed description of the invention:
Fig. 1 is a kind of structural schematic diagram of power distribution network auxiliary programming system based on power grid gridding of the invention.
Fig. 2,3,4,5,6,7 are the human-computer interaction interfaces of the mesh-managing module of power distribution network auxiliary programming system
Fig. 8,9,10 are the human-computer interaction interfaces of grid As-Is analysis module of the present invention.
Figure 11,12,13,14,15,16,17 are the man-machine friendships of power distribution network auxiliary system project planning management module of the present invention Mutual interface.
Figure 18,19,20,21 are a kind of human-computer interactions circle of embodiment of project tracking control of full process module of the present invention Face.
Specific embodiment:
Below in conjunction with the attached drawing in specific embodiments of the present invention, technical solution of the present invention is carried out clear, complete Ground explanation.
A kind of power distribution network auxiliary programming system based on power grid gridding is provided in the embodiment of the present invention 1, structure chart is such as Shown in Fig. 1, comprising:
Mesh-managing module, comprising: the full dimension of grid manages module, shows grid dividing management module based on map view The grid of division, and call the grid real-time running data of power distribution network grid database, with human-computer interaction interface to related work Personnel show, while calculating the circuit load situation in grid;Grid dividing management module, for issuing grid dividing task, Relevant staff is based on grid dividing principle and draws grid on cloud platform map, after drawing grid by staff's audit Automatically grid is numbered, power distribution network facility operation real time data establishes power distribution network grid data with mesh mapping in reading grid Library is shown with tabular form to relevant staff by human-computer interaction interface;
In the embodiment of the present invention, power distribution network is divided into 3 layers, respectively whole city's layer, L1 layers, L2 by the grid dividing principle Layer, whole city's layer as shown in Figure 2 is city whole region, including several administrative areas, is made of several L1 layers of grids;As shown in Figure 3 L1 layers are formed by 3 to 5 Ge Yuan substations, are formed with the region that several main roads, natural cover are encircled into;Wherein such as Fig. 4 Shown L2 layers is to be formed with the power supply of several feeder line group standards with several blocks.
Power distribution network grid database described in the embodiment of the present invention, counting in grid includes: powering area, 110kV power transformation Stand quantity, 220kV substation quantity, public feeder line return number, dedicated feeder lines return number, public distribution transforming quantity, dedicated distribution transforming quantity, in Pressure number of users etc. can reflect the index of power distribution network facility operation situation in grid, while number to the grid of division, such as Fig. 5 institute Show and is shown with tabular form to relevant staff.
In the embodiment of the present invention, the real time monitoring special grid as shown in fig. 6, by the way that special grid is marked, The grid data of special grid is shown with human-computer interaction interface.
In the embodiment of the present invention, capacity of trunk data in the real time monitoring grid, early warning abnormal conditions as shown in fig. 7, Different colours are filled to grid according to load factor, react the loading condition of power distribution network facility in grid.
Grid As-Is analysis module, comprising:
Planning strategy management module, as shown in figure 8, managing the planning strategy of each grid with tabular form;
Power distribution network As-Is analysis module analyzes power distribution network for reading the real-time running data of power distribution network grid database Overall operation situation, power load in real-time predicted grid formulate the reference of grid project programme for staff;
Power distribution network overall operation situation is analyzed described in the embodiment of the present invention, as shown in figure 9, being by counting high pressure (110KV) power distribution network status, middle pressure (10KV) power distribution network status, low-voltage network status, with tabular form for related work people Member's reference analysis.
Power load in real-time predicted grid described in the embodiment of the present invention, be by configure the natural growth of grid and Simultaneity factor parameter, the power load in predicted grid, as shown in Figure 10, respectively to the electricity consumption of whole city's layer, L1 layers, L2 layers grid Load prediction, and prediction result is showed with tabular form.
Project planning management module, comprising:
Grid programme management module, for managing the account data in grid, operation data, rack data, power grid Resource data establishes power distribution network problem base, to power distribution network representation and map entries warehouse, proposes automatically for problem auxiliary Help the grid project programme of reference;
Account data described in the embodiment of the present invention, as shown in figure 11, including power supply substation's quantity, supply lines number Amount, public parameter amount, public varying capacity, special parameter amount, special varying capacity, breaker quantity, three distant quantity, power distribution room quantity and switch Room quantity, and it is associated with locating grid;The operation data, including main transformer, distribution line, distribution transforming load factor situation;Institute Rack data are stated, as shown in figure 12, including user can turn turn for data, lines branch problem data, route for data;It is described Power network resources data, as shown in figure 13, the load factor data including equipment such as route, main transformer, distribution transformers, global, each area Office, grid, the outgoing line cabinet in substation use data, the side that these data can be read or be manually entered automatically by system Formula obtains.
Power distribution network problem base described in the embodiment of the present invention can classify as shown in figure 14 according to different problems, association Auto--Generating Mesh representation, system can be according to the Distribution Network Equipment data and project storage in Questions types, related grid Standby library, the automatic grid project programme for searching for Similar Problems, the grid item of the auxiliary reference for new problem is proposed with this Mesh programme.
Project warehouse described in the embodiment of the present invention is as shown in figure 15 to be stored as to solve in power distribution network problem base Existing power distribution network problem and the grid planned project scheme carried out, main contents include grid number, grid characteristics, correspondence Problem base coding, preliminary project coding, engineering name, office, affiliated area, classification of the items, the classification of project purpose, time, investment are estimated It calculates.By the way that project warehouse and power distribution network problem base to be associated, system can propose the net of auxiliary reference for problem automatically Lattice project planning scheme.
Grid project programme evaluation module assesses economic benefit, technology for showing design size, project report Feasibility establishes project warehouse;
Assessment of economic benefit described in the embodiment of the present invention, comprising: power distribution network overall investment estimation, power distribution network classification investment Brief summary, medium voltage distribution network construction project classification investment estimate, middle pressure industry expansion conveyance system classification investment estimate, power distribution automation are special The classification of item improvement project, the analysis of grid investment situation show Project Economy Benefit assessment knot as shown in figure 16 with report form Fruit.
Technical feasibility described in the embodiment of the present invention assessment, comprising: high voltage distribution network there are Resolving probiems situation, in it is low Being press-fitted power grid, there are Resolving probiems situation, 110k ratio of transformer capacity to load situation, distribution net work structures to improve situation, medium voltage distribution network wiring Mode statistical, medium-Voltage Distribution network planning index analysis show technical feasibility assessment result as shown in figure 17 with report form.
Project Whole Course Management module, comprising:
System policy management module is used for management project management system file as shown in figure 18;
Investment deposit database management module, as shown in figure 19, for will be according to the project examination result shape in project warehouse At the classification of investment warehouse, and shown with tabular form;
Project management indicator-specific statistics module, as shown in figure 20, the item for being given an written reply in statistical item warehouse by feasibility study Mesh number amount and accounting, and shown with tabular form;
Project tracking control of full process module is used for project and grid coding and power distribution network representation phase as shown in figure 21 Association, and renewal item progress and variation, are shown with card form list.
According to above embodiments, a kind of embodiment of the available power distribution network auxiliary programming system: pass through first Grid dividing management module is based on grid dividing principle, is divided, numbered to citywide power distribution network and read Distribution Network Equipment Data establish power distribution network grid database;The full dimension display module of grid is according to power distribution network grid database, in map interface exhibition Show;Grid As-Is analysis module gives phase by the prediction of power load in analysis to power distribution network overall operation situation and grid It closes staff and does grid project programme and make reference in data;Project planning management module passes through the account in grid Data, operation data, rack data, power network resources data, establish power distribution network problem base, and problem base map entries warehouse leads to Existing similar grid project programme is crossed, the grid project referred to for relevant staff, which is advised, to be proposed to new distribution problem The scheme of drawing, relevant staff modify the grid project programme of reference according to the data of As-Is analysis module.Phase Staff is closed by grid project programme evaluation module, to modified grid project programme from economic benefit and It is assessed in terms of technical feasibility two, which is entered into project warehouse by assessment after passing through.In Grid project programme in project warehouse will enter implementation phase, and interior at this stage, relevant staff passes through project Whole Course Management module is tracked management to investment deposit, examination & approval situation, project process, until project is finally completed.

Claims (10)

1. a kind of power distribution network auxiliary programming system based on power grid gridding characterized by comprising mesh-managing module, net Lattice As-Is analysis module, project planning management module, project Whole Course Management module, wherein mesh-managing module is used for according to net Lattice division principle grid division numbers grid and calls distribution in the operation data real time monitoring grid of power distribution network facility netted Condition;Grid As-Is analysis module is used to read the operation data of distribution network device in grid, analysis power distribution network there are the problem of, Distribution network construction is formulated for relevant staff and transformation project provides data and supports;Project planning management module, for counting Distribution Network Equipment operation data in related grid, the problem of being reflected according to data, establish power distribution network issue database, with associated nets Lattice establish connection, and issue database and project warehouse are mapped, the automatic project planning scheme proposed for reference, by assessment Afterwards, stored items programme is into project warehouse;Project Whole Course Management module is established according to project planning management module Planned project project investment, feasibility study, construction progress are tracked, relevant staff updates item according to development of projects manually Mesh progress.
2. power distribution network auxiliary programming system according to claim 1, which is characterized in that the mesh-managing module includes: net The full dimension of lattice manages module, shows the grid that grid dividing management module divides based on map view, and call power distribution network grid The grid real-time running data of database is shown to relevant staff with human-computer interaction interface, while calculating the electricity in grid Road load state;Grid dividing management module, for issuing grid dividing task, relevant staff is based on grid dividing principle Grid is drawn on cloud platform map, draws after grid is audited by staff and grid is numbered automatically, read in grid and match Electrical network facilities run real time data and establish power distribution network grid database with mesh mapping, by human-computer interaction interface with list shape Formula is shown to relevant staff.
3. power distribution network auxiliary programming system according to claim 1, which is characterized in that the grid As-Is analysis module packet It includes: planning strategy management module, for managing the planning strategy of each grid;Power distribution network As-Is analysis module is matched for reading The real-time running data of power grid grid database analyzes power distribution network overall operation situation, power load in real-time predicted grid.
4. power distribution network auxiliary programming system according to claim 1, which is characterized in that the project planning management module packet It includes: grid programme management module, for managing the account data in grid, operation data, rack data, power network resources number According to, establish power distribution network problem base, to power distribution network representation and map entries warehouse, according to the programme of existing project and Account data, operation data, rack data, power network resources data in grid, the automatic grid project rule for searching for Similar Problems The scheme of drawing, the grid project programme of auxiliary reference is proposed with this;Grid project programme evaluation module, for showing rule It plans mould, project report, assesses economic benefit, technical feasibility, establish project warehouse.
5. power distribution network auxiliary programming system according to claim 1, which is characterized in that the project Whole Course Management module packet It includes: system policy management module, the project management system formulated for managing each subordinate unit;Investment deposit database management module, According to the approval results of project in project warehouse, investment warehouse is formed, with human-computer interaction interface to relevant staff's exhibition Show;Project management indicator-specific statistics module, according in project warehouse project feasibility study give an written reply situation, with human-computer interaction interface to Relevant staff shows;Project tracking control of full process module, manually by grid coding, problem base coding in project warehouse Project matching, updates and shows the construction progress of project.
6. a kind of power distribution network auxiliary programming method based on power grid gridding, which comprises the following steps:
Mesh-managing step, for the fortune of power distribution network facility to be numbered and called to grid according to grid dividing principle grid division Line number factually when monitoring grid in power distribution network situation;
Grid As-Is analysis step is analyzed and is asked existing for power distribution network for reading the operation data of the distribution network device in grid Topic formulates distribution network construction for relevant staff and transformation project provides data and supports;
Project planning management process, for Distribution Network Equipment operation data in statistical correlation grid, the problem of reflection according to data Power distribution network issue database is established, is contacted to the foundation of related grid, issue database and project warehouse is mapped, it is automatic to propose Project planning scheme for reference, after assessment, stored items programme is into project warehouse;
Project Whole Course Management step, planned project for being established according to project planning management module to project investment, feasibility study, Construction progress is tracked, and relevant staff is according to the manual renewal item progress of development of projects.
7. power distribution network auxiliary programming method according to claim 6, which is characterized in that the mesh-managing includes following step It is rapid:
The full dimension of grid manages step, for showing the grid of grid dividing management module division based on map view, and calls The grid real-time running data of power distribution network grid database is shown to relevant staff with human-computer interaction interface, is calculated simultaneously Circuit load situation in grid;
Grid dividing management process, for issuing grid dividing task, it is flat in cloud that relevant staff is based on grid dividing principle Grid is drawn on the figure of tableland, draws after grid is audited by staff and grid is numbered automatically, is read power distribution network in grid and is set Operation real time data is applied, with mesh mapping, establishes power distribution network grid database, by human-computer interaction interface with tabular form to phase Staff is closed to show.
8. power distribution network auxiliary programming method according to claim 6, which is characterized in that the grid As-Is analysis includes following Step:
Planning strategy management process, for managing the planning strategy of each grid;
Power distribution network As-Is analysis step, for reading the real-time running data of power distribution network grid database, analysis power distribution network is whole Operating condition, power load in real-time predicted grid.
9. power distribution network auxiliary programming method according to claim 6, which is characterized in that the project planning management includes following Step:
Grid programme management process, for managing the account data in grid, operation data, rack data, power network resources Data establish power distribution network problem base, to power distribution network representation and map entries warehouse, according to the programme of existing project With account data, operation data, rack data, the power network resources data in grid, the automatic grid project for searching for Similar Problems Programme proposes the grid project programme of auxiliary reference with this;
Grid project programme appraisal procedure assesses economic benefit, technical feasibility for showing design size, project report Property, establish project warehouse.
10. power distribution network auxiliary programming method according to claim 6, which is characterized in that the project Whole Course Management includes Following steps:
System tactical management step, the project management system formulated for managing each subordinate unit;
Warehouse management process is invested, according to the approval results of project in project warehouse, investment warehouse is formed, with man-machine friendship Mutual interface is shown to relevant staff;Project management indicator-specific statistics module is given an written reply according to the feasibility study of project in project warehouse Situation, and shown with human-computer interaction interface to relevant staff;
Project tracking control of full process step, by grid coding, problem base coding matches with the project in project warehouse, updates and open up Aspect purpose construction progress.
CN201910439947.5A 2019-05-24 2019-05-24 A kind of distribution network planning auxiliary system and method based on power grid gridding Pending CN110503230A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910439947.5A CN110503230A (en) 2019-05-24 2019-05-24 A kind of distribution network planning auxiliary system and method based on power grid gridding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910439947.5A CN110503230A (en) 2019-05-24 2019-05-24 A kind of distribution network planning auxiliary system and method based on power grid gridding

Publications (1)

Publication Number Publication Date
CN110503230A true CN110503230A (en) 2019-11-26

Family

ID=68585690

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910439947.5A Pending CN110503230A (en) 2019-05-24 2019-05-24 A kind of distribution network planning auxiliary system and method based on power grid gridding

Country Status (1)

Country Link
CN (1) CN110503230A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111210121A (en) * 2019-12-26 2020-05-29 深圳供电局有限公司 Dynamic visual management information system of power distribution network based on meshing
CN112036766A (en) * 2020-09-11 2020-12-04 上海国泉科技有限公司 Gridding distribution network service management method and device, computer equipment and storage medium
CN112132318A (en) * 2020-08-21 2020-12-25 成都飞机工业(集团)有限责任公司 Design change implementation monitoring management system and management method
CN112348339A (en) * 2020-10-28 2021-02-09 国网信通亿力科技有限责任公司 Power distribution network planning method based on big data analysis
CN112769235A (en) * 2020-12-28 2021-05-07 深圳供电局有限公司 Index monitoring system and method for power distribution network grid

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103971184A (en) * 2014-05-29 2014-08-06 国家电网公司 Power transmission line path generation method based on spatial GIS (Geographic Information System)
CN105976124A (en) * 2016-05-18 2016-09-28 国网山东省电力公司经济技术研究院 GIS-based power grid planning project full-process closed-loop control method and system
CN106446345A (en) * 2016-08-30 2017-02-22 国网江苏省电力公司 Distribution network operation indicator processing method based on segmented geographic region
CN107169878A (en) * 2017-04-12 2017-09-15 华中科技大学 A kind of method based on information independence collection space load basic data of increasing income

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103971184A (en) * 2014-05-29 2014-08-06 国家电网公司 Power transmission line path generation method based on spatial GIS (Geographic Information System)
CN105976124A (en) * 2016-05-18 2016-09-28 国网山东省电力公司经济技术研究院 GIS-based power grid planning project full-process closed-loop control method and system
CN106446345A (en) * 2016-08-30 2017-02-22 国网江苏省电力公司 Distribution network operation indicator processing method based on segmented geographic region
CN107169878A (en) * 2017-04-12 2017-09-15 华中科技大学 A kind of method based on information independence collection space load basic data of increasing income

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
严鹏飞等: "基于_网格化_的中压配电网规划方法", 《农村电气化》 *
胡耀方: "顺德地区配电网规划辅助决策系统的研发与应用", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *
许冠中等: "基于网格的项目全过程管理研究与应用", 《数字通信世界》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111210121A (en) * 2019-12-26 2020-05-29 深圳供电局有限公司 Dynamic visual management information system of power distribution network based on meshing
CN112132318A (en) * 2020-08-21 2020-12-25 成都飞机工业(集团)有限责任公司 Design change implementation monitoring management system and management method
CN112132318B (en) * 2020-08-21 2022-01-25 成都飞机工业(集团)有限责任公司 Design change implementation monitoring management system and management method
CN112036766A (en) * 2020-09-11 2020-12-04 上海国泉科技有限公司 Gridding distribution network service management method and device, computer equipment and storage medium
CN112348339A (en) * 2020-10-28 2021-02-09 国网信通亿力科技有限责任公司 Power distribution network planning method based on big data analysis
CN112769235A (en) * 2020-12-28 2021-05-07 深圳供电局有限公司 Index monitoring system and method for power distribution network grid

Similar Documents

Publication Publication Date Title
CN110503230A (en) A kind of distribution network planning auxiliary system and method based on power grid gridding
WO2020147349A1 (en) Power distribution network operation aided decision-making analysis system and method
CN106203890B (en) Battalion's auxiliary tone integration data modeling method based on CIM
Sun et al. Review of smart grid comprehensive assessment systems
CN109980642A (en) A kind of digital intelligent distribution network planning auxiliary system
WO2023115842A1 (en) Data-driven offline and online integrated simulation system and method for power distribution network
CN103675600B (en) Based on the Fault Diagnosis of Distribution Network system and method for topological knowledge
Roncero Integration is key to smart grid management
CN103762723B (en) Method and system for managing a power grid
CN107038530A (en) A kind of power distribution network overall planning method and system
CN104123675A (en) Power distribution network simulation research and analysis system and method based on network-wide data
CN112541618A (en) Active power distribution network planning method based on gridding and storage medium
CN104331844B (en) A kind of power network construction project investment decision method
CN109583767A (en) A kind of distribution net gridding overall planning method
CN103199521B (en) Power network planning construction method based on network reconstruction and optimized load-flow simulating calculation
CN106127377A (en) A kind of intelligent grid multiple-energy-source comprehensive coordination level evaluation method
CN104240139A (en) Multi-service system information fusion power grid comprehensive visualization method based on three-dimensional GIS
CN112541617B (en) Constant volume and site selection method for transformer substation and storage medium
CN104766140A (en) Layered and segmented modularized power grid scheduling method
CN103970887A (en) Information stream display system and method based on GIS distribution network graphs
CN105893516A (en) Power distribution network operation-maintenance cockpit based on operation and distribution data and application thereof
CN105654393A (en) Energy efficiency management service system of power distribution network area
CN107256442A (en) Line loss calculation method based on mobile client
CN107944659A (en) A kind of substation supervisory control system auto report completing method and apparatus
CN110033195A (en) Adjust grid model splicing method to a kind of province based on CIM/CIS

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191126

RJ01 Rejection of invention patent application after publication