CN110500822A - Control method of variable frequency air conditioner - Google Patents
Control method of variable frequency air conditioner Download PDFInfo
- Publication number
- CN110500822A CN110500822A CN201910636763.8A CN201910636763A CN110500822A CN 110500822 A CN110500822 A CN 110500822A CN 201910636763 A CN201910636763 A CN 201910636763A CN 110500822 A CN110500822 A CN 110500822A
- Authority
- CN
- China
- Prior art keywords
- frequency
- heat exchange
- variable frequency
- pump
- branch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 55
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 138
- 238000004378 air conditioning Methods 0.000 claims abstract description 50
- 230000008859 change Effects 0.000 claims abstract description 25
- 239000002826 coolant Substances 0.000 claims description 4
- 230000005494 condensation Effects 0.000 claims 1
- 238000009833 condensation Methods 0.000 claims 1
- 238000006243 chemical reaction Methods 0.000 abstract description 16
- 230000000694 effects Effects 0.000 abstract description 11
- 239000002918 waste heat Substances 0.000 abstract description 9
- 238000011084 recovery Methods 0.000 abstract description 7
- 238000010438 heat treatment Methods 0.000 abstract description 5
- 230000009467 reduction Effects 0.000 abstract description 2
- 230000008569 process Effects 0.000 description 5
- 239000002699 waste material Substances 0.000 description 4
- 230000032258 transport Effects 0.000 description 3
- 230000033228 biological regulation Effects 0.000 description 2
- 238000005265 energy consumption Methods 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000002159 abnormal effect Effects 0.000 description 1
- 125000002015 acyclic group Chemical group 0.000 description 1
- 239000000567 combustion gas Substances 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 230000004069 differentiation Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000008020 evaporation Effects 0.000 description 1
- 238000001704 evaporation Methods 0.000 description 1
- 230000004907 flux Effects 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 230000017525 heat dissipation Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 239000003507 refrigerant Substances 0.000 description 1
- 238000005057 refrigeration Methods 0.000 description 1
- 239000008400 supply water Substances 0.000 description 1
- 238000010792 warming Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B41/00—Fluid-circulation arrangements
- F25B41/20—Disposition of valves, e.g. of on-off valves or flow control valves
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B41/00—Fluid-circulation arrangements
- F25B41/30—Expansion means; Dispositions thereof
- F25B41/31—Expansion valves
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B49/00—Arrangement or mounting of control or safety devices
- F25B49/02—Arrangement or mounting of control or safety devices for compression type machines, plants or systems
- F25B49/022—Compressor control arrangements
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2600/00—Control issues
- F25B2600/02—Compressor control
- F25B2600/021—Inverters therefor
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
- Y02B30/70—Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Thermal Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Air Conditioning Control Device (AREA)
Abstract
The invention belongs to the technical field of air conditioners, and particularly relates to a control method of a variable frequency air conditioner. The invention aims to solve the problem that the existing air conditioning system with the waste heat recovery function is poor in energy-saving effect. For this purpose, the control method of the inverter air conditioner can determine the frequency mode of the inverter pump according to different branch circuit operation conditions, so that the energy-saving effect of the air conditioner is improved on the basis of meeting the basic operation requirement and the hot water heating requirement of the air conditioner and realizing waste heat recovery through the inverter operation of the inverter pump. Moreover, the control method of the invention can also determine whether the frequency conversion pump needs to reduce the frequency according to the current frequency mode of the frequency conversion pump and the opening degree change condition of the electronic expansion valve, and execute corresponding frequency reduction schemes aiming at different frequency modes of the frequency conversion pump under the condition that the frequency conversion pump needs to reduce the frequency, thereby optimizing and improving the energy-saving effect of the air conditioner again.
Description
Technical field
The invention belongs to air conditioner technical fields, and in particular to a kind of control method of transducer air conditioning.
Background technique
Due to summer weather heat, people's can also be increased accordingly with water, and city will be increased with water power supply, by
Be not in the temperature requirement of summer water it is very high, in the epoch of energy shortages, if by air-conditioning generate waste heat be used to heat life
Water is applied flexibly to meet the daily demand of people, can both exempt the consumption with hot water to energy such as combustion gas, is imitated to global warming is improved
Should also have certain contribution.
A kind of air-conditioning system is now provided.Compared with existing air conditioner, which can absorb air-conditioning including one and give up
Heat and the cycle heat exchange water route of heat hot water and an acyclic heat exchange water route for having water inlet end and a water outlet, so as to according to heat
The demand for heat of water exchanges heat to switch above-mentioned two water routes.Due to the flow demand not phase of the water in two water routes that exchange heat
Together, therefore, if sending demand and being arranged to determine frequency pump to can satisfy the water transport in two heat exchange water routes, will lead to the energy need not
It wastes.For this problem, now consider to provide a kind of and air-conditioning system more matched control method in overall heat exchange water route, with
Just the energy-saving effect of the air-conditioning system is further promoted.
Summary of the invention
In order to solve the above problem in the prior art, in order to solve the above-mentioned air-conditioning system for having waste heat recovery function
The bad problem of energy-saving effect, the present invention provides a kind of control method of transducer air conditioning, the transducer air conditioning includes
Compressor, electric expansion valve, evaporator, condenser and heat exchange water route, the compressor, the electric expansion valve, the evaporation
Device and the condenser constitute the coolant circulating system of closed loop, and the heat exchange water route includes the first heat exchange branch, the second heat exchange branch
Road, variable frequency pump and valve member, the first heat exchange branch road are provided with water storage device, and the second heat exchange branch road is provided with
Water supply device and drainage arrangement, it is described first heat exchange branch and it is described heat exchange branch in any one can be with the frequency conversion
Pump connection, the condenser is radiated by flowing water in the first heat exchange branch or the second heat exchange branch, described
Valve member can be such that the heat exchange water route switches between the first heat exchange branch and the second heat exchange branch, the frequency conversion
The flow regime of the pump control first heat exchange branch or the water in the second heat exchange branch, the control method include:
Obtain the frequency mode of the variable frequency pump;Obtain the aperture situation of change of the electric expansion valve;According to the frequency of the variable frequency pump
The aperture situation of change of rate mode and the electric expansion valve, transports the variable frequency pump selectively in a manner of corresponding frequency reducing
Row.
It is " swollen according to the frequency mode of the variable frequency pump and the electronics in the optimal technical scheme of above-mentioned control method
The aperture situation of change of swollen valve, runs the variable frequency pump selectively in a manner of corresponding frequency reducing " if the step of include: institute
It states variable frequency pump and is reduced under high frequency mode with the aperture of the operation of the first raising frequency rate raising frequency and the electric expansion valve, then make institute
It states variable frequency pump to be reduced to after the first setpoint frequency again with the operation of the second raising frequency rate raising frequency, wherein the first raising frequency rate is big
In the second raising frequency rate.
In the optimal technical scheme of above-mentioned control method, " make the variable frequency pump be reduced to after the first setpoint frequency again with
Second raising frequency rate raising frequency operation " the step of include: make the variable frequency pump with present operating frequency run the first preset time after,
It is reduced to the first setpoint frequency, then just with the operation of the second raising frequency rate raising frequency.
It is " swollen according to the frequency mode of the variable frequency pump and the electronics in the optimal technical scheme of above-mentioned control method
The aperture situation of change of swollen valve, runs the variable frequency pump selectively in a manner of corresponding frequency reducing " the step of further include: if
The variable frequency pump is run under low frequency mode and the aperture of the electric expansion valve reduces, then the variable frequency pump is made to be reduced to the
The operation of two setpoint frequencies.
In the optimal technical scheme of above-mentioned control method, " making the variable frequency pump that the second setpoint frequency is reduced to run "
Step includes: after so that the variable frequency pump is run the second preset time with present operating frequency, the second setpoint frequency to be just reduced to transport
Row.
In the optimal technical scheme of above-mentioned control method, " frequency mode for obtaining the variable frequency pump " the step of before, institute
State control method further include: in the case of the variable frequency pump brings into operation, obtain the valve opening and closing information of the valve member;
According to the valve opening and closing information, the present branch operating condition in the heat exchange water route is determined;" obtain the frequency of the variable frequency pump
The step of mode " includes: to determine the frequency mode of the variable frequency pump according to the present branch operating condition.
In the optimal technical scheme of above-mentioned control method, " according to the present branch operating condition, the frequency conversion is determined
The frequency mode of pump " if the step of include: the heat exchange water route with the first heat exchange branch operation, obtain described first
The temperature parameter of water in heat exchange branch;If the temperature parameter increases and raised temperature parameter is less than set temperature,
Make the variable frequency pump under high frequency mode with the operation of the first raising frequency rate raising frequency.
In the optimal technical scheme of above-mentioned control method, in the variable frequency pump situation that raising frequency is run under high frequency mode
Under, the control method further include: if the variable frequency pump raising frequency makes described in the heat-exchanging water routing to maximum operation frequency
First heat exchange branch switches to the second heat exchange branch, while the variable frequency pump being made to switch to low frequency mode fortune by high frequency mode
Row.
In the optimal technical scheme of above-mentioned control method, " according to the present branch operating condition, the frequency conversion is determined
The frequency mode of pump " if the step of include: it is described first heat exchange water route in water temperature parameter be equal to set temperature, make
Heat-exchanging water routing the first heat exchange branch switches to the second heat exchange branch, while making the variable frequency pump with Low-frequency Modes
Formula operation.
In the optimal technical scheme of above-mentioned control method, " according to the present branch operating condition, the frequency conversion is determined
The running frequency of pump " if the step of include: the heat exchange water route with the second heat exchange branch operation, make the variable frequency pump
It is run with low frequency mode.
It will be appreciated to those of skill in the art that the control method of transducer air conditioning of the invention can be according to variable frequency pump
Current frequency mode and electric expansion valve aperture situation of change, determine whether variable frequency pump needs frequency reducing, and in variable frequency pump
In the case of needing frequency reducing, corresponding frequency reducing scheme is executed for the different frequency mode of variable frequency pump, thus meeting frequency conversion sky
It adjusts the basic operation demand of device, influence the energy consumption for reducing variable frequency pump on the basis of its condenser normally exchanges heat as much as possible, from
And make air conditioner that can also further promote the energy-saving effect of air conditioner while realizing Waste Heat Recovery.
Detailed description of the invention
The preferred embodiment of the present invention described with reference to the accompanying drawings.Attached drawing are as follows:
Fig. 1 is the key step flow chart of the control method of transducer air conditioning of the invention;
Fig. 2 is the first operation curve figure of the control method of transducer air conditioning of the invention;
Fig. 3 is the first operation curve figure of the control method of transducer air conditioning of the invention.
Specific embodiment
It will be apparent to a skilled person that in the description of the present invention, although according to particular order in the application
Describe each step of control method of the invention, but these be not sequentially it is restrictive, without departing from of the invention
Under the premise of basic principle, those skilled in the art can execute the step in a different order.
The bad problem of energy-saving effect based on the air-conditioning system for having waste heat recovery function pointed out in background technique, this
Invention provides a kind of control method of transducer air conditioning, it is intended to further be promoted on the basis of air conditioner realizes Waste Heat Recovery
The energy-saving effect of air conditioner.
In the inventive solutions, the present invention provides a kind of transducer air conditioning, which includes compression
Mechanical, electrical sub- expansion valve, evaporator, condenser and heat exchange water route.Compressor, electric expansion valve, evaporator and condenser composition are closed
The coolant circulating system of ring.Above-mentioned transducer air conditioning is provided with air supply device in the position of evaporator, so as to by evaporator heat exchange
The cold wind generated afterwards is transported to interior.Heat exchange water route specifically includes the first heat exchange branch, the second heat exchange branch, variable frequency pump and valve
Component, wherein the first heat exchange branch road is provided with water storage device, and the second heat exchange branch road is provided with water supply device and draining dress
It sets, any one in the first heat exchange branch and the branch that exchanges heat can be connected to variable frequency pump.First heat exchange branch and second changes
At least part of hot branch flows through condenser, so that condenser can be by the first heat exchange branch or the second heat exchange branch
Flowing water heat dissipation.Valve member includes multiple switch valves for being respectively arranged at the first heat exchange branch and the second heat exchange branch, on
The control module for stating transducer air conditioning can control multiple switch valve and turn on or off, and be separated with will pass through open/close portion
The mode for closing valve switches the work water route in heat exchange water route between the first heat exchange branch and the second heat exchange branch, to be switched to
The branch that condenser exchanges heat.Above-mentioned variable frequency pump can control the stream of the first heat exchange branch or the water in the second heat exchange branch
Dynamic state promotes water to flow in the first heat exchange branch or the second heat exchange branch, the water in regulation first/second heat exchange branch
Flow.
By the system structure of above-mentioned transducer air conditioning it is found that the condenser of transducer air conditioning can pass through the first heat exchange branch
Or second heat exchange branch in flowing water exchange heat.And when the condenser is exchanged heat by the first heat exchange branch, it should
Water in heat exchange branch circulates, and stores so that the heat released using condenser is heated water to after certain temperature to storage
In water installations, taken for user.When condenser is exchanged heat by the second heat exchange branch, water and condenser in the branch into
It is discharged after row heat exchange.Since the flow path of the water of two heat exchange branches is different, in the first heat exchange branch with condenser
The temperature of water for carrying out heat exchange gradually rises, and is gradually reduced with the temperature difference of condenser, and in the second heat exchange branch with condenser
The temperature for carrying out the water of heat exchange is the temperature of substantially invariable supply water.In consideration of it, for the different branch in heat exchange water route
Exchange heat situation, and the frequency mode of frequency conversion pump operation is different.
The preferred embodiment of the present invention is described below with reference to above-mentioned transducer air conditioning.
It is the key step flow chart of the control method of transducer air conditioning of the invention referring initially to Fig. 1, Fig. 1.Such as Fig. 1 institute
Show, control method of the invention includes:
Step S1: the frequency mode of variable frequency pump is obtained;
Step S2: the aperture situation of change of electric expansion valve is obtained;
Step S3: according to the aperture situation of change of the frequency mode of variable frequency pump and electric expansion valve, keep variable frequency pump selective
Ground is run in a manner of corresponding frequency reducing.
In step sl, the frequency mode of variable frequency pump specifically refers to the operational mode in the different frequency scope of variable frequency pump.
For example, variable frequency pump is divided into high band in a higher frequency range, when variable frequency pump is run with the frequency in the high band
Mode be high frequency mode.Similarly, frequency mode can also include low frequency mode.In this step, frequency mode is obtained
Concrete mode be not limit.For example, the acquisition modes of frequency mode can be the control unit of general transducer air conditioning
Active detecting simultaneously obtains, and can also be that control associated there is singly when transducer air conditioning determines the frequency mode of variable frequency pump
The information of representative frequency mode that member is automatically generated and stored, directly transfers currently represent the information of frequency mode i.e. when needed
It can.
In step s 2, the aperture that the aperture situation of change of electric expansion valve specifically refers to electric expansion valve increases or subtracts
Small situation.Monitoring list similar, which can also be changed by that can monitor the aperture of electric expansion valve
Information that member obtains in real time or transferring, automatically generating and store in each aperture variation of electric expansion valve.
In step s3, the frequency mode of variable frequency pump can represent the current heat exchange demand of the condenser of transducer air conditioning,
The aperture situation of change of electric expansion valve is directly related to the variation of the cold medium flux in coolant circulating system, represents convertible frequency air-conditioner
The current refrigeration situation of device.According to the aperture situation of change of the frequency mode of variable frequency pump and electric expansion valve under suitable opportunity
Make variable frequency pump frequency reducing in a certain way run, can current operation demand and condenser based on transducer air conditioning currently exchange heat need
The energy consumption for reducing variable frequency pump is asked, to further promote the energy-saving effect of above-mentioned transducer air conditioning.
Further, step S3 includes:
If variable frequency pump is reduced under high frequency mode with the aperture of the operation of the first raising frequency rate raising frequency and electric expansion valve,
It is reduced to variable frequency pump after the first setpoint frequency again with the operation of the second raising frequency rate raising frequency, wherein the first raising frequency rate is greater than
Second raising frequency rate.
In above-mentioned steps, variable frequency pump with the operation of the first raising frequency rate raising frequency, then shows current under high frequency mode
In the situation that exchanges heat, heat that absorptive condenser sheds, water in the branch to exchange heat with condenser flow be gradually increased
Variation tendency under can meet the heat exchange demand of condenser.At this point, if room temperature has reached the established standards of user,
The compressor frequency reducing of air conditioner is run, and the aperture of electric expansion valve reduces, then the flow of its condenser reduces, the heat exchange of condenser
Demand reduces.In this case, based on the frequency variation pattern in the current operating scheme of variable frequency pump, the frequency of variable frequency pump is lowered
Certain amplitude and the raising frequency rate for reducing variable frequency pump, to adapt to the heat exchange demand of the condenser after frequency reducing.Wherein, raising frequency
Frequency ramp-up rate when what rate represented is the operation of variable frequency pump raising frequency.Above-mentioned first raising frequency rate and the second raising frequency rate can be with
It is set or is adjusted according to the practical operation situation of transducer air conditioning.
Further, the step for " being reduced to variable frequency pump after the first setpoint frequency again with the operation of the second raising frequency rate raising frequency "
Suddenly include:
After so that variable frequency pump is run the first preset time with present operating frequency, it is reduced to the first setpoint frequency and just with second
The operation of raising frequency rate raising frequency.
In above-mentioned steps, after reducing due to the aperture of transducer air conditioning frequency reducing operation, electric expansion valve, although condenser
Heat exchange slump in demand certain amplitude, but initial stage lowered in its demand that exchanges heat, condenser exchanges heat before flow becomes smaller
When a large amount of waste heats for generating absorbed completely by the water in heat exchange branch not yet.At this point, if lowering the operation of variable frequency pump immediately
Frequency, the flow for reducing water in heat exchange branch, may result in the waste heat around condenser and are difficult quickly to be transferred to heat exchange branch
In the water on road, to make condenser can be in the higher environment of ambient temperature, influence condenser within a very long time
Change thermal velocity, and then influences the normal operation of air conditioner.In consideration of it, if making it first before variable frequency pump frequency reducing currently to run frequency
Rate operation a period of time, first a large amount of waste heats of condenser quickly can be absorbed, then needed further according to the subsequent heat exchange of condenser
Seek the mobility status of the water of adjustment heat exchange branch, thus solve the problems, such as it is above-mentioned it is possible that condenser heat exchange it is abnormal.
Wherein, above-mentioned first setpoint frequency can be according to the practical reduction amplitude of electronic expansion valve opening, the operation ring of transducer air conditioning
The temperature etc. in border is set, as long as the first setpoint frequency of setting does not influence the normal heat exchange of condenser.First is default
Time can be reduced according to electronic expansion valve opening before the practical heat exchange demand of condenser set.
In alternatively possible embodiment, step S3 includes:
If variable frequency pump is run under low frequency mode and the aperture of electric expansion valve reduces, variable frequency pump is made to be reduced to the
The operation of two setpoint frequencies.
In above-mentioned steps, temperature has reached the situation of the established standards of user, transducer air conditioning frequency reducing operation indoors
Under, the aperture of electric expansion valve reduces, and the flow of refrigerant reduces, and the heat exchange demand of condenser weakens.At this point, reducing variable frequency pump
It is run to the second setpoint frequency, the heat exchange demand after variation to adapt to condenser.Wherein, the second setpoint frequency can basis
Practical heat exchange demand after condenser variation is set.
Further, the step of " make variable frequency pump be reduced to the second setpoint frequency run " includes:
After so that variable frequency pump is run the second preset time with present operating frequency, variable frequency pump is just made to be reduced to the second setpoint frequency
Operation.
In above-mentioned steps, before running variable frequency pump frequency reducing, the second preset time is first run with current operation frequency, with
Just frequency reducing is carried out again after having absorbed a large amount of waste heats of condenser, avoids condenser heat exchange bad.Similarly, above-mentioned second setting frequency
Rate and the second preset time can also be set according to the actual motion demand of transducer air conditioning, with the first setpoint frequency and
There is no any incidence relation or precedence relationships between first preset time, and " first ", " second " in this are merely to right
Setpoint frequency and preset time under different implement scenes make differentiation.
Preferably, before the frequency mode of variable frequency pump " obtain " the step of, control method of the invention further include:
In the case of variable frequency pump brings into operation, the valve opening and closing information of valve member is obtained;
According to valve opening and closing information, the present branch operating condition in heat exchange water route is determined;
The step of " frequency mode for obtaining the variable frequency pump " includes:
According to present branch operating condition, the frequency mode of variable frequency pump is determined.
In above-mentioned steps, the valve opening and closing information of valve member specifically refers to opening for each valve that valve member includes
Close situation.The acquisition modes of the valve opening and closing situation are not to limit, for example, can directly be detected by detecting element each
The closing situation of valve can also be that the control module of above-mentioned transducer air conditioning exists to be aggregated into above-mentioned valve opening and closing information
The information for having generated and having stored after having adjusted valve switch state every time.
" present branch operating condition " include currently be condenser exchanged heat, the specific branch of absorptive condenser heat
The operating status (in such as continuous service, i.e. by the state of the water in switching state and the branch) of road and the branch, so as to
In conjunction with current operating status determine the heat exchange situation of condenser whether normally, can satisfy the normal operation demand of air conditioner,
And the running frequency by controlling variable frequency pump controls the mobility status of the water in heat exchange branch, to the heat exchange situation of condenser into
Row regulation.In the case of determining the current frequency mode of variable frequency pump, the frequency mode can be obtained.
Further, the step of above-mentioned " according to present branch operating condition, determining the frequency mode of variable frequency pump " includes:
If the water route that exchanges heat obtains the temperature parameter of the water in the first heat exchange branch with the first heat exchange branch operation;
If temperature parameter increase and raised temperature parameter be less than set temperature, make variable frequency pump under high frequency mode with
The operation of first raising frequency rate raising frequency.
Water in above-mentioned steps, when the situation that the water route that exchanges heat is run with the first heat exchange branch, in the first heat exchange branch
Flowing through condenser each time can the heat that sheds of absorptive condenser.Water first heat exchange branch internal circulation flow situation
Under, the temperature of water constantly increases.It follows that obtaining water therein when the first heat exchange branch exchanges heat to condenser
Temperature parameter, can know the heated condition of water, to judge subsequent whether need to continue whithin a period of time to heat the branch
Interior water determines whether the demand with switching heat exchange branch, to be sentenced according to specific demand for heat change conditions
The operation demand of disconnected variable frequency pump, and then determine the running frequency of variable frequency pump;It is increased in temperature parameter and raised temperature parameter is small
In the case of set temperature, shows that the water in the first heat exchange branch is not up to the standard for stopping heating, do not there is switching yet currently
Water in the demand of branch, the first heat exchange branch still needs to heat.But since the temperature of the water in the first heat exchange branch is gradually climbed
Rise, cause the temperature gap of water and condenser locations in the first heat exchange branch to become smaller, first heat exchange branch exchange capability of heat by
Decrescence weak, therefore, in order to guarantee that condenser normally exchanges heat, then making variable frequency pump, raising frequency is run under high frequency mode, gradually to add
Its strong facilitation for circulating generation to water in the first heat exchange branch, makes to flow through condenser in the first heat exchange branch
The flow of water becomes larger.Wherein, set temperature is the temperature of the water after the completion of the heating that sets according to the demand for heat of water.Example
Such as, the water for being 50 DEG C if necessary to maximum temperature, then its temperature parameter in cyclic process of the water in the first heat exchange branch rises
The switching demand of heat exchange branch is just had to 50 DEG C, 50 DEG C are then set temperature at this time.
Further, in the case of raising frequency is run variable frequency pump under high frequency mode, control method of the invention is also wrapped
It includes:
If variable frequency pump raising frequency makes heat-exchanging water routing the first heat exchange branch switch to the second heat exchange to maximum operation frequency
Branch, while variable frequency pump being made to switch to low frequency mode operation by high frequency mode.
In above-mentioned steps, if variable frequency pump raising frequency shows variable frequency pump to water in the first heat exchange to maximum operation frequency
The facilitation for circulating generation in branch has reached most by force, and the flow for flowing through the water of condenser has reached maximum.This
When, for the temperature of the water in the first heat exchange branch also in soaring state, the exchange capability of heat of the first heat exchange branch can be in variable frequency pump
Operation power gradually weakens in the case of having reached the maximum.In order to guarantee the normal heat exchange of condenser, then need to make the water route that exchanges heat
Second heat exchange branch is switched to by the first heat exchange branch, while variable frequency pump being made to switch to low frequency mode operation by high frequency mode, with
Just match with water temperature is constant, exchange capability of heat is stable the second heat exchange branch.
It is above-mentioned " according to present branch operating condition, to determine the frequency mould of variable frequency pump in alternatively possible embodiment
The step of formula " further include:
If the temperature parameter of the water in the first heat exchange water route is equal to set temperature, make heat-exchanging water routing the first heat exchange branch
Road switches to the second heat exchange branch, while runs variable frequency pump with low frequency mode.
When the first heat exchange branch exchanges heat to condenser, if the temperature parameter of the water in the first heat exchange branch is equal to
Set temperature then shows that the hot water heating to exchange heat in water route finishes.At this time, it may be necessary to which the branch to exchange heat with condenser is switched
To the second heat exchange branch, so that the first heat exchange branch is out of service, so that the water energy in the first heat exchange branch be made enough to flow into water storage
Device is kept the temperature.In the case of the branch that exchanges heat is switched to the second heat exchange branch, water is supplied in one end of the second heat exchange branch,
Water in branch flows through after condenser is exchanged heat from the discharge ends outflow of the second heat exchange branch.That is, the second heat exchange
Water in branch is not to circulate, and the initial temperature for flowing through the water of condenser is always to supply the temperature of water, and second changes
The exchange capability of heat of hot branch is more stable.At this point, running variable frequency pump with low frequency mode, so as in the heat exchange need for meeting condenser
The supply energy source (such as electric energy) of variable frequency pump is saved while asking.
It is above-mentioned " according to present branch operating condition, determining the running frequency of variable frequency pump " in the case of another is possible
The step of include:
If the water route that exchanges heat runs variable frequency pump with low frequency mode with the second heat exchange branch operation.
In above-mentioned steps, finishes, becomes in the case of user does not have hot water supply requirement, or hot water is heated
In the case of frequency air conditioner has switched heat exchange branch before last time end of run, when variable frequency pump brings into operation, exchange heat branch
It may be directly with the second heat exchange branch operation.At this point, running variable frequency pump with the low frequency mode to match with the second heat exchange branch
.
In a preferred embodiment, control method of the invention specifically includes the following steps:
In the case of variable frequency pump brings into operation, the valve opening and closing information of valve member is obtained;
According to valve opening and closing information, the present branch operating condition in heat exchange water route is determined;
In the case of the water route that exchanges heat is with the first heat exchange branch operation, the temperature ginseng of the water in the first heat exchange branch is obtained
Number;
If temperature parameter increase and raised temperature parameter be less than set temperature, make variable frequency pump under high frequency mode with
The operation of first raising frequency rate raising frequency;
Under high frequency mode in the case of raising frequency operation, if variable frequency pump raising frequency makes heat-exchanging water to maximum operation frequency
Routing the first heat exchange branch switches to the second heat exchange branch, while variable frequency pump being made to switch to low frequency mode operation by high frequency mode;
If the temperature parameter of the water in the first heat exchange water route is equal to set temperature, make heat-exchanging water routing the first heat exchange branch
Road switches to the second heat exchange branch, while runs variable frequency pump with low frequency mode;
In the case of the water route that exchanges heat is with the second heat exchange branch operation, run variable frequency pump with low frequency mode;
In the case of determining the frequency mode of variable frequency pump, the frequency mode of variable frequency pump is obtained;
Obtain the aperture situation of change of electric expansion valve;
Under if variable frequency pump is subtracted under high frequency mode with the aperture of the operation of the first raising frequency rate raising frequency and electric expansion valve,
Then make variable frequency pump with present operating frequency run the first preset time after, then be reduced to the first setpoint frequency and with the second raising frequency speed
Rate raising frequency operation, wherein the first raising frequency rate is greater than the second raising frequency rate;
If variable frequency pump is run under low frequency mode and the aperture of electric expansion valve reduces, make variable frequency pump with current work
After working frequency runs the second preset time, then the second setpoint frequency is reduced to run.
It is the first operation curve figure (dotted line in figure of the control method of transducer air conditioning of the invention referring again to Fig. 2, Fig. 2
For the T/F change curve of variable frequency pump, solid line is the when m- aperture change curve of electric expansion valve, wherein the longitudinal axis it is upper
Half part gradually rises from zero supreme frequency, and longitudinal axis lower half portion is gradually increased from zero to lower aperture).As shown in Fig. 2, in this hair
In a kind of bright possible embodiment, the operational process of the variable frequency pump of transducer air conditioning of the invention is as follows:
In the case of transducer air conditioning brings into operation, electric expansion valve closes valve to the first aperture by maximum opening, so as to
Air conditioner is set quickly to form pressure difference, to realize the light-load starting of air conditioner.Then, then keep electric expansion valve fast by the first aperture
Speed increases to the second aperture (the work aperture that the aperture is electric expansion valve when air conditioner normally freezes).Meanwhile in frequency conversion sky
It adjusts device to bring into operation and after a period of time, variable frequency pump is made to bring into operation, it is sharp when not flowed so as to the water in the branch that exchanges heat
With the heat of the water absorptive condenser of condenser locations close in the hot branch, the energy is saved;After variable frequency pump brings into operation,
Variable frequency pump is in highest frequency achieved of last operation phase when rapid raising frequency to transducer air conditioning last time runs;Obtain valve group
The valve opening and closing information of part is determining heat exchange water route with the first heat exchange branch operation and the first heat exchange branch by valve opening and closing information
When the water on road is not up to set temperature, variable frequency pump is made to start raising frequency operation under high frequency mode with the first raising frequency rate;Indoors
When temperature reaches temperature set by user, transducer air conditioning is run with low frequency mode, compressor frequency reducing operation, electric expansion valve by
Second aperture is reduced to third aperture (first the second aperture of aperture < third aperture <).In this case, make variable frequency pump first with
Present operating frequency runs the first preset time (horizontal segment i.e. since the m point position in Fig. 2;First preset time can be with
It is 2min), then be reduced to after the first setpoint frequency with the operation of the second raising frequency rate raising frequency;In the raising frequency operational process of variable frequency pump
In, the water in the first heat exchange branch reaches set temperature or the running frequency of variable frequency pump reaches maximum (i.e. n point in Fig. 2
Set), heat exchange water route switches to the operation of the second heat exchange branch, and variable frequency pump switches to low frequency mode, under low frequency mode with it is lower,
Fixed working frequency operation, until transducer air conditioning is closed.
It is the first operation curve figure (dotted line in figure of the control method of transducer air conditioning of the invention referring again to Fig. 3, Fig. 3
For the T/F change curve of variable frequency pump, solid line is the when m- aperture change curve of electric expansion valve, wherein the longitudinal axis it is upper
Half part gradually rises from zero supreme frequency, and longitudinal axis lower half portion is gradually increased from zero to lower aperture).As shown in figure 3, in this hair
In bright alternatively possible embodiment, the operational process of the variable frequency pump of transducer air conditioning of the invention is as follows:
In the case of transducer air conditioning brings into operation, electric expansion valve closes valve to the first aperture by maximum opening, so as to
Air conditioner is set quickly to form pressure difference, to realize the light-load starting of air conditioner.Then, then keep electric expansion valve fast by the first aperture
Speed increases to the second aperture (the work aperture that the aperture is electric expansion valve when air conditioner normally freezes).Meanwhile in frequency conversion sky
It adjusts device to bring into operation and after a period of time, variable frequency pump is made to bring into operation, it is sharp when not flowed so as to the water in the branch that exchanges heat
With the heat of the water absorptive condenser of condenser locations close in the hot branch, the energy is saved;After variable frequency pump brings into operation,
Variable frequency pump is in highest frequency achieved of last operation phase when rapid raising frequency to transducer air conditioning last time runs;Obtain valve group
The valve opening and closing information of part is determining heat exchange water route with the first heat exchange branch operation and the first heat exchange branch by valve opening and closing information
When the water on road is not up to set temperature, variable frequency pump is made to start raising frequency operation under high frequency mode with the first raising frequency rate;In frequency conversion
In the raising frequency operational process of pump, the water in the first heat exchange branch reaches set temperature or the running frequency of variable frequency pump reaches most
(i.e. p point position in Fig. 2) greatly, heat exchange water route switch to the operation of the second heat exchange branch, and variable frequency pump switches to low frequency mode, low
With lower, fixed working frequency operation under frequency mode;When temperature reaches temperature set by user indoors, transducer air conditioning
It is run with low frequency mode, compressor frequency reducing operation, electric expansion valve is reduced to third aperture (the first aperture < the by the second aperture
Three the second apertures of aperture <).In this case, variable frequency pump is made first to run the second preset time (i.e. from Fig. 2 with present operating frequency
In the horizontal segment that starts of q point position;Second preset time can be 2min), then the second setpoint frequency is reduced to run, until
Transducer air conditioning is closed.
In conclusion the control method of transducer air conditioning of the invention can be true by the valve opening and closing information of valve member
Surely the present branch operating condition in heat exchange water route.According to different branch operating condition, the running frequency of variable frequency pump is carried out true
It is fixed.By the converting operation of variable frequency pump, the different operating conditions of heat exchange branch are realized to cold when can run for air conditioner
The heat exchange of condenser, in the basic operation demand and hot water heating demand for meeting air conditioner of the invention, to realize Waste Heat Recovery
While further promote the energy-saving effect of the air conditioner.On this basis, control method of the invention can also be according to frequency conversion
The current frequency mode of pump and the aperture situation of change of electric expansion valve, determine whether variable frequency pump needs frequency reducing, and in frequency conversion
In the case of pump needs frequency reducing, corresponding frequency reducing scheme is executed for the different frequency mode of variable frequency pump, thus to air conditioner
Energy-saving effect optimizes promotion again.
So far, it has been combined preferred embodiment shown in the drawings and describes technical solution of the present invention, still, this field
Technical staff is it is easily understood that protection scope of the present invention is expressly not limited to these specific embodiments.Without departing from this
Under the premise of the principle of invention, those skilled in the art can make equivalent change or replacement to the relevant technologies feature, these
Technical solution after change or replacement will fall within the scope of protection of the present invention.
Claims (10)
1. a kind of control method of transducer air conditioning, which is characterized in that the transducer air conditioning includes compressor, electronic expansion
Valve, evaporator, condenser and heat exchange water route, the compressor, the electric expansion valve, the evaporator and the condenser structure
At the coolant circulating system of closed loop, the heat exchange water route includes the first heat exchange branch, the second heat exchange branch, variable frequency pump and valve group
Part, the first heat exchange branch road are provided with water storage device, and the second heat exchange branch road is provided with water supply device and draining dress
It sets, any one in the first heat exchange branch and the heat exchange branch can be connected to the variable frequency pump, the condensation
Device is radiated by flowing water in the first heat exchange branch or the second heat exchange branch, and the valve member can make institute
It states heat exchange water route and switches between the first heat exchange branch and the second heat exchange branch, the variable frequency pump control described first is changed
The flow regime of hot branch or the water in the second heat exchange branch,
The control method includes:
Obtain the frequency mode of the variable frequency pump;
Obtain the aperture situation of change of the electric expansion valve;
According to the aperture situation of change of the frequency mode of the variable frequency pump and the electric expansion valve, make the variable frequency pump selectivity
Ground is run in a manner of corresponding frequency reducing.
2. control method according to claim 1, which is characterized in that " according to the frequency mode of the variable frequency pump and described
The aperture situation of change of electric expansion valve, runs the variable frequency pump selectively in a manner of corresponding frequency reducing " the step of include:
If the variable frequency pump is under high frequency mode with the operation of the first raising frequency rate raising frequency and the aperture of the electric expansion valve
Reduce, be then reduced to the variable frequency pump after the first setpoint frequency again with the operation of the second raising frequency rate raising frequency, wherein
The first raising frequency rate is greater than the second raising frequency rate.
3. control method according to claim 2, which is characterized in that " variable frequency pump is made to be reduced to the first setpoint frequency
Afterwards again with the second raising frequency rate raising frequency operation " the step of include:
After so that the variable frequency pump is run the first preset time with present operating frequency, it is just reduced to the first setpoint frequency, then with the
The operation of two raising frequency rate raising frequencies.
4. control method according to claim 1, which is characterized in that " according to the frequency mode of the variable frequency pump and described
The aperture situation of change of electric expansion valve, runs the variable frequency pump selectively in a manner of corresponding frequency reducing " the step of include:
If the variable frequency pump is run under low frequency mode and the aperture of the electric expansion valve reduces, make the variable frequency pump
It is reduced to the second setpoint frequency to run.
5. control method according to claim 4, which is characterized in that " variable frequency pump is made to be reduced to the second setpoint frequency
Operation " the step of include:
After making the variable frequency pump run the second preset time with present operating frequency, just make that the second setpoint frequency is reduced to run.
6. control method according to any one of claim 1 to 5, which is characterized in that " obtaining the frequency of the variable frequency pump
Before the step of rate mode ", the control method further include:
Obtain the valve opening and closing information of the valve member;
According to the valve opening and closing information, the present branch operating condition in the heat exchange water route is determined;
The step of " frequency mode for obtaining the variable frequency pump " includes:
According to the present branch operating condition, the frequency mode of the variable frequency pump is determined.
7. control method according to claim 6, which is characterized in that " according to the present branch operating condition, determine institute
State the frequency mode of variable frequency pump " the step of include:
If the heat exchange water route is run with the first heat exchange branch, the temperature of the water in the first heat exchange branch is obtained
Parameter;
If the temperature parameter increases and raised temperature parameter is less than set temperature, make the variable frequency pump in high frequency mode
Under with the first raising frequency rate raising frequency operation.
8. control method according to claim 7, which is characterized in that in the variable frequency pump, raising frequency is run under high frequency mode
In the case of, the control method further include:
If the variable frequency pump raising frequency switches to the heat-exchanging water routing the first heat exchange branch to maximum operation frequency
The second heat exchange branch, while the variable frequency pump being made to switch to low frequency mode operation by high frequency mode.
9. control method according to claim 6, which is characterized in that " according to the present branch operating condition, determine institute
State the frequency mode of variable frequency pump " the step of include:
If the temperature parameter of the water in first heat exchange water route is equal to set temperature, make heat-exchanging water routing described the
One heat exchange branch switches to the second heat exchange branch, while runs the variable frequency pump with low frequency mode.
10. control method according to claim 6, which is characterized in that " according to the present branch operating condition, determine
The step of running frequency of the variable frequency pump " includes:
If the heat exchange water route is run with the second heat exchange branch, run the variable frequency pump with low frequency mode.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910636763.8A CN110500822B (en) | 2019-07-15 | 2019-07-15 | Control method of variable frequency air conditioner |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910636763.8A CN110500822B (en) | 2019-07-15 | 2019-07-15 | Control method of variable frequency air conditioner |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110500822A true CN110500822A (en) | 2019-11-26 |
CN110500822B CN110500822B (en) | 2021-10-29 |
Family
ID=68585305
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910636763.8A Active CN110500822B (en) | 2019-07-15 | 2019-07-15 | Control method of variable frequency air conditioner |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110500822B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113683207A (en) * | 2021-09-09 | 2021-11-23 | 瑞纳智能设备股份有限公司 | Intelligent energy-saving variable-frequency electronic descaling system and control method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004317021A (en) * | 2003-04-16 | 2004-11-11 | Matsushita Electric Ind Co Ltd | Heat pump water heater |
CN102278795A (en) * | 2011-07-25 | 2011-12-14 | 浙江大学 | Central air-conditioning air supply system adopting double cooling coils |
CN202254269U (en) * | 2011-10-13 | 2012-05-30 | 张斗庆 | Hot water system of non-bearing double water tank heat pump |
CN102865671A (en) * | 2012-09-26 | 2013-01-09 | 西安交通大学 | Variable-flow sewage-source heat pump water heating system utilizing solar energy |
CN103388905A (en) * | 2013-07-12 | 2013-11-13 | 西安交通大学 | Evaporator flow-adjustable heat-pump water heater system |
CN104075442A (en) * | 2014-06-17 | 2014-10-01 | 浙江理工大学 | Water tank waste water heat recovery heat pump water heater |
CN109520053A (en) * | 2018-11-30 | 2019-03-26 | 上海理工大学 | A kind of room air adjusts and hot water supply composite system |
-
2019
- 2019-07-15 CN CN201910636763.8A patent/CN110500822B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004317021A (en) * | 2003-04-16 | 2004-11-11 | Matsushita Electric Ind Co Ltd | Heat pump water heater |
JP4016875B2 (en) * | 2003-04-16 | 2007-12-05 | 松下電器産業株式会社 | Heat pump water heater |
CN102278795A (en) * | 2011-07-25 | 2011-12-14 | 浙江大学 | Central air-conditioning air supply system adopting double cooling coils |
CN202254269U (en) * | 2011-10-13 | 2012-05-30 | 张斗庆 | Hot water system of non-bearing double water tank heat pump |
CN102865671A (en) * | 2012-09-26 | 2013-01-09 | 西安交通大学 | Variable-flow sewage-source heat pump water heating system utilizing solar energy |
CN103388905A (en) * | 2013-07-12 | 2013-11-13 | 西安交通大学 | Evaporator flow-adjustable heat-pump water heater system |
CN104075442A (en) * | 2014-06-17 | 2014-10-01 | 浙江理工大学 | Water tank waste water heat recovery heat pump water heater |
CN109520053A (en) * | 2018-11-30 | 2019-03-26 | 上海理工大学 | A kind of room air adjusts and hot water supply composite system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113683207A (en) * | 2021-09-09 | 2021-11-23 | 瑞纳智能设备股份有限公司 | Intelligent energy-saving variable-frequency electronic descaling system and control method |
Also Published As
Publication number | Publication date |
---|---|
CN110500822B (en) | 2021-10-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107014016B (en) | Fluorine pump natural cooling evaporation type condensation water chiller and control method thereof | |
CN109579348B (en) | Multifunctional multi-connected dry capillary radiation heat pump unit and control method thereof | |
CN102032648B (en) | Refrigerant flow control method for multi-connected air-conditioning system during heating | |
US5099651A (en) | Gas engine driven heat pump method | |
US5003788A (en) | Gas engine driven heat pump system | |
CN107575971B (en) | Evaporative water chilling unit and control method | |
CN101240962B (en) | Carbon dioxide heat pump control method based on pressure-temperature | |
CN105637298A (en) | Air-conditioning system and control method therefor | |
JP2010054152A (en) | Heat source system and its control method | |
CN108583204B (en) | A kind of CO2Air conditioner heat pump system | |
CN105180538A (en) | Power distribution device of inverter compressor and operation method of power distribution device | |
CN202371919U (en) | Air conditioner | |
JP2007298235A (en) | Heat source system and its control method | |
CN201331158Y (en) | Air conditioning device capable of synchronously, atomically and accurately adjusting temperature and humidity | |
CN204665584U (en) | A kind of heat pump air conditioner defrosting device | |
CN110500822A (en) | Control method of variable frequency air conditioner | |
JP2010236816A (en) | Heat pump type air conditioner and method of controlling heat pump type air conditioner | |
CN115235052B (en) | Automatic adjusting control system of water chiller | |
KR200412598Y1 (en) | Heat pump system for having function of hot water supply | |
CN110500821A (en) | Control method of variable frequency air conditioner | |
CN102748892A (en) | Movable-type heat pump device for partial heating/refrigerating | |
CN212109083U (en) | Air conditioning system | |
CN212512172U (en) | Greenhouse type multi-compressor heat pump drying device | |
KR102257544B1 (en) | Energy enhanced air-conditioning system and control method thereof | |
CN115366936A (en) | Air conditioning system for railway vehicle, control method of air conditioning system and railway vehicle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |