CN110500049A CN201910726988.2A CN201910726988A CN110500049A CN 110500049 A CN110500049 A CN 110500049A CN 201910726988 A CN201910726988 A CN 201910726988A CN 110500049 A CN110500049 A CN 110500049A
Authority
CN
China
Prior art keywords
pipe
snap
gauge
column
hinged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910726988.2A
Other languages
Chinese (zh)
Inventor
王昌荣
胡德祥
唐会兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhongman Petroleum Equipment Co Ltd
Original Assignee
Jiangsu Zhongman Petroleum Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhongman Petroleum Equipment Co Ltd filed Critical Jiangsu Zhongman Petroleum Equipment Co Ltd
Priority to CN201910726988.2A priority Critical patent/CN110500049A/en
Publication of CN110500049A publication Critical patent/CN110500049A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/14Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of land rig column pipe racking device, the pipe racking device includes: basic platform;Tube drawbench, the tube drawbench includes height-regulating mechanism, free-wheeling system, reciprocating mechanism, telescoping mechanism, the height-regulating mechanism is arranged on the basic platform, the free-wheeling system is arranged on the height-regulating mechanism, the reciprocating mechanism is slidably arranged on the free-wheeling system, and the telescoping mechanism is connected on the reciprocating mechanism;And pipe storage facility, the pipe storage facility include several storagetanks towards the tube drawbench, are used to vertical storage pipe.Beneficial effects of the present invention are to realize the discharge of tubing string low level, and tube drawbench can be installed in low level, and each module is all satisfied land transport condition, have safe and reliable installation and maintenance channel.

Description

A kind of land rig column pipe racking device
Technical field
The invention belongs to oil drilling and extracting equipment fields, and in particular to a kind of land rig column pipe racking device.
Background technique
Pipe discharge manipulator (hereinafter referred to as tube drawbench) is divided into two class of land formula and ocean formula, marine drilling platform row Pipe machine is mostly based on column, i.e., whole height is the large-scale column structure of 26m or so, is not easy to land transport.To adapt to land The transport requirement of ground highway, railway, equipment must split into several modules that can individually transport.
And the mode of existing land rig tube drawbench is mostly the quadruple board platform of conventional drill after reinforcing, in quadruple board platform Lower section mounts entire tube drawbench, in order to balance the structurally and operationally habit of conventional drill, the position of the operation and maintenance of tube drawbench Very high, for 5000m drilling machine, this highly has reached the height of liftoff 35m, and high altitude operation danger coefficient is higher, must It must be equipped with manned maintenance hand basket, maintenance personal is promoted to corresponding height and carries out high altitude operation, has personnel's life security, tool It the risks such as falls to exist, while repairing that timeliness is bad and the second largest unfavorable factor of high altitude operation, usually will affect entire The main reason for promoting is difficult on drilling benefit and land rig.
In order to solve above-mentioned principal contradiction, in order to which the working depth of tube drawbench is reduced, Te Famingben pipe racking device.
Summary of the invention
Aiming at the problems existing in the prior art, the present invention provides a kind of land rig column pipe racking device, the present invention It can be realized the discharge of tubing string low level, tube drawbench can be installed in low level, and each module is all satisfied land transport condition, be had safe and reliable Installation and maintenance channel.
To achieve the above object, the invention adopts the following technical scheme:
A kind of land rig column pipe racking device, the pipe racking device include: basic platform;Tube drawbench, the comb Machine includes height-regulating mechanism, free-wheeling system, reciprocating mechanism, telescoping mechanism, and the height-regulating mechanism is arranged in the basic platform On, the free-wheeling system is arranged on the height-regulating mechanism, and the reciprocating mechanism is slidably arranged on the free-wheeling system, The telescoping mechanism is connected on the reciprocating mechanism;And
Pipe storage facility, the pipe storage facility include several storagetanks towards the tube drawbench, and it is vertical to be used to Store pipe;Wherein, the height-regulating mechanism includes mounting platform, supporting leg, and one end of the supporting leg is hinged on the basic platform On, the other end of the supporting leg is hinged on the mounting platform, and the mounting platform can fall, the pipe storage facility Top be provided with hoisting gear, the hoisting gear is connect with the mounting platform;The free-wheeling system includes column, revolution Bearing, first driving device, the column include active column and vertical columns, and it is flat that the vertical columns are fixed on the installation On platform, the active column is connect by the pivoting support with the vertical columns, and the active column and the fixation are vertical The first driving device is connected between column;The reciprocating mechanism includes upper pulley, lower block, the upper pulley, downslide Vehicle is slidably arranged on the active column, and the upper pulley and lower block are connected with therebetween drive cylinder.
Preferably, guide surface is provided on the active column, the upper pulley, downslide is arranged in sliding on the guide surface Vehicle.
Preferably, the telescoping mechanism includes telescopic arm, clamping limb, and one end of the telescopic arm is fixedly connected on described On coaster and lower block, the other end of the telescopic arm is fixedly connected with the clamping limb.
Preferably, the telescoping mechanism includes two groups of first bars and the second bar disposed in parallel, first bar, the second bar First end be hinged on the upper pulley, first bar, the second bar second end be respectively hinged at the both ends of quarter butt, institute The one end for stating quarter butt is hinged on the clamping limb, and one end of third bar, the third bar are hinged in the middle part of first bar The other end be hinged on the lower block.
Preferably, the clamping limb includes gripper clamp, third oil cylinder in upper and lower ends, the top of the clamping limb with The telescopic arm is hinged, and the middle part of the clamping limb is connect with one end of the third oil cylinder, the other end of the third oil cylinder It is hinged with the other end of the quarter butt.
Preferably, the pipe storage facility includes several pipe cartridge clips, if the pipe cartridge clip include steel structure frame, Dry fingerboard snap-gauge, the steel structure frame form several storagetanks, the setting finger at the notch of each storagetank Beam snap-gauge.
Preferably, the fingerboard snap-gauge includes cylinder, base of fixed plate and snap-gauge, and the base of fixed plate is fixedly connected on the notch On, the snap-gauge is hinged on the base of fixed plate, and the cylinder is connected between the base of fixed plate and the snap-gauge.
Preferably, the fingerboard snap-gauge includes motor, shaft coupling, base of fixed plate and snap-gauge, and the base of fixed plate is fixedly connected on On the notch, the snap-gauge is hinged on the base of fixed plate, and the rotor of the motor is connect with one end of the shaft coupling, institute The other end for stating shaft coupling is connect with the snap-gauge.
Preferably, the pipe storage facility includes the first pipe cartridge clip, the second pipe cartridge clip, third pipe cartridge clip, the Four pipe cartridge clips, the first pipe cartridge clip, the second pipe cartridge clip, third pipe cartridge clip, the 4th pipe cartridge clip are around the row The setting of pipe machine.
Compared with prior art, the invention has the benefit that
1, tubing string low level discharges, and tube drawbench can be installed in low level, excludes high altitude operation hidden danger;
2, each module is all satisfied land transport condition, has safe and reliable installation and maintenance channel, no conventional derrick High-altitude quadruple board platform is a kind of pipe discharge mode of novel concept;
3, the fingerboard of each pipe cartridge clip is directed to the centre of gyration of tube drawbench, and tube drawbench is carried along polar coordinate mode and managed Son, without X, Y way moving of tube drawbench itself, than X, Y coordinates mode, mobile tube drawbench reduces crossbeam and coaster, has knot The advantages that structure is simple, operational efficiency is high, control program is simple;
4, tube drawbench module is simplified by upper pulley, lower block, eliminates a set of coaster translation system and drag chain dress It sets, provides a kind of new fingerboard clamp structure.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the overall effect schematic diagram of embodiment.
Fig. 2 is the embodiment schematic diagram after filling pipe.
Fig. 3 is the median plane diagrammatic cross-section of Fig. 1.
Fig. 4 is tube drawbench schematic diagram.
Fig. 5 is the enlarged schematic partial view of Fig. 4.
Fig. 6 is tube drawbench low level posture schematic diagram.
Fig. 7 is pipe cartridge clip module diagram.
Fig. 8 is pipe cartridge clip fingerboard snap-gauge enlarged drawing.
Fig. 9 is tube drawbench in standby posture schematic diagram.
Figure 10 is the comb route schematic diagram of tube drawbench.
Figure 11 is the posture schematic diagram that pipe is discharged into pipe cartridge clip designated position by tube drawbench.
Figure 12 is another mechanism form schematic diagram of telescopic arm.
Figure 13 is another drive form schematic diagram of fingerboard snap-gauge.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under that premise of not paying creative labor Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that, term " longitudinal direction ", " transverse direction ", "upper", "lower", "front", "rear", The orientation or positional relationship of the instructions such as "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside" is based on attached drawing institute The orientation or positional relationship shown, is merely for convenience of description of the present invention and simplification of the description, rather than the dress of indication or suggestion meaning It sets or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to limit of the invention System.
As shown in figures 1-13, the present embodiment provides a kind of land rig column pipe racking device, pipe racking device includes: basis Platform 1;Tube drawbench 2, tube drawbench 2 include height-regulating mechanism, free-wheeling system, reciprocating mechanism, telescoping mechanism, height-regulating mechanism setting On basic platform 1, free-wheeling system is arranged on height-regulating mechanism, and reciprocating mechanism is slidably arranged on free-wheeling system, stretches Mechanism is connected on reciprocating mechanism;And
Pipe storage facility, pipe storage facility include several storagetanks towards tube drawbench 2, are used to vertical storage pipe Son;Wherein, height-regulating mechanism includes mounting platform 21, supporting leg 201, and one end of supporting leg 201 is hinged on basic platform 1, supporting leg 201 The other end be hinged on mounting platform 21, mounting platform 21 can fall, be provided at the top of pipe storage facility promotion twist Vehicle 202, hoisting gear 202 are connect with mounting platform 21;Free-wheeling system includes column 22, floating bearing, first driving device, is stood Column 22 includes active column 203 and vertical columns 204, and vertical columns 204 are fixed on mounting platform 21, and active column 203 is logical It crosses pivoting support to connect with vertical columns 204, connects first driving device between active column 203 and vertical columns 204;Up and down Mobile mechanism includes upper pulley 224, lower block 226, the second driving device, and upper pulley 224, lower block 226 are slidably arranged in work On dynamic column 203, upper pulley 224 and lower block 226 are connected with therebetween drive cylinder 225, one end of the second driving device It is connect with upper pulley 224 and/or lower block 226 and/or drive cylinder 225, the other end and active column of the second driving device 203 connections.
Guide surface is provided on active column 203, sliding setting upper pulley 224, lower block 226 on guide surface, second drives Dynamic device is any one of Ffirst cylinder 2 07, gear rack arrangement, hoist engine.
Telescoping mechanism includes telescopic arm 23, clamping limb 24, and one end of telescopic arm 23 is fixedly connected on upper pulley 224 and glides On vehicle 226, the other end of telescopic arm 23 is fixedly connected with clamping limb 24.
Telescoping mechanism includes two groups of first bars 221 disposed in parallel and the second bar 222, the first bar 221, the second bar 222 First end is hinged on upper pulley 224, the first bar 221, the second bar 222 second end be respectively hinged at the both ends of quarter butt 227, One end of quarter butt 227 is hinged on clamping limb 24, and the middle part of the first bar 221 is hinged with one end of third bar 223, third bar 223 The other end be hinged on lower block 226.Telescopic arm 23, as shown in figure 12.When oil cylinder 225 shortens, upper pulley 224 and downslide The distance of vehicle 226 becomes close, the machine that the first bar 221, the parallelogram mechanism of the second bar 222 composition and third bar 223 form Clamping limb 24 can be pushed away column 22 by structure, so that tubing string be driven to stretch.
Clamping limb 24 includes gripper clamp 211, third oil cylinder 210 in upper and lower ends, the top of clamping limb 24 and flexible Arm 23 is hinged, and the middle part of clamping limb 24 is connect with one end of third oil cylinder 210, the other end and the quarter butt 227 of third oil cylinder 210 The other end is hinged.
Pipe storage facility includes several pipe cartridge clips, and pipe cartridge clip includes steel structure frame, several fingerboard snap-gauges 213, Steel structure frame forms several storagetanks, and fingerboard snap-gauge 213 is arranged at the notch of each storagetank.
Fingerboard snap-gauge 213 includes cylinder 214, base of fixed plate 215 and snap-gauge 216, and base of fixed plate 215 is fixedly connected on notch, Snap-gauge 216 is hinged on base of fixed plate 215, and cylinder 214 is connected between base of fixed plate 215 and snap-gauge 216.
Fingerboard snap-gauge 213 is also designed to motor-driven form or similar structures, as shown in figure 13.Snap-gauge in figure 216, motor 231 is mounted on base of fixed plate 215, shaft coupling 232 is provided between motor 231 and snap-gauge 216, for protecting motor Not by additional impact.A component is integrally formed, is mounted on the front end of all fingerboards.Snap-gauge 216 can be under the driving of motor 231 Rotation is to opening or closing state.Equally realize the function of preventing pipe from freely skidding off fingerboard.Fingerboard snap-gauge 213 includes motor 231, shaft coupling 232, base of fixed plate 215 and snap-gauge 216, base of fixed plate 215 are fixedly connected on notch, and snap-gauge 216 is hinged on snap-gauge On seat 215, the rotor of motor 231 is connect with one end of shaft coupling 232, and the other end of shaft coupling 232 is connect with snap-gauge 216.
Pipe storage facility includes the first pipe cartridge clip 3, the second pipe cartridge clip 4, third pipe cartridge clip 5, the 4th pipe bullet Folder 6, the first pipe cartridge clip 3, the second pipe cartridge clip 4, third pipe cartridge clip 5, the 4th pipe cartridge clip 6 are arranged around tube drawbench 2.
In another embodiment, a kind of land rig column pipe racking device is provided, is specifically included:
Basic platform 1, is the base part of rig substructure, and entire tube drawbench and each pipe cartridge clip module are installed in this On a basic platform.
Tube drawbench 2 is mounted on basic platform 1, mainly includes: mounting platform 21, column 22, telescopic arm 23, clamping limb 24 etc..
Mounting platform 21, the supporting part as entire tube drawbench.There are 4 supporting legs 201, supporting leg one end and basis in its underpart Platform 1 is hinged, and the other end and mounting platform 21 are hinged, and all leg lengths are consistent, forms parallelogram mechanism.Entire platform Can fall, fell after be placed on cat road 7 or directly by outrigger support on the ground, as shown in Fig. 6.Two promotions twist Vehicle 202 can be electric winch, be also possible to pneumatically or hydraulically winch, be mounted on the pipe cartridge clip edge of two sides, wirerope with Mounting platform 21 connects, and hoisting gear 202 is responsible for the promotion and decentralization of mounting platform 21.
Column 22 is mounted on mounting platform 21, is the bearing of entire tube drawbench, and column is divided into active column 203 and consolidates Determine column 204, pivoting support and corresponding first driving device 205 are installed among two columns, a kind of specific drive scheme, The outer ring of pivoting support connects active column, and inner ring is then connected on vertical columns, and active column 203 is relative to vertical columns 204 can rotate around vertical axes, and first driving device can be motor, be also possible to hydraulic, air motor, and motor is mounted on revolution On the outer ring of bearing, pivoting support inner ring can be driven relative to outer ring rotating, so that entire active column 203 is driven to rotate, Active column rotational angle is close to 280 degree.
There is guide surface 25 on active column, the trolley 206 of telescopic arm 23 can be slided up and down along this face.Trolley 206 and work It is connected between dynamic column 203 by Ffirst cylinder 2 07.Under the action of Ffirst cylinder 2 07, trolley 206 can be slided up and down.When So, the effect of the first oil cylinder herein can also use the same functions of realizations such as rack-and-pinion, promotion hoist engine.Along vertical columns 204, the settable ladder (not shown) of active column 203, the height of tube drawbench can be reached along ladder staff, is convenient for Overhaul of the equipments and maintenance.
Telescopic arm 23 is mounted on column 22 by trolley 206, and telescopic arm is made of two groups of four-bar linkages 208, tool Body, it using the four-bar mechanism of parallelogram, is driven by the second oil cylinder 209, realizes whole stretching or retract, specifically, the The main body of two oil cylinders is connected on trolley, and the moving portion of the second oil cylinder is connected on a rod piece of four-bar mechanism.
Clamping limb 24, top have connecting hole hinged by pin shaft with telescopic arm, and middle part is equipped with third oil cylinder 210, and third is oily 210 one end of cylinder and telescopic arm are hinged, and the other end and clamping limb 24 are hinged, pass through the flexible, it can be achieved that clamping limb 24 inclines of oil cylinder Gradient control and adjusting.Top and bottom are equipped with two groups of gripper clamps 211, are fixedly mounted with clamping limb, and pincers are equipped in gripper clamp 211 The friction block of tooth or great friction coefficient holds column tube for clamping and hanging.It is settable in gripper clamp 211 to be for detecting pipe The no sensor (not shown) for reaching commitment positions.
First pipe cartridge clip 3 is made of a steel structure frame 212, several fingerboard snap-gauges 213.Integral installation is in base On plinth platform 1, middle part is equipped with the connection structure with tube drawbench mounting platform 21, the fixation after being promoted in place for tube drawbench 2.Refer to Beam snap-gauge 213 is the turnable snap-gauge of cylinder driving, is made of cylinder 214, base of fixed plate 215 and snap-gauge 216 etc., is pipe disengaging The switch of fingerboard, prevents pipe from freely skidding off fingerboard.Otic placode can also can be arranged in bottom with integral hoisting in entire pipe cartridge clip And pin, it is installed by the way of rotating and upgrading.If road conditions license, it can also drop to the ground and be attached to whole pipe one Change transport.Finger structure at the top of fingerboard, that is, steel structure frame.
Second pipe cartridge clip 4, third pipe cartridge clip 5,6 structure of the 4th pipe cartridge clip are similar with the first pipe cartridge clip, whole After installation, the fingerboard of each pipe cartridge clip is directed to the centre of gyration of tube drawbench, and tube drawbench carries pipe, nothing along polar coordinate mode Need X, Y way moving of tube drawbench itself.Than X, Y coordinates mode, mobile tube drawbench reduces crossbeam and coaster, has structure letter The advantages that list, operational efficiency are high, control program is simple.
Installation process
Mainly comprise the following steps:
1) (base portion of corresponding drilling machine), cat road 7 lift in place (if any) lifting of basic platform 1 in place;
2) the first pipe cartridge clip, the second pipe cartridge clip, third pipe cartridge clip, the 4th pipe cartridge clip are installed;
3) 4 supporting legs 201 are installed, lower end is connect with basic platform 1, puts on pin;
4) mounting platform 21 is connect with 201 other end of supporting leg, puts on pin;
5) by the 22 of tube drawbench, 23,24 integral installations to mounting platform 21, then by relevant pipeline, cable connection It is good;
6) wirerope of two hoisting geares 202 is connect with mounting platform 21, puts on pin, connect pipeline;
7) two simultaneously operations of hoisting gear 202 pull wirerope, and mounting platform 21, which will slowly revolve, rises to set height Degree, puts on the pin connecting with two sides pipe cartridge clip.
It installs.
Comb process(take over pipe from target position and be emitted on the process of pipe cartridge clip)
Mainly comprise the following steps:
1) column tube of target position is in place, waits tube drawbench to grab pipe, tube drawbench returns to standby posture, such as Fig. 9 It is shown;
2) the second oil cylinder 209 acts, and telescopic arm 23 stretches out, and clamping limb 24 is transplanted on to the position of target pipe;
3) two groups of gripper clamps 211 simultaneously operation on clamping limb 24, the pipe of target position is clamped;
4) Ffirst cylinder 2 07 acts, and the raising of target pipe is left ground by entire tube drawbench;
5) the second oil cylinder 209 acts, and telescopic arm 23 retracts certain distance;
6) first driving device 205 acts, and clamping limb 24 and pipe do rotary motion around vertical axes together, when clamping limb 24 After being directed at the fingerboard of discharge, stop motion;
7) the second oil cylinder 209 acts, and telescopic arm 23 stretches out, and pipe reaches specific bit in pipe cartridge clip and postpones stopping;
8) Ffirst cylinder 2 07 acts, and entire tube drawbench transfers target pipe, until pipe lower end contacting pipe cartridge clip bottom surface After stop;
So far the discharge process of a pipe is completed.
Take pipe process(take out pipe from pipe cartridge clip and send to the process of target position) is with comb process on the contrary, herein It repeats no more.
This pipe racking device can satisfy the discharge of tubing string low level, reduce the center of gravity of entire drilling machine.Tube drawbench can be individually low Position installation, each module are all satisfied land transport condition, have safe and reliable installation and maintenance channel, the high-altitude of no conventional derrick Quadruple board platform, the risk of no high altitude operation.Tube drawbench walks polar motion mode, than conventional XY cartesian coordinate motion mode Tube drawbench has many advantages, such as that operational efficiency is high, structure is simple, control program is simple, is a kind of pipe of safe and reliable novel concept Sub- discharge mode.
Although above-described embodiment makes specific descriptions to the present invention, come for those of ordinary skill in the art It says, it is understood that can be modified within spirit and scope of the invention based on present disclosure not departing from Or improve, these modification and improvement are all within spirit and scope of the invention.

Claims (9)

1. a kind of land rig column pipe racking device, which is characterized in that the pipe racking device includes: basic platform (1);
Tube drawbench (2), the tube drawbench (2) include height-regulating mechanism, free-wheeling system, reciprocating mechanism, telescoping mechanism, the tune High mechanism is arranged on the basic platform (1), and the free-wheeling system is arranged on the height-regulating mechanism, described to move up and down machine Structure is slidably arranged on the free-wheeling system, and the telescoping mechanism is connected on the reciprocating mechanism;And
Pipe storage facility, the pipe storage facility includes several storagetanks towards the tube drawbench (2), for depositing vertically Put pipe;
Wherein, the height-regulating mechanism includes mounting platform (21), supporting leg (201), and one end of the supporting leg (201) is hinged on described On basic platform (1), the other end of the supporting leg (201) is hinged on the mounting platform (21), the mounting platform (21) It can fall, be provided at the top of the pipe storage facility hoisting gear (202), the hoisting gear (202) and the peace Assembling platform (21) connection;
The free-wheeling system includes column (22), floating bearing, first driving device, and the column (22) includes active column (203) it is fixed on the mounting platform (21) with vertical columns (204), the vertical columns (204), the active column (203) it is connect by the pivoting support with the vertical columns (204), the active column (203) and the vertical columns (204) first driving device is connected between;
The reciprocating mechanism includes upper pulley (224), lower block (226), and the upper pulley (224), lower block (226) are sliding Dynamic to be arranged on the active column (203), the upper pulley (224) and lower block (226) are connected with therebetween driving oil Cylinder (225).
2. land rig column pipe racking device according to claim 1, which is characterized in that the active column (203) On be provided with guide surface, the upper pulley (224), lower block (226) is arranged in sliding on the guide surface.
3. land rig column pipe racking device according to claim 1, which is characterized in that the telescoping mechanism includes stretching One end of contracting arm (23), clamping limb (24), the telescopic arm (23) is fixedly connected on the upper pulley (224) and lower block (226) on, the other end of the telescopic arm (23) is fixedly connected with the clamping limb (24).
4. land rig column pipe racking device according to claim 3, which is characterized in that the telescoping mechanism includes two Group the first bar (221) disposed in parallel and the second bar (222), first bar (221), the second bar (222) first end cut with scissors Connect on the upper pulley (224), first bar (221), the second bar (222) second end be respectively hinged at quarter butt (227) Both ends, one end of the quarter butt (227) is hinged on the clamping limb (24), is hinged in the middle part of first bar (221) The other end of one end of third bar (223), the third bar (223) is hinged on the lower block (226).
5. land rig column pipe racking device according to claim 4, which is characterized in that the clamping limb (24) includes Gripper clamp (211), third oil cylinder (210) in upper and lower ends, the top and the telescopic arm (23) of the clamping limb (24) Hingedly, the middle part of the clamping limb (24) is connect with one end of the third oil cylinder (210), the third oil cylinder (210) it is another The other end of one end and the quarter butt (227) is hinged.
6. land rig column pipe racking device according to claim 1, which is characterized in that the pipe storage facility packet Several pipe cartridge clips are included, the pipe cartridge clip includes steel structure frame, several fingerboard snap-gauges (213), the steel structure frame shape At several storagetanks, the fingerboard snap-gauge (213) is set at the notch of each storagetank.
7. land rig column pipe racking device according to claim 6, which is characterized in that the fingerboard snap-gauge (213) Including cylinder (214), base of fixed plate (215) and snap-gauge (216), the base of fixed plate (215) is fixedly connected on the notch, described Snap-gauge (216) is hinged on the base of fixed plate (215), and the cylinder (214) is connected to the base of fixed plate (215) and the snap-gauge (216) between.
8. land rig column pipe racking device according to claim 6, which is characterized in that the fingerboard snap-gauge (213) Including motor (231), shaft coupling (232), base of fixed plate (215) and snap-gauge (216), the base of fixed plate (215) is fixedly connected on institute It states on notch, the snap-gauge (216) is hinged on the base of fixed plate (215), the rotor and the shaft coupling of the motor (231) (232) one end connection, the other end of the shaft coupling (232) are connect with the snap-gauge (216).
9. land rig column pipe racking device according to claim 6, which is characterized in that the pipe storage facility packet Include the first pipe cartridge clip (3), the second pipe cartridge clip (4), third pipe cartridge clip (5), the 4th pipe cartridge clip (6), first pipe Cartridge clip (3), the second pipe cartridge clip (4), third pipe cartridge clip (5), the 4th pipe cartridge clip (6) are set around the tube drawbench (2) It sets.
CN201910726988.2A 2019-08-07 2019-08-07 A kind of land rig column pipe racking device Pending CN110500049A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910726988.2A CN110500049A (en) 2019-08-07 2019-08-07 A kind of land rig column pipe racking device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910726988.2A CN110500049A (en) 2019-08-07 2019-08-07 A kind of land rig column pipe racking device

Publications (1)

Publication Number Publication Date
CN110500049A true CN110500049A (en) 2019-11-26

Family

ID=68587967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910726988.2A Pending CN110500049A (en) 2019-08-07 2019-08-07 A kind of land rig column pipe racking device

Country Status (1)

Country Link
CN (1) CN110500049A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111594073A (en) * 2020-04-07 2020-08-28 中曼石油装备集团有限公司 Land off-line operation drilling machine
CN113187415A (en) * 2021-06-17 2021-07-30 浙江科技学院 Vertical discharging device and method for petroleum sucker rod

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437722A (en) * 2013-08-23 2013-12-11 四川宏华石油设备有限公司 Drilling tool transporting manipulator
CN103958816A (en) * 2011-11-28 2014-07-30 T&T技术维护公司 Tubular stand building and discharging system
CN203939464U (en) * 2014-06-15 2014-11-12 武汉市元博智能控制技术研究设计院(有限合伙) Novel land rig quadruple board platform pipe system
CN105756580A (en) * 2016-04-08 2016-07-13 山东胜利石油装备产业技术研究院 Full-automatic tubing string arranging and transferring apparatus
CN205591850U (en) * 2016-04-08 2016-09-21 山东胜利石油装备产业技术研究院 Full -automatic oil pipe post calandria moves a tub device
CN107208464A (en) * 2014-12-10 2017-09-26 那伯斯工业公司 Modularization pipe system for rig
CN109736729A (en) * 2019-03-25 2019-05-10 上海中曼石油装备集团有限公司 A kind of drilling machine module formula pipe exhaust system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103958816A (en) * 2011-11-28 2014-07-30 T&T技术维护公司 Tubular stand building and discharging system
CN103437722A (en) * 2013-08-23 2013-12-11 四川宏华石油设备有限公司 Drilling tool transporting manipulator
CN203939464U (en) * 2014-06-15 2014-11-12 武汉市元博智能控制技术研究设计院(有限合伙) Novel land rig quadruple board platform pipe system
CN107208464A (en) * 2014-12-10 2017-09-26 那伯斯工业公司 Modularization pipe system for rig
CN105756580A (en) * 2016-04-08 2016-07-13 山东胜利石油装备产业技术研究院 Full-automatic tubing string arranging and transferring apparatus
CN205591850U (en) * 2016-04-08 2016-09-21 山东胜利石油装备产业技术研究院 Full -automatic oil pipe post calandria moves a tub device
CN109736729A (en) * 2019-03-25 2019-05-10 上海中曼石油装备集团有限公司 A kind of drilling machine module formula pipe exhaust system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111594073A (en) * 2020-04-07 2020-08-28 中曼石油装备集团有限公司 Land off-line operation drilling machine
CN111594073B (en) * 2020-04-07 2022-04-08 中曼石油装备集团有限公司 Land off-line operation drilling machine
CN113187415A (en) * 2021-06-17 2021-07-30 浙江科技学院 Vertical discharging device and method for petroleum sucker rod

Similar Documents

Publication Publication Date Title
EP0548900A2 (en) Hydraulic drilling machine of telescopic tower type with a rod stowing and handling system
CN106150382B (en) It bores anchor and visits Multi Role Aircraft
CN104968597B (en) For the apparatus and method of the component of displacement structure
CN104747078B (en) A kind of tunnel construction trolley
CN109110700B (en) A tunnel overhauls operation locomotive that is used for operation platform of tunnel to overhaul and includes it
CN109882214A (en) A kind of multi-functional arch installation trolley
CN106761487A (en) Marine drilling platform pipe processing system and the method for connection movement thribble
CN110500049A (en) A kind of land rig column pipe racking device
CN101215940A (en) Boring and pole setting machine
CN105545228A (en) Tubular column conveying system
CN111573524A (en) Mine pipeline engineering vehicle
CN102242602A (en) Spiral pile drilling machine
CN109057835A (en) Multiple arch supporting trolley
CN201122810Y (en) Large spanning divided conductor man-carrying routing device for maintenance
CN109736729A (en) A kind of drilling machine module formula pipe exhaust system
CN207739946U (en) A kind of operating mechanism of multi-functional arching drill jumbo
CN109138897A (en) Well head centralising device and with its well workover equip
CN201078200Y (en) Earth surface operating apparatus of continues oil tube
CN202100192U (en) Spiral ground pile drilling rig
CN115596463A (en) Arch frame installation device for repairing operated tunnel defects
CN209277844U (en) Well head centralising device and with its well workover equip
CN108412514A (en) Cantilevered pick shield all-in-one machine
CN209308713U (en) A kind of arch trolley manipulator
CN109322682A (en) A kind of arch trolley manipulator
CN209067244U (en) Multiple arch supporting trolley

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191126