- CN110485433A CN110485433A CN201910821716.0A CN201910821716A CN110485433A CN 110485433 A CN110485433 A CN 110485433A CN 201910821716 A CN201910821716 A CN 201910821716A CN 110485433 A CN110485433 A CN 110485433A
- Authority
- CN
- China
- Prior art keywords
- fender post
- foundation pit
- concrete
- design
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/12—Restraining of underground water by damming or interrupting the passage of underground water
- E02D19/18—Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Sand gravel geology Among Piles In Deep Foundation Pit formula diaphragm wall steel anchor method for protecting support of the present invention.It is to construct according to insertion depth, diameter, the spacing etc. of fender post to concrete fender post;Concrete continuous wall is formed between concrete fender post, forms whole building enclosure with fender post;Hanging plate is hung up at the crown beam for going along with sb. to guard him stake top, and anchor cable is added at the design position of foundation pit and fixes, forms prestress anchorage cable;Tripod is anchored into fender post, the monitoring of supporting construction sidesway is carried out.The present invention makes to improve the effect that construction method reaches other method for protecting support under the premise of guaranteeing that deep pit monitor is feasible.And the advantages of reducing difficulty of construction, accelerating works progress, reduce engineering cost, inherit concrete fender post system and diaphram wall system, the shortcomings that both avoiding;Bracing members and anchor pole collective effect simultaneously, reduce the requirement of construction site, and the dismounting of bracing members later period is more convenient.
Description
Technical field
The present invention relates to a kind of Construction of Civil Engineering steel anchor method for protecting support, and in particular to sand gravel geology Among Piles In Deep Foundation Pit formula connects
Continuous wall steel anchor method for protecting support, belongs to underground engineering field.
Background technique
Urban transportation plays a crucial role the development of economic, the social people's livelihood, and subway is as special traffic work
Have the traffic pressure in city of largely having releived, is made that huge contribution for the fast development of modern city.Due to
The variability of geological conditions, so the steel anchor support pattern used is also had nothing in common with each other, and deep basal pit is opened during subway construction
Digging supporting becomes technical problem.Sand gravel geology is widely distributed in China, and deep foundation pit support is very common.Such as subway station, people's air defense work
Journey, skyscraper, market place builet below the ground, underground pipe gallery etc., since sand gravel geology deep foundation pit support does not have systematic Study, so one
As the deep foundation pit support of sand gravel geology be all deep foundation pit support directly with reference to other areas, or select a kind of deep pit support
The optimization for carrying out thin portion parameter after shield scheme to it, wastes many times and engineering cost.
Currently, most common four kinds of support systems are respectively in sand gravel geology deep pit digging supporting: drilling fender post+
Suspension roof support system, this system subway and deep foundation pit of tall buildings all in be widely used, its construction application is flexible, still
The deformation of stake is excessive in ultra-deep foundation pit, and the soil body requirement in anchor bolt construction space is openr, is not suitable for applying under crowded environment
Work;Drilling fender post+inner support support system is conducive to control foundation pit deformation, but the dismounting cost in later period is larger, when construction
Between it is longer;Though drilling fender post+anchor pole+inner support support system has the advantages that the above two, it is not suitable for cheating outer construction
Build the too complicated foundation pit of object;Diaphram wall+anchor pole+inner support support system stiffness by itself is bigger, good integrity,
But the joint quality of diaphram wall is difficult to control, and be easy to cause the weak spot of structure.
Summary of the invention
The purpose of the present invention is overcoming the defect of current sand gravel geology deep pit digging method for protecting support, a kind of sand ovum is disclosed
Stone geology Among Piles In Deep Foundation Pit formula diaphragm wall steel anchor method for protecting support.
The present invention is achieved by the following technical solutions:
A. according to the geological mapping of foundation pit as a result, calculating between the insertion depth of fender post, the diameter of fender post, fender post
Away from and arrangement of reinforcement;
B. the excavation place of smooth mistake is pinpointed with design scheme, according to the construction work of steel reinforced concrete fender post
Skill constructs to concrete fender post 1;
C. concrete continuous wall 3 is formed between concrete fender post using the form of rotary churning pile 2, is formed simultaneously sealing curtain
The barrier of curtain;
D. it constructs to crown beam 4, forms whole building enclosure with fender post;
E. after the completion of building enclosure is constructed, precipitation is carried out to foundation pit using precipitation scheme, is started gradually after the completion of precipitation
Excavation pit;
When f. to the depth of excavation of foundation pit to design requirement, hanging plate 6 is hung up at the crown beam 4 for going along with sb. to guard him stake top, setting is together
Bracing members 5, and the given prestressing force of design is applied to bracing members 5, to ensure the stability of structure;
G. anchor cable is added at the design position of foundation pit to fix, bore position is squeezed at the center of 1 spacing of concrete fender post
Concrete is gone along with sb. to guard him after steel strand wires 8, correcting wedge 9 sets up waist rail 10 and supports on diaphragm wall surface, then is twisted with anchorage extended steel
Line is simultaneously fixed with fixture 11 and gasket 12, forms prestress anchorage cable 13;
H. tripod 14 is anchored into fender post 1 to design Support Position in excavation of foundation pit, sets up steel and encloses wingceltis 7 and will hang
Plate 6 hangs over steel and encloses on wingceltis 7, while setting up bracing members 5, and applies the given prestressing force of design to bracing members 5, while to supporting knot
Structure carries out sidesway monitoring.
Reasonably selected after being computed according to specification regulation the diameter of concrete fender post, fender post center away from crown beam
Size, determines the model of the grade and reinforcing bar using concrete, and the building-in depth of fender post determines design bracing members and draws anchor
Quantity and its position;Further according to the soil layer information that exploration obtains, the stress of rod piece is calculated, then calculate internal force and the position of rod piece
It moves;According to the internal force being calculated, then the arrangement of reinforcement of fender post is calculated, the configuration of anchor pole and the type selecting of bracing members;To calculated result
It is checked, it is ensured that the stability of structure checks the maximal displacement of structure: Δ≤ΔuIn formula: Δ refers to the maximal displacement of structure;
ΔuRefer to the maximal displacement for allowing structure, it is related with security level.
The advantage and disadvantage of comparative analysis of the present invention various application methods at present are closed under the premise of guaranteeing that deep pit monitor is feasible
Reason utilizes limited place, reduces engineering cost and risk, meets the requirement of environmental protection, and construction technology is simplified, and shortens
Duration makes construction method reach the effect of other method for protecting support, and reduces difficulty of construction compared to other method for protecting support, adds
Fast construction progress is but kept away the advantages of reducing engineering cost, remain concrete fender post system and diaphram wall system
The shortcomings that having exempted from the two;Bracing members and anchor pole collective effect simultaneously, construction site require to reduce, and the bracing members later period removes more square
Just.Make support system being optimal between the effect of excavation supporting, engineering cost and construction progress three.
Detailed description of the invention
Attached drawing 1 is the floor map that the present invention constructs.
Attached drawing 2 is the longitudinal profile schematic diagram that the present invention constructs.
Attached drawing 3 is the horizontal section schematic diagram that the present invention constructs.
The reference numerals are as follows: fender post 1, rotary churning pile 2, diaphragm wall 3, crown beam 4, bracing members 5, hanging plate 6, steel
Enclose wingceltis 7, steel strand wires 8, correcting wedge 9, waist rail 10, fixture 11, gasket 12, prestress anchorage cable 13, tripod 14.
Specific embodiment
Below in conjunction with attached drawing, the invention will be described in further detail:
A. according to the geological mapping of foundation pit as a result, calculate the insertion depth of fender post, the diameter of fender post, fender post away from
And arrangement of reinforcement;
B. smooth to place progress, fender post is positioned by design position, according to applying for steel reinforced concrete fender post
Work technique carries out artificial inspecting hole, mechanical hole building, filling concrete to concrete fender post 1 and constructs;
C. it constructs to rotary churning pile 2, forms concrete continuous wall 3, while shape after the completion of construction with concrete fender post
At the barrier of water-stop curtain;
D. formwork is carried out to crown beam 4, binds the configuration reinforcement and casting concrete of crown beam, it is made to form entirety with fender post
Building enclosure;
E. after the completion of building enclosure is constructed, according to precipitation scheme to precipitation well construction, precipitation to design Foundation Pit bottom one
Rice is hereinafter, start gradually excavation pit;
When f. to the depth of excavation of foundation pit to design requirement, hanging plate 6 is hung up at the crown beam 4 for going along with sb. to guard him stake top, and using swollen
Swollen bolt is fixed, and one of bracing members 5 is arranged, and apply the given prestressing force of design to bracing members, to ensure the stability of structure;
G. anchor cable is added at the design position of foundation pit to fix, bore position is squeezed at the center of 1 spacing of concrete fender post
Concrete is gone along with sb. to guard him after steel strand wires 8, correcting wedge 9 sets up waist rail 10 and supports on diaphragm wall surface, then is twisted with anchorage extended steel
Line is simultaneously fixed with fixture 11 and gasket 12, after slurry intensity reaches design value, carries out steel strand tension, forms prestress anchorage cable
13;
H. in excavation of foundation pit to design Support Position, tripod 14 is anchored into fender post 1 using expansion bolt, steel is enclosed
Wingceltis 7 is erected on tripod, and hanging plate 6 is hung over steel and is enclosed on wingceltis 7, while setting up bracing members 5, and applies to bracing members 5 and design
Given prestressing force, while sidesway monitoring is carried out to supporting construction.
Sidesway monitoring calculation example: existing sand gravel geology deep basal pit, the cutting depth of foundation pit are 8m, the geology of foundation pit
Condition is as follows: miscellaneous fill, with a thickness of 3m, severe 18kN/m3, cohesive strength 3kPa, internal friction angle is 15 °, cohesive soil, thickness
For 2m, severe 20kN/m3, cohesive strength 25kPa, internal friction angle is 11 °, round gravel, with a thickness of 20m, severe 25kN/m3,
Cohesive strength is 30kPa, and internal friction angle is 13 °, and buoyant weight degree is 15kN/m3, underwater cohesive strength is 30kPa, and underwater internal friction angle is
13 °, under soil layer be all rock stratum.
The diameter of the concrete fender post of selection is 0.8m, and the spacing of fender post is 1.6m, using C30 grade concrete,
Building-in depth is 9m, and one of I-shaped bracing members is arranged at crown beam, and depth is that anchor is drawn in setting together at 3m, and depth is to be arranged at 6m
One of I-shaped bracing members determines internal force and displacement according to calculation diagram, carries out structure design.
Maximal displacement is 4mm on the inside of the foundation pit of computation model, and the security level of this foundation pit is level-one, and permission maximal displacement is
0.0025h checks the maximal displacement of foundation pit: Δ=4mm≤Δu=0.0025 × 8000=20mm event, is designed feasible.
Claims (2)
1. sand gravel geology Among Piles In Deep Foundation Pit formula diaphragm wall steel anchor method for protecting support, it is characterised in that: be real by the following technical programs
Existing:
A. according to the geological mapping of foundation pit as a result, calculate the insertion depth of fender post, the diameter of fender post, fender post spacing with
And arrangement of reinforcement;
B. the excavation place of smooth mistake is pinpointed with design scheme, it is right according to the construction technology of steel reinforced concrete fender post
Concrete fender post (1) is constructed;
C. concrete continuous wall (3) are formed between concrete fender post using the form of rotary churning pile (2), is formed simultaneously sealing curtain
The barrier of curtain;
D. it constructs to crown beam (4), forms whole building enclosure with fender post;
E. after the completion of building enclosure is constructed, precipitation is carried out to foundation pit using precipitation scheme, starts gradually to excavate after the completion of precipitation
Foundation pit;
It when f. to the depth of excavation of foundation pit to design requirement, is hung up hanging plate (6) at the crown beam (4) for going along with sb. to guard him stake top, setting is together
Bracing members (5), and the given prestressing force of design is applied to bracing members (5), to ensure the stability of structure;
G. anchor cable is added at the design position of foundation pit to fix, bore position squeezes into steel at the center of concrete fender post (1) spacing
Twisted wire goes along with sb. to guard him concrete after (8), sets up waist rail (10) with correcting wedge (9) on diaphragm wall surface and supports, then is stretched with anchorage
Steel strand wires are simultaneously fixed with fixture (11) and gasket (12), formed prestress anchorage cable (13);
H. tripod (14) is anchored into fender post (1) to design Support Position in excavation of foundation pit, erection steel encloses wingceltis (7) and will
Hanging plate (6) hangs over steel and encloses on wingceltis (7), while setting up bracing members (5), and applies the given prestressing force of design to bracing members (5), together
When to supporting construction carry out sidesway monitoring.
2. sand gravel geology Among Piles In Deep Foundation Pit formula diaphragm wall steel anchor method for protecting support according to claim 1, it is characterised in that:
B. smooth to place progress, fender post is positioned by design position, according to the construction work of steel reinforced concrete fender post
Skill carries out artificial inspecting hole, mechanical hole building, filling concrete to concrete fender post (1) and constructs;
D. formwork is carried out to crown beam (4), binds the configuration reinforcement and casting concrete of crown beam, it is made to form whole enclose with fender post
Protection structure;
E. after the completion of building enclosure is constructed, according to precipitation scheme to precipitation well construction, precipitation to design one meter of Foundation Pit bottom with
Under, start gradually excavation pit;
It when f. to the depth of excavation of foundation pit to design requirement, is hung up hanging plate (6) at the crown beam (4) for going along with sb. to guard him stake top, and using swollen
Swollen bolt is fixed, and one of bracing members (5) is arranged, and apply the given prestressing force of design to bracing members, to ensure the stabilization of structure
Property;
G. anchor cable is added at the design position of foundation pit to fix, bore position squeezes into steel at the center of concrete fender post (1) spacing
Twisted wire goes along with sb. to guard him concrete after (8), sets up waist rail (10) with correcting wedge (9) on diaphragm wall surface and supports, then is stretched with anchorage
Steel strand wires are simultaneously fixed with fixture (11) and gasket (12), after slurry intensity reaches design value, carry out steel strand tension, formed pre-
Stress anchor cable (13);
H. in excavation of foundation pit to design Support Position, tripod (14) is anchored into fender post 1 using expansion bolt, steel is enclosed into wingceltis
(7) it is erected on tripod, and hanging plate (6) is hung over into steel and is enclosed on wingceltis (7), while setting up bracing members (5), and to bracing members (5)
Apply the given prestressing force of design, while sidesway monitoring is carried out to supporting construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910821716.0A CN110485433A (en) | 2019-08-30 | 2019-08-30 | Sand gravel geology Among Piles In Deep Foundation Pit formula diaphragm wall steel anchor method for protecting support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910821716.0A CN110485433A (en) | 2019-08-30 | 2019-08-30 | Sand gravel geology Among Piles In Deep Foundation Pit formula diaphragm wall steel anchor method for protecting support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110485433A true CN110485433A (en) | 2019-11-22 |
Family
ID=68556187
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910821716.0A Pending CN110485433A (en) | 2019-08-30 | 2019-08-30 | Sand gravel geology Among Piles In Deep Foundation Pit formula diaphragm wall steel anchor method for protecting support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110485433A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110820763A (en) * | 2019-11-29 | 2020-02-21 | 兰州理工大学 | Truss type cast-in-situ bored pile supporting method for mucky soil deep foundation pit |
CN111719563A (en) * | 2020-06-24 | 2020-09-29 | 中铁第五勘察设计院集团有限公司 | Foundation pit supporting structure |
CN114164726A (en) * | 2021-12-28 | 2022-03-11 | 同济大学 | Local deep excavation backfill structural roadbed and rapid construction method |
CN114892672A (en) * | 2022-05-10 | 2022-08-12 | 北京市机械施工集团有限公司 | Foundation pit support construction process method |
CN115305924A (en) * | 2022-08-30 | 2022-11-08 | 甘肃中建市政工程勘察设计研究院有限公司 | Prestress construction method for reducing deformation of deep foundation pit |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000129716A (en) * | 1998-10-29 | 2000-05-09 | Kajima Corp | Method and device for conveying excavated sediment in excavation work adopting earth-retaining strut construction method |
CN202969392U (en) * | 2012-12-06 | 2013-06-05 | 中铁四局集团有限公司 | Combined support for complex geological deep foundation pit |
CN203440821U (en) * | 2013-07-17 | 2014-02-19 | 广州中煤江南基础工程公司 | Closed type barrel supporting structure |
CN106400813A (en) * | 2016-10-28 | 2017-02-15 | 北京城建勘测设计研究院有限责任公司 | Foundation pit support system and construction method thereof |
-
2019
- 2019-08-30 CN CN201910821716.0A patent/CN110485433A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000129716A (en) * | 1998-10-29 | 2000-05-09 | Kajima Corp | Method and device for conveying excavated sediment in excavation work adopting earth-retaining strut construction method |
CN202969392U (en) * | 2012-12-06 | 2013-06-05 | 中铁四局集团有限公司 | Combined support for complex geological deep foundation pit |
CN203440821U (en) * | 2013-07-17 | 2014-02-19 | 广州中煤江南基础工程公司 | Closed type barrel supporting structure |
CN106400813A (en) * | 2016-10-28 | 2017-02-15 | 北京城建勘测设计研究院有限责任公司 | Foundation pit support system and construction method thereof |
Non-Patent Citations (2)
Title |
---|
葛强: "美兰机场明挖隧道基坑围护支撑体系优化及实施 ", 《铁道建筑技术》 * |
邵长久等: "城际轨道交通工程某深基坑外扩方案优化探讨 ", 《广东建材》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110820763A (en) * | 2019-11-29 | 2020-02-21 | 兰州理工大学 | Truss type cast-in-situ bored pile supporting method for mucky soil deep foundation pit |
CN111719563A (en) * | 2020-06-24 | 2020-09-29 | 中铁第五勘察设计院集团有限公司 | Foundation pit supporting structure |
CN114164726A (en) * | 2021-12-28 | 2022-03-11 | 同济大学 | Local deep excavation backfill structural roadbed and rapid construction method |
CN114892672A (en) * | 2022-05-10 | 2022-08-12 | 北京市机械施工集团有限公司 | Foundation pit support construction process method |
CN114892672B (en) * | 2022-05-10 | 2023-09-26 | 北京市机械施工集团有限公司 | Foundation pit supporting construction process method |
CN115305924A (en) * | 2022-08-30 | 2022-11-08 | 甘肃中建市政工程勘察设计研究院有限公司 | Prestress construction method for reducing deformation of deep foundation pit |
CN115305924B (en) * | 2022-08-30 | 2023-10-27 | 甘肃中建市政工程勘察设计研究院有限公司 | Prestress construction method for reducing deformation of deep foundation pit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110485433A (en) | Sand gravel geology Among Piles In Deep Foundation Pit formula diaphragm wall steel anchor method for protecting support | |
CN105041349B (en) | A kind of excavating construction method that station is digged on the basis of Subway Tunnel shield tunnel | |
CN104612162B (en) | A kind of Deep Foundation Pit of Metro Stations excavation construction method | |
CN102704957B (en) | Shed-frame method for shallowly burying large-sized underground structure construction | |
CN105133627B (en) | Construction under single wall steel sheet-pile cofferdam flowing water state | |
CN110067563A (en) | Close on the station entrance-exit main structure construction method of urban architecture and road | |
CN106759376B (en) | For closing on the construction method of the Anchored Sheet Pile Wall for Excavation system of existing underground structure | |
CN102828518B (en) | Construction method of prestressed anchor cable anchoring structure of manual hole digging support pile | |
CN103774675B (en) | Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof | |
CN109208637A (en) | Increase the construction method of open-cut station newly on the basis of existing tunnel | |
CN105862930B (en) | A kind of protection structure to creating existing tunnel below underground engineering | |
CN104389610B (en) | A kind of ultrashort step construction method of traversing operation freeway tunnel | |
CN104676110A (en) | On-site overhanging protection method of high-voltage cable bailey truss under condition of excavation of foundation pit | |
CN204418187U (en) | Subway protection region soil nail wall is in conjunction with double-row pile deep foundation ditch composite supporting construction | |
CN109914456A (en) | A kind of bridge and subway tunnel adjoin newly-built or with design and construction method when building | |
CN109763483B (en) | Up-going type sectional grouting process for thick fourth-system deep-buried mining cave-in broken stratum | |
CN102953341A (en) | Overhead trestle structure built on non-covering steep bare rocks in deep rapids | |
CN110566223B (en) | Deep-buried PBA subway station section design method | |
CN211898463U (en) | Reinforcing device combining micro-steel pipe pile and anchor rod | |
CN109457709A (en) | A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable | |
CN110206038A (en) | Supporting construction and construction method at a kind of concave foundation pit external corner | |
CN203049443U (en) | High level trestle structure arranged on steep bare rock of deepwater torrent unsheathed layer | |
CN111677530B (en) | Safe construction method for three-step temporary inverted arch at tunnel through section | |
CN107514266A (en) | Shield export & import bolt anchorage soil body construction method | |
CN107165173A (en) | A kind of foundation pit supporting system and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191122 |