CN110468846A CN201910705254.6A CN201910705254A CN110468846A CN 110468846 A CN110468846 A CN 110468846A CN 201910705254 A CN201910705254 A CN 201910705254A CN 110468846 A CN110468846 A CN 110468846A
Authority
CN
China
Prior art keywords
foundation pit
curtain wall
same foundation
swm
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910705254.6A
Other languages
Chinese (zh)
Inventor
李晓东
杨胜磊
吴震
袁凌飞
刘成伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 7 Group Co Ltd
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Priority to CN201910705254.6A priority Critical patent/CN110468846A/en
Publication of CN110468846A publication Critical patent/CN110468846A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Foundations (AREA)

Abstract

The present invention provides the constructing structures and method of a kind of same foundation pit different construction stages.The present invention is by being divided into two sub- foundation pits for same foundation pit, existing construction can be cheated in the subbase of same foundation pit side, and slope is taken in adjacent area, the adjacent plot of two sub- foundation pits is by increasing building enclosure and original SWM engineering method stake formation to support, it is completed to basement structure, surrounding waterproofing work is completed, and after backfill, the H profile steel of increased water-stop curtain wall is extracted together with building enclosure.By increasing intermediate seepproof screen, building enclosure to achieve the purpose that sealing and go along with sb. to guard him, it is unaffected to reach Adjacent Pit construction, guarantee that foundation pit sealing forms closed loop, can go through the formalities to avoid a prescription foundation pit in early period lag, it is impacted to an adjacent side, it can speed up the work, keep the progress of foundation pit construction unaffected.The principle of the invention is simple, and easy construction shortens the construction period, save the cost, and using safe.

Description

The constructing structure and method of same foundation pit different construction stages
Technical field
The present invention relates to the constructing structures and method of a kind of same foundation pit different construction stages.
Background technique
Currently, the groups of building in city are rised sheer from level ground with the rapid development of urban construction, building is constantly sent out to the underground space Exhibition, newly-built building is almost respectively provided with the basement of various functions.And basement homogeneously connects, it is also possible to be subordinate to difference Proprietor, requirement because of each proprietor to the duration is different, handles items formality early period speed difference and will cause being designed as same base The basement in hole, the case where construction stage by stage.Previous processing mode often re-starts layout design or progress The evaluation of design scheme, influences construction speed.
Summary of the invention
The purpose of the present invention is to provide the constructing structures and method of a kind of same foundation pit different construction stages.
To solve the above problems, the present invention provides the constructing structure of same foundation pit difference construction stage a kind of, comprising: setting Water-stop curtain wall among same foundation pit, wherein same foundation pit is divided into two sub- foundation pit A, B by the water-stop curtain wall, The both ends of the water-stop curtain wall are connect with the former SWM engineering method stake on the both sides of the same foundation pit respectively;
The slope structure being respectively arranged at around the junction of the water-stop curtain wall and the original SWM engineering method stake;
A building enclosure is respectively set in each slope structure in two building enclosures, and the building enclosure is set to only The same side of water curtain wall, one end of each building enclosure are connect with the former SWM engineering method stake on the both sides of the same foundation pit, and two Pre-determined distance is spaced between building enclosure.
Further, in said structure, the water-stop curtain wall is row's Double shaft stirring stake.
Further, in said structure, the building enclosure is newly-installed SWM engineering method stake.
Further, in said structure, the slope structure is second level slope structure.
Further, in said structure, the ratio of the second level slope structure is 1:2.
Another side according to the present invention provides the construction method of same foundation pit difference construction stage a kind of, comprising:
Water-stop curtain wall is set among same foundation pit, wherein same foundation pit is divided into two by the water-stop curtain wall Subbase cheats A, B, and the both ends of the water-stop curtain wall are connect with the former SWM engineering method stake on the both sides of the same foundation pit respectively;
Slope structure is respectively set around the junction of the water-stop curtain wall and the original SWM engineering method stake;
A building enclosure is respectively set in each slope structure, wherein two building enclosures are set to the sealing One end of each building enclosure is connect, simultaneously by the same side of curtain wall with the former SWM engineering method stake on the both sides of the same foundation pit Pre-determined distance is spaced between two building enclosures.
Further, in the above-mentioned methods, water-stop curtain wall is set among same foundation pit, comprising:
One row's Double shaft stirring stake is set among same foundation pit.
Further, in the above-mentioned methods, a building enclosure is respectively set in each slope structure, comprising:
The SWM engineering method stake of one row of new setting respectively in each slope structure.
Further, in the above-mentioned methods, divide around the junction of the water-stop curtain wall and the original SWM engineering method stake It She Zhi slope structure, comprising:
Second level slope structure is respectively set around the junction of the water-stop curtain wall and the original SWM engineering method stake.
Further, in the above-mentioned methods, divide around the junction of the water-stop curtain wall and the original SWM engineering method stake It She Zhi second level slope structure, comprising:
The second level that ratio is 1:2 is respectively set around the junction of the water-stop curtain wall and the original SWM engineering method stake Slope structure.
Compared with prior art, the present invention, can be in same foundation pit side by the way that same foundation pit is divided into two sub- foundation pits Subbase cheat existing construction, and take slope in adjacent area, the adjacent plot of two sub- foundation pits is by increasing building enclosure and former SWM engineering method stake is formed to support, is completed to basement structure, and surrounding waterproofing work is completed, and after backfill, increased to stop The H profile steel of water curtain wall is extracted together with building enclosure.By increasing intermediate seepproof screen, building enclosure to reach sealing and go along with sb. to guard him Purpose, reach Adjacent Pit construction it is unaffected, guarantee foundation pit sealing formed closed loop, can be to avoid a prescription foundation pit in early period It goes through the formalities lag, impacts, can speed up the work to an adjacent side, keep the progress of foundation pit construction unaffected.This Inventive principle is simple, and easy construction shortens the construction period, save the cost, and using safe.
Detailed description of the invention
Fig. 1 is the horizontal plane layout drawing of the constructing structure of the same foundation pit different construction stages of one embodiment of the invention;
Fig. 2 is the Double shaft stirring stake, the stake of SWM engineering method and support construction relationship plan view of one embodiment of the invention.
Specific embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real Applying mode, the present invention is described in further detail.
As shown in Fig. 1~2, the present invention provides the constructing structure of same foundation pit difference construction stage a kind of, comprising:
The water-stop curtain wall 1 being set among same foundation pit, wherein same foundation pit is divided by the water-stop curtain wall 1 Two sub- foundation pit A, B, the both ends of the water-stop curtain wall 1 connect with the former SWM engineering method stake 2 on the both sides of the same foundation pit respectively It connects;
The slope structure 3 being respectively arranged at around the junction of the water-stop curtain wall 1 and the original SWM engineering method stake 2;
A building enclosure 4 is respectively set in each slope structure in two building enclosures 4, and the building enclosure 4 is set to The same side of water-stop curtain wall 1, one end of each building enclosure are connect with the former SWM engineering method stake 2 on the both sides of the same foundation pit, Pre-determined distance is spaced between two building enclosures 4.
Here, the present invention by the way that same foundation pit is divided into two sub- foundation pits, can cheat existing in the subbase of same foundation pit side Row construction, and take slope in adjacent area, the adjacent plot of two sub- foundation pits is by increasing building enclosure and original SWM engineering method stake shape Support in pairs is completed to basement structure, and surrounding waterproofing work is completed, and after backfill, the H of increased water-stop curtain wall Fashioned iron is extracted together with building enclosure.By increasing intermediate seepproof screen, building enclosure to achieve the purpose that sealing and go along with sb. to guard him, reach Adjacent Pit construction is unaffected, guarantees that foundation pit sealing forms closed loop, can go through the formalities to avoid a prescription foundation pit in early period stagnant Afterwards, it impacts, can speed up the work to an adjacent side, keep the progress of foundation pit construction unaffected.Principle of the invention letter Single, easy construction shortens the construction period, save the cost, and using safe.
In one embodiment of constructing structure of same foundation pit of the invention different construction stages, the water-stop curtain wall 1 is one Arrange Double shaft stirring stake.
Here, carrying out sealing using Double shaft stirring stake, the sealing in a foundation pit is divided into two foundation pits, one can be formed A complete sealing closed loop, conducive to the Dewatering and earth excavation in the region.When adjacent plot carries out foundation pit construction simultaneously It can utilize simultaneously.
In Fig. 1, a point hole is carried out when A pit enclosure engineering starts and is constructed, it is increased among same foundation pit in constructionSame foundation pit is separated into the hole A and B is cheated by Double shaft stirring stake 1.The A that constructs cheats precipitation, support, construction of bottom plates.The bottom of at Start the construction of Static Pressure Pile in the hole B after the completion of plate construction, to reduce the influence that static pressed pile soil compaction effect cheats A.
In one embodiment of constructing structure of same foundation pit of the invention different construction stages, the building enclosure 4 is newly to set The SWM engineering method stake set.
Here, the method for carrying out sealing using water-stop curtain wall, is divided into two foundation pits for the sealing in a foundation pit, it can be with A complete sealing closed loop is formed, conducive to the Dewatering and earth excavation in the region.Adjacent plot progress foundation pit is applied simultaneously Working hour can also utilize simultaneously.
In one embodiment of constructing structure of same foundation pit of the invention different construction stages, the slope structure 3 is second level Slope structure.
Here, foundation pit two sides by way of second level slope, can carry out phase in, can also be become according to foundation pit condition Location and range, length etc. is adjusted flexibly in change, implements flexible.
In one embodiment of constructing structure of same foundation pit of the invention different construction stages, the second level slope structure 3 Ratio is 1:2.
In one embodiment of constructing structure of same foundation pit of the invention different construction stages, the slope structure is using injection Concrete revetment.
Here, the collateral support in the hole A has been removed, and A cheats construct out ± 0, in B pit enclosure structure construction, construction in Fig. 2 Increased SWM engineering method stake, 10 meters of length in reserve of the gradient in the hole A and the construction of the hole B, is put in the hole two sides A, B using 1:2 two-stage Slope, slope surface use 60mm thickness C20 gunite concrete slope protection.
After the completion of B cheats increased SWM engineering method pile driving construction maintenance, start to carry out earth excavation and Construction of Supporting.Underground is cheated in B After the completion of cell structure construction, after the completion of the waterproof construction of basement periphery, start the H profile steel for extracting increased SWM engineering method stake, original increases The Double shaft stirring stake added retains together.
As shown in Fig. 1~2, the present invention provides the construction method of same foundation pit difference construction stage a kind of, comprising:
Water-stop curtain wall 1 is arranged in step S1 among same foundation pit, wherein the water-stop curtain wall 1 divides same foundation pit Two sub- foundation pit A, B are segmented into, by the both ends of the water-stop curtain wall 1 former SWM engineering method with the both sides of the same foundation pit respectively Stake 2 connects;
Slope knot is respectively set around the junction of the water-stop curtain wall 1 and the original SWM engineering method stake 2 in step S2 Structure 3;
A building enclosure 4 is respectively set in step S3 in each slope structure, wherein two building enclosures 4 are set to The same side of the water-stop curtain wall 1, by the former SWM engineering method of one end of each building enclosure 4 and the both sides of the same foundation pit Stake 2 connects, while being spaced pre-determined distance between two building enclosures 4.
Here, the present invention by the way that same foundation pit is divided into two sub- foundation pits, can cheat existing in the subbase of same foundation pit side Row construction, and take slope in adjacent area, the adjacent plot of two sub- foundation pits is by increasing building enclosure and original SWM engineering method stake shape Support in pairs is completed to basement structure, and surrounding waterproofing work is completed, and after backfill, the H of increased water-stop curtain wall Fashioned iron is extracted together with building enclosure.By increasing intermediate seepproof screen, building enclosure to achieve the purpose that sealing and go along with sb. to guard him, reach Adjacent Pit construction is unaffected, guarantees that foundation pit sealing forms closed loop, can go through the formalities to avoid a prescription foundation pit in early period stagnant Afterwards, it impacts, can speed up the work to an adjacent side, keep the progress of foundation pit construction unaffected.Principle of the invention letter Single, easy construction shortens the construction period, save the cost, and using safe.
In one embodiment of constructing structure of same foundation pit of the invention different construction stages, step S1, in same foundation pit Between be arranged water-stop curtain wall 1, comprising:
One row's Double shaft stirring stake is set among same foundation pit.
Here, carrying out sealing using Double shaft stirring stake, the sealing in a foundation pit is divided into two foundation pits, one can be formed A complete sealing closed loop, conducive to the Dewatering and earth excavation in the region.When adjacent plot carries out foundation pit construction simultaneously It can utilize simultaneously.
In Fig. 1, a point hole is carried out when A pit enclosure engineering starts and is constructed, it is increased among same foundation pit in constructionSame foundation pit is separated into the hole A and B is cheated by Double shaft stirring stake 1.The A that constructs cheats precipitation, support, construction of bottom plates.The bottom of at Start the construction of Static Pressure Pile in the hole B after the completion of plate construction, to reduce the influence that static pressed pile soil compaction effect cheats A.
In one embodiment of constructing structure of same foundation pit of the invention different construction stages, step S3, in each slope knot A building enclosure 4 is respectively set on structure, comprising:
The SWM engineering method stake of one row of new setting respectively in each slope structure.
Here, the method for carrying out sealing using water-stop curtain wall, is divided into two foundation pits for the sealing in a foundation pit, it can be with A complete sealing closed loop is formed, conducive to the Dewatering and earth excavation in the region.Adjacent plot progress foundation pit is applied simultaneously Working hour can also utilize simultaneously.
In one embodiment of constructing structure of same foundation pit of the invention different construction stages, step S2, in the sealing curtain Slope structure 3 is respectively set around the junction of curtain wall 1 and the original SWM engineering method stake 2, comprising:
Second level slope structure is respectively set around the junction of the water-stop curtain wall 1 and the original SWM engineering method stake 2.
Here, foundation pit two sides by way of second level slope, can carry out phase in, can also be become according to foundation pit condition Location and range, length etc. is adjusted flexibly in change, implements flexible.
In one embodiment of constructing structure of same foundation pit of the invention different construction stages, the water-stop curtain wall 1 with Second level slope structure is respectively set around the junction of the original SWM engineering method stake 2, comprising:
Two that ratio is 1:2 are respectively set around the junction of the water-stop curtain wall 1 and the original SWM engineering method stake 2 Grade slope structure.
In one embodiment of constructing structure of same foundation pit of the invention different construction stages, step S2, in the sealing curtain Slope structure 3 is respectively set around the junction of curtain wall 1 and the original SWM engineering method stake 2, comprising:
Gunite concrete shield is respectively set around the junction of the water-stop curtain wall 1 and the original SWM engineering method stake 2 Slope.
Here, the collateral support in the hole A has been removed, and A cheats construct out ± 0, in B pit enclosure structure construction, construction in Fig. 2 Increased SWM engineering method stake, 10 meters of length in reserve of the gradient in the hole A and the construction of the hole B, is put in the hole two sides A, B using 1:2 two-stage Slope, slope surface use 60 thickness C20 gunite concrete slope protections.
After the completion of B cheats increased SWM engineering method pile driving construction maintenance, start to carry out earth excavation and Construction of Supporting.Underground is cheated in B After the completion of cell structure construction, after the completion of the waterproof construction of basement periphery, start the H profile steel for extracting increased SWM engineering method stake, original increases The Double shaft stirring stake added retains together.
It can be seen that being beneficial to consequence brought by the present invention:
1, the method constructed using same foundation pit in the different construction stages does not need owner to the foundation pit carried out Design scheme is evaluated again, is remodified to the blueprint formed.The unit in charge of construction for not influencing first to march into the arena marches into the arena Construction does not influence the duration examination of the progress node of construction of the owner to the region, the nest for the unit in charge of construction's generation that avoids having marched into the arena Work.This method occupies short time limit, and expense relatively saves, and constructs more convenient, and progress is provided, and influences on surrounding enviroment small.
2, sealing is carried out using water-stop curtain wall, the sealing in a foundation pit is divided into two foundation pits, one can be formed Complete sealing closed loop, conducive to the Dewatering and earth excavation in the region.Adjacent plot also can when foundation pit construction simultaneously It utilizes simultaneously.
3, building enclosure uses the stake of SWM engineering method, identical as the building enclosure on foundation pit periphery, without construction machine of making separate arrangements Tool does not need a large amount of hand fits, facilitates construction.SWM engineering method stake belongs to mature construction technology, operates ease and safety Degree greatly improves.In addition the SWM engineering method stake for going along with sb. to guard him side use does not need to independently form closure, has saved construction cost.It is increased Building enclosure can make support construction carry out East and West direction power transmission, solve the problems, such as that foundation pit East and West direction power transmission is not.
4, foundation pit two sides can carry out phase in by way of second level slope, can also be changed according to foundation pit condition Location and range, length etc. is adjusted flexibly, implements flexible.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
Obviously, those skilled in the art can carry out various modification and variations without departing from spirit of the invention to invention And range.If in this way, these modifications and changes of the present invention belong to the claims in the present invention and its equivalent technologies range it Interior, then the invention is also intended to include including these modification and variations.

Claims (10)

1. a kind of constructing structure of same foundation pit difference construction stage characterized by comprising
The water-stop curtain wall being set among same foundation pit, wherein same foundation pit is divided into two sons by the water-stop curtain wall Foundation pit A, B, the both ends of the water-stop curtain wall are connect with the former SWM engineering method stake on the both sides of the same foundation pit respectively;
The slope structure being respectively arranged at around the junction of the water-stop curtain wall and the original SWM engineering method stake;
A building enclosure is respectively set in each slope structure in two building enclosures, and the building enclosure is set to sealing curtain The same side of curtain wall, one end of each building enclosure are connect with the former SWM engineering method stake on the both sides of the same foundation pit, and two are gone along with sb. to guard him Pre-determined distance is spaced between structure.
2. the constructing structure of same foundation pit difference construction stage as described in claim 1, which is characterized in that the water-stop curtain Wall is row's Double shaft stirring stake.
3. the constructing structure of same foundation pit difference construction stage as described in claim 1, which is characterized in that the building enclosure For newly-installed SWM engineering method stake.
4. the constructing structure of same foundation pit difference construction stage as described in claim 1, which is characterized in that the slope structure For second level slope structure.
5. the constructing structure of same foundation pit difference construction stage as claimed in claim 4, which is characterized in that the second level slope The ratio of structure is 1:2.
6. a kind of construction method of same foundation pit difference construction stage characterized by comprising
Water-stop curtain wall is set among same foundation pit, wherein same foundation pit is divided into two subbases by the water-stop curtain wall A, B are cheated, the both ends of the water-stop curtain wall are connect with the former SWM engineering method stake on the both sides of the same foundation pit respectively;
Slope structure is respectively set around the junction of the water-stop curtain wall and the original SWM engineering method stake;
A building enclosure is respectively set in each slope structure, wherein two building enclosures are set to the water-stop curtain One end of each building enclosure is connect by the same side of wall with the former SWM engineering method stake on the both sides of the same foundation pit, while two Pre-determined distance is spaced between building enclosure.
7. the construction method of same foundation pit difference construction stage as claimed in claim 6, which is characterized in that in same foundation pit Between water-stop curtain wall is set, comprising:
One row's Double shaft stirring stake is set among same foundation pit.
8. the construction method of same foundation pit difference construction stage as claimed in claim 6, which is characterized in that in each slope knot A building enclosure is respectively set on structure, comprising:
The SWM engineering method stake of one row of new setting respectively in each slope structure.
9. the construction method of same foundation pit difference construction stage as claimed in claim 6, which is characterized in that in the sealing curtain Slope structure is respectively set around the junction of curtain wall and the original SWM engineering method stake, comprising:
Second level slope structure is respectively set around the junction of the water-stop curtain wall and the original SWM engineering method stake.
10. the construction method of same foundation pit difference construction stage as claimed in claim 9, which is characterized in that in the sealing Second level slope structure is respectively set around the junction of curtain wall and the original SWM engineering method stake, comprising:
The second level slope that ratio is 1:2 is respectively set around the junction of the water-stop curtain wall and the original SWM engineering method stake Structure.
CN201910705254.6A 2019-08-01 2019-08-01 The constructing structure and method of same foundation pit different construction stages Pending CN110468846A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910705254.6A CN110468846A (en) 2019-08-01 2019-08-01 The constructing structure and method of same foundation pit different construction stages

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910705254.6A CN110468846A (en) 2019-08-01 2019-08-01 The constructing structure and method of same foundation pit different construction stages

Publications (1)

Publication Number Publication Date
CN110468846A true CN110468846A (en) 2019-11-19

Family

ID=68509392

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910705254.6A Pending CN110468846A (en) 2019-08-01 2019-08-01 The constructing structure and method of same foundation pit different construction stages

Country Status (1)

Country Link
CN (1) CN110468846A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4656796A (en) * 1984-10-19 1987-04-14 Rodio Foundation Engineering Ltd. Building structure and method of producing the same
CN105862722A (en) * 2016-04-07 2016-08-17 中建交通建设集团有限公司 Three-dimensional treatment method of subway deep foundation pit in karst intense development region
CN210737552U (en) * 2019-08-01 2020-06-12 上海建工七建集团有限公司 Construction structure of same foundation pit at different construction stages

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4656796A (en) * 1984-10-19 1987-04-14 Rodio Foundation Engineering Ltd. Building structure and method of producing the same
CN105862722A (en) * 2016-04-07 2016-08-17 中建交通建设集团有限公司 Three-dimensional treatment method of subway deep foundation pit in karst intense development region
CN210737552U (en) * 2019-08-01 2020-06-12 上海建工七建集团有限公司 Construction structure of same foundation pit at different construction stages

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
袁光辉等: ""大型深基坑分区封闭降排水施工技术"", 《施工技术》, no. 14, pages 22 - 24 *
许世雄等: ""长条形深大基坑分坑支护分区开挖施工及工序优化技术"", 《第十一届建筑物改造与病害处理学术研讨会暨第六届工程质量学术会议论文集》, pages 236 - 238 *

Similar Documents

Publication Publication Date Title
CN106978843B (en) Municipal drainage pipeline construction technology
CN106703050B (en) Cut Slopes of Expansive Soil reinforced earth back-pressure antiseepage supporting construction and its construction method
CN105464686B (en) Multi-layer underground space curtain posture excavating construction method and supporting construction under existing facility
CN105951843B (en) A kind of construction method of deep foundation ditch
CN103510520A (en) Sectionalized construction method of deep and large foundation pit
CN105239578B (en) Water-rich sand layer deep foundation pit underwater construction method
CN107587516A (en) A kind of efficient sealing of Follow-up type hinders sand precipitation hybrid system and its construction method
CN109113129A (en) A kind of construction method of irrigation and drainage system and canal for water conveyance
CN108867692A (en) The protection of city big cross section open trench tunnel Nearby Structure and tunnel foundation pit method for digging
CN105804007A (en) Reinforced soil bank wall structure based on beach soft foundation
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN106245916B (en) The three-dimensional construction method of Group Buildings
CN106758890B (en) Campshed box culvert structure and its construction method
CN106245677B (en) The construction method of the Group Buildings underground space
CN104947679B (en) Close to the earthwork digging method of construction of structures deep big foundation pit
CN110306586A (en) A kind of foundation reinforcement method for traditional architecture
CN203729309U (en) Support system with combined double-row piles combined with vertical prestressed anchor bolts
CN110468846A (en) The constructing structure and method of same foundation pit different construction stages
CN205839779U (en) A kind of sandy soil stratum base pit dewatering water level following catch pit structure
CN103866775A (en) Protection method of cold region dispersive soil side slope
CN207211176U (en) A kind of big open caisson of superelevation
KR101351462B1 (en) Construction method for supporting post of viewing facility for natural scene
CN207469262U (en) The supporting construction that a kind of foundation pit is combined with side slope
CN207228173U (en) A kind of underground project waterproof structure
CN110185051A (en) Deep narrow excavation water discharge method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination