CN110460115A - A kind of AGC controls in advance method of the new energy containing polymorphic type - Google Patents
A kind of AGC controls in advance method of the new energy containing polymorphic type Download PDFInfo
- Publication number
- CN110460115A CN110460115A CN201910761093.2A CN201910761093A CN110460115A CN 110460115 A CN110460115 A CN 110460115A CN 201910761093 A CN201910761093 A CN 201910761093A CN 110460115 A CN110460115 A CN 110460115A
- Authority
- CN
- China
- Prior art keywords
- unit
- power
- agc
- advance
- ultra
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 49
- 238000005096 rolling process Methods 0.000 claims abstract description 20
- 238000005457 optimization Methods 0.000 claims abstract description 18
- 238000009826 distribution Methods 0.000 claims abstract description 14
- 238000010248 power generation Methods 0.000 claims abstract description 8
- 238000005516 engineering process Methods 0.000 claims abstract description 6
- 238000013439 planning Methods 0.000 claims description 14
- 230000001105 regulatory effect Effects 0.000 claims description 11
- 230000002123 temporal effect Effects 0.000 claims description 4
- 230000009977 dual effect Effects 0.000 claims description 2
- 235000013399 edible fruits Nutrition 0.000 claims 1
- 239000004744 fabric Substances 0.000 claims 1
- 238000009527 percussion Methods 0.000 abstract description 2
- 230000005611 electricity Effects 0.000 description 5
- 238000004364 calculation method Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 235000017788 Cydonia oblonga Nutrition 0.000 description 1
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 238000012913 prioritisation Methods 0.000 description 1
- 230000008929 regeneration Effects 0.000 description 1
- 238000011069 regeneration method Methods 0.000 description 1
- 238000009987 spinning Methods 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
- 238000010792 warming Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
- H02J3/48—Controlling the sharing of the in-phase component
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- Power Engineering (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Public Health (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of AGC controls in advance methods of new energy containing polymorphic type, comprising the following steps: is ready for data for establishment AGC controls in advance method, determines constraint condition, optimization aim and respective algorithms option according to reqirement of compilation;According to unit parameter, the unit for participating in AGC controls in advance method is determined;It was rolled using every 5 minutes primary, dispatching cycle is the online rolling strategy of half an hour, power deviation is calculated in advance according to ultra-short term power prediction and ultra-short term system loading, establishes the adjustment power distribution model based on cycle time section global optimization, which is solved using branch and bound method algorithm;EMS system is published in a manner of being issued operation plan by file mode or automatically by energy-saving power generation dispatching technology support system, per half an hour issues an AGC controls in advance method.The invention avoids the hysteresis qualitys of Automatic Generation Control, reduce new energy to the percussion of power grid, alleviate the adjusting burden of AGC unit.
Description
Technical field
The present invention relates to a kind of electric system active power dispatch methods, and in particular to a kind of AGC of the new energy containing polymorphic type is super
Preceding control method.
Background technique
With global warming, the continuous deterioration of ecological environment, the consumption of non-regeneration energy is growing, and development is new
At global hot spot, energy pattern great change is worldwide all occurring for the energy.Wind-powered electricity generation, photovoltaic power generation etc.
New energy has intermittent and randomness, can not control effectively to it, so generally directly will during dispatching of power netwoks
Intermittent energy source is fully surfed the Internet.But traditional rational dispatching by power grids is established on the Accurate Prediction to load, using wind-powered electricity generation as representative
Intermittent energy source power prediction precision well below load prediction, the demand that is not able to satisfy in engineering.Therefore, on a large scale
New technical problem is brought to the scheduling of conventional electric power systematic economy after intermittent energy source is grid-connected.
Traditional scheduling strategy is using the dispatching method for planning directly to combine with Automatic Generation Control (AGC) a few days ago.Day
Preceding plan is carried out based on the lower short term power prediction of precision, therefore, arranges the unit output of next day will by plan a few days ago
Biggish power shortage is generated, which is all undertaken by AGC unit.When the permeability of intermittent energy source is higher, hold
Easily there is the situation of AGC pondage deficiency, the safe and economical operation of system is impacted.Document [1] proposes a kind of consumption
In a few days rolling planning and reality is added between plan and AGC a few days ago in the Multiple Time Scales active power dispatch method of large-scale wind power
When plan two time scales, realize the effect of " multilevel coordination, step by step optimize ".
The maximum power vacancy that system is likely to occur can reduce using in a few days rolling planning, but power shortage is still deposited
, how theoretically to guarantee conventional power unit have digest this Partial Power vacancy ability be a critical issue.Although
Long-term forecast, medium-term forecast are the power prediction precision of the intermittent energy source of representative well below negative using wind-powered electricity generation in short-term forecast
Lotus prediction, in engineering without very big reference significance;But it is pre- as the ultra-short term power of the intermittent energy source of representative using wind-powered electricity generation
It is sufficiently high to survey precision, can satisfy engineering demand.Document [2], document [3], document [4], document [5] consider only ultrashort
The prediction of phase system loading, the ultra-short term power prediction without considering intermittent energy source;And their advanced controls for being realized
Method processed is the optimization on cycle time point to power deviation distribution, it is possible to will lead to and the case where AGC anti-tune occurs, add
Weight system burden.
[1], Zhang Baiming, Wu Wenchuan, the active power dispatch system that the Multiple Time Scales of the too first-class consumption large-scale wind power of Zheng are coordinated
System design [J], Automation of Electric Systems, 2011,35 (1): 1-6
[2], high ancestor and, fourth is proper, and quince is hard, and is waited to realize controls in advance [J] electric power of AGC using super short period load forecast
System automation, 2000,24 (11): 42-44.
[3], Li Yuzhou, Wu Wenchuan, Zhang Baiming, Jiang Mu, the district control deviation controls in advance for waiting Multiple Time Scales to coordinate
Method, electric power network technique, 2009,2 (33): 15-19
[4], Weng Shasha, skies Ji Hainan Power Grid AGC controls in advance [J], south electric network technology, 2011,5 (6): 64-68
[5], English is robbed week, Zhang Baiming, Guo Yujin wait fired power generating unit controls in advance strategy [J], electric power network technique, and 2005,11
(29):57-60。
Summary of the invention
To solve the above problems, the present invention has comprehensively considered the ultra-short term power of ultra-short term, intermittent energy source
Prediction, proposes a kind of AGC controls in advance method of new energy containing polymorphic type, to reduce the uncertainty of new energy power output to electricity
The adverse effect of net improves the ability of power grid consumption new energy.On the one hand on the basis of in a few days rolling planning, based on prediction essence
It spends higher ultra-short term and ultra-short term new energy power prediction carries out AGC controls in advance method.It was rolled using every 5 minutes
Dynamic primary, dispatching cycle is half an hour in line computation mode.By establishing AGC controls in advance method model, cuts down adjust in real time
The deviation of degree scheme and actual motion avoids the hysteresis quality of Automatic Generation Control, reduces new energy and makees to the impact of power grid
With;On the other hand, using AGC controls in advance method, so that the non-AGC unit in part can also shift to an earlier date according to system loading variation tendency
Increasing and decreasing load alleviates the adjusting burden of AGC unit, achievees the purpose that reasonable employment AGC resource.
To achieve the above object, the technical scheme adopted by the invention is as follows:
A kind of AGC controls in advance method of the new energy containing polymorphic type, comprising the following steps:
Step 1 is ready for data for establishment AGC controls in advance method, determines constraint condition, optimization according to reqirement of compilation
Target and respective algorithms option;
Step 2, according to unit parameter, determine the unit for participating in AGC controls in advance method;
Step 3 was rolled once using every 5 minutes, and dispatching cycle is the online rolling strategy of half an hour, according to ultra-short term function
Rate prediction and ultra-short term system loading calculate power deviation in advance, establish the adjustment power point based on cycle time section global optimization
With model, which is solved using branch and bound method algorithm (Cplex solver);
Step 4, the side for being issued operation plan with file mode or automatically by energy-saving power generation dispatching technology support system
Formula is published to EMS system, and per half an hour issues an AGC controls in advance method, including each conventional power unit of the following half an hour
Power output plan, temporal resolution are 5 minutes.
Further, the step 1 is used to prepare basic data, input number therein for establishment AGC controls in advance method
According to the prediction of ultra-short term system loading and ultra-short term power prediction data, each unit basic number of new energy for including real-time update
According to the scheduling result of, tie line plan data, the system demand data and in a few days rolling planning spare to load.
Further, in the step 2, according to data such as each unit regulating power, machine set types, unit is divided into three
Class: 1, plan unit, similar traditional non-AGC unit, by default plan power generation, regulating cycle is the tune of upper level operation plan
It saves period (i.e. the regulating cycle of in a few days rolling planning);
2, AGC controls in advance unit, controls in advance ACE coordinate unit output, the i.e. machine of present invention participation controls in advance
Group, regulating cycle are 5 minutes;
3, AGC unit, traditional AGC function correct ACE, and regulating cycle is second grade.
Further, specifically comprise the following steps: in the step 3
S31, online rolling strategy is formulated
The calculating cycle of online rolling planning is identical as ultra-short term system loading predetermined period, i.e. the period is half an hour, often
A scheduling slot is 5 minutes, i.e., 6 scheduling slots are shared in dispatching cycle;
S32, power deviation is calculated
In each scheduling slot, according to ultra-short term power prediction, the prediction of ultra-short term system loading, in a few days rolling planning tune
It spends the data such as result, tie line plan and calculates power deviation;
S33, the adjustment power distribution model for establishing period times global optimization
1. determining objective function
Objective function by cycle time section in each unit operating cost and cycle time section in AGC unit service charge
It is formed with using the method for weighted value;
2. improving constraint condition
Constraint condition includes system side constraint and the constraint of unit side, and system side constraint includes power-balance constraint and spare appearance
Amount constraint, the constraint of unit side include units limits, the Climing constant etc. of each unit, and essence reflects each unit characteristic and reality
The constraint of border situation;
S34, the adjustment power distribution mould that period times global optimization is solved using branch-bound algorithm (Cplex solver)
Type
The adjustment power point of period times global optimization is solved using the original dual interior point with Quadratic Convergence
With model.
The present invention has the following beneficial effects with respect to the prior art:
(1) the AGC controls in advance method preparation method for the new energy containing polymorphic type that the present invention establishes, in a few days rolling planning
On the basis of introduce AGC controls in advance method, gradually reduced the uncertain percussion to power grid of new energy, reduced
The adjusting burden of AGC.
(2) consider to be not only the period prioritization scheme to time point, make scheduling scheme that there is stronger robustness,
Prevent the case where unit demodulates.
(3) present invention has comprehensively considered the ultra-short term power prediction and ultra-short term of various intermittent energy sources, because
This, scheduling mode wide adaptation range proposed by the present invention can apply to the actual electric network containing various energy resource structures.
Detailed description of the invention
Fig. 1 is a kind of flow chart of the AGC controls in advance method of new energy containing polymorphic type of the embodiment of the present invention.
Fig. 2 is AGC controls in advance method flow diagram in the embodiment of the present invention.
Fig. 3 is that power distribution method flow chart is adjusted in the embodiment of the present invention.
Specific embodiment
In order to which objects and advantages of the present invention are more clearly understood, the present invention is carried out with reference to embodiments further
It is described in detail.It should be appreciated that specific implementation example described herein is not used to limit this hair only to explain the present invention
It is bright.
As Figure 1-Figure 2, the AGC controls in advance method of a kind of new energy containing polymorphic type of the embodiment of the present invention, firstly,
Data are ready for for establishment day AGC controls in advance method, constraint condition, optimization aim and corresponding calculation are determined according to reqirement of compilation
Method option;Secondly, formulating online rolling strategy, it is inclined to calculate power in advance according to ultra-short term power prediction and ultra-short term system loading
Difference establishes the adjustment power distribution model based on cycle time section global optimization, using branch-bound algorithm (Cplex solver)
Solve the model;Finally, the green operation plan of Security Checking will be passed through by energy-saving power generation dispatching technology support system with file
Mode or the mode issued automatically are published to EMS system, the AGC controls in advance method of publication in every 5 minutes, including future half
The power output plan of hour each unit, temporal resolution are 5 minutes.
Specifically comprise the following steps:
1) early-stage preparations
For establishment AGC controls in advance method prepare basic data, including real-time update ultra-short term system loading prediction and
Ultra-short term power prediction data, each unit master data, tie line plan, the system of the new energy demand spare to load, day
The scheduling result of interior rolling planning;Constraint condition includes power-balance constraint, spinning reserve constraint, unit regulations speed;Optimization
Target includes the service fee of each unit operating cost in cycle time section and the AGC unit in cycle time section;Algorithm choosing
Item includes the condition of convergence and computational accuracy.
2) online rolling strategy is formulated
The calculating cycle for the online rolling planning that the present invention uses is identical as ultra-short term system loading predetermined period, i.e. the period
For half an hour, each scheduling slot is 5 minutes, i.e., 6 scheduling slots are shared in dispatching cycle.
3) power deviation is calculated, the adjustment power distribution model based on cycle time section global optimization is established, using branch
Key-machine (Cplex solver) solves the model.
The present invention is established by following steps by the adjustment power distribution model of cycle time section global optimization: based on (one)
Calculate power deviation
The power deviation of calculating is the deviation based on prediction, is not the current power deviation of system, and accuracy depends on
The ultra-short term power prediction and ultra-short term system loading of intermittent energy source are predicted.The calculation formula of total adjustment power Δ P are as follows:
Δ P=PL+PT-P-PG+PF
Wherein, PLFor ultra-short term value;PTFor Tie line Power, send outside as positive direction;P is in a few days to roll
The generated output of plan;PGFor the ultra-short term power prediction of intermittent energy source;PFFor AGC unit to be made be optimal power output and
The generation schedule of AGC unit is adjusted to optimal in order to allow AGC unit to remain with biggish adjustment nargin by the power undertaken
Contribute and power that the unit of AGC controls in advance that lets on undertakes.
(2) power distribution model is adjusted
We use one group of integer variable Zj, j ∈ J, using this variable with adjust step-length be multiplied as the adjustment amount of unit,
That is Δ Pj=Zj*Aj,j∈J;Wherein, Δ PjIndicate the adjustment amount of unit j, AjIndicate the adjusting step-length of unit j.
(1) objective function
One, it is each unit operating cost in cycle time section: in the case where total regulated quantity is fixed, finds optimal tune
Whole expense, i.e.,Wherein C (j) is the power purchase price of unit j.
Two, be cycle time section in AGC unit service fee: due to unit participate in AGC adjustment reimbursement for expenses compared with
Height has so regulations speed or the combination faster unit of regulations speed should be chosen as far as possible:
(wherein D is the unit costs (member/MW) of AGC service, and Δ P is total adjustment amount).Above formula is to unit regulation power
Integral in time is multiplied by the formula that AGC service fee obtains.
(2) constraint equation
One, the adjustment total amount of total adjustment amount Δ P and each unitDifference be less than AGC dynamic regulation dead zone PDD, i.e.,
Two, regulations speed has with unit reserve
WhereinFor the adjustment capability bound of unit j in a period, calculated before distribution:
Wherein PjRepresent the power output plan of unit j;rjRepresent the spare of unit j;WithRespectively unit j's goes out
Power limit restraint;WithThe respectively regulations speed in raising and lowering direction;Δ t is AGC controls in advance cycle time.
AGC controls in advance method be in line computation, it is more demanding to the calculating speed of algorithm.The present invention uses branch-and-bound
Algorithm (Cplex solver) solves the model.
4) AGC controls in advance method is worked out
By energy-saving power generation dispatching technology support system by by the green operation plan of Security Checking with file mode or
Automatically the mode issued is published to EMS system, the AGC controls in advance method of publication in every 5 minutes, including each machine of the following half an hour
The power output plan of group, temporal resolution are 5 minutes.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered
It is considered as protection scope of the present invention.
Claims (4)
1. a kind of AGC controls in advance method of new energy containing polymorphic type, it is characterised in that: the following steps are included:
Step 1 is ready for data for establishment AGC controls in advance method, determines constraint condition, optimization aim according to reqirement of compilation
With respective algorithms option;
Step 2, according to unit parameter, determine the unit for participating in AGC controls in advance method;
Step 3 was rolled once using every 5 minutes, and dispatching cycle is the online rolling strategy of half an hour, pre- according to ultra-short term power
It surveys and ultra-short term system loading calculates power deviation in advance, establish the adjustment power distribution mould based on cycle time section global optimization
Type solves the model using branch and bound method algorithm;
Step 4 is sent out in a manner of being issued operation plan by file mode or automatically by energy-saving power generation dispatching technology support system
For cloth to EMS system, per half an hour issues an AGC controls in advance method, the power output including each conventional power unit of the following half an hour
Plan, temporal resolution are 5 minutes.
2. a kind of AGC controls in advance method of the new energy containing polymorphic type as described in claim 1, it is characterised in that: the step
Input data in rapid 1 include real-time update ultra-short term system loading prediction and new energy ultra-short term power prediction data,
The scheduling of each unit master data, tie line plan data, the system demand data spare to load and in a few days rolling planning
As a result.
3. a kind of AGC controls in advance method of the new energy containing polymorphic type as described in claim 1, it is characterised in that: the step
In rapid 2, according to each unit regulating power, machine set type, unit is divided into three classes:
Class1, plan unit, similar traditional non-AGC unit, by default plan power generation, regulating cycle is upper level scheduling meter
The regulating cycle drawn;
Type 2, AGC controls in advance unit, controls in advance ACE coordinate unit output, and regulating cycle is 5 minutes;
Type 3, AGC unit, traditional AGC function correct ACE, and regulating cycle is second grade.
4. a kind of AGC controls in advance method of the new energy containing polymorphic type as described in claim 1, it is characterised in that: the step
Specifically comprise the following steps: in rapid 3
S31, online rolling strategy is formulated
The calculating cycle of online rolling planning is identical as ultra-short term system loading predetermined period, i.e. the period is half an hour, each tune
Spending the period is 5 minutes, i.e., 6 scheduling slots are shared in dispatching cycle;
S32, power deviation is calculated
In each scheduling slot, according to ultra-short term power prediction, the prediction of ultra-short term system loading, in a few days rolling planning scheduling knot
Fruit, tie line plan calculate power deviation;
S33, the adjustment power distribution model for establishing period times global optimization
1. determining objective function
Objective function is adopted by the service fee of the AGC unit in each unit operating cost and cycle time section in cycle time section
It is formed with the method for weighted value;
2. improving constraint condition
Constraint condition includes system side constraint and the constraint of unit side, system side constraint include power-balance constraint and spare capacity about
Beam, the constraint of unit side include units limits, the Climing constant etc. of each unit, and essence reflects each unit characteristic and practical feelings
Condition constraint;
S34, the adjustment power distribution model that period times global optimization is solved using branch-bound algorithm
The adjustment power distribution mould of period times global optimization is solved using the original dual interior point with Quadratic Convergence
Type.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910761093.2A CN110460115A (en) | 2019-08-17 | 2019-08-17 | A kind of AGC controls in advance method of the new energy containing polymorphic type |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910761093.2A CN110460115A (en) | 2019-08-17 | 2019-08-17 | A kind of AGC controls in advance method of the new energy containing polymorphic type |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110460115A true CN110460115A (en) | 2019-11-15 |
Family
ID=68487309
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910761093.2A Pending CN110460115A (en) | 2019-08-17 | 2019-08-17 | A kind of AGC controls in advance method of the new energy containing polymorphic type |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110460115A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113098059A (en) * | 2021-04-07 | 2021-07-09 | 国网安徽省电力有限公司六安供电公司 | AGC advanced control method containing multiple types of new energy |
CN113381454A (en) * | 2021-06-02 | 2021-09-10 | 国网河北省电力有限公司 | New energy joint debugging method combining ultra-short-term prediction and regional control deviation |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103199565A (en) * | 2013-03-29 | 2013-07-10 | 华南理工大学 | Multi-zone automatic generation control coordination method based on differential game theory |
CN105046395A (en) * | 2015-05-15 | 2015-11-11 | 华南理工大学 | Intraday rolling scheduling method of electric power system including multiple types of new energy |
-
2019
- 2019-08-17 CN CN201910761093.2A patent/CN110460115A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103199565A (en) * | 2013-03-29 | 2013-07-10 | 华南理工大学 | Multi-zone automatic generation control coordination method based on differential game theory |
CN105046395A (en) * | 2015-05-15 | 2015-11-11 | 华南理工大学 | Intraday rolling scheduling method of electric power system including multiple types of new energy |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113098059A (en) * | 2021-04-07 | 2021-07-09 | 国网安徽省电力有限公司六安供电公司 | AGC advanced control method containing multiple types of new energy |
CN113381454A (en) * | 2021-06-02 | 2021-09-10 | 国网河北省电力有限公司 | New energy joint debugging method combining ultra-short-term prediction and regional control deviation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11641177B2 (en) | Coordinated control of renewable electric generation resource and charge storage device | |
CN105046395B (en) | Method for compiling day-by-day rolling plan of power system containing multiple types of new energy | |
CN102738833B (en) | Multi-time-scale rolling coordination scheduling method for electric power system with wind power | |
CN107248751A (en) | A kind of energy storage station dispatch control method for realizing distribution network load power peak load shifting | |
CN107196294A (en) | Micro-capacitance sensor Multiple Time Scales adaptive energy dispatching method under the net load interaction pattern of source | |
CN110401186A (en) | Area power grid source net lotus stores up the ubiquitous Dispatching Control System of Multi-value coordination | |
CN106655243B (en) | The automatic demand response method of electric car for the purpose of maintaining the micro-capacitance sensor equilibrium of supply and demand | |
CN108133322A (en) | It is a kind of based on when sort run simulation balance of electric power and ener index calculating method | |
CN106160008B (en) | A kind of consumption new energy is obstructed the lotus source coordinated control rolling amendment method of power | |
CN109038686A (en) | A kind of rolling optimal dispatching method based on wind power output prediction error | |
CN105703355B (en) | Diversity load grading self-discipline collaborative demand response method | |
CN104333047B (en) | Real-time rolling planning method applied to wind power integration of power system | |
CN104537428B (en) | One kind meter and the probabilistic economical operation appraisal procedure of wind power integration | |
CN109345019A (en) | A kind of micro-capacitance sensor economic load dispatching optimisation strategy based on improvement particle swarm algorithm | |
CN114977330B (en) | Building distributed photovoltaic-storage battery system continuous operation scheduling method and platform | |
WO2022252382A1 (en) | Source-grid-load-storage networked coordinated frequency control method | |
CN109390981A (en) | The sending end power grid Unit Combination progress control method of new energy participation electric quantity balancing | |
CN110460115A (en) | A kind of AGC controls in advance method of the new energy containing polymorphic type | |
CN107069830A (en) | Improve the method and device of wind electricity digestion capability | |
CN103280845B (en) | Water-fire-electricity system trans-provincial peak-regulating load distribution method | |
CN112101607A (en) | Active power distribution network rolling optimization scheduling method considering demand response time effect | |
CN103199538A (en) | Day-ahead planed multi-scale imminent generation scheduling closed-loop control method | |
CN110808616A (en) | Micro-grid frequency control method based on power shortage distribution | |
CN103187730B (en) | Advanced control method related to automatic generation control | |
CN106651136A (en) | Day-ahead power generation plan compilation method of bilateral transaction and apparatus thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191115 |
|
RJ01 | Rejection of invention patent application after publication |