CN110459049A - A kind of intelligent meter data recording system and its construction method based on Wisun agreement - Google Patents

A kind of intelligent meter data recording system and its construction method based on Wisun agreement Download PDF

Info

Publication number
CN110459049A
CN110459049A CN201910906124.9A CN201910906124A CN110459049A CN 110459049 A CN110459049 A CN 110459049A CN 201910906124 A CN201910906124 A CN 201910906124A CN 110459049 A CN110459049 A CN 110459049A
Authority
CN
China
Prior art keywords
ammeter
network
concentrator
frame
name
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910906124.9A
Other languages
Chinese (zh)
Inventor
顾陈瑜
季海涛
尹建丰
魏华义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Linyang Solarfun Co Ltd
Original Assignee
Jiangsu Linyang Solarfun Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Linyang Solarfun Co Ltd filed Critical Jiangsu Linyang Solarfun Co Ltd
Priority to CN201910906124.9A priority Critical patent/CN110459049A/en
Publication of CN110459049A publication Critical patent/CN110459049A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C17/00Arrangements for transmitting signals characterised by the use of a wireless electrical link
    • G08C17/02Arrangements for transmitting signals characterised by the use of a wireless electrical link using a radio link
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L69/00Network arrangements, protocols or services independent of the application payload and not provided for in the other groups of this subclass
    • H04L69/26Special purpose or proprietary protocols or architectures

Abstract

A kind of intelligent meter data recording system and its construction method based on Wisun agreement, it is related to intelligent electric meter field, it is based especially on the communications field between the data collector, intelligent electric meter and indoor manipulation unit three of Wisun agreement, the system includes several sub-networks, and each sub-network includes a concentrator, several ammeters and several indoor manipulation unit CIU;Network name and pan-id is arranged in each concentrator, contains a concentrator in each sub-network;Each ammeter Configuration network name and logical device name;For the logical device name of each indoor manipulation unit CIU Configuration network name and its ammeter that can be connected;Only the equipment with identical network name can be just added in the same network.Wisun agreement based on standard agreement is applied to intelligent meter data recording system by the present invention, and the range that intelligent meter data recording system can not only covered is wider, meter reading power consumption is lower;And it can be convenient the equipment for allowing different manufacturers to produce and network be added.

Description

A kind of intelligent meter data recording system and its construction method based on Wisun agreement
Technical field
The invention patent relates to intelligent electric meter fields, and in particular to a kind of data collector based on Wisun agreement, intelligence The communications field between ammeter and indoor manipulation unit three.
Background technique
Wi-SUN is a kind of 802.15.4 mesh network protocol of continuous development, is established in 802.15.4g/e, IPv6/ On 6LoWPAN and CoAP.High by IP addressability end to end, wide covering, safety and scalability, Wi-SUN is Applied to more than in 50,000,000 utility networks and smart city infrastructure equipment.
Since instability problem is supplied in fossil fuel exhaustion and renewable energy, following energy management is had become in the world One of most important and most uneasy problem.At this moment, the concept of intelligent Ubiquitous Network is come into being.It can not only guarantee surely Fixed energy supply, and management of energy consumption appropriate can be provided.Intelligent Ubiquitous Network can be effectively a large number of users The data collections such as water, gas and electricity get up, be then sent to data collector.This will be typically based in smart grid structure The communication system of radio.Intelligent Ubiquitous Network transmits data by radio, can reduce cost needed for manual metering Cost;And user data is collected by intelligent Ubiquitous Network, it is ensured that the collection of data is more comprehensively and without manually going Supervision.Intelligent Ubiquitous Network effect also highly significant in terms of safety is provided, moreover, it, which is also equipped with, supports two-way communication Potentiality can be used to measure the consumption management of the intelligent energy in house and community.The advantage of intelligent Ubiquitous Network will enable it to As one of component part most possible in smart grid structure.
Summary of the invention
The purpose of the present invention is designing a kind of intelligent meter data recording system based on Wisun agreement, mainly in wide scope The remote of intelligent electric meter, low power loss communication transmission.
The technical scheme is that
A kind of intelligent meter data recording system based on Wisun agreement, the system include several sub-networks, and each sub-network includes One concentrator, several ammeters and several indoor manipulation unit CIU, wherein;
The concentrator is configured with network name and pan-id, and aforementioned network name is for identifying whole network title, pan- Id is used to identify the sub-network title where the concentrator, and each concentrator carries out constructing communication network company with corresponding each ammeter respectively It connects;
The ammeter is configured with network name and logical device name, and each ammeter carries out communication set with corresponding concentrator respectively Net connection, and the indoor manipulation unit CIU that can be equipped with it of the ammeter connect and is communicated;
The indoor manipulation unit CIU is configured with the logical device name of network name and its ammeter that can be connected, preceding The corresponding ammeter connection of indoor manipulation unit CIU is stated to be communicated.
Further, concentrator and ammeter are full-function device, and indoor manipulation unit CIU is reduced function device.
A kind of construction method of the intelligent meter data recording system based on Wisun agreement, comprising the following steps:
S1, network name and pan-id are set for each concentrator, aforementioned network name is for identifying whole network title, pan-id For identifying sub-network title, contain a concentrator in each sub-network;For each ammeter Configuration network name and logical device name;For The logical device name of each interior manipulation unit CIU Configuration network name and its ammeter that can be connected;
S2, concentrator send beacon frame to neighbouring other equipment in a broadcast manner, include in the frame load of beacon frame Network name and pan-id;
After S3, ammeter or interior manipulation unit CIU receive the beacon frame of concentrator transmission, inquires in frame load data and wrap The network name whether network name contained configures with oneself matches;If matching, the ammeter or indoor manipulation unit CIU can be to collection Middle device sends networking claim frame, if mismatching, does not deal with;
After S4, concentrator receive the networking claim frame of ammeter transmission, whether the network name for including in inquiry frame load data Match with the network name of oneself configuration;If matching, concentrator can be added in neighbor list using the ammeter as node, such as Fruit mismatches, then concentrator refuses ammeter addition;
After concentrator receives the networking claim frame that indoor manipulation unit CIU is sent, refusal is added;
S5, the ammeter for having been added to network are broadcast periodically identical with transmitted by concentrator in the subnet where it is located network Beacon frame;
After S6, ammeter or interior manipulation unit CIU receive the beacon frame that the aforementioned ammeter for having been added to network is sent, inquiry The network name whether network name for including in frame load data configures with oneself matches;If matching, the ammeter or indoor manipulation Unit CIU then can send networking claim frame to the aforementioned ammeter for having been added to network, if mismatching, not deal with;
After S7, the aforementioned ammeter for having been added to network receive the networking claim frame of other ammeters transmission, inquiry frame loads number Match according to the network name whether inner network name for including configures with oneself;If matching, concentrator can be using the ammeter as section Point is added in neighbor list, if it does not match, concentrator refuses ammeter addition;
After the aforementioned ammeter for having been added to network receives the networking claim frame that indoor manipulation unit CIU is sent, further look into Whether consistent with the logical device name of oneself logical device name for including in frame load data is ask, if unanimously, which can permit Perhaps the interior manipulation unit CIU is added, if inconsistent, does not handle.
It further, include the frame being made of frame control domain, number of frames, address field and add-on security head in beacon frame Head is loaded by the MAC that superframe description field, GTS distribution release information and frame load are constituted, and verifies the frame constituted by FCS Tail;
It include the frame head being made of frame control domain, number of frames, address field and add-on security head in networking claim frame, by The MAC load that frame load is constituted, and the postamble constituted is verified by FCS.
Further, in step S3, if any ammeter receives the beacon frame that multiple concentrators are sent simultaneously, basis is received Beacon frame signal intensity, networking claim frame is successively sent to corresponding concentrator on earth by high according to beacon frame signal intensity, If being allowed to network, stop sending to network again to other concentrators requesting to exist;If being rejected networking, then to other concentrators Send the request that networks.
Further, in step S1, white list is configured for concentrator, the logic for the ammeter having access to is recorded in white list Implementor name, in corresponding step S4, ammeter consistent for network name, further inquire the ammeter logical device name whether In the white list of concentrator, if it does, then concentrator can be added in neighbor list using the ammeter as node, if not Match, then concentrator refuses ammeter addition.
Further, superframe description field defines super-frame durations, active period duration, contention access period Duration;GTS distribution release information describes the distribution condition that non-competing access-hours ensure time slot.
Beneficial effects of the present invention:
Wisun agreement based on standard agreement is applied to intelligent meter data recording system by the present invention, can not only make smart meter reading The range of system covering is wider, meter reading power consumption is lower;And it can conveniently be allowed not by modifying the network name of devices from different manufacturers Network is added in equipment with producer's production.
Other features and advantages of the present invention will then part of the detailed description can be specified.
Detailed description of the invention
Exemplary embodiment of the invention is described in more detail in conjunction with the accompanying drawings, it is of the invention above-mentioned and its Its purpose, feature and advantage will be apparent, wherein in exemplary embodiment of the invention, identical reference label Typically represent same parts.
Fig. 1 is tree network structure schematic diagram.
Fig. 2 is beacon frame structure schematic diagram.
Fig. 3 is timeslot-based CSMA/CA schematic diagram.
Fig. 4 is superframe structure schematic diagram.
Fig. 5 is networking claim frame structural schematic diagram.
Fig. 6 is that network development process schematic diagram is added in equipment.
Specific embodiment
The preferred embodiment that the present invention will be described in more detail below with reference to accompanying drawings.Although showing the present invention in attached drawing Preferred embodiment, however, it is to be appreciated that may be realized in various forms the present invention without the embodiment party that should be illustrated here Formula is limited.
A kind of intelligent meter data recording system based on Wisun agreement, the system include several sub-networks, and each sub-network includes One concentrator, several ammeters and several indoor manipulation unit CIU, wherein;
The concentrator is configured with network name and pan-id, and aforementioned network name is for identifying whole network title, pan- Id is used to identify the sub-network title where the concentrator, and each concentrator carries out constructing communication network company with corresponding each ammeter respectively It connects;
The ammeter is configured with network name and logical device name, and each ammeter carries out communication set with corresponding concentrator respectively Net connection, and the indoor manipulation unit CIU that can be equipped with it of the ammeter connect and is communicated;
The indoor manipulation unit CIU is configured with the logical device name of network name and its ammeter that can be connected, preceding The corresponding ammeter connection of indoor manipulation unit CIU is stated to be communicated.
Further, concentrator and ammeter are full-function device, and indoor manipulation unit CIU is reduced function device.
A kind of intelligent meter data recording system construction method based on Wisun agreement, comprising the following steps:
S1, network name and pan-id are set for each concentrator, aforementioned network name is for identifying whole network title, pan-id For identifying sub-network title, contain a concentrator in each sub-network;For each ammeter Configuration network name and logical device name;For The logical device name of each interior manipulation unit CIU Configuration network name and its ammeter that can be connected;It can also match in concentrator White list is set, the logical device name for the ammeter having access to is recorded in white list;
S2, concentrator send beacon frame to neighbouring other equipment in a broadcast manner, include in the frame load of beacon frame Network name and pan-id;
After S3, ammeter or interior manipulation unit CIU receive the beacon frame of concentrator transmission, inquires in frame load data and wrap The network name whether network name contained configures with oneself matches;If matching, the ammeter or indoor manipulation unit CIU can be to collection Middle device sends networking claim frame, if mismatching, does not deal with;
If any ammeter receives the beacon frame that multiple concentrators are sent simultaneously, according to the beacon frame signal intensity received, According to beacon frame signal intensity by it is high on earth, successively send networking claim frame to corresponding concentrator and stop if being allowed to network Only the request that networks is sent to other concentrators again to exist;If being rejected networking, then the request that networks is sent to other concentrators.
After S4, concentrator receive the networking claim frame of ammeter transmission, whether the network name for including in inquiry frame load data Match with the network name of oneself configuration;If matching, concentrator can be added in neighbor list using the ammeter as node, such as Fruit mismatches, then concentrator refuses ammeter addition;
After concentrator receives the networking claim frame that indoor manipulation unit CIU is sent, refusal is added;
When configuring white list in concentrator, ammeter consistent for network name, the logic for further inquiring the ammeter is set Whether standby name is in the white list of concentrator, if it does, then concentrator can be added to neighbor list using the ammeter as node In, if it does not match, concentrator refuses ammeter addition.
S5, the ammeter for having been added to network are broadcast periodically identical with transmitted by concentrator in the subnet where it is located network Beacon frame;
After S6, ammeter or interior manipulation unit CIU receive the beacon frame that the aforementioned ammeter for having been added to network is sent, inquiry The network name whether network name for including in frame load data configures with oneself matches;If matching, the ammeter or indoor manipulation Unit CIU then can send networking claim frame to the aforementioned ammeter for having been added to network, if mismatching, not deal with;
After S7, the aforementioned ammeter for having been added to network receive the networking claim frame of other ammeters transmission, inquiry frame loads number Match according to the network name whether inner network name for including configures with oneself;If matching, concentrator can be using the ammeter as section Point is added in neighbor list, if it does not match, concentrator refuses ammeter addition;
After the aforementioned ammeter for having been added to network receives the networking claim frame that indoor manipulation unit CIU is sent, further look into Whether consistent with the logical device name of oneself logical device name for including in frame load data is ask, if unanimously, which can permit Perhaps the interior manipulation unit CIU is added, if inconsistent, does not handle.
It further, include the frame being made of frame control domain, number of frames, address field and add-on security head in beacon frame Head is loaded by the MAC that superframe description field, GTS distribution release information and frame load are constituted, and verifies the frame constituted by FCS Tail;
It include the frame head being made of frame control domain, number of frames, address field and add-on security head in networking claim frame, by The MAC load that frame load is constituted, and the postamble constituted is verified by FCS.
Superframe description field defines super-frame durations, active period duration, contention access window duration; GTS distribution release information describes the distribution condition that non-competing access-hours ensure time slot.
When specific implementation:
Step 1: the network in order to construct a tree topology needs global function and simplifies both equipment of function. The difference of both equipment is as follows: can lead between full-function device and between full-function device and reduced function device Letter;It cannot be communicated between reduced function device.When constructing network, chooses full-function device and (concentrated as network coordinator Device).Whole network and a pan-id are identified by the way that a network name is arranged to concentrator to identify each sub-network, are such as schemed 1.Only the equipment with identical network name can be just added in the same network.Then, concentrator is set to neighbouring other It is standby to send beacon frame, the structure of beacon frame such as Fig. 2 in a broadcast manner.Superframe description field defines super-frame durations, work Jump window duration, contention access window duration;Ensure that time slot (GTS) distribution release information describes non-competing access The distribution condition of period guarantee time slot;It include network name information in beacon frame load data.It, can in order to improve the utilization rate of channel Not distribute the non-competing period, the Channel Access Mechanism of data all so is all timeslot-based CSMA/CA channel access machine System, such as Fig. 3.Beacon frame is sent in first time slot of superframe, the structure of superframe such as Fig. 4.
Step 2: other full-function devices (ammeter) are when receiving the beacon frame of concentrator transmission in network, first The network name whether network name for including in load data in beacon frame configures with oneself can be inquired to match.If matching, ammeter Request can then be sent, the data frame of network is added to concentrator, the claim frame of networking such as Fig. 5.If concentrator allows the ammeter to add Enter, then concentrator can be added in neighbor list using the ammeter as node, becomes one of the network from equipment.Net is added Data exchange process such as Fig. 6 when network.In network, often there is more than one concentrator, an ammeter may receive simultaneously The beacon frame of multiple concentrators.On the one hand, ammeter can be allowed to choose oneself according to the size of the beacon frame signal intensity received Which it is added under concentrator.On the other hand, ammeter is added in the data frame that network is added in the request that can be sent in ammeter to answer The logical device name being arranged with layer, concentrator can be according to the logical device names in the claim frame received to determine whether allowing the electricity Network is added in table, ensures that ammeter is added under specified concentrator in this way.By the way that above-mentioned networking Rule of judgment is added Afterwards, it can effectively control M1 and M2 and pan-id1 concentrator is added, pan-id2 concentrator, such as Fig. 1 is added in M3.
Step 3: the ammeter for having been added to network can also periodically send and be associated with the identical beacon frame of concentrator. Other cannot receive the candidate device of concentrator beacon frame, if the beacon frame of this ammeter can be received, can pass through this Network is added in platform ammeter.It can be global function by the slave equipment that network is added as father node for already present ammeter to set It is standby, it is also possible to simplify function device.Ammeter can continue to send beacon frame to allow other equipment to be added as full-function device Network.Network can be added in M4 by M3 as shown in figure 1, and then M4 can continue to send beacon frame, allow other equipment to be added. Indoor manipulation unit cannot be further continued for sending beacon frame, can only communicate with the father node of oneself as function device is simplified.Generally In the case of, an ammeter is not intended to indoor manipulation unit directly as concentrator all only equipped with an indoor manipulation unit Child node, such as Fig. 1.So can be by requesting patrolling in the data frame that network is added by judgement described in step 2 Collect the addition network condition that implementor name carrys out manipulation unit in control room.Network is added when indoor manipulation unit directly transmits request When data frame is to concentrator, concentrator directly refuses its addition.When some wants to pass through with the indoor manipulation unit that ammeter does not match When network is added in the ammeter, ammeter can also refuse its addition.
Various embodiments of the present invention are described above, above description is exemplary, and non-exclusive, and It is not limited to disclosed each embodiment.Without departing from the scope and spirit of illustrated each embodiment, for this skill Many modifications and changes are obvious for the those of ordinary skill in art field.

Claims (7)

1. a kind of intelligent meter data recording system based on Wisun agreement, which is characterized in that the system includes several sub-networks, each son Network includes a concentrator, several ammeters and several indoor manipulation unit CIU, wherein;
The concentrator is configured with network name and pan-id, and aforementioned network name is used for identifying whole network title, pan-id Sub-network title where identifying the concentrator, each concentrator carry out constructing communication network connection with corresponding each ammeter respectively;
The ammeter is configured with network name and logical device name, and each ammeter carries out constructing communication network company with corresponding concentrator respectively It connects, and the indoor manipulation unit CIU that can be equipped with it of the ammeter connect and communicated;
The indoor manipulation unit CIU is configured with the logical device name of network name and its ammeter that can be connected, aforementioned room Interior manipulation unit CIU corresponding ammeter connection is communicated.
2. the intelligent meter data recording system according to claim 1 based on Wisun agreement, it is characterized in that the concentrator and electricity Table is full-function device, and indoor manipulation unit CIU is reduced function device.
3. the construction method of the intelligent meter data recording system based on Wisun agreement described in a kind of one of claim 1-2, including it is following Step:
S1, network name and pan-id are set for each concentrator, for identifying whole network title, pan-id is used for aforementioned network name Sub-network title is identified, contains a concentrator in each sub-network;For each ammeter Configuration network name and logical device name;For each room The logical device name of interior manipulation unit CIU Configuration network name and its ammeter that can be connected;
S2, concentrator send beacon frame to neighbouring other equipment in a broadcast manner, include network in the frame load of beacon frame Name and pan-id;
After S3, ammeter or interior manipulation unit CIU receive the beacon frame of concentrator transmission, include in inquiry frame load data The network name whether network name configures with oneself matches;If matching, the ammeter or indoor manipulation unit CIU can be to concentrators Networking claim frame is sent, if mismatching, is not dealt with;
S4, concentrator receive ammeter transmission networking claim frame after, inquire frame load data in include network name whether with from Oneself matches at the network name of configuration;If matching, concentrator can be added in neighbor list using the ammeter as node, if not Matching, then concentrator refuses ammeter addition;
After concentrator receives the networking claim frame that indoor manipulation unit CIU is sent, refusal is added;
S5, the ammeter for having been added to network are broadcast periodically and identical beacon transmitted by concentrator in the subnet where it is located network Frame;
After S6, ammeter or interior manipulation unit CIU receive the beacon frame that the aforementioned ammeter for having been added to network is sent, inquiry frame is negative The network name whether network name for including in data configures with oneself is carried to match;If matching, the ammeter or indoor manipulation unit CIU then can send networking claim frame to the aforementioned ammeter for having been added to network, if mismatching, not deal with;
After S7, the aforementioned ammeter for having been added to network receive the networking claim frame of other ammeters transmission, inquire in frame load data The network name whether network name for including configures with oneself matches;If matching, concentrator can add using the ammeter as node Enter into neighbor list, if it does not match, concentrator refuses ammeter addition;
After the aforementioned ammeter for having been added to network receives the networking claim frame that indoor manipulation unit CIU is sent, frame is further inquired Whether the logical device name for including in load data is consistent with the logical device name of oneself, if unanimously, which can allow this Indoor manipulation unit CIU is added, if inconsistent, does not handle.
4. the intelligent meter data recording system construction method according to claim 3 based on Wisun agreement, it is characterized in that in beacon frame Including the frame head being made of frame control domain, number of frames, address field and add-on security head, distributed by superframe description field, GTS The MAC load of information and frame load composition is discharged, and the postamble constituted is verified by FCS;
Include the frame head being made of frame control domain, number of frames, address field and add-on security head in networking claim frame, is born by frame The MAC load constituted is carried, and the postamble constituted is verified by FCS.
5. the intelligent meter data recording system construction method according to claim 3 based on Wisun agreement, it is characterized in that the step In rapid S3, if any ammeter receives the beacon frame that multiple concentrators are sent simultaneously, according to the beacon frame signal intensity received, root According to beacon frame signal intensity by it is high on earth, successively send networking claim frame to corresponding concentrator and stop if being allowed to network The request that networks is sent to other concentrators again to exist;If being rejected networking, then the request that networks is sent to other concentrators.
6. the intelligent meter data recording system construction method according to claim 3 based on Wisun agreement, it is characterized in that the step In rapid S1, white list is configured for concentrator, the logical device name for the ammeter having access to, corresponding step S4 are recorded in white list In, ammeter consistent for network name further inquires the logical device name of the ammeter whether in the white list of concentrator, such as Fruit matching, then concentrator can be added in neighbor list using the ammeter as node, if it does not match, concentrator refuses the electricity Table is added.
7. the intelligent meter data recording system construction method according to claim 4 based on Wisun agreement, it is characterized in that described is super Frame delineation field defines super-frame durations, active period duration, contention access window duration;GTS distribution is released It puts information and describes the distribution condition that non-competing access-hours ensure time slot.
CN201910906124.9A 2019-09-24 2019-09-24 A kind of intelligent meter data recording system and its construction method based on Wisun agreement Pending CN110459049A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910906124.9A CN110459049A (en) 2019-09-24 2019-09-24 A kind of intelligent meter data recording system and its construction method based on Wisun agreement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910906124.9A CN110459049A (en) 2019-09-24 2019-09-24 A kind of intelligent meter data recording system and its construction method based on Wisun agreement

Publications (1)

Publication Number Publication Date
CN110459049A true CN110459049A (en) 2019-11-15

Family

ID=68492662

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910906124.9A Pending CN110459049A (en) 2019-09-24 2019-09-24 A kind of intelligent meter data recording system and its construction method based on Wisun agreement

Country Status (1)

Country Link
CN (1) CN110459049A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112770370A (en) * 2021-01-28 2021-05-07 青岛海尔空调器有限总公司 Method and device for intelligent equipment to access network and intelligent equipment
CN114422878A (en) * 2021-12-28 2022-04-29 江苏林洋能源股份有限公司 Portable and rapid module signal quality acquisition method based on Wi-SUN communication technology
WO2022105093A1 (en) * 2020-11-02 2022-05-27 珠海中慧微电子有限公司 Mobile meter reading method based on wisun protocol

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080072228A (en) * 2007-02-01 2008-08-06 고려대학교 산학협력단 System for transmitting sensing data of human body using cluster identity and method thereof
CN102006228A (en) * 2010-11-24 2011-04-06 华为技术有限公司 Communication method in PAN (personal area network) of sensor network and network node
CN102065575A (en) * 2009-11-11 2011-05-18 中国科学院沈阳自动化研究所 Method for constructing mesh and star hybrid topological wireless sensor network based on IEEE 802.15.4
US20110276665A1 (en) * 2010-05-07 2011-11-10 Samsung Electronics Co., Ltd. Method of performing pairing between coordinator and device in network, method of performing pairing between devices, method of pairing between coordinators and network system including the coordinators and the devices
CN103051741A (en) * 2012-12-18 2013-04-17 东南大学 Internetworking method for wireless intelligent meter reading system
CN104486813A (en) * 2014-12-10 2015-04-01 广东广联电子科技有限公司 Networking method based on Zigbee technology
CN108986440A (en) * 2018-09-27 2018-12-11 深圳友讯达科技股份有限公司 The address distribution method of multi-internet integration kilowatt meter reading-out system and kilowatt meter reading-out system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080072228A (en) * 2007-02-01 2008-08-06 고려대학교 산학협력단 System for transmitting sensing data of human body using cluster identity and method thereof
CN102065575A (en) * 2009-11-11 2011-05-18 中国科学院沈阳自动化研究所 Method for constructing mesh and star hybrid topological wireless sensor network based on IEEE 802.15.4
US20110276665A1 (en) * 2010-05-07 2011-11-10 Samsung Electronics Co., Ltd. Method of performing pairing between coordinator and device in network, method of performing pairing between devices, method of pairing between coordinators and network system including the coordinators and the devices
CN102006228A (en) * 2010-11-24 2011-04-06 华为技术有限公司 Communication method in PAN (personal area network) of sensor network and network node
CN103051741A (en) * 2012-12-18 2013-04-17 东南大学 Internetworking method for wireless intelligent meter reading system
CN104486813A (en) * 2014-12-10 2015-04-01 广东广联电子科技有限公司 Networking method based on Zigbee technology
CN108986440A (en) * 2018-09-27 2018-12-11 深圳友讯达科技股份有限公司 The address distribution method of multi-internet integration kilowatt meter reading-out system and kilowatt meter reading-out system

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
张晓华: "基于ZigBee的自动抄表系统研究与设计", 《中国优秀硕士学位论文全文数据库工程科技II辑》 *
王春艳: "IEEE 802.15.4协议仿真与研究", 《中国优秀硕士学位论文全文数据库信息科技辑》 *
百度文库: "智能电能表应用及发展趋势", 《百度文库》 *
百度网页: "Wi-SUN通讯协议有望成为物联网核心技术", 《百度网页》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022105093A1 (en) * 2020-11-02 2022-05-27 珠海中慧微电子有限公司 Mobile meter reading method based on wisun protocol
CN112770370A (en) * 2021-01-28 2021-05-07 青岛海尔空调器有限总公司 Method and device for intelligent equipment to access network and intelligent equipment
CN112770370B (en) * 2021-01-28 2023-04-18 青岛海尔空调器有限总公司 Method and device for intelligent equipment to access network and intelligent equipment
CN114422878A (en) * 2021-12-28 2022-04-29 江苏林洋能源股份有限公司 Portable and rapid module signal quality acquisition method based on Wi-SUN communication technology

Similar Documents

Publication Publication Date Title
CN106357305B (en) A kind of automatic network-building method, the apparatus and system of tree structure network
CN108401041B (en) Dual-mode heterogeneous network networking communication method for power information acquisition system
CN111970030B (en) Signal transmitting method of broadband carrier communication network
CN108494824B (en) Network architecture and networking method for Internet of things
CN104243595B (en) A kind of power information acquisition system and its method based on IPv6
CN110459049A (en) A kind of intelligent meter data recording system and its construction method based on Wisun agreement
CN103713608B (en) Wireless Internet of Things house system hierarchical network framework and its group-net communication method
CN105262687B (en) A kind of power information acquisition system group-net communication method based on WIA-PA technologies
CN101877827B (en) Building monitoring oriented wireless sensor network data acquisition method
CN111970031B (en) Meter reading method based on broadband carrier communication network
CN112565351B (en) Mobile meter reading method based on WiSUN protocol
CN110401971B (en) Communication method based on 230MHz electric power special frequency band intelligent ad hoc network
CN102223734A (en) Wireless communication network and communication method of same
CN111739275A (en) Control method, control device, control equipment and storage medium for dual-mode communication
CN106604344B (en) RPL-based power utilization information system and networking and communication method thereof
CN110519866B (en) Communication system based on 230MHz microgrid and networking method thereof
CN109788444A (en) Applied to the node networking method in high density multihop network
CN104683323A (en) Hybrid protocol-based intelligent power distribution network wireless communication system
CN111147105B (en) Communication method of slave metering module
CN104754757A (en) Channel and time slot scheduling method suitable for WIA-PA network
CN110519093A (en) A kind of information acquisition system network architecture based on ubiquitous electric power Internet of Things
CN107508919A (en) A kind of electrical appliances intelligent control method based on smart mobile phone
CN201374587Y (en) Automation system for wireless information transmission power distribution network
KR20140129944A (en) Smart appliance apparatus and network management system
CN110381563A (en) A kind of uplink resources allocation strategy of self-organizing relay forwarding network

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191115