CN110459040A - A kind of cooperative monitoring system and method - Google Patents
A kind of cooperative monitoring system and method Download PDFInfo
- Publication number
- CN110459040A CN110459040A CN201910755551.1A CN201910755551A CN110459040A CN 110459040 A CN110459040 A CN 110459040A CN 201910755551 A CN201910755551 A CN 201910755551A CN 110459040 A CN110459040 A CN 110459040A
- Authority
- CN
- China
- Prior art keywords
- linkage
- data
- module
- alarm
- processing module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G08—SIGNALLING
- G08B—SIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G08B21/00—Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
- G08B21/18—Status alarms
-
- G—PHYSICS
- G08—SIGNALLING
- G08B—SIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G08B7/00—Signalling systems according to more than one of groups G08B3/00 - G08B6/00; Personal calling systems according to more than one of groups G08B3/00 - G08B6/00
- G08B7/06—Signalling systems according to more than one of groups G08B3/00 - G08B6/00; Personal calling systems according to more than one of groups G08B3/00 - G08B6/00 using electric transmission, e.g. involving audible and visible signalling through the use of sound and light sources
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Alarm Systems (AREA)
Abstract
The invention discloses a kind of cooperative monitoring system and methods, to solve the monitoring system waste of manpower existing in the prior art applied in electric system, the problem of processing time length.After acquisition module of the present invention collects a plurality of types of data, a plurality of types of data are sent to processing module, processing module handles collected data, generate chart and/or video frame, display device is connect with the processing module, for showing the chart generated by processing module and/or video frame, simultaneously, alarm module is also connected with processing module, when there is alarm condition, export alarm signal, alert data is sent to interlocking module by processing module simultaneously, interlocking module is set to start linkage, so as to control alarm scene by linkage, short processing time, save human resources.
Description
Technical field
The present invention relates to monitoring technology field, in particular to a kind of cooperative monitoring system and method.
Background technique
The electrical energy production and consumption system that electric system is made of links such as power generation, transmission of electricity, power transformation, distribution and electricity consumptions.
The main structure of electric system has power supply (power plants such as power station, thermal power plant, nuclear power station), electric substation (step-up substation, load
Center electric substation etc.), transmission of electricity, distribution line and load center.Each power supply point is also mutually connected to realize between different regions
Electric energy exchange and adjusting.
The continuous development of electric system pushes the development of social production every field, therefore, safeguards the steady of electric system
Surely develop most important.
Currently, the system of auxiliary power system development has very much, based on monitoring system.Existed by the data acquired in real time
It is shown on display screen, for example some charts, video etc. will call the police if data exception, staff is according to warning message
The case where determining at alert locations and alert locations, are rescued in time, so that the safe and stable operation for electric system provides
Support and technology guarantee, improve the reliability of operation of power networks.
However, the monitoring system waste of manpower in existing electric system, the processing time is long.
Summary of the invention
The present invention provides a kind of cooperative monitoring system and method, existing in the prior art is applied to power train to solve
Monitoring system waste of manpower in system, the problem of processing time length.
In a first aspect, the embodiment of the present invention provides a kind of cooperative monitoring system, which includes:
Acquisition module, for acquiring a plurality of types of data;
Processing module generates figure for handling the collected a plurality of types of data of the acquisition module
Table and/or video frame;
Alarm module is connect, for exporting alarm signal with the processing module;
Display module is connect with the processing module, for showing the chart and/or video frame of stating acquisition module generation;
Interlocking module is connect, for when there is alarm condition, starting the linkage with linkage, the alarm module
Device.
In the embodiment of the present invention, after acquisition module collects a plurality of types of data, a plurality of types of data are sent to
Processing module, processing module handle collected data, generate chart and/or video frame, display device and the processing
Module connection, for showing the chart generated by processing module and/or video frame, meanwhile, alarm module also connects with processing module
It connects, when there is alarm condition, exports alarm signal, while alert data is sent to interlocking module by processing module, make the mould that links
Block starts linkage, and so as to control alarm scene by linkage, short processing time saves human resources.
In one possible implementation, the acquisition module is connect with the equipment of multiple and different types.
Above system can acquire a variety of different types of equipment, can acquire different types of data, to make system
Applicability it is wider.
In one possible implementation, the processing module is specifically used for:
For any data, the data are compared with preset value, if exceeding the preset value, trigger the report
Alert module exports alarm signal, and the data that will exceed preset value are sent to the interlocking module.
Above system, processing module is when handling a plurality of types of data, for any data, by the data with
Preset value is compared, if exceeding preset value, triggers alarm module output alarm signal, and will exceed being somebody's turn to do for preset value
Data are sent to interlocking module, so that interlocking module be made to start linkage.
In one possible implementation, the alarm module includes some or all of in following:
Picture warning piece;
Light warning piece;
Audible alarm component.
Above system, warning device can be picture warning piece, be also possible to light warning piece, can also be sound report
Any two or three combinations of alert component or three of the above warning piece.
In one possible implementation, the linkage includes some or all of in following:
Fire-fighting link device;
Security protection linkage;
Environmental monitoring linkage;
SCADA (Supervisory ControlAnd Data Acquisition, data acquisition analysis system) linkage
Device.
Above system defines the linkage in system, fire-fighting link device;Security protection linkage;Environmental monitoring connection
Dynamic device;Some or all of SCADA linkage, start in the above linkage, it can effectively control alarm condition.
In one possible implementation, the linkage further include:
Link terminal, for notifying user's warning message.
Above system, linkage can also include linkage terminal, when there is alarm condition, can pass through the terminal that links
User is notified, so as to play the effect of effectively control abnormal conditions.
In one possible implementation, the linkage further include:
Link gate inhibition, opens the door or closes the door for linkage control.
Above system, linkage can also include linkage gate inhibition, when there is abnormal conditions, can with linkage control open the door or
It closes the door.
In one possible implementation, system further include: control module is used for debugging software.
Above system, in addition to hardware, it is also necessary to which software control, control module are used for debugging software.
Second aspect, the embodiment of the present invention provide a kind of linkage surveillance method, this method comprises:
Any one data in collected a plurality of types of data are compared with preset value, if beyond default
Value, then alarm;
Start linkage.
The above method acquires a plurality of types of data first, then by any one data in a plurality of types of data
It is compared with preset value, if exceeding preset value, alarms, and start linkage.To make linkage can be with
Abnormal conditions are automatically controlled, human resources can be saved while shortening the processing time.
In one possible implementation, this method further include:
Collected a plurality of types of data are handled, chart and/or video frame are generated;
Show the chart and/or the video frame.
The above method handles collected a plurality of types of data, generates chart and/or video frame, and show
The chart and/or video frame, the case where so as to clearly see each website in system.
The third aspect, the embodiment of the present invention also provide a kind of computer storage medium, are stored thereon with computer program, should
The step of first aspect the method is realized when computer program is executed by processor.
The aspects of the invention or other aspects can more straightforwards in the following description.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment
Attached drawing is briefly introduced, it should be apparent that, drawings in the following description are only some embodiments of the invention, for this
For the those of ordinary skill in field, without any creative labor, it can also be obtained according to these attached drawings
His attached drawing.
Fig. 1 is a kind of cooperative monitoring system structural schematic diagram provided in an embodiment of the present invention;
Fig. 2 is a kind of linkage surveillance method flow schematic diagram provided in an embodiment of the present invention;
Fig. 3 is a kind of complete cooperative monitoring system structural schematic diagram provided in an embodiment of the present invention.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with attached drawing to the present invention make into
It is described in detail to one step, it is clear that the described embodiments are only some of the embodiments of the present invention, rather than whole implementation
Example.Based on the embodiments of the present invention, obtained by those of ordinary skill in the art without making creative efforts
All other embodiment, shall fall within the protection scope of the present invention.
The energy such as intelligent substation and conventional substation, transmission line of electricity, power distribution network, intelligent power distribution station, Intelligent platform zone
The auxiliary operation and management in field, can be realized by monitoring system, the data of equipment each in system or website are being monitored
It is shown in video, other than video monitoring, the data cases of each equipment or website can also be inquired, graphically opened up
It is existing.System can issue alarm signal when having monitored abnormal conditions, and staff can rush for live place according to alarm signal
Abnormal conditions are managed, or abnormal conditions are operated by equipment.
Have exception in staff's discovery, rush for scene, or by equipment control abnormal conditions, waste time it is longer, and
And the human resources of consumption are also very big, if system can automatically control abnormal conditions, it will shorten processing abnormal conditions when
Between, the waste of personnel can also be reduced.
The application scenarios of description of the embodiment of the present invention are the technical solutions in order to more clearly illustrate the embodiment of the present invention,
The restriction for technical solution provided in an embodiment of the present invention is not constituted, those of ordinary skill in the art are it is found that with newly answering
With the appearance of scene, technical solution provided in an embodiment of the present invention is equally applicable for similar technical problem.
For above-mentioned application scenarios, the embodiment of the invention provides cooperative monitoring systems, as shown in Figure 1, the system includes:
Acquisition module 100, for acquiring a plurality of types of data;
Processing module 101 is generated for handling the collected a plurality of types of data of the acquisition module
Chart and/or video frame;
Alarm module 102 is connect, for exporting alarm signal with the processing module;
Display module 103 is connect with the processing module, for showing the chart and/or view of the processing module generation
Frequency frame;
Interlocking module 104 is connect with linkage, the processing module, described for starting when there is alarm condition
Dynamic device.
In the embodiment of the present invention, after acquisition module collects a plurality of types of data, a plurality of types of data are sent to
Processing module, processing module handle collected data, generate chart and/or video frame, display device and the processing
Module connection, for showing the chart generated by processing module and/or video frame, meanwhile, alarm module also connects with processing module
It connects, when there is alarm condition, exports alarm signal, while alert data is sent to interlocking module by processing module, make the mould that links
Block starts linkage, and so as to control alarm scene by linkage, short processing time saves human resources.
The present invention can be applied in intelligent substation and conventional substation, transmission line of electricity, power distribution network, intellectual power distributing station
The energy fields such as room, Intelligent platform zone.
In an implementation, acquisition module can be connect with the equipment of multiple and different types, acquire a plurality of types of data, thus
The applicability of system can be made stronger.
After acquisition module collects a plurality of types of data, a plurality of types of data are sent to processing module, handle mould
Block handles a plurality of types of data received, generates chart and/or video frame.
Processing module to a plurality of types of data in the process of processing, can to any one data and preset value into
Row compares, and if it is greater than preset value, exports alarm signal in processing module triggering alarm module, and will be greater than the data of preset value
It is sent to interlocking module.
What needs to be explained here is that different types of data can be right when any one data is compared with preset value
Different preset values is answered, the data of the type can only be compared with preset value corresponding with the type.
It may determine that as abnormal conditions there is abnormal conditions generation just to will start linkage greater than the data with preset value.
For example, there is alert (fire, is broken in immersion probe), system starts live siren immediately, and cuts automatically
Corresponding video camera is changed to, to the video camera for having preparatory function, moreover it is possible to be automatically brought to corresponding preset point.
Specifically, alarm module can be picture warning piece, it is also possible to light warning piece, can also be audible alarm
Component can also be any two combination or three combinations in three of the above.
In an implementation, linkage includes some or all of in following:
Fire-fighting link device;
Security protection linkage;
Environmental monitoring linkage;
SCADA linkage.
Linkage is illustrated separately below.
1, fire-fighting link device:
When detecting fire, warning message is uploaded center by alarm host machine, and security personnel can come rapidly spot
Point;It links corresponding lighting simultaneously, calls presetting bit, to stand end and monitoring center can understand the live intensity of a fire in time.System
The switching value of system is able to achieve various linkages: opening gate, and the personnel of conflagration area is enable to escape;Realization and power control switch
Linkage, automatically cut off the power supply of important equipment.
2, security protection linkage:
The linkage lighting of the security devices such as infrared dual-technology, infrared curtain, fence, starts live siren, and automatic
It is switched to corresponding video camera, to the video camera for having preparatory function, moreover it is possible to be automatically brought to corresponding preset point.
3, environmental monitoring linkage:
Situations such as environmental monitoring is mainly for water logging, SF6 leakage, temperature and humidity and wind speed.When immersion probe monitors water logging
Alarm linkage water pump occurs and starts drainage system;Alarm linkage blower exhaust is issued when SF6 leakage;When temperature and humidity, wind
When saying sensor monitors that its value is more than threshold value, issue alarm and start air-conditioning equipment etc..
4, SCADA linkage:
When equipment is alarmed, monitored picture is popped up in real time, and strategically link, including alarm video recording,
PTZ linkage, warning output, video wall is operation associated, monitor client is operation associated, short massage notice etc. is operation associated, video recording
Time can set;It supports alarm linkage to the function of alarm bell siren, supports voice alarm function;It is jumped when accident occurs for substation
Whens lock, disconnecting link opening and closing operation failure, main transformer oil irregular change, protection signal, telemetering are abnormal etc., SCADA is by switch changed position
The multi-signals such as signal, accident resultant signal, reclosing signal, alarm signal pass to this system simultaneously, and this system issues alarm simultaneously
Picture is released on a display screen, and camera is automatically aligned to presetting bit according to prefabricated position, carries out video confirmation.It avoids because of single malfunction
Signal causes this system to issue alarm.
Specifically, linkage can also include linkage terminal, for notifying user's warning message.
For example, fire occurs for place A, then the terminal that user uses can be sent by the fire information of place A.
Specifically, linkage can also include linkage gate inhibition, opens the door or close the door for linkage control.
For example, can link gate inhibition when fire occurs, the door that will be linked is opened, and is used for escape.
It is the explanation to linkage above, linkage type is illustrated below.
Linkage type may include some or all of in following:
Remote control is outputed: for linkage control light, gate inhibition, water pump, blower etc..
Alarm bell siren: starting alarm bell siren alarm.
Phonic warning: phonic warning is issued.
Video interlink: the real-time pictures for the single or multiple video cameras being associated in advance are opened.
It calls presetting bit: opening the real-time pictures for the single or multiple video cameras being associated in advance, and automatically turn holder
To the presetting bit pre-defined.
Starting video recording: it records a video to the single or multiple video cameras being associated in advance.
Starting grabgraf: grabgraf is carried out to the single or multiple video cameras being associated in advance.
Short massage notice: it sends warning content in the form of short message on the mobile phone of related personnel.
Video wall association: warning content or video pictures are output on video wall.
Further include control module in cooperative monitoring system, is used for debugging software.
Based on the same inventive concept, the embodiment of the invention also provides a kind of linkage surveillance methods, as shown in Fig. 2, the party
Method includes:
S200, any one data in collected a plurality of types of data are compared with preset value, if exceeding
Preset value is then alarmed;
S201, starting linkage.
In the embodiment of the present invention, a plurality of types of data are acquired first, it then will be any one in a plurality of types of data
A data are compared with preset value, if exceeding preset value, are alarmed, and start linkage.To make linkage fill
Abnormal conditions can be automatically controlled by setting, and can save human resources while shortening the processing time.
The inter-linked controlling method further include:
Collected a variety of data are handled, chart and/or video frame is generated, shows the chart and/or video frame.
As shown in figure 3, the embodiment of the invention provides a kind of complete cooperative monitoring systems, comprising: system application, system
Kernel service, database layer, operating system layer and network layer.
Above by reference to showing according to the method, apparatus (system) of the embodiment of the present application and/or the frame of computer program product
Figure and/or flow chart describe the application.It should be understood that can realize that block diagram and or flow chart is shown by computer program instructions
The combination of the block of a block and block diagram and or flow chart diagram for figure.These computer program instructions can be supplied to logical
With computer, the processor of special purpose computer and/or other programmable data processing units, to generate machine, so that via meter
The instruction that calculation machine processor and/or other programmable data processing units execute creates for realizing block diagram and or flow chart block
In specified function action method.
Correspondingly, the application can also be implemented with hardware and/or software (including firmware, resident software, microcode etc.).More
Further, the application can take computer usable or the shape of the computer program product on computer readable storage medium
Formula has the computer realized in the medium usable or computer readable program code, to be made by instruction execution system
It is used with or in conjunction with instruction execution system.In the present context, computer can be used or computer-readable medium can be with
It is arbitrary medium, may include, stores, communicates, transmits or transmit program, is made by instruction execution system, device or equipment
With, or instruction execution system, device or equipment is combined to use.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art
Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies
Within, then the present invention is also intended to include these modifications and variations.
Claims (10)
1. a kind of cooperative monitoring system, which is characterized in that the system includes:
Acquisition module, for acquiring a plurality of types of data;
Processing module, for handling the collected a plurality of types of data of the acquisition module, generate chart and/
Or video frame;
Alarm module is connect, for exporting alarm signal with the processing module;
Display module is connect with the processing module, for showing the chart and/or video frame of the processing module generation;
Interlocking module is connect with linkage, the alarm module and the processing module, for when there is alarm condition,
Start the linkage.
2. the system as claimed in claim 1, which is characterized in that the acquisition module is connect with the equipment of multiple and different types.
3. system as claimed in claim 2, which is characterized in that the processing module is specifically used for:
For any data, the data are compared with preset value, if more than the preset value, then trigger the alarm mould
Block exports alarm signal, and the data that will be greater than preset value are sent to the interlocking module.
4. system as claimed in claim 3, which is characterized in that the alarm module includes some or all of in following:
Picture warning piece;
Light warning piece;
Audible alarm component.
5. system as claimed in claim 4, which is characterized in that the linkage includes some or all of in following:
Fire-fighting link device;
Security protection linkage;
Environmental monitoring linkage;
SCADA (Supervisory ControlAnd DataAcquisition, data acquisition analysis system) linkage.
6. system as claimed in claim 5, which is characterized in that the linkage further include:
Link terminal, for notifying user's warning message.
7. system as claimed in claim 6, which is characterized in that the linkage further include:
Link gate inhibition, opens the door or closes the door for linkage control.
8. system as claimed in claim 7, which is characterized in that institute's system further include:
Control module is used for debugging software.
9. a kind of linkage surveillance method, which is characterized in that this method comprises:
Any one data in collected a plurality of types of data are compared with preset value, if exceeding preset value,
It alarms;
Start linkage.
10. method as claimed in claim 9, which is characterized in that this method further include:
Collected a plurality of types of data are handled, chart and/or video frame are generated;
Show the chart and/or the video frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910755551.1A CN110459040A (en) | 2019-08-15 | 2019-08-15 | A kind of cooperative monitoring system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910755551.1A CN110459040A (en) | 2019-08-15 | 2019-08-15 | A kind of cooperative monitoring system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110459040A true CN110459040A (en) | 2019-11-15 |
Family
ID=68486890
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910755551.1A Pending CN110459040A (en) | 2019-08-15 | 2019-08-15 | A kind of cooperative monitoring system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110459040A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110864747A (en) * | 2019-12-30 | 2020-03-06 | 南京市仪器仪表工业供销有限公司 | Water quality monitoring and early warning system |
CN111178417A (en) * | 2019-12-23 | 2020-05-19 | 云南恒协科技有限公司 | Energy accurate load prediction method for individual and group of users |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102355060A (en) * | 2011-10-10 | 2012-02-15 | 国电南瑞科技股份有限公司 | Intelligent interlocking system of transformer substation |
CN102354174A (en) * | 2011-07-30 | 2012-02-15 | 山东电力研究院 | Inspection system based on mobile inspection apparatus of transformer station and inspection method thereof |
CN202535158U (en) * | 2012-03-26 | 2012-11-14 | 深圳市爱科赛科技有限公司 | Auxiliary system for transformer station |
CN104052151A (en) * | 2014-05-14 | 2014-09-17 | 国家电网公司 | Intelligent auxiliary comprehensive monitoring and D5000 comprehensive linkage platform of transformer substation |
CN104750073A (en) * | 2015-03-13 | 2015-07-01 | 国家电网公司 | Security linkage system |
-
2019
- 2019-08-15 CN CN201910755551.1A patent/CN110459040A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102354174A (en) * | 2011-07-30 | 2012-02-15 | 山东电力研究院 | Inspection system based on mobile inspection apparatus of transformer station and inspection method thereof |
CN102355060A (en) * | 2011-10-10 | 2012-02-15 | 国电南瑞科技股份有限公司 | Intelligent interlocking system of transformer substation |
CN202535158U (en) * | 2012-03-26 | 2012-11-14 | 深圳市爱科赛科技有限公司 | Auxiliary system for transformer station |
CN104052151A (en) * | 2014-05-14 | 2014-09-17 | 国家电网公司 | Intelligent auxiliary comprehensive monitoring and D5000 comprehensive linkage platform of transformer substation |
CN104750073A (en) * | 2015-03-13 | 2015-07-01 | 国家电网公司 | Security linkage system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111178417A (en) * | 2019-12-23 | 2020-05-19 | 云南恒协科技有限公司 | Energy accurate load prediction method for individual and group of users |
CN110864747A (en) * | 2019-12-30 | 2020-03-06 | 南京市仪器仪表工业供销有限公司 | Water quality monitoring and early warning system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204652570U (en) | The long-range cruising inspection system of fire protection equipment | |
CN110083103A (en) | A kind of machine room intelligent monitoring system | |
CN104052151B (en) | Intelligent substation aided synthesis is monitored and D5000 cooler interlock platforms | |
CN102930702B (en) | Zero false alarm networking video security method and system thereof | |
CN102063116A (en) | Building information total management system and method | |
CN205621229U (en) | Prevent high -pressure electric shock alarming monitoring system | |
CN108631447A (en) | Unattended intelligent transformer substation system | |
CN110555982A (en) | Intelligent high-rise building fire control monitored control system | |
CN104269936A (en) | Comprehensive monitoring method and system | |
CN201749547U (en) | Unattended communication room safety management system | |
CN208820537U (en) | A kind of box-type substation integrated information monitoring system based on Internet of Things | |
CN209894901U (en) | Wisdom power consumption monitoring and early warning system based on wireless network deployment transmission | |
CN212970114U (en) | Comprehensive intelligent monitoring system for electrical equipment | |
CN101315726A (en) | Remote monitoring warning system | |
CN105561513A (en) | Smart fire-fighting management and control system | |
CN110459040A (en) | A kind of cooperative monitoring system and method | |
CN113082588A (en) | Museum fire extinguishing system | |
CN104689513A (en) | Communication method and communication system based on fire hydrant boxes | |
CN114446001A (en) | Multifunctional fire alarm device for intelligent construction and use method thereof | |
CN203288029U (en) | Alarm linkage system | |
CN203204760U (en) | Building intercom system with fire alarm function | |
CN113037842A (en) | Remote maintenance system of substation automation system | |
CN115001135B (en) | Charging and changing electric field station based on active fire control treatment | |
CN111986417A (en) | Intelligent electrical fire monitoring system based on Internet of things | |
CN102611193B (en) | The interaction control method of power system, Apparatus and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20191115 |