CN208820537U - A kind of box-type substation integrated information monitoring system based on Internet of Things - Google Patents
A kind of box-type substation integrated information monitoring system based on Internet of Things Download PDFInfo
- Publication number
- CN208820537U CN208820537U CN201821462198.5U CN201821462198U CN208820537U CN 208820537 U CN208820537 U CN 208820537U CN 201821462198 U CN201821462198 U CN 201821462198U CN 208820537 U CN208820537 U CN 208820537U
- Authority
- CN
- China
- Prior art keywords
- unit
- monitoring unit
- monitoring
- video
- box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 9
- 238000004891 communication Methods 0.000 claims description 5
- 239000007921 spray Substances 0.000 claims description 4
- 230000002457 bidirectional Effects 0.000 claims description 3
- 239000000523 sample Substances 0.000 claims description 3
- 239000000779 smoke Substances 0.000 claims description 3
- 238000004458 analytical method Methods 0.000 abstract description 3
- 230000001131 transforming Effects 0.000 description 3
- 238000004378 air conditioning Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000003796 beauty Effects 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 230000003111 delayed Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 230000029578 entry into host Effects 0.000 description 1
- 238000007654 immersion Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006011 modification reaction Methods 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000001105 regulatory Effects 0.000 description 1
- 230000011664 signaling Effects 0.000 description 1
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821462198.5U CN208820537U (en) | 2018-09-06 | 2018-09-06 | A kind of box-type substation integrated information monitoring system based on Internet of Things |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821462198.5U CN208820537U (en) | 2018-09-06 | 2018-09-06 | A kind of box-type substation integrated information monitoring system based on Internet of Things |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208820537U true CN208820537U (en) | 2019-05-03 |
Family
ID=66276236
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821462198.5U Active CN208820537U (en) | 2018-09-06 | 2018-09-06 | A kind of box-type substation integrated information monitoring system based on Internet of Things |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208820537U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110808632A (en) * | 2019-10-23 | 2020-02-18 | 云南恒协科技有限公司 | Transformer substation operation safety control system |
CN111208763A (en) * | 2020-01-15 | 2020-05-29 | 安徽华明电气设备有限公司 | Box-type substation maintenance management system and method |
CN111327112A (en) * | 2020-02-26 | 2020-06-23 | 国网陕西省电力公司电力科学研究院 | Transformer substation auxiliary equipment monitoring system and method based on Internet of things |
CN112838947A (en) * | 2020-12-23 | 2021-05-25 | 广州体育职业技术学院 | Construction method of power communication scheduling system |
-
2018
- 2018-09-06 CN CN201821462198.5U patent/CN208820537U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110808632A (en) * | 2019-10-23 | 2020-02-18 | 云南恒协科技有限公司 | Transformer substation operation safety control system |
CN110808632B (en) * | 2019-10-23 | 2022-06-14 | 云南恒协科技有限公司 | Transformer substation operation safety control system |
CN111208763A (en) * | 2020-01-15 | 2020-05-29 | 安徽华明电气设备有限公司 | Box-type substation maintenance management system and method |
CN111327112A (en) * | 2020-02-26 | 2020-06-23 | 国网陕西省电力公司电力科学研究院 | Transformer substation auxiliary equipment monitoring system and method based on Internet of things |
CN111327112B (en) * | 2020-02-26 | 2021-10-15 | 国网陕西省电力公司电力科学研究院 | Transformer substation auxiliary equipment monitoring system and method based on Internet of things |
CN112838947A (en) * | 2020-12-23 | 2021-05-25 | 广州体育职业技术学院 | Construction method of power communication scheduling system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208820537U (en) | A kind of box-type substation integrated information monitoring system based on Internet of Things | |
CN101783530B (en) | Intelligent monitoring and auxiliary control system for transformer substation based on Internet of things | |
CN102122844B (en) | Communication network based on sensor and smart substation of expert system | |
CN204652570U (en) | The long-range cruising inspection system of fire protection equipment | |
CN204465736U (en) | A kind of power transmission line intelligent long distance control system based on Internet of Things | |
CN107632581A (en) | A kind of monitoring management system of underground pipe gallery | |
CN104052151A (en) | Intelligent auxiliary comprehensive monitoring and D5000 comprehensive linkage platform of transformer substation | |
CN105425762A (en) | Machine room power environment centralized monitoring system | |
CN206992800U (en) | A kind of monitoring system of the intelligent substation of Internet of Things | |
CN104581087A (en) | Intelligent remote monitoring system of power transmission line on basis of internet of things | |
CN201629605U (en) | Substation intelligent monitoring and auxiliary control system based on internet of things | |
CN105785946A (en) | Machine room environment control integrated monitoring platform | |
CN103941784A (en) | System and method for monitoring and acquiring power distribution station environment | |
CN210536814U (en) | Unified supervision platform for fire-fighting internet of things | |
CN102566519A (en) | Setting method for power tunnel monitoring system | |
CN205375743U (en) | Transformer substation concentrates early warning controlling means | |
CN108375962A (en) | Offshore boosting station patrols control system | |
CN108539861A (en) | A kind of power distribution cabinet intellectualized management system | |
WO2021103831A1 (en) | Internet of things terminal for distribution room information management | |
CN104410825A (en) | Transformer substation video monitoring system | |
CN101976889A (en) | Substation video and environment monitoring terminal system | |
CN103560590A (en) | Power grid intelligent dispatching framework and achieving method thereof | |
CN102542745A (en) | Linkage alarming system on internet of things | |
CN107018205A (en) | A kind of network intelligence fire fighting hydraulic pressure table control system and its control method | |
CN102611193B (en) | The interaction control method of power system, Apparatus and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 014010 Qing Circuit No. 1, Rare Earth High-tech Zone, Baotou City, Inner Mongolia Autonomous Region Patentee after: Qingshan Electric (Inner Mongolia) Co.,Ltd. Address before: 014000 Qing Circuit No. 1, Rare Earth High-tech Zone, Baotou City, Inner Mongolia Autonomous Region Patentee before: BAOTOU QINGSHAN ELECTRIC EQUIPMNET Co.,Ltd. |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Box-type substation comprehensive information monitoring system based on Internet of Things Effective date of registration: 20200623 Granted publication date: 20190503 Pledgee: Bank of China Limited Baotou Jiuyuan sub branch Pledgor: Qingshan Electric (Inner Mongolia) Co.,Ltd. Registration number: Y2020150000031 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20210708 Granted publication date: 20190503 Pledgee: Bank of China Limited Baotou Jiuyuan sub branch Pledgor: Qingshan Electric (Inner Mongolia) Co.,Ltd. Registration number: Y2020150000031 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Integrated information monitoring system of box type substation based on Internet of things Effective date of registration: 20210712 Granted publication date: 20190503 Pledgee: Bank of China Limited Baotou Jiuyuan sub branch Pledgor: Qingshan Electric (Inner Mongolia) Co.,Ltd. Registration number: Y2021150000055 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20220715 Granted publication date: 20190503 Pledgee: Bank of China Limited Baotou Jiuyuan sub branch Pledgor: Qingshan Electric (Inner Mongolia) Co.,Ltd. Registration number: Y2021150000055 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: An integrated information monitoring system for box type substation based on Internet of things Effective date of registration: 20220718 Granted publication date: 20190503 Pledgee: Bank of China Limited Baotou Jiuyuan sub branch Pledgor: Qingshan Electric (Inner Mongolia) Co.,Ltd. Registration number: Y2022150000073 |