CN110453693A - It is a kind of using adit formula to the treatment schemes of anchor - Google Patents
It is a kind of using adit formula to the treatment schemes of anchor Download PDFInfo
- Publication number
- CN110453693A CN110453693A CN201910157776.7A CN201910157776A CN110453693A CN 110453693 A CN110453693 A CN 110453693A CN 201910157776 A CN201910157776 A CN 201910157776A CN 110453693 A CN110453693 A CN 110453693A
- Authority
- CN
- China
- Prior art keywords
- anchor
- hole
- caverns
- anchorage head
- slope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 16
- 230000002787 reinforcement Effects 0.000 claims abstract description 8
- 238000005553 drilling Methods 0.000 claims abstract description 4
- 239000003550 marker Substances 0.000 claims abstract description 4
- 238000004873 anchoring Methods 0.000 claims description 5
- 239000004568 cement Substances 0.000 claims description 4
- 239000002002 slurry Substances 0.000 claims description 4
- 238000002372 labelling Methods 0.000 claims description 3
- 238000004080 punching Methods 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 3
- 239000011435 rock Substances 0.000 description 5
- 230000004888 barrier function Effects 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000011083 cement mortar Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000032683 aging Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 230000035882 stress Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/76—Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a kind of using adit formula to the treatment schemes of anchor, comprising the following steps: step 1: surveying to the slope geological to need reinforcement, formulates processing scheme, draws engineering drawing;Step 2: the anchor caverns of specified quantity are set into side slope in the two sides designated position of side slope, through theodolite on side slope surface, the position of anchor caverns inner marker anchor hole;Step 3: it is drilled with anchor hole in slope surface using drilling machine, anchor cable is worn in anchor hole, the anchor cable one end for exposing slope surface is fixed in slope surface with outer anchorage head, the anchor cable end in anchor caverns is fixed with interior anchorage head;Step 4: outer anchorage head is interconnected using reinforcing bar and is fixed, interior anchorage head is connected with reinforcing bar;Step 5: vertical anchor caverns equidistantly set drainage hole to anchor caverns top.In short, the present invention has many advantages, such as that scheme is perfect, construction is convenient, highly-safe.
Description
Technical field
The present invention relates to Geotechnical Engineering fields, are specifically related to a kind of Slope Treatment side using adit formula to anchor
Case.
Background technique
Anchor cable refer in suspension bridge it is lateral opening main push-towing rope is anchored when, by main push-towing rope be divided into many stock steel beams difference anchors in
In anchor ingot, these steel beams are just referred to as anchor cable.Anchor cable is that slope surface is fixed on by outer end, and the other end is anchored within sliding surface
The prestress wire that slope sliding face is passed through in rock mass stability, directly generates sliding resistance on sliding surface, increases antiskid friction
Resistance makes structural plane be in impaction state, to improve the globality of slope rock mass, to fundamentally improve the mechanical property of rock mass
Can, the displacement of rock mass is efficiently controlled, its stabilization is promoted, achievees the purpose that renovate concordant, landslide and crag, danger stone.
But anchor cable is usually since anchored end country rock relaxation destruction, Anchor Agent aging, anchored end stress concentrate gradual break
The reasons such as bad, anchor cable creep relaxation cause failure of cable, and then induce slope problem.It is now novel in order to avoid the above problem
Pressure dispersing anchorage cable, pressure anchor wire etc., its purpose is to guarantee the reliability of anchored end and actual effect.
Summary of the invention
In view of the above problems, the present invention provides a kind of using adit formula to the treatment schemes of anchor.
The technical scheme is that it is a kind of using adit formula to the treatment schemes of anchor, comprising the following steps:
Step 1: slope geological exploration
The slope geological to need reinforcement is surveyed, processing scheme is formulated by slope geological parameter, draws engineering drawing
Paper;
Step 2: anchor caverns are set
The anchor caverns of specified quantity are set into side slope in the two sides designated position of side slope according to engineering drawing, pass through longitude and latitude
Instrument is according to the anchoring hole site on engineering drawing on side slope surface, the position of anchor caverns inner marker anchor hole;
Step 3: anchor hole and two-ended cables are set
Mark position using drilling machine in slope surface anchor hole is drilled with anchoring to the anchor caverns internal labeling position of identical label
Anchor cable is worn in hole in anchor hole after punching, the anchor cable one end for exposing slope surface is fixed in slope surface with outer anchorage head, by anchor caverns
Interior anchor cable end is fixed with interior anchorage head, applies certain pulling force to anchor cable both ends, then blocks outer anchorage head, interior anchorage head;
Step 4: reinforcing bar connection
The outer anchorage head being arranged on side slope surface is interconnected using reinforcing bar and is fixed, by the interior anchoring in same anchor caverns
Head is connected with reinforcing bar;
Step 5: drainage hole is set
It pushes up to anchor caverns top and equidistantly sets three drainage holes in vertical anchor caverns hole.
Further, the processing scheme includes the need reinforcement area of side slope, the quantity of anchor caverns and position and anchoring
The quantity in hole and position.
Further, the anchor hole label same numbers number of interconnection is compiled same numbers in the step 2
Number anchor hole label get through and be formed anchor hole, digital number is convenient for construction identification.
Further, Fast Setting Cement Slurry, perfusion speed will be perfused in the step 3 after the block of anchor cable both ends into anchor hole
Condensate cement mortar avoids leak in anchor hole that anchor hole is caused to collapse.
Further, connecting the connection type of outer anchorage head with reinforcing bar in the step 4 is to intersect latticed connection, is handed over
It is more firm to pitch grid type connection.
Further, the bottom surface of the anchor caverns is the slope surface shape that two sides are low, centre is high, convenient for the row of water in anchor caverns
Out.
Further, the bottom end of the drainage hole is equipped with barrier net, and the barrier net can will fall off in drainage hole
Sundries barrier, avoiding drainage hole from largely falling off causes to collapse.
The beneficial effects of the present invention are: it is provided by the invention it is a kind of using adit formula to the treatment schemes of anchor, compare
For the prior art, first the slope geological to need reinforcement is surveyed, processing scheme system is carried out according to specific geological conditions
It is fixed, anchor caverns then are set in side slope two sides, the anchor hole label same numbers number of interconnection numbers same numbers
Anchor hole label get through and be formed anchor hole, Fast Setting Cement Slurry will be perfused into anchor hole after the block of anchor cable both ends, be perfused
Accelerated cement mortar avoids leak in anchor hole that anchor hole is caused to collapse, the outer anchorage head being arranged on side slope surface using reinforcing bar
Intersect latticed interconnection to fix, set drainage hole vertically upward in anchor caverns, at the same the bottom surface of anchor caverns be two sides it is low,
Intermediate high slope surface shape, convenient for the discharge of water in anchor caverns.In short, the present invention has, scheme is perfect, construction is convenient, highly-safe
The advantages that.
Detailed description of the invention
Fig. 1 is side slope sectional view of the invention.
Wherein, the outer anchorage head of 1- side slope, 2- anchor caverns, 3- anchor hole, 4- anchor cable, 5-, anchorage head, 7- reinforcing bar, 8- in 6-
Drainage hole.
Specific embodiment
For convenient for the understanding to technical solution of the present invention, with reference to the accompanying drawing 1 and specific embodiment the present invention is done into one
The explanation of step, embodiment do not constitute the restriction to invention protection scope.
It is a kind of using adit formula to the treatment schemes of anchor, mainly comprise the steps that
Step 1: 1 geological exploration of side slope
1 geology of side slope to need reinforcement is surveyed, processing scheme, processing scheme packet are formulated by slope geological parameter
The quantity and position of the area for the side slope 1 that needs reinforcement, the quantity of anchor caverns 2 and position and anchor hole 3 are included, engineering drawing is drawn;
Step 2: anchor caverns are set
As shown in Figure 1, setting the anchor of specified quantity into side slope 1 in the two sides designated position of side slope 1 according to engineering drawing
Gu hole 2, the bottom surface of anchor caverns 2 is the slope surface shape that two sides are low, centre is high, by theodolite according to the anchor hole 3 on engineering drawing
The anchor hole 3 of interconnection is marked identical number in 1 slope surface of side slope, the position of 2 inner marker anchor hole 3 of anchor caverns by position
Word number;
Step 3: anchor hole 3 and two-ended cables 4 are set
Mark position using drilling machine in slope surface anchor hole 3 is drilled with anchor to the 2 internal labeling position of anchor caverns of identical label
Solid hole 3 wears anchor cable 4 in anchor hole 3 after punching, the outer anchorage head 5 in 4 one end of anchor cable for exposing slope surface is fixed in slope surface,
4 end of anchor cable in anchor caverns 2 is fixed with interior anchorage head 6, apply certain pulling force to 4 both ends of anchor cable, then by outer anchorage head 5,
Interior anchorage head 6 blocks, and Fast Setting Cement Slurry is perfused into anchor hole 3;
Step 4: reinforcing bar 7 connects
The outer anchorage head 5 being arranged in 1 slope surface of side slope is interconnected using reinforcing bar 7 and is fixed, connection type is to intersect grid
Shape connection, the reinforcing bar 7 of interior anchorage head 6 in same anchor caverns 2 is connected;
Step 5: drainage hole 8 is set
It pushes up to 2 top of anchor caverns and equidistantly sets three drainage holes 8 in vertical 2 hole of anchor caverns.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although
Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used
To modify to technical solution documented by previous embodiment or equivalent replacement of some of the technical features;And
These are modified or replaceed, the spirit and model of technical solution of the embodiment of the present invention that it does not separate the essence of the corresponding technical solution
It encloses.
Claims (7)
1. it is a kind of using adit formula to the treatment schemes of anchor, which is characterized in that mainly comprise the steps that
Step 1: side slope (1) geological exploration
Side slope (1) geology to need reinforcement is surveyed, processing scheme is formulated by slope geological parameter, draws engineering drawing
Paper;
Step 2: anchor caverns are set
The anchor caverns (2) for setting specified quantity into side slope (1) in the two sides designated position of side slope (1) according to engineering drawing, lead to
Theodolite is crossed according to anchor hole (3) position on engineering drawing in side slope (1) slope surface, anchor caverns (2) inner marker anchor hole
(3) position;
Step 3: anchor hole (3) and two-ended cables (4) are set
Mark position using drilling machine in slope surface anchor hole (3) is drilled with anchor to anchor caverns (2) internal labeling position of identical label
Solid hole (3) wears anchor cable (4) in anchor hole (3) after punching, and anchor cable (4) one end for exposing slope surface is fixed with outer anchorage head (5)
It is in slope surface, anchor cable (4) end in anchor caverns (2) is fixed with interior anchorage head (6), apply certain pulling force to anchor cable (4) both ends,
Then outer anchorage head (5), interior anchorage head (6) are blocked;
Step 4: reinforcing bar (7) connection
The outer anchorage head (51) being arranged in side slope (1) slope surface is interconnected using reinforcing bar (7) and is fixed, by same anchor caverns (2)
Interior interior anchorage head (6) is connected with reinforcing bar (7);
Step 5: drainage hole (8) are set
It pushes up to anchor caverns (2) top and equidistantly sets three drainage holes (8) in vertical anchor caverns (2) hole.
2. it is according to claim 1 it is a kind of using adit formula to the treatment schemes of anchor, which is characterized in that the processing
Quantity and position of the scheme including the need reinforcement area of side slope (1), the quantity of anchor caverns (2) and position and anchor hole (3).
3. it is according to claim 1 it is a kind of using adit formula to the treatment schemes of anchor, which is characterized in that the step
By the anchor hole of interconnection (3) label same numbers number in two.
4. it is according to claim 1 it is a kind of using adit formula to the treatment schemes of anchor, which is characterized in that the step
Fast Setting Cement Slurry will be perfused into anchor hole (3) after the block of anchor cable (4) both ends in three.
5. it is according to claim 1 it is a kind of using adit formula to the treatment schemes of anchor, which is characterized in that the step
The connection type of outer anchorage head (5) is connected in four with reinforcing bar (7) to intersect latticed connection.
6. it is according to claim 1 it is a kind of using adit formula to the treatment schemes of anchor, which is characterized in that the anchoring
The bottom surface in hole (2) is the slope surface shape that two sides are low, centre is high.
7. it is according to claim 1 it is a kind of using adit formula to the treatment schemes of anchor, which is characterized in that the step
Outer anchorage head (5) are interconnected with reinforcing bar (7) in four.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910157776.7A CN110453693B (en) | 2019-03-02 | 2019-03-02 | Side slope processing scheme adopting flat hole type anchor pair |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910157776.7A CN110453693B (en) | 2019-03-02 | 2019-03-02 | Side slope processing scheme adopting flat hole type anchor pair |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110453693A true CN110453693A (en) | 2019-11-15 |
CN110453693B CN110453693B (en) | 2021-06-11 |
Family
ID=68480574
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910157776.7A Expired - Fee Related CN110453693B (en) | 2019-03-02 | 2019-03-02 | Side slope processing scheme adopting flat hole type anchor pair |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110453693B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111140248A (en) * | 2020-01-17 | 2020-05-12 | 中铁二院工程集团有限责任公司 | Bias tunnel structure applying prestress to pilot tunnel and construction method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104032758A (en) * | 2014-05-26 | 2014-09-10 | 中国建筑第八工程局有限公司 | Reinforcement construction method for ultrahigh slope in abandoned pit |
CN104612719A (en) * | 2014-12-15 | 2015-05-13 | 中铁二十局集团有限公司 | Collapse prevention processing method for soft rock tunnel portal |
CN105862885A (en) * | 2016-04-12 | 2016-08-17 | 化学工业岩土工程有限公司 | Soil slope reinforcing method |
CN106120820A (en) * | 2016-08-14 | 2016-11-16 | 中国电建集团贵阳勘测设计研究院有限公司 | The anchoring process of a kind of rock side slope and structure |
CN205934940U (en) * | 2016-08-14 | 2017-02-08 | 中国电建集团贵阳勘测设计研究院有限公司 | Anchor structure of rock matter side slope |
-
2019
- 2019-03-02 CN CN201910157776.7A patent/CN110453693B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104032758A (en) * | 2014-05-26 | 2014-09-10 | 中国建筑第八工程局有限公司 | Reinforcement construction method for ultrahigh slope in abandoned pit |
CN104612719A (en) * | 2014-12-15 | 2015-05-13 | 中铁二十局集团有限公司 | Collapse prevention processing method for soft rock tunnel portal |
CN105862885A (en) * | 2016-04-12 | 2016-08-17 | 化学工业岩土工程有限公司 | Soil slope reinforcing method |
CN106120820A (en) * | 2016-08-14 | 2016-11-16 | 中国电建集团贵阳勘测设计研究院有限公司 | The anchoring process of a kind of rock side slope and structure |
CN205934940U (en) * | 2016-08-14 | 2017-02-08 | 中国电建集团贵阳勘测设计研究院有限公司 | Anchor structure of rock matter side slope |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111140248A (en) * | 2020-01-17 | 2020-05-12 | 中铁二院工程集团有限责任公司 | Bias tunnel structure applying prestress to pilot tunnel and construction method thereof |
CN111140248B (en) * | 2020-01-17 | 2024-05-07 | 中铁二院工程集团有限责任公司 | Bias tunnel structure with prestress applied to pilot tunnel and construction method of bias tunnel structure |
Also Published As
Publication number | Publication date |
---|---|
CN110453693B (en) | 2021-06-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104790978B (en) | The tunnel ring-shaped base tunnel construction method of small interval crossings on different level | |
CN111364486B (en) | Remediation and reinforcement device and method for emergency rescue of slide-resistant pile side slope | |
BR112012033713B1 (en) | reinforcement system for an anchor for stays | |
CN106320348A (en) | Opposite-pulling anchor cable supporting structure for adjacent deep foundation pits and construction method of opposite-pulling anchor cable supporting structure | |
CN107905224A (en) | It is a kind of to expand head in perforate steel pipe to improve the anchor structure of anti-pulling of anchor bar and construction method using expanding cement | |
CN209277895U (en) | A kind of tunnel portal anchor pile and pipe canopy are oriented to wall connection structure | |
CN104532868A (en) | Anchored high bearing platform grouped pile foundation building method for high-steep deformation slope area bridge | |
CN105569051A (en) | Foundation pit support system of sandy pebble boulder geological stratification and construction method | |
CN110158497A (en) | A kind of high cantilever rock-fall protection structure and construction method | |
CN113431039A (en) | Construction method of bridge implanted pile | |
CN110453693A (en) | It is a kind of using adit formula to the treatment schemes of anchor | |
CN109441502A (en) | Based on arch-beam coupled structure deep-well method of compound roof support containing coal | |
CN202925575U (en) | Pre-buried structure for core-drilling detection of foundation pile | |
CN218508416U (en) | Rotary excavating cast-in-place pile under miscellaneous fill high backfill geological condition | |
CN109083669A (en) | Roadway floor prestressed grouting birdcage anchor cable construction method | |
CN110030001A (en) | A kind of construction method that mountain tunnel is appeared | |
CN214169107U (en) | Cast-in-situ bored pile structure in area with intense karst | |
CN212405118U (en) | Pile pouring structure and pile structure based on informatization technology | |
CN204703920U (en) | A kind of solidifying of the working face system based on fiberglass pipe bolt grouting | |
CN212358029U (en) | Tunnel type anchorage structure for cable crane | |
CN209555949U (en) | A kind of mine landslide-proofing ruggedized construction | |
CN110725326A (en) | Geotechnical engineering slope reinforcement device and method | |
KR20090049132A (en) | The ground reinforcement apparatus and ground reinforcement method | |
CN215801683U (en) | Foundation pit supporting structure in civil engineering construction process | |
CN110565664A (en) | Protective structure and treatment method for side slope inverted suspension |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210611 |
|
CF01 | Termination of patent right due to non-payment of annual fee |