CN110030001A - A kind of construction method that mountain tunnel is appeared - Google Patents

A kind of construction method that mountain tunnel is appeared Download PDF

Info

Publication number
CN110030001A
CN110030001A CN201910461546.XA CN201910461546A CN110030001A CN 110030001 A CN110030001 A CN 110030001A CN 201910461546 A CN201910461546 A CN 201910461546A CN 110030001 A CN110030001 A CN 110030001A
Authority
CN
China
Prior art keywords
tunnel
appeared
mountain
construction
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910461546.XA
Other languages
Chinese (zh)
Other versions
CN110030001B (en
Inventor
吴波
张子仪
黄惟
邓政
蒙国往
李静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi University
Original Assignee
Guangxi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi University filed Critical Guangxi University
Priority to CN201910461546.XA priority Critical patent/CN110030001B/en
Publication of CN110030001A publication Critical patent/CN110030001A/en
Application granted granted Critical
Publication of CN110030001B publication Critical patent/CN110030001B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention discloses a kind of construction method that mountain tunnel is appeared, suspend driving in safe distance, simple workbench is piled up using the part rock ballast generated in leading portion digging process for advance support and the prevention Blasting shock wave of constructing, and protective net is hung using the grouting pipe beaten from inside to outside from hole, then control explosion is repeatedly carried out on a small quantity by the sequence of construction of design, formation is slagged tap funnel, and in combination with mechanical excavation, thus the mode of cycle operation is appeared.The present invention piles up simple workbench using rock ballast and adjusts inclination angle and the size of funnel of slagging tap, solve the problems, such as that the unfavorable factors such as precipitous, the falling rocks slungshot of the landform faced during tunnel outlet are brought to a certain extent, influence during tunnel outlet to surrounding enviroment is preferably minimized, guarantees construction environmental protection and safety.

Description

A kind of construction method that mountain tunnel is appeared
Technical field
The present invention relates to method for tunnel construction technical fields, more particularly to a kind of construction method that mountain tunnel is appeared.
Background technique
Tunnel is the engineering works being embedded in stratum, is a kind of form of human use's underground space.Tunnel can divide For traffic tunnel, Hydraulic Tunnel, municipal tunnel, mining tunnel.The structure in tunnel includes main building object and auxiliary device two Point.Main building object is made of barrel and portal, and auxiliary device includes that refuge chamber, fire fighting device, emergency communication and guarded drainage are set It applies, there are also special ventilation and lighting apparatus for major long tunnel.
Currently, short, Pollen sterility the mode for mostly using only head to tunnel by going out hole into hole to the other end of appearing, construction is extremely Out when hole, it will usually generate a large amount of rock ballast and be directly discharged from hole out.When having residential building, highway, crops etc. under mountain, It will cause a degree of destruction, it is clear that the form of construction work of this extensive style is simultaneously undesirable.Ecological environmental protection is considered simultaneously It is the problem of aspect, particularly significant using economic, environmental protection, effective mode of appearing.
Therefore, how to change in the prior art, rock ballast shows to what ambient enviroment damaged when constructing tunnel to hole out Shape is those skilled in the art's urgent problem to be solved.
Summary of the invention
The object of the present invention is to provide a kind of construction methods that mountain tunnel is appeared, above-mentioned of the existing technology to solve Problem makes tunnel outlet construction being capable of existing building or topography and geomorphology under effective protection mountain.
To achieve the above object, the present invention provides following schemes: the present invention provides a kind of construction that mountain tunnel is appeared Method includes the following steps:
Step 1: face pause is tunneled forward, and the rock ballast that tunnel cutting is generated is accumulated when excavating barrel to hole out Simple workbench is formed, there is gap between simple workbench and country rock face to be excavated;
Step 2: pipe shed support is arranged at the top of face excavating, distance is equal to barrel between pipe shed support and out hole Diameter, the steel pipe of pipe shed support is obliquely installed obliquely towards the direction for going out hole;
Step 3: grouting pipe is arranged in the bottom of inverted arch, the axis of grouting pipe and the axis in tunnel are parallel, slip casting Conduit stretches out outside the side slope of the mountain ridge, and protective net is arranged outside the side slope of the mountain ridge, and protective net one end is fixed in grouting pipe, protective net Height is high compared with the height of barrel;
Step 4: Smooth Blasting Construction
A, free face is formed by vertical wedge cut, aperture, row spacing and the hole depth of vertical wedge cut are according to enclosing Rock category setting;
B, explosion design is carried out according to practical country rock situation, excavated section, explosive, difficulty of construction;
C, blast working is from top to bottom carried out by the way of repeatedly a small amount of when explosion, since face has gradient, Funnel of slagging tap is formed after explosion;
D, the remaining rock mass within the scope of Excavation blasting by way of mechanical excavation, penetrates through face, when excavation, the cross in tunnel Section direction is according to first both sides intermediate sequence of excavation again, and vertical direction is according to top-down sequence of excavation;
E, since Blasting Excavation generates new rock ballast, the new rock ballast generated will be excavated and accumulate to form new simple work and put down Platform makees preliminary bracing using new simple workbench, by unwanted rock ballast in simple workbench before by into hole It transports;
F, using the method cycle operation of A-E, until completing the excavation of face;
Step 5: face is completed after excavating, by rock ballast remaining in tunnel all by transporting into hole, complete to appear.
Preferably, in step 1, barrel is excavated apart from when hole is 4-8m out, pause is tunneled forward.
Preferably, in step 1, simple workbench is prismatoid shape.
Preferably, in step 2, the diameter of steel tube of pipe shed support is 96mm.
Preferably, in step 3, the distance that grouting pipe is stretched out outside the side slope of the mountain ridge is 2m.
Preferably, in step 4, using shortening or the borehole that is staggered, the method for controlling total explosive charge encloses periphery with reducing The disturbance of rock.
Preferably, tunnel uses the mode of the bolt support.
The present invention achieves following technical effect compared with the existing technology: the construction party that mountain tunnel of the invention is appeared Method suspends driving in safe distance, piles up simple workbench using the part rock ballast generated in leading portion digging process and be used to Construction advance support and prevention Blasting shock wave, and protective net is hung using the grouting pipe beaten from inside to outside from hole, then press The sequence of construction of design repeatedly carries out control explosion on a small quantity, funnel of slagging tap is formed, in combination with mechanical excavation, thus cycle operation Mode appear.The present invention piles up simple workbench using rock ballast and adjusts inclination angle and the size of funnel of slagging tap, certain Solve the problems, such as that the unfavorable factors such as precipitous, the falling rocks slungshot of the landform faced during tunnel outlet are brought in degree, by tunnel Influence to surrounding enviroment is preferably minimized during road is appeared, and guarantees construction environmental protection and safety.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without any creative labor, can also be according to these attached drawings Obtain other attached drawings.
Fig. 1 is the construction process figure for the construction method that mountain tunnel of the invention is appeared;
Fig. 2 is the construction surrounding enviroment schematic diagram for the construction method that mountain tunnel of the invention is appeared;
Fig. 3 is the entrance construction schematic cross-sectional view out for the construction method that mountain tunnel of the invention is appeared;
Fig. 4 is the entrance construction axial direction sectional schematic diagram out for the construction method that mountain tunnel of the invention is appeared;
Wherein, 1 is the rock mass for hole and not excavating, and 2 be Tunnel Design contour line, and 3 be simple workbench, and 4 be slip casting Conduit, 5 be protective net, and 6 be non-breakable building, and 7 be suspension roof support, and 8 be pipe shed support, and 9 be inverted arch, and 10 be leakage of slagging tap Bucket, 11 be interim steel arch-shelf, and 12 is excavate face, and 13 be to excavate the rock ballast generated, and α is funnel angle of slagging tap.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The object of the present invention is to provide a kind of construction methods that mountain tunnel is appeared, above-mentioned of the existing technology to solve Problem makes tunnel outlet construction being capable of existing building or topography and geomorphology under effective protection mountain.
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real Applying mode, the present invention is described in further detail.
Please refer to Fig. 1-4, wherein Fig. 1 is the construction process figure for the construction method that mountain tunnel of the invention is appeared, Fig. 2 For the construction surrounding enviroment schematic diagram for the construction method that mountain tunnel of the invention is appeared, Fig. 3 is that mountain tunnel of the invention goes out The construction method in hole goes out entrance construction schematic cross-sectional view, and Fig. 4 is going out for the construction method that mountain tunnel of the invention is appeared Entrance construction axial direction sectional schematic diagram.
The present invention provides a kind of construction method that mountain tunnel is appeared, and includes the following steps:
Step 1: building operation platform
When tunnel excavation barrel to hole a distance out, is excavating in face safe distance, tunnel cutting is being generated Rock ballast accumulate to form simple workbench 3, between simple workbench 3 and country rock face to be excavated have gap.
Step 2: carrying out out pre support at hole
Pipe shed support is set at the top of face excavating, the length of steel pipe of pipe shed support be it is medium, pipe shed support with appear Distance is equal to the diameter of barrel between mouthful, and the steel pipe of pipe shed support is obliquely installed obliquely towards the direction for going out hole;When construction, Drilling is carried out according to the boring direction of design, diameter, the elevation angle, depth, ring phase spacing above face excavating, is often drilled one Steel pipe and slip casting are inserted into behind hole in time.
Step 3: installation safeguard procedures
Grouting pipe 4 is set in the bottom of inverted arch, the axis of grouting pipe 4 and the axis in tunnel are parallel, grouting pipe 4 It stretches out outside the side slope of the mountain ridge, grouting pipe 4 can be used as a part of tunnel excavation pre support, and completion need to will only stretch out mountain after appearing Part grouting pipe 4 outside the side slope of ridge is cut, and it is convenient to operate.Protective net 5,5 one end of protective net are set outside the side slope of the mountain ridge It is fixed in grouting pipe 4, grouting pipe 4 can provide support for protective net 5, and the height of protective net 5 is high compared with the height of barrel.
Step 4: Smooth Blasting Construction
A, free face is formed by vertical wedge cut, aperture, row spacing and the hole depth of vertical wedge cut are according to enclosing Rock category setting.
B, explosion design is carried out according to practical country rock situation, excavated section, explosive, difficulty of construction.
C, blast working is from top to bottom carried out by the way of repeatedly a small amount of when explosion, since face has gradient, Funnel 10 of slagging tap is formed after explosion, the lower leakage due to gravity of the rock mass of loosening is formed slopely leakage of slagging tap using excavation face Bucket 10 can reduce operator's workload by leaking rock ballast under gravity, improve working efficiency.In present embodiment In, the inclination angle for funnel 10 of slagging tap is 5 ° -10 °.
D, the remaining rock mass within the scope of Excavation blasting by way of mechanical excavation, penetrates through face, when excavation, the cross in tunnel Section direction is according to first both sides intermediate sequence of excavation again, and vertical direction is according to top-down sequence of excavation;Specifically please refer to Figure, horizontal direction first excavates upper left side section, then excavates upper right side section, finally excavate upside mid-section, vertical direction by It is excavated in order under.The mode of appearing of a small amount of multiple photoface exploision combination mechanical excavation can effectively reduce work progress In disturbance to country rock, while reducing the falling rocks of explosion generation, slungshot.
E, since Blasting Excavation generates new rock ballast, the new rock ballast generated will be excavated and accumulate to form new simple work and put down Platform 3 makees preliminary bracing using new simple workbench 3, by unwanted rock ballast in simple workbench 3 before by into hole Mouth transports.Herein it should be noted that the simple workbench 3 that rock ballast is piled into not is fixation, in work progress of appearing In, continue the new simple workbench 3 of accumulation using the new rock ballast for excavating generation on one side, on one side the unwanted accumulation by before The rock ballast of simple workbench 3 by transporting into hole, i.e., constantly update and move towards direction is excavated by simple workbench 3, Simple workbench 3 can not only be as the operation platform of lead pipe-shed support, additionally it is possible to effectively stop to generate when blast working Shock wave.
F, using the method cycle operation of A-E, until completing the excavation of face.The present invention uses photoface exploision, this The protective net 5 slagged tap outside funnel 10 and hole formed in the control explosion combination blasting process of microseismic activity, will appear construction pair The influence of surrounding enviroment minimizes, additionally it is possible to shorten the construction period, improve working efficiency.
Step 5: face is completed after excavating, by rock ballast remaining in tunnel all by transporting into hole, complete to appear, mountain Lower building is not influenced by tunnel outlet construction.
In this embodiment, in step 1, barrel is excavated apart from when hole is 4-8m out, pause is tunneled forward, Stop tunneling forward when being excavated to hole a certain distance, the material elements such as the size of distance and geological conditions are related.
Specifically, in step 1, simple workbench 3 is prismatoid shape, and the simple workbench 3 of prismatoid shape is construction It provides and stablizes support.
In addition, the diameter of steel tube of pipe shed support is 96mm in step 2, pipe shed support reliability is improved.
More specifically, the distance that grouting pipe 4 is stretched out outside the side slope of the mountain ridge is 2m in step 3, grouting pipe 4 is protective net 5 provide stable support.
Further, in step 4, when country rock situation is poor, using shortening or the borehole that is staggered, total explosive charge is controlled Method, to reduce the disturbance to peripheral rock.
Further, tunnel uses the mode of the bolt support, and suspension roof support supporting effect is good, at low cost, easy to operate.
The construction method that mountain tunnel of the invention is appeared, suitable for having non-breakable building below massif, can not When expropriation of land, as much as possible reduction mountain tunnel appear construction in the adverse effect caused by it, in safe distance Pause driving, using the part rock ballast generated in leading portion digging process pile up simple workbench 3 be used to construct advance support and Prevent Blasting shock wave, and hang protective net 5 using the grouting pipe 4 beaten from inside to outside from hole, then the construction by design is suitable Sequence repeatedly carries out control explosion on a small quantity, forms funnel 10 of slagging tap, in combination with mechanical excavation, thus the mode of cycle operation goes out Hole.The present invention piles up simple workbench 3 using rock ballast and adjusts inclination angle and the size of funnel 10 of slagging tap, to a certain extent Solve the problems, such as that the unfavorable factors such as precipitous, the falling rocks slungshot of the landform faced during tunnel outlet are brought, by tunnel outlet The influence of surrounding enviroment is preferably minimized in the process, guarantees construction environmental protection and safety.Meanwhile mountain tunnel of the invention is appeared Construction method, difficulty of construction is low, reduce personnel, machinery and construction method adjustment triviality, reduce construction cost, Importantly, can neatly adjust the simple workbench 3 piled up according to the actual conditions of country rock and surrounding enviroment and appear The position of mouth, the inclination angle for funnel 10 of slagging tap and size.
Specific examples are applied in the present invention, and principle and implementation of the present invention are described, above embodiments Illustrate to be merely used to help understand method and its core concept of the invention;At the same time, for those skilled in the art, according to According to thought of the invention, there will be changes in the specific implementation manner and application range.In conclusion the content of the present specification It should not be construed as limiting the invention.

Claims (7)

1. a kind of construction method that mountain tunnel is appeared, which comprises the steps of:
Step 1: face pause is tunneled forward when excavating barrel to hole out, the rock ballast that tunnel cutting generates is accumulated to be formed Simple workbench has gap between simple workbench and country rock face to be excavated;
Step 2: pipe shed support is arranged at the top of face excavating, distance is equal to the straight of barrel between pipe shed support and out hole The steel pipe of diameter, pipe shed support is obliquely installed obliquely towards the direction for going out hole;
Step 3: grouting pipe is arranged in the bottom of inverted arch, the axis of grouting pipe and the axis in tunnel are parallel, grouting pipe It stretches out outside the side slope of the mountain ridge, protective net is set outside the side slope of the mountain ridge, protective net one end is fixed in grouting pipe, the height of protective net It is high compared with the height of barrel;
Step 4: Smooth Blasting Construction
A, free face is formed by vertical wedge cut, aperture, row spacing and the hole depth of vertical wedge cut are according to country rock class It does not set;
B, explosion design is carried out according to practical country rock situation, excavated section, explosive, difficulty of construction;
C, blast working is from top to bottom carried out by the way of repeatedly a small amount of when explosion, since face has gradient, explosion Funnel of slagging tap is formed afterwards;
D, the remaining rock mass within the scope of Excavation blasting by way of mechanical excavation, penetrates through face, when excavation, the cross section in tunnel Direction is according to first both sides intermediate sequence of excavation again, and vertical direction is according to top-down sequence of excavation;
E, since Blasting Excavation generates new rock ballast, the new rock ballast generated will be excavated and accumulate to form new simple workbench, Make preliminary bracing using new simple workbench, by unwanted rock ballast in simple workbench before by transporting into hole Out;
F, using the method cycle operation of A-E, until completing the excavation of face;
Step 5: face is completed after excavating, by rock ballast remaining in tunnel all by transporting into hole, complete to appear.
2. the construction method that mountain tunnel according to claim 1 is appeared, it is characterised in that: in step 1, excavate barrel Distance out hole be 4-8m when, pause tunnel forward.
3. the construction method that mountain tunnel according to claim 1 is appeared, it is characterised in that: simple to work in step 1 Platform is prismatoid shape.
4. the construction method that mountain tunnel according to claim 1 is appeared, it is characterised in that: in step 2, pipe shed support Diameter of steel tube be 96mm.
5. the construction method that mountain tunnel according to claim 1 is appeared, it is characterised in that: in step 3, grouting pipe The distance stretched out outside the side slope of the mountain ridge is 2m.
6. the construction method that mountain tunnel according to claim 1 is appeared, it is characterised in that: in step 4, using shortening Or the borehole that is staggered, the method for controlling total explosive charge, to reduce the disturbance to peripheral rock.
7. the construction method that mountain tunnel according to claim 1 is appeared, it is characterised in that: tunnel uses suspension roof support side Formula.
CN201910461546.XA 2019-05-30 2019-05-30 Construction method for mountain tunnel to go out of hole Active CN110030001B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910461546.XA CN110030001B (en) 2019-05-30 2019-05-30 Construction method for mountain tunnel to go out of hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910461546.XA CN110030001B (en) 2019-05-30 2019-05-30 Construction method for mountain tunnel to go out of hole

Publications (2)

Publication Number Publication Date
CN110030001A true CN110030001A (en) 2019-07-19
CN110030001B CN110030001B (en) 2020-06-30

Family

ID=67243646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910461546.XA Active CN110030001B (en) 2019-05-30 2019-05-30 Construction method for mountain tunnel to go out of hole

Country Status (1)

Country Link
CN (1) CN110030001B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110513121A (en) * 2019-08-20 2019-11-29 中国电建集团贵阳勘测设计研究院有限公司 A kind of egg shell shape grouting tunnel refuge chamber structure
WO2022198841A1 (en) * 2021-03-24 2022-09-29 山东科技大学 Flying-limiting hole drilling and blasting method for controlling flying stones in tunnel blasting

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07229390A (en) * 1994-02-17 1995-08-29 Teruki Fujiyama Tunnel
CN102620614A (en) * 2012-04-19 2012-08-01 中铁二局股份有限公司 Construction method for cave depot slag funnel
CN104533428A (en) * 2014-11-28 2015-04-22 大连市市政设计研究院有限责任公司 Steep cliff tunnel hole excavation construction method
CN104596372A (en) * 2014-12-31 2015-05-06 中国铁道科学研究院铁道建筑研究所 Tunneling method for improving explosion driving rate and lowering explosion vibration
CN109707399A (en) * 2019-02-21 2019-05-03 中铁二院工程集团有限责任公司 Tunnel outlet support structure and its construction method
CN109812277A (en) * 2019-02-28 2019-05-28 中铁十八局集团有限公司 A kind of vertical cliff tunnel active defense bimetallic tube canopy of high drop is appeared safely method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07229390A (en) * 1994-02-17 1995-08-29 Teruki Fujiyama Tunnel
CN102620614A (en) * 2012-04-19 2012-08-01 中铁二局股份有限公司 Construction method for cave depot slag funnel
CN104533428A (en) * 2014-11-28 2015-04-22 大连市市政设计研究院有限责任公司 Steep cliff tunnel hole excavation construction method
CN104596372A (en) * 2014-12-31 2015-05-06 中国铁道科学研究院铁道建筑研究所 Tunneling method for improving explosion driving rate and lowering explosion vibration
CN109707399A (en) * 2019-02-21 2019-05-03 中铁二院工程集团有限责任公司 Tunnel outlet support structure and its construction method
CN109812277A (en) * 2019-02-28 2019-05-28 中铁十八局集团有限公司 A kind of vertical cliff tunnel active defense bimetallic tube canopy of high drop is appeared safely method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110513121A (en) * 2019-08-20 2019-11-29 中国电建集团贵阳勘测设计研究院有限公司 A kind of egg shell shape grouting tunnel refuge chamber structure
CN110513121B (en) * 2019-08-20 2024-03-26 中国电建集团贵阳勘测设计研究院有限公司 Eggshell-shaped grouting tunnel car-avoiding tunnel structure
WO2022198841A1 (en) * 2021-03-24 2022-09-29 山东科技大学 Flying-limiting hole drilling and blasting method for controlling flying stones in tunnel blasting

Also Published As

Publication number Publication date
CN110030001B (en) 2020-06-30

Similar Documents

Publication Publication Date Title
CN104533467B (en) A kind of high artesian, the method for protecting support in fault disruption zone tunnel
CN103306687B (en) Soft rock tunnel long cantilever horizontal jet grouting Deformation control construction method
CN108643907A (en) One kind being crushed direct top edge sky caving into lane without pillar mining method
CN108049896B (en) A kind of fully mechanized coal face gob-side entry retaining method
CN109611103B (en) Method for reinforcing shield section suspended boulder group
CN102518470B (en) Method for preventing and controlling water by using freezing pipes in annular water intercepting tunnel
CN106014424B (en) A kind of blasting digging method for shallow overlying strata shallow-depth-excavation tunnel
CN108005660A (en) A kind of Optimization of Expressway Tunnel Construction method
CN107023300A (en) A kind of use canopy, which is defended the doctrine, builds the construction method of subway station
AU2021355609B2 (en) Method for mining by filling and caving
CN105715296A (en) Blowing sand backfill and grouting construction method of tunnel crossing coal mine goaf
CN111997639B (en) Method for getting rid of trouble and reinforcing and improving geology of TBM construction tunnel bad geology section card machine
CN106121659B (en) The narrow-bore tunnel excavation method of major urban arterial highway upper-soft lower-hard ground is worn under one kind
CN107339108B (en) The layer of sand location subway pipe shed construction method of underground water enrichment
CN109736827A (en) The method that city underground ground consisting of hard rock service channel high pressure gas expansion fracturing is excavated
CN107503755A (en) A kind of construction method for exempting from button arch flat-top cavern-pile method construction subway station
CN102704950B (en) Support method used in passing water guide fracture structure in mine exploration
CN110030001A (en) A kind of construction method that mountain tunnel is appeared
CN105909262B (en) A kind of bored tunnel driving method
CN107514266A (en) Shield export & import bolt anchorage soil body construction method
CN102235010A (en) Treatment method for hanging sinking stop due to expansive soil in well sinking
CN106150522A (en) A kind of top board utilizing inspection instrument for borehole detection Collapsed zone subsides administering method
CN113187499A (en) Weathering alteration belt TBM card machine escaping method
CN105840203A (en) Large section loess tunnel pre-cutting method construction method
CN206129278U (en) Earth pressure balance shield machine closely inclines and just props up undercut tunnel's construction structures

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant