CN110442998A - A kind of Building Information Model dividing method, device, system and storage medium - Google Patents

A kind of Building Information Model dividing method, device, system and storage medium Download PDF

Info

Publication number
CN110442998A
CN110442998A CN201910749357.2A CN201910749357A CN110442998A CN 110442998 A CN110442998 A CN 110442998A CN 201910749357 A CN201910749357 A CN 201910749357A CN 110442998 A CN110442998 A CN 110442998A
Authority
CN
China
Prior art keywords
post
cast strip
model
information
building information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910749357.2A
Other languages
Chinese (zh)
Other versions
CN110442998B (en
Inventor
刘跃
吕旭芒
潘虹
龚寅星
方曼曼
李军
陈飞军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pin Ming Technology Co ltd
Original Assignee
Hangzhou Tea Science And Information Technology Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Tea Science And Information Technology Ltd By Share Ltd filed Critical Hangzhou Tea Science And Information Technology Ltd By Share Ltd
Priority to CN201910749357.2A priority Critical patent/CN110442998B/en
Publication of CN110442998A publication Critical patent/CN110442998A/en
Application granted granted Critical
Publication of CN110442998B publication Critical patent/CN110442998B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T7/00Image analysis
    • G06T7/10Segmentation; Edge detection
    • G06T7/11Region-based segmentation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T7/00Image analysis
    • G06T7/10Segmentation; Edge detection
    • G06T7/187Segmentation; Edge detection involving region growing; involving region merging; involving connected component labelling

Abstract

The invention discloses a kind of Building Information Model dividing method, device, system and computer readable storage mediums, including carry out post-cast strip path drawing to Building Information Model to be split, obtain corresponding post-cast strip path;Post-cast strip entity area corresponding with each target member model in Building Information Model is generated according to post-cast strip path and post-cast strip parameter information;According to the boundary line of each post-cast strip entity area and respective objects component model, each target member model is cut, obtains multi-members submodel corresponding with corresponding target member model and post-cast strip physical model.The present invention can make staff that any one section of component submodel or post-cast strip entity area progress parameter information be selected to check the calculating with project amount according to demand in use, accurate data information be provided for subsequent construction, to improve construction efficiency.

Description

A kind of Building Information Model dividing method, device, system and storage medium
Technical field
The present embodiments relate to construction engineering technical field fields, more particularly to a kind of Building Information Model segmentation side Method, device, system and computer readable storage medium.
Background technique
It, usually can be in the structural elements such as beam, plate (including sole plate), wall in the biggish building engineering construction of the scale of construction It is reserved that there is one fixed width and the concrete belt by pouring again after a certain period of time, to avoid by variation of ambient temperature, concrete Phenomena such as concrete cracking caused by the factors such as contraction, structure differential settlement, this concrete belt is called post-cast strip.
In the actual construction process, it usually can be that boundary divides region with post-cast strip by the biggish engineering of the scale of construction, press respectively Region construction, finally pours post-cast strip, so that these regions are connected into an entirety again.In addition, being supervised for construction speed The requirement of survey, cost analysis etc., the engineering of component and these components that engineering staff needs subregion to check that needs are constructed Measure information.
Currently, being usually to draw line by graphical tool as the boundary for dividing region, then in Building Information Model Make component along this edge circle carry out it is virtual interrupt segmentation, obtain imaginary components.The defect of this method is needed through figure work Tool draws line as the reference line interrupted, and virtual interrupting not is that actually cut model, causes check component When information, a certain section that component is interrupted cannot be taken separated from and checked, can only check entire complete component, it is difficult to apply Worker person provides accurate project amount information, influences construction efficiency.
Summary of the invention
It can the purpose of the embodiment of the present invention is that providing a kind of Building Information Model dividing method, device, system and computer Storage medium is read, staff can in use according to demand looked into any one section of progress parameter information in component It sees the calculating with project amount, accurate data information is provided for subsequent construction, to improve construction efficiency.
In order to solve the above technical problems, the embodiment of the invention provides a kind of Building Information Model dividing methods, comprising:
Post-cast strip path drawing is carried out to Building Information Model to be split, obtains corresponding post-cast strip path;
According to the post-cast strip path and post-cast strip parameter information generate with it is each in the Building Information Model to be split The corresponding post-cast strip entity area of a target member model;
According to the boundary line of each the post-cast strip entity area and respective objects component model, to each target structure Part model is cut, and multi-members submodel corresponding with corresponding target member model and post-cast strip physical model are obtained.
Optionally, the post-cast strip parameter information includes the post-cast strip width information, and the post-cast strip path is poured after being The center line of band;
It is described according to the post-cast strip path and post-cast strip parameter information generate in the Building Information Model to be split The corresponding post-cast strip entity area of each target member model process are as follows:
The post-cast strip path is projected to the engineering Z axis of the Building Information Model to be split, and according to described Post-cast strip width information obtains post-cast strip projection;
It determines to project each target member mould intersected with the post-cast strip from the Building Information Model to be split Type, and obtain post-cast strip entity area corresponding with the post-cast strip projection section in each target member model.
Optionally, further includes:
According to the parameter information of each section of component submodel, corresponding with component submodel described in every section is obtained One project amount information;
It is added separately in corresponding component submodel using each first project amount information as label.
Optionally, further includes:
According to the parameter information with each post-cast strip physical model, obtain and each post-cast strip physical model point Not corresponding second project amount information;
It is added separately in corresponding post-cast strip physical model using each second project amount information as label.
The embodiment of the present invention has also correspondingly provided a kind of Building Information Model segmenting device, comprising:
Drafting module obtains corresponding post-cast strip for carrying out post-cast strip path drawing to Building Information Model to be split Path;
Generation module is believed for generating according to the post-cast strip path and post-cast strip parameter information with the building to be split Cease the corresponding post-cast strip entity area of each target member model in model;
Cutting module, it is right for the boundary line according to each the post-cast strip entity area and respective objects component model Each target member model is cut, obtain multi-members submodel corresponding with corresponding target member model and after Pour band physical model.
Optionally, the post-cast strip parameter information includes the post-cast strip width information, and the post-cast strip path is poured after being The center line of band;
The generation module includes:
Projecting cell, for the post-cast strip path to be projected to the engineering Z axis of the Building Information Model, and according to Post-cast strip projection is obtained according to the post-cast strip width information;
Acquiring unit, it is each for determining to intersect with post-cast strip projection from the Building Information Model to be split A target member module, and it is real to obtain post-cast strip corresponding with the post-cast strip projection section in each target member model Body region.
Optionally, further includes:
Computing module, for being obtained and component submodel described in every section according to the parameter information of each section of component submodel Corresponding first project amount information;
Adding module, for being added separately to corresponding component submodule using each first project amount information as label In type.
Optionally, the computing module is also used to obtain according to the parameter information with each post-cast strip physical model The second project amount information corresponding with each post-cast strip physical model;
The adding module, after being also used to for each second project amount information being added separately to accordingly as label It pours in band physical model.
The embodiment of the invention also provides a kind of Building Information Model segmenting systems, comprising:
Memory, for storing computer program;
Processor realizes the step of Building Information Model dividing method as described above when for executing the computer program Suddenly.
The embodiment of the invention also provides a kind of computer readable storage medium, deposited on the computer readable storage medium Computer program is contained, the computer program realizes Building Information Model dividing method as described above when being executed by processor The step of.
The embodiment of the invention provides a kind of Building Information Model dividing method, device, system and computer-readable storages Medium, by drawing the post-cast strip path of Building Information Model to be split, and according to post-cast strip path and post-cast strip parameter information Post-cast strip entity area corresponding with each target member model in Building Information Model to be split is generated, then further according to each A post-cast strip entity area is split truncation to each target member model with the boundary line of corresponding target member model, from And obtain with the corresponding multi-members submodel of each target member model and post-cast strip physical model, so as to staff It selects corresponding component submodel or post-cast strip entity area progress parameter information to check the calculating with project amount according to demand, is Subsequent construction provides accurate data information, to improve construction efficiency.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to institute in the prior art and embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is a kind of flow diagram of Building Information Model dividing method provided in an embodiment of the present invention;
Fig. 2 is a kind of structural schematic diagram in post-cast strip path provided in an embodiment of the present invention;
Fig. 3 is a kind of structural schematic diagram of post-cast strip entity area provided in an embodiment of the present invention;
Fig. 4 is the structure of each target member model in a kind of Building Information Model to be split provided in an embodiment of the present invention Schematic diagram;
Fig. 5 is the structural representation of each section after a kind of Building Information Model to be split provided in an embodiment of the present invention is divided Figure;
Fig. 6 is a kind of structural schematic diagram of Building Information Model segmenting device provided in an embodiment of the present invention.
Specific embodiment
The embodiment of the invention provides a kind of Building Information Model dividing method, device, system and computer-readable storages Medium can be such that staff checks according to demand to any one section of progress parameter information in component and work in use The calculating of journey amount provides accurate data information for subsequent construction, to improve construction efficiency.
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art Every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
Fig. 1 is please referred to, Fig. 1 is a kind of process signal of Building Information Model dividing method provided in an embodiment of the present invention Figure.This method, comprising:
S110: post-cast strip path drawing is carried out to Building Information Model to be split, obtains corresponding post-cast strip path;
It should be noted that in the present embodiment when carrying out post-cast strip segmentation to Building Information Model to be split, Ke Yixian The post-cast strip path of the Building Information Model to be split is drawn out, specifically post-cast strip path can be drawn by drawing tool, In, the concrete condition in post-cast strip corresponding with Building Information Model to be split path can carry out true according to practice of construction demand It is fixed, then after determining corresponding post-cast strip path, the post-cast strip path is directly drawn out in Building Information Model to be split i.e. It can.For example, including beam, board member and wall member in Building Information Model to be split, it is specific as shown in Figure 2, wherein dotted line For post-cast strip path corresponding with the Building Information Model to be split, it is seen that the post-cast strip path has passed through these three components.
S120: it is generated and each mesh in Building Information Model to be split according to post-cast strip path and post-cast strip parameter information Mark the corresponding post-cast strip entity area of component model;
Specifically, after drawing out post-cast strip path, it specifically can be according to post-cast strip road in Building Information Model to be split Diameter and post-cast strip parameter information corresponding with the post-cast strip in the Building Information Model to be split can further determine that out building letter Cease specific size, the area etc. of post-cast strip in model, wherein post-cast strip path is passed through each in Building Information Model to be split A component is target member model as target member model, such as beam, board member and the wall member in Fig. 2, in determination It can further be obtained after the concrete condition of post-cast strip out and the corresponding post-cast strip entity area of each target member model.
Specifically, the post-cast strip parameter information in the present embodiment may include post-cast strip width information, and specifically drawing It can be the center line of post-cast strip by post-cast strip path when post-cast strip path processed;Therefore, can according to post-cast strip path and after pour Bandwidth information determines the information such as the specific size of post-cast strip, area;
Correspondingly, being generated and architecture information mould to be split in above-mentioned S120 according to post-cast strip path and post-cast strip parameter information The process of the corresponding post-cast strip entity area of each target member model in type, is specifically as follows:
Post-cast strip path is projected to the engineering Z axis of Building Information Model to be split, and is believed according to post-cast strip width Breath obtains post-cast strip projection;
It determines to project each target member model intersected with post-cast strip from Building Information Model to be split, and obtains Post-cast strip corresponding with post-cast strip projection section entity area in each target member model.
Specifically, after drawing out post-cast strip path, can by post-cast strip path Building Information Model to be split work Journey Z axis is projected, after capable of being obtained in Building Information Model to be split according to post-cast strip width information in the projected Band projection is poured, which has certain width, and is projected according to post-cast strip and to cover in Building Information Model to be split Each component determines each corresponding target member model, and corresponding with post-cast strip projection on each target member model Part be corresponding post-cast strip entity area, such as post-cast strip path shown in Fig. 3 in Building Information Model to be split The projection of engineering Z axis, and obtained post-cast strip projection, to further obtain respectively for beam, board member and wall member One-to-one post-cast strip entity area, namely obtain beam post-cast strip, board post poured band and wall post-cast strip, wherein orthogonal grid is filled out Filling region is post-cast strip corresponding with beam entity area, and oblique stroke filling region is the post-cast strip entity area of board member, Monocline line filling region is the post-cast strip entity area of wall member.
S130: according to the boundary line of each post-cast strip entity area and respective objects component model, to each target member Model is cut, and multi-members submodel corresponding with corresponding target member model and post-cast strip physical model are obtained.
It should be noted that after obtaining post-cast strip entity area corresponding with each target member model, it can energy Post-cast strip entity area and the corresponding boundary line made up between component model are enough determined, along the boundary line by corresponding mesh Mark component model component cylinder be split truncation, obtain multi-members submodel corresponding with the target member model and by The post-cast strip physical model split.For example, state of each target member model shown in Fig. 4 before being divided, It can be seen that beam, board member and wall member are an entirety before it is split, as shown in figure 5, by beam, plate structure After part and wall member with the boundary line of post-cast strip entity area respectively along being respectively split, each component submodel is obtained, Such as beam be divided after obtain the first end beam submodel on the left side, intermediate beam post-cast strip physical model and the right the Two end carriage component submodels;Board member obtains the first end plate component submodel on the left side after being divided, intermediate board post poured band is real Body Model and the right the second end plate member submodel;Wall member obtains the first end wall member submodel on the left side after being divided, in Between wall post-cast strip physical model and the right second end wall member submodel, each section be all it is independent, so staff can To select any one section of progress information inspection etc. to operate, be conducive to obtain accurate project amount information, so as to according to the project amount Information prepares the follow-up works such as physics, is conducive to improve engineering construction efficiency and reduces the waste of material.
Further, this method further includes:
According to the parameter information of each section of component submodel, the first project amount corresponding with every section of component submodel is obtained Information;
It is added separately to each first project amount information as label in corresponding component submodel.
It should be noted that in the present embodiment in order to further facilitate user obtain project amount information, can obtain with After the corresponding multi-members submodel of each target member model, each structure of each target member model can also be obtained The parameter information of part submodel, and the first project amount corresponding with corresponding component submodel is calculated according to the parameter information and is believed Breath, and the first obtained project amount information is added in corresponding component submodel as label, to be needed in staff The component submodel is carried out to be directly obtained accordingly by obtaining the label of the component submodel when project amount is checked Project amount information, do not need manually to be calculated further according to the parameter information of component submodel, to further increase work Efficiency and accuracy.
Further, this method further include:
According to the parameter information with each post-cast strip physical model, obtain corresponding with each post-cast strip physical model Second project amount information;
It is added separately to each second project amount information as label in corresponding post-cast strip physical model.
It should also be noted that, in order to further facilitate the project amount letter that user obtains every part post-cast strip physical model Breath, can obtain each target member model after obtaining post-cast strip physical model corresponding with each target member model Post-cast strip physical model parameter information, and calculated and post-cast strip entity mould according to the parameter information of post-cast strip physical model The corresponding second project amount information of type, and the second obtained project amount information is added to corresponding post-cast strip entity as label In model, thus when staff needs to carry out project amount to the post-cast strip physical model of some target member model to check, Root again can not be needed to be directly obtained corresponding project amount information by obtaining the label of the post-cast strip physical model It is manually calculated according to the parameter information of component submodel, to further increase working efficiency and accuracy.
The embodiment of the invention provides a kind of Building Information Model dividing methods, by drawing Building Information Model to be split Post-cast strip path, and according to post-cast strip path and post-cast strip parameter information generate with it is each in Building Information Model to be split The corresponding post-cast strip entity area of target member model, then further according to each post-cast strip entity area and corresponding target member The boundary line of model is split truncation to each target member model, to obtain respectively corresponding with each target member model Multi-members submodel, so that staff selects corresponding component submodel or post-cast strip entity area to carry out according to demand Parameter information checks the calculating with project amount, accurate data information is provided for subsequent construction, to improve construction efficiency.
On the basis of the above embodiments, the embodiment of the present invention has also correspondingly provided a kind of Building Information Model segmentation dress It sets, specifically please refers to Fig. 6, which includes:
Drafting module 21 pours after obtaining accordingly for carrying out post-cast strip path drawing to Building Information Model to be split Belt path;
Generation module 22, for being generated and Building Information Model to be split according to post-cast strip path and post-cast strip parameter information In the corresponding post-cast strip entity area of each target member model;
Cutting module 23, for the boundary line according to each post-cast strip entity area and respective objects component model, to every A target member model is cut, and multi-members submodel corresponding with corresponding target member model is obtained.
Optionally, post-cast strip parameter information includes post-cast strip width information, and post-cast strip path is the center line of post-cast strip;
Generation module includes:
Projecting cell, for post-cast strip path to be projected to the engineering Z axis of Building Information Model to be split, and foundation Post-cast strip width information obtains post-cast strip projection;
Acquiring unit projects each target structure intersected with post-cast strip for determining from Building Information Model to be split Part model, and obtain post-cast strip corresponding with post-cast strip projection section entity area in each target member model.
Optionally, the device further include:
Computing module, for obtaining respectively corresponding with every section of component submodel according to the parameter information of each section of component submodel The first project amount information;
Adding module, for being added separately to corresponding component submodel for each first project amount information as label In.
Optionally, computing module is also used to according to the parameter information with each post-cast strip physical model, after obtaining and being each Pour the corresponding second project amount information of band physical model;
Adding module is also used to be added separately to corresponding post-cast strip entity for each second project amount information as label In model.
It should be noted that Building Information Model segmenting device provided in the present embodiment have in above-described embodiment The identical beneficial effect of provided Building Information Model dividing method, and building involved in this present embodiment is believed The specific introduction of breath model dividing method please refers to above-described embodiment, and details are not described herein by the application.
On the basis of the above embodiments, the embodiment of the invention also provides a kind of Building Information Model segmenting systems, should System includes:
Memory, for storing computer program;
Processor is realized when for executing computer program such as the step of above-mentioned Building Information Model dividing method.
For example, the processor in the present embodiment is drawn for realizing to Building Information Model to be split progress post-cast strip path System, obtains corresponding post-cast strip path;It is generated and architecture information mould to be split according to post-cast strip path and post-cast strip parameter information The corresponding post-cast strip entity area of each target member model in type;According to each post-cast strip entity area and corresponding mesh The boundary line for marking component model, cuts each target member model, obtains corresponding with corresponding target member model Multi-members submodel and post-cast strip physical model.
On the basis of the above embodiments, the embodiment of the invention also provides a kind of computer readable storage mediums, calculate It is stored with computer program on machine readable storage medium storing program for executing, such as above-mentioned architecture information mould is realized when computer program is executed by processor The step of type dividing method.
The computer readable storage medium may include: USB flash disk, mobile hard disk, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), magnetic or disk etc. is various to deposit Store up the medium of program code.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other The difference of embodiment, the same or similar parts in each embodiment may refer to each other.For device disclosed in embodiment For, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is said referring to method part It is bright.
It should also be noted that, in the present specification, relational terms such as first and second and the like be used merely to by One entity or operation are distinguished with another entity or operation, without necessarily requiring or implying these entities or operation Between there are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant meaning Covering non-exclusive inclusion, so that the process, method, article or equipment for including a series of elements not only includes that A little elements, but also including other elements that are not explicitly listed, or further include for this process, method, article or The intrinsic element of equipment.In the absence of more restrictions, the element limited by sentence "including a ...", is not arranged Except there is also other identical elements in the process, method, article or apparatus that includes the element.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (10)

1. a kind of Building Information Model dividing method characterized by comprising
Post-cast strip path drawing is carried out to Building Information Model to be split, obtains corresponding post-cast strip path;
It is generated and each mesh in the Building Information Model to be split according to the post-cast strip path and post-cast strip parameter information Mark the corresponding post-cast strip entity area of component model;
According to the boundary line of each the post-cast strip entity area and respective objects component model, to each target member mould Type is cut, and multi-members submodel corresponding with corresponding target member model and post-cast strip physical model are obtained.
2. Building Information Model dividing method according to claim 1, which is characterized in that the post-cast strip parameter information packet The post-cast strip width information is included, the post-cast strip path is the center line of post-cast strip;
It is described according to the post-cast strip path and post-cast strip parameter information generate with it is each in the Building Information Model to be split The process of the corresponding post-cast strip entity area of a target member model are as follows:
The post-cast strip path is projected to the engineering Z axis of the Building Information Model to be split, and according to pouring after described Bandwidth information obtains post-cast strip projection;
It determines to project each target member model intersected with the post-cast strip from the Building Information Model to be split, and Obtain post-cast strip entity area corresponding with the post-cast strip projection section in each target member model.
3. Building Information Model dividing method according to claim 1, which is characterized in that further include:
According to the parameter information of each section of component submodel, the first work corresponding with component submodel described in every section is obtained Journey amount information;
It is added separately in corresponding component submodel using each first project amount information as label.
4. Building Information Model dividing method according to claim 3, which is characterized in that further include:
According to the parameter information with each post-cast strip physical model, it is right respectively with each post-cast strip physical model to obtain The the second project amount information answered;
It is added separately in corresponding post-cast strip physical model using each second project amount information as label.
5. a kind of Building Information Model segmenting device characterized by comprising
Drafting module obtains corresponding post-cast strip path for carrying out post-cast strip path drawing to Building Information Model to be split;
Generation module, for being generated and the architecture information mould to be split according to the post-cast strip path and post-cast strip parameter information The corresponding post-cast strip entity area of each target member model in type;
Cutting module, for the boundary line according to each the post-cast strip entity area and respective objects component model, to each The target member model is cut, and multi-members submodel corresponding with corresponding target member model and post-cast strip are obtained Physical model.
6. Building Information Model segmenting device according to claim 5, which is characterized in that the post-cast strip parameter information packet The post-cast strip width information is included, the post-cast strip path is the center line of post-cast strip;
The generation module includes:
Projecting cell, for the post-cast strip path to be projected to the engineering Z axis of the Building Information Model to be split, and Post-cast strip projection is obtained according to the post-cast strip width information;
Acquiring unit projects each mesh intersected with the post-cast strip for determining from the Building Information Model to be split Mark component model, and obtain in each target member model with post-cast strip projection section corresponding post-cast strip entity area Domain.
7. Building Information Model segmenting device according to claim 5, which is characterized in that further include:
Computing module, for obtaining distinguishing with component submodel described in every section according to the parameter information of each section of component submodel Corresponding first project amount information;
Adding module, for being added separately to corresponding component submodel using each first project amount information as label In.
8. Building Information Model segmenting device according to claim 7, which is characterized in that
The computing module is also used to obtain and each described according to the parameter information with each post-cast strip physical model The corresponding second project amount information of post-cast strip physical model;
The adding module is also used to be added separately to corresponding post-cast strip using each second project amount information as label In physical model.
9. a kind of Building Information Model segmenting system characterized by comprising
Memory, for storing computer program;
Processor realizes the Building Information Model as described in Claims 1-4 any one when for executing the computer program The step of dividing method.
10. a kind of computer readable storage medium, which is characterized in that be stored with computer on the computer readable storage medium Program realizes the Building Information Model point as described in Claims 1-4 any one when the computer program is executed by processor The step of segmentation method.
CN201910749357.2A 2019-08-14 2019-08-14 Building information model segmentation method, device, system and storage medium Active CN110442998B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910749357.2A CN110442998B (en) 2019-08-14 2019-08-14 Building information model segmentation method, device, system and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910749357.2A CN110442998B (en) 2019-08-14 2019-08-14 Building information model segmentation method, device, system and storage medium

Publications (2)

Publication Number Publication Date
CN110442998A true CN110442998A (en) 2019-11-12
CN110442998B CN110442998B (en) 2020-08-14

Family

ID=68435421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910749357.2A Active CN110442998B (en) 2019-08-14 2019-08-14 Building information model segmentation method, device, system and storage medium

Country Status (1)

Country Link
CN (1) CN110442998B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112906112A (en) * 2021-02-09 2021-06-04 杭州品茗安控信息技术股份有限公司 Wall model generation method, device, equipment and readable storage medium

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103390283A (en) * 2012-05-09 2013-11-13 腾讯科技(深圳)有限公司 Method and device for drawing parallel curves
CN105678006A (en) * 2016-01-25 2016-06-15 中建一局集团第三建筑有限公司 Method for drawing foundation pit excavation drawing
CN206070598U (en) * 2016-08-24 2017-04-05 中国人民解放军63926部队 A kind of poured band of outer wall of basement outboard template and its fixed structure
US20180247002A1 (en) * 2017-02-28 2018-08-30 Applied Software Technology, Inc. Custom fabrication from generic revit templates
CN109308362A (en) * 2017-07-28 2019-02-05 广联达科技股份有限公司 Construction method, system and the computer installation of raft board post poured band
CN109684735A (en) * 2018-12-26 2019-04-26 中民筑友科技投资有限公司 Rebar model generation method, system, device and storage medium in component model
CN110046364A (en) * 2018-01-16 2019-07-23 中国建筑第八工程局有限公司 A kind of method for computing work amount based on BIM technology

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103390283A (en) * 2012-05-09 2013-11-13 腾讯科技(深圳)有限公司 Method and device for drawing parallel curves
CN105678006A (en) * 2016-01-25 2016-06-15 中建一局集团第三建筑有限公司 Method for drawing foundation pit excavation drawing
CN206070598U (en) * 2016-08-24 2017-04-05 中国人民解放军63926部队 A kind of poured band of outer wall of basement outboard template and its fixed structure
US20180247002A1 (en) * 2017-02-28 2018-08-30 Applied Software Technology, Inc. Custom fabrication from generic revit templates
CN109308362A (en) * 2017-07-28 2019-02-05 广联达科技股份有限公司 Construction method, system and the computer installation of raft board post poured band
CN110046364A (en) * 2018-01-16 2019-07-23 中国建筑第八工程局有限公司 A kind of method for computing work amount based on BIM technology
CN109684735A (en) * 2018-12-26 2019-04-26 中民筑友科技投资有限公司 Rebar model generation method, system, device and storage medium in component model

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
ISBIM模术师产品团队: "isBIM模术师2019全功能详解", 《HTTPS://PAN.BAIDU.COM/S/1CA5JKQ》 *
上海比程: "【每周一技】带你玩转isBIM模术师—【后浇带分割】", 《HTTP://WWW.CTOUTIAO.COM/154806.HTML》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112906112A (en) * 2021-02-09 2021-06-04 杭州品茗安控信息技术股份有限公司 Wall model generation method, device, equipment and readable storage medium
CN112906112B (en) * 2021-02-09 2022-04-15 杭州品茗安控信息技术股份有限公司 Wall model generation method, device, equipment and readable storage medium

Also Published As

Publication number Publication date
CN110442998B (en) 2020-08-14

Similar Documents

Publication Publication Date Title
CN111721308B (en) Three-dimensional road network map drawing method, device, equipment and medium
US20170067744A1 (en) Hybrid road network and grid based spatial-temporal indexing under missing road links
CN108267154B (en) Map display method and device
CN109710711B (en) Map rasterization method and platform
CN110677859A (en) Method and device for determining weak coverage area and computer readable storage medium
US20160117858A1 (en) Computing device and method for simplifying point cloud of object
Jemison et al. Filament capturing with the multimaterial moment-of-fluid method
CN112541049B (en) High-precision map processing method, apparatus, device, storage medium, and program product
CN109754460B (en) Automatic die overturning method, electronic equipment and storage medium
CN115063557B (en) Building intelligent extraction method and device based on tilt model
CN110442998A (en) A kind of Building Information Model dividing method, device, system and storage medium
CN106326588B (en) A kind of method of BIM auxiliary dam storehouse surface design
CN106339842A (en) Storage material quantity statistics method and device
CN103870636A (en) Gridding processing method for mass discrete data based on geographical fragmentation
CN109631934A (en) Information processing method, device, server and the storage medium of map application
CN104700406A (en) Method and system for extracting plane occurrence texture
CN106598516B (en) The data processing method and system of target window
CN115511999A (en) Line measurement segmentation method, device, equipment and medium
CN113223167B (en) Three-dimensional weather sand table building method and system
CN114138925A (en) Location point belonging area retrieval method, device, electronic equipment, medium and product
CN103984779A (en) Data updating method and device
CN107644139A (en) A kind of attribute mapping method from CAD model to CAE models
CN112988932A (en) High-precision map labeling method, device, equipment, readable storage medium and product
CN109150571B (en) Grid mapping method and device
CN110374061A (en) The toe board alignment on rock-faced dam dam determines method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Block C, 5th Floor, Building B, Paradise Software Park, No. 3 Xidoumen Road, Xihu District, Hangzhou, Zhejiang 310000

Patentee after: Pin Ming Technology Co.,Ltd.

Address before: 310012 Room C, 5 / F, building B, Paradise Software Park, 3 xidoumen Road, Xihu District, Hangzhou City, Zhejiang Province

Patentee before: HANGZHOU PINMING SAFETY CONTROL INFORMATION TECHNOLOGY CO.,LTD.