CN110440770A - A kind of instrument support and its measurement method suitable for steel construction measurement correction - Google Patents

A kind of instrument support and its measurement method suitable for steel construction measurement correction Download PDF

Info

Publication number
CN110440770A
CN110440770A CN201810421679.XA CN201810421679A CN110440770A CN 110440770 A CN110440770 A CN 110440770A CN 201810421679 A CN201810421679 A CN 201810421679A CN 110440770 A CN110440770 A CN 110440770A
Authority
CN
China
Prior art keywords
instrument
steel
mounting platform
fixed
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810421679.XA
Other languages
Chinese (zh)
Inventor
张洲
龚应波
赵虎军
杨小军
李庆达
赵立志
张裕海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN201810421679.XA priority Critical patent/CN110440770A/en
Publication of CN110440770A publication Critical patent/CN110440770A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/10Plumb lines
    • G01C15/105Optical plumbing

Abstract

The present invention relates to a kind of instrument supports suitable for steel construction measurement correction, including steel plate fixing bracket and instrument fixing rack;Steel plate fixing bracket includes fixing piece and connector;Fixing piece and connector integrally connected;Fixing piece is fixed with girder steel;Connector is detachably connected with instrument fixing rack;Instrument fixing rack includes: connecting plate, instrument mounting platform and reception target;Connecting plate and instrument mounting platform and reception target are fixed, and connecting plate is detachably connected with connector;Instrument mounting platform is oppositely arranged by support plate with target is received.The present invention not only constructs reliable and stable instrument mounting platform in the space in high-altitude no operatton face by above-mentioned setting, but also steel plate fixing bracket and instrument fixing rack are detachably connected, and turnover is flexible, easy to assembly, high recycling rate;Site welding is not needed simultaneously, avoids the generation of toxic and harmful gas and light pollution, it is environment friendly and pollution-free, the investment of welding equipment is reduced, artificial and material cost is thereby reduced.

Description

A kind of instrument support and its measurement method suitable for steel construction measurement correction
Technical field
The present invention relates to be full steel structure, steel reinforced concrete frame structure, steel reinforced concrete Core Walls Structure for structure type Structure etc. is related to the field of engineering technology of girder steel, steel column installation correction, more particularly to a kind of to be suitable for steel construction Measure the instrument support and its measurement method of correction.
Background technique
With the fast development of country, the quickening of urban construction process, super high-rise building is more and more, and most of superelevation Layer building is all made of Construction of Steel Structure technique, steel column and girder steel, therefore its measurement is corrected particularly important;Super high-rise building Construction generally uses the structure type of Core Walls Structure and outline border cylinder, and core tube construction is prior to outline border tube construction;Vertical steel column installation is wanted It,, can not be in a conventional manner since high-altitude does not have work surface after steel column and steel girder erection earlier than the installation of horizontal floor girder steel Total station, which is set up, using tripod carries out the positioning of steel column Coordinate setting-out.
Have in the prior art using one instrument mounting platform of site welding building on steel column;But above scheme is scarce Falling into is first, need site welding, and site welding will cause pollution;The second, site welding difficulty is bigger, needs repeatedly Measurement welding benchmark, it is time-consuming;Although third, due to instrument platform and the welded increase stability of steel column, adjust each time It is inconvenient to turn instrument platform disassembly.
Therefore how to solve the problems, such as that above-mentioned technical problem is those skilled in the art's urgent need to resolve.
Summary of the invention
In view of this, being solved at least the present invention provides a kind of instrument support suitable for steel construction measurement correction State technical problem.
To achieve the goals above, the present invention adopts the following technical scheme:
A kind of instrument support suitable for steel construction measurement correction, comprising: steel plate fixing bracket and instrument fixing rack;
Steel plate fixing bracket includes fixing piece and connector;Fixing piece and connector integrally connected;Fixing piece is fixed with girder steel;
Instrument fixing rack includes: connecting plate, instrument mounting platform and reception target;Connecting plate and instrument mounting platform and reception Target is fixed, and connecting plate is detachably connected with connector;Instrument mounting platform is connected by support plate and instrument mounting platform The reception target being oppositely arranged.
It can be seen via above technical scheme that compared with prior art, the present disclosure provides one kind to be suitable for steel knot The instrument support of structure measurement correction, since the connecting plate on the connector and instrument fixing rack on steel plate fixing bracket detachably connects It connects, steel plate fixing bracket is fixed on girder steel by fixing piece, is not only constructed in the space in high-altitude no operatton face reliable and stable Instrument mounting platform, and steel plate fixing bracket and instrument fixing rack are detachably connected, and turnover is flexibly, easy to assembly, recycling Rate is high;Site welding is not needed simultaneously, avoids the generation of toxic and harmful gas and light pollution, it is environment friendly and pollution-free, reduce weldering The investment for connecing equipment thereby reduces artificial and material cost.
Preferably, steel plate fixing bracket and instrument fixing rack are that the waste and old steel plate of recycling is formed by connecting;Using this scheme Effect: improving the utilization rate of waste and old plate, further reduced the cost of equipment Alignment investment.
Preferably, fixing piece includes bottom plate and grab;Bottom plate one end and grab weld;Grab is fixed with girder steel;Bottom plate is another One end connects connector.Wherein grab is similar to reverse U shape, and one end and bottom plate weld, and the other end hooks on girder steel and has Certain depth ensure that fixed fastness.
Preferably, there is through-hole, bolt is fixed bottom plate and girder steel by through-hole on grab;Further by bottom plate and girder steel It is fixed, provide the accurately premise of measurement and calibration.
A kind of instrument support suitable for steel construction measurement correction provided by the invention, further includes auxiliary fixing member, auxiliary Fixing piece is connect with fixing piece in the angle α;Wherein auxiliary fixing member and fixing piece can be welded directly or movable company It connects, under the premise of guaranteeing that bracket stable is fixed on girder steel, α is 40 ° -60 °, preferably 45 °.
Preferably, auxiliary fixing member includes auxiliary backplane and auxiliary grab;Auxiliary backplane one end and auxiliary grab welding;Separately It is connected between one end and bottom plate in the angle α;Preferably, assist that there is hole on grab, bolt through hole consolidates auxiliary backplane and girder steel It is fixed, it is further provided the accurately premise of measurement and calibration.
Preferably, there is mounting groove on instrument mounting platform, be used for retainer instrument pedestal;Wherein mounting groove is strip groove, Not only facilitate fixed various instrument bases, while instrument base opposite can receive target and be adjusted in a certain range.
Preferably, strip-shaped hole is all had on connector and connecting plate;High-strength bolt passes through two strip-shaped holes for connector It is fixed with connecting plate;Wherein the length of the strip-shaped hole on connector is 300-350mm, and bar shaped hole length is 250- on connecting plate 280mm;Using the effect of this scheme: the connection distance between steel plate fixing bracket and instrument fixing rack is sufficiently increased in design, The steel plate that can be stretched by two strip-shaped holes adjusts the position of laser pick-off target, and maximal dilation distance may be implemented up to 725mm Multiple project recyclings, save material and processing charges, improve social benefit.
The present invention also provides a kind of measurement methods of instrument support suitable for steel construction measurement correction, comprising:
Establish survey station: assembling one is suitable for the instrument support of steel construction measurement correction, is installed instrument by fixing piece Platform is fixed on the girder steel of fixed position or any position;Laser plummet is set by axis in the lower part measuring basis layer frame of girder steel Line point, which is thrown, to be surveyed to the reception target of instrument support, and point position mark is carried out;It sets up total station: setting up whole station on instrument mounting platform Instrument;Total station centering leveling;
It establishes backsight: assembling two or more instruments suitable for steel construction measurement correction again in backsight corresponding position Above-mentioned bracket is fixed on girder steel by bracket by fixing piece;Setting laser plummet in the lower part measuring basis layer frame of girder steel will Axis point, which is thrown, to be surveyed to the reception target of instrument support, and point position mark is carried out;It sets up prism base: being set up on instrument mounting platform Prism base;Prism base centering leveling;
Being established after survey station and backsight using above-mentioned erection total station and prism can be directed to, and method of polar coordinates is utilized to carry out steel column With the correction of girder steel.
It can be seen via above technical scheme that compared with prior art, the present disclosure provides one kind to be suitable for steel knot The measurement method of the instrument support of structure measurement correction, component assembling flexibly, solve the problems, such as that the erection of measuring instrument, realization can spirits It is living to adjust position, be used in turn, measure convenient technical effect.
When the vertical steel column construction of super high steel structure construction Core Walls Structure is synchronous with horizontal floor steel girder erection, can use Following method is corrected steel column:
S1 establishes survey station
S11 assembles the instrument support for being suitable for steel construction measurement correction, and instrument is installed flat fix by fixing piece On girder steel;
S12 sets laser plummet in the lower part measuring basis layer frame of girder steel and axis point is thrown to the reception target surveyed to instrument support On, carry out point position mark;
S13 sets up total station: total station is set up on instrument mounting platform;Total station centering leveling;
S2 establishes backsight
S21 assembles two instrument supports for being suitable for steel construction measurement correction in backsight corresponding position again, passes through fixing piece Instrument installation is put down and is fixed on girder steel;
S22 sets laser plummet in the lower part measuring basis layer frame of girder steel and axis point is thrown to the reception target surveyed to instrument support On, carry out point position mark;
S23, it sets up prism base: setting up prism base on instrument mounting platform;Prism base centering leveling;
S3 is established after survey station and backsight using erection total station in step S1 and S2 and prism and be can be directed to, and polar coordinates are utilized The correction of method progress steel column and girder steel.
When the vertical steel column construction of Core Walls Structure is faster than steel girder erection, total station is set up when correcting steel column on girder steel, due to Height difference is excessive, and the instrument elevation angle is excessive, can be corrected at this time using following method:
S1 establishes backsight
S11 assembles two or more instrument supports suitable for steel construction measurement correction in backsight corresponding position, leads to It crosses fixing piece and instrument is installed into flat be fixed on girder steel;
S12 sets laser plummet in the lower part measuring basis layer frame of girder steel and axis point is thrown to the reception target surveyed to instrument support On, carry out point position mark;
S13, it sets up prism base: setting up prism base on instrument mounting platform;Prism base centering leveling;
S2 establishes survey station
If the above method assembles instrument support and sets up total station, wherein (this position is needed at an arbitrary position for total station erection Simultaneously can be with two or more rearscope pedestal intervisibilities), survey station is established using Free Station with Total Station electronic Thacheometer function;
S3 establishes backsight using erection prism in step S1 and S2 and total station and establishes i.e. orientable after voluntary intake, benefit The correction of steel column and girder steel is carried out with method of polar coordinates.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis The attached drawing of offer obtains other attached drawings.
Fig. 1 attached drawing is a kind of main view of instrument support suitable for steel construction measurement correction provided by the invention;
Fig. 2 attached drawing is a kind of top view of instrument support suitable for steel construction measurement correction provided by the invention;
Fig. 3 attached drawing is a kind of instrument fixing rack of instrument support suitable for steel construction measurement correction provided by the invention Structural schematic diagram;
Fig. 4 attached drawing is a kind of steel plate fixing bracket of instrument support suitable for steel construction measurement correction provided by the invention Structural schematic diagram.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The embodiment of the invention discloses a kind of instrument supports suitable for steel construction measurement correction, and turnover is flexible, assembling side Just, high recycling rate.
A kind of instrument support suitable for steel construction measurement correction provided by the invention, referring to attached drawing 1-4, comprising: steel plate Fixed frame 2 and instrument fixing rack 1;Steel plate fixing bracket 2 includes fixing piece 21 and connector 22;22 one of fixing piece 21 and connector Connection;Fixing piece 21 is fixed with girder steel;Connector 22 is detachably connected with instrument fixing rack 1;Instrument fixing rack 1 includes: connection Plate 11, instrument mounting platform 12 and reception target 13;Connecting plate 11 and instrument mounting platform 12 and reception target 13 are fixed, and connect Plate 11 is detachably connected with connector 22;Instrument mounting platform 12 is oppositely arranged by support plate with target 13 is received.
The present disclosure provides a kind of instrument supports suitable for steel construction measurement correction, due to steel plate fixing bracket 2 and Instrument fixing rack 1 is detachably connected, and steel plate fixing bracket 2 is fixed on girder steel by fixing piece 21, not only in high-altitude no operatton face Space construct reliable and stable instrument mounting platform, and steel plate fixing bracket 2 and instrument fixing rack 1 are detachably connected, week Turn flexibly, easy to assembly, high recycling rate;Site welding is not needed simultaneously, avoids toxic and harmful gas and light pollution It generates, it is environment friendly and pollution-free, the investment of welding equipment is reduced, artificial and material cost is thereby reduced.
In one embodiment of the invention, steel plate fixing bracket 2 and instrument fixing rack 1 are the waste and old steel plate welding of recycling It forms;The utilization rate for improving waste and old plate further reduced the cost of equipment Alignment investment.
In one embodiment of the invention, fixing piece 21 includes bottom plate 211 and grab 212;211 one end of bottom plate and grab 212 welding;The other end connects connector 22;Wherein grab is similar to reverse U shape, and one end and bottom plate 211 weld, another end hook Enter on girder steel and have certain depth, ensure that fixed fastness.
Specifically, having through-hole 2121 on grab 212, bolt is fixed bottom plate 211 with girder steel by through-hole 2121;Into one Step fixes bottom plate and girder steel, provides the accurately premise of measurement and calibration.
It in another embodiment of the present invention, further include auxiliary fixing member 23, auxiliary fixing member 23 and fixing piece 21 are in α Angle connection;Wherein auxiliary fixing member 23 and fixing piece 21 can be welded directly or movable connection, steady in guarantee bracket Surely under the premise of being fixed on girder steel, α is 40 ° -60 °, preferably 45 °.
Advantageous, auxiliary fixing member 23 includes auxiliary backplane 231 and auxiliary grab 232;231 one end of auxiliary backplane and auxiliary Grab 232 welds;The other end is connected on bottom plate 211.
It is more favorable, assist that there is hole 2321 on grab 232, bolt through hole 2321 is auxiliary by auxiliary backplane 231 and girder steel Help fixation, it is further provided the accurately premise of measurement and calibration.
In other embodiments of the invention, there is mounting groove 121 on instrument mounting platform 12, is used for retainer instrument base Seat;Wherein mounting groove 121 is strip groove, not only facilitates fixed various instrument bases, while instrument base opposite can receive target It is adjusted in a certain range.
In other embodiments of the invention, strip-shaped hole 24 is all had on connector 22 and connecting plate 11;High-strength bolt It is across two strip-shaped holes 24 that connector 22 and connecting plate 11 is fixed;Wherein the length of the strip-shaped hole on connector is 300- 350mm, bar shaped hole length is 250-280mm on connecting plate;Using the effect of this scheme: sufficiently increasing Interal fixation in design Connection distance between frame and instrument fixing rack, the steel plate that can be stretched by two strip-shaped holes adjust the position of laser pick-off target, Maximal dilation distance may be implemented multiple project recyclings, save material and processing charges, improve society up to 725mm Benefit.
The present invention also provides a kind of measurement methods of instrument support suitable for steel construction measurement correction:
When the vertical steel column construction of super high steel structure construction Core Walls Structure is synchronous with horizontal floor steel girder erection, can use Following method is corrected steel column:
S1 establishes survey station
S11 assembles the instrument support for being suitable for steel construction measurement correction, and instrument is installed flat fix by fixing piece On girder steel;
S12 sets laser plummet in the lower part measuring basis layer frame of girder steel and axis point is thrown to the reception target surveyed to instrument support On, carry out point position mark;
S13 sets up total station: total station is set up on instrument mounting platform;Total station centering leveling;
S2 establishes backsight
S21 assembles two instrument supports for being suitable for steel construction measurement correction in backsight corresponding position again, passes through fixing piece Instrument installation is put down and is fixed on girder steel;
S22 sets laser plummet in the lower part measuring basis layer frame of girder steel and axis point is thrown to the reception target surveyed to instrument support On, carry out point position mark;
S23, it sets up prism base: setting up prism base on instrument mounting platform;Prism base centering leveling;
S3 is established after survey station and backsight using erection total station in step S1 and S2 and prism and be can be directed to, and polar coordinates are utilized The correction of method progress steel column and girder steel.
When the vertical steel column construction of Core Walls Structure is faster than steel girder erection, total station is set up when correcting steel column on girder steel, due to Height difference is excessive, and the instrument elevation angle is excessive, can be corrected at this time using following method:
S1 establishes backsight
S11 assembles two or more instrument supports suitable for steel construction measurement correction in backsight corresponding position, leads to It crosses fixing piece and instrument is installed into flat be fixed on girder steel;
S12 sets laser plummet in the lower part measuring basis layer frame of girder steel and axis point is thrown to the reception target surveyed to instrument support On, carry out point position mark;
S13, it sets up prism base: setting up prism base on instrument mounting platform;Prism base centering leveling;
S2 establishes survey station
If the above method assembles instrument support and sets up total station, wherein (this position is needed at an arbitrary position for total station erection Simultaneously can be with two or more rearscope pedestal intervisibilities), survey station is established using Free Station with Total Station electronic Thacheometer function;
S3 establishes backsight using erection prism in step S1 and S2 and total station and establishes i.e. orientable after voluntary intake, benefit The correction of steel column and girder steel is carried out with method of polar coordinates.
Application of the invention: Circulated utilization instrument support provided by the invention is successfully applied to Beijing's CBD core The area plot Z14 trade financing project, the project are made of two 45 floor Super High high buildings, height 238m, and south, north high building are on the ground Steel reinforced concrete frame+Reinforced Concrete Core Walls Structure+semi-girder truss+annulus truss structure.In view of two high buildings are used as one A flowing water segment sync construction, every high building do 3 such brackets, can meet live steel construction surveying setting-out requirement.
The effect that the present invention obtains: such Circulated utilization instrument support installation and disassembly are easy, compared to conventional three feet Frame erection stability of instrument is good, and measurement accuracy is easily guaranteed that, and can be reused, it can be ensured that Steel Structure Installation precision simultaneously can Accelerate live steel column and measure correction progress, owner's favorable comment consistent with supervisor is obtained in this project.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other The difference of embodiment, the same or similar parts in each embodiment may refer to each other.For device disclosed in embodiment For, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is said referring to method part It is bright.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (10)

1. a kind of instrument support suitable for steel construction measurement correction characterized by comprising steel plate fixing bracket (2) and instrument Fixed frame (1);
The steel plate fixing bracket (2) includes fixing piece (21) and connector (22);The fixing piece (21) and the connector (22) integrally connected;The fixing piece (21) is fixed with girder steel;
The instrument fixing rack (1) includes: connecting plate (11), instrument mounting platform (12) and receives target (13);The connecting plate (11) fixed with the instrument mounting platform (12) and the reception target (13), and the connecting plate (11) and the connector (22) it is detachably connected;The instrument mounting platform (12) connects set opposite with the instrument mounting platform (12) by support plate The reception target (13) set.
2. a kind of instrument support suitable for steel construction measurement correction according to claim 1, which is characterized in that the steel Plate fixed frame (2) and the instrument fixing rack (1) are that the waste and old steel plate of recycling is formed by connecting.
3. a kind of instrument support suitable for steel construction measurement correction according to claim 1, which is characterized in that described solid Determining part (21) includes bottom plate (211) and grab (212);Described bottom plate (211) one end and the grab (212) are welded, the card Hook (212) is fixed with girder steel;Connector (22) described in bottom plate (211) other end integrally connected.
4. a kind of instrument support suitable for steel construction measurement correction according to claim 3, which is characterized in that the card There are through-hole (2121) on hook (212), bolt is fixed bottom plate (211) with girder steel by the through-hole (2121).
5. a kind of instrument support suitable for steel construction measurement correction according to claim 3, which is characterized in that further include Auxiliary fixing member (23), the auxiliary fixing member (23) connect with the fixing piece (21) in the angle α.
6. a kind of instrument support suitable for steel construction measurement correction according to claim 3, which is characterized in that described auxiliary Helping fixing piece (23) includes auxiliary backplane (231) and auxiliary grab (232);Described auxiliary backplane (231) one end and the auxiliary Grab (232) welding;It is connect between the other end and the bottom plate (211) in the angle α.
7. a kind of instrument support suitable for steel construction measurement correction according to claim 6, which is characterized in that described auxiliary Helping on grab (232) has hole (2321), and bolt is fixed auxiliary backplane (231) with girder steel by the hole (2321).
8. a kind of instrument support suitable for steel construction measurement correction according to claim 1-7, feature exist In with mounting groove (121) on the instrument mounting platform (12), for retainer instrument pedestal.
9. a kind of instrument support suitable for steel construction measurement correction according to claim 1-7, feature exist In all having strip-shaped hole (24) on the connector (22) and the connecting plate (11);High-strength bolt passes through two items Shape hole (24) is fixed by the connector (22) and the connecting plate (11).
10. a kind of measurement method of the instrument support suitable for steel construction measurement correction characterized by comprising
Establish survey station: assembling one measures the instrument supports corrected suitable for steel construction as claim 1-9 is described in any item, Instrument mounting platform is fixed on the girder steel of fixed position or any position by fixing piece;In the lower part measuring basis of girder steel Layer frame sets laser plummet and axis point is thrown survey to the reception target of the instrument support, carries out point position mark;Set up total station: Total station is set up on instrument mounting platform;Total station centering leveling;
It establishes backsight: assembling two or more in backsight corresponding position and be suitable for as claim 1-9 is described in any item Above-mentioned bracket, is fixed on girder steel by the instrument support of steel construction measurement correction by fixing piece;Base is measured in the lower part of girder steel Quasi- layer frame sets laser plummet and axis point is thrown survey to the reception target of the instrument support, carries out point position mark;Set up prism Pedestal: prism base is set up on instrument mounting platform;Prism base centering leveling;
Being established after survey station and backsight using above-mentioned erection total station and prism can be directed to, and method of polar coordinates is utilized to carry out steel column and steel The correction of beam.
CN201810421679.XA 2018-05-04 2018-05-04 A kind of instrument support and its measurement method suitable for steel construction measurement correction Pending CN110440770A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810421679.XA CN110440770A (en) 2018-05-04 2018-05-04 A kind of instrument support and its measurement method suitable for steel construction measurement correction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810421679.XA CN110440770A (en) 2018-05-04 2018-05-04 A kind of instrument support and its measurement method suitable for steel construction measurement correction

Publications (1)

Publication Number Publication Date
CN110440770A true CN110440770A (en) 2019-11-12

Family

ID=68427465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810421679.XA Pending CN110440770A (en) 2018-05-04 2018-05-04 A kind of instrument support and its measurement method suitable for steel construction measurement correction

Country Status (1)

Country Link
CN (1) CN110440770A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201133817Y (en) * 2007-10-08 2008-10-15 中建一局集团建设发展有限公司 Super high steel structure column measurement and correction base
CN203642949U (en) * 2013-11-04 2014-06-11 上海宝冶集团有限公司 Installation fixing mount of high-rise structure top measuring device
CN204064326U (en) * 2014-08-12 2014-12-31 中国建筑第七工程局有限公司 Portable rotation instrument trays device
CN205637632U (en) * 2016-04-21 2016-10-12 山西四建集团有限公司 Special instrument holder is rectified in installation of shaped steel post
CN206019694U (en) * 2016-07-29 2017-03-15 中建钢构有限公司 A kind of switching device
CN206638251U (en) * 2017-03-20 2017-11-14 中铁大桥局集团有限公司 A kind of novel column measuring instrument leg means
CN208333482U (en) * 2018-05-04 2019-01-04 中建三局集团有限公司 A kind of instrument support suitable for steel construction measurement correction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201133817Y (en) * 2007-10-08 2008-10-15 中建一局集团建设发展有限公司 Super high steel structure column measurement and correction base
CN203642949U (en) * 2013-11-04 2014-06-11 上海宝冶集团有限公司 Installation fixing mount of high-rise structure top measuring device
CN204064326U (en) * 2014-08-12 2014-12-31 中国建筑第七工程局有限公司 Portable rotation instrument trays device
CN205637632U (en) * 2016-04-21 2016-10-12 山西四建集团有限公司 Special instrument holder is rectified in installation of shaped steel post
CN206019694U (en) * 2016-07-29 2017-03-15 中建钢构有限公司 A kind of switching device
CN206638251U (en) * 2017-03-20 2017-11-14 中铁大桥局集团有限公司 A kind of novel column measuring instrument leg means
CN208333482U (en) * 2018-05-04 2019-01-04 中建三局集团有限公司 A kind of instrument support suitable for steel construction measurement correction

Similar Documents

Publication Publication Date Title
CN106638318B (en) The localization method and cable guide pipe installation method of cable-stayed bridge beam-ends anchor point
CN104328799A (en) Accurate positioning method for steel pipe column in cover and cut top-down subway station
CN102778893B (en) Precise locating detecting method for truss girder
CN103114732A (en) Cast steel penetration pipe node space positioning method
CN208333482U (en) A kind of instrument support suitable for steel construction measurement correction
CN101985824B (en) For the embedded part installation device of bridge pad
CN110440751A (en) A kind of deep basal pit elevation transmission equipment and its application method
CN206562667U (en) A kind of quick pedestal anchor bolt structure in place
CN110440770A (en) A kind of instrument support and its measurement method suitable for steel construction measurement correction
CN112551395B (en) Method for correcting installation inclination of tower crane installation structure caused by foundation inclination
CN102493296B (en) Method for measuring longspan steel truss girder rail control network
CN108931237A (en) A kind of total station is accurately positioned the construction method of large-scale furnace body frame column verticality
CN104713534A (en) Submodule-assembled three-dimensional positioning mounting method
CN210797670U (en) Deep basal pit supporting construction top horizontal displacement monitoring devices
CN211775792U (en) Be used for bridge structures thing template to observe and control positioner
CN112161615A (en) Bridge tower pier body template non-contact measurement device and measurement method
CN209026411U (en) A kind of fixed device of portable instrument
CN209469021U (en) A kind of moulding bed
CN217980326U (en) Quick centering device
CN206554273U (en) A kind of pre-assembled Anchor Bolts in Steel Column Bases structure
CN214171879U (en) Platform device is laid to attached measuring apparatu
CN201233232Y (en) Passenger transport dedicated line railway foundation pile control network height measurement sign device
CN209894183U (en) Super high-rise building measuring device
CN213629743U (en) A portable ultrasonic ranging device for civil engineering
CN211121222U (en) Pile foundation center point throwing instrument

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination